26-2-05 CDRL.pdf

PDF 465 KB Posted

Attached to
Pedestal and Bridge Crane
Solicitation number
W519TC-26-Q-A060
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423-1) for a Pedestal Crane, prepared by Dane Taghon on 28-Oct-2025 for Rock Island Arsenal. The document outlines multiple data submission requirements for the contractor, including various technical documentation to be provided electronically and in paper format. Required submissions include Installation and Preparation Documentation with subtitles such as Equipment Characteristics, Installation Documentation List, Tool List, Footprint Drawing, Machine Foundation Drawing, Installation Drawing, Electrical Schematic, Pneumatic Schematic, Hydraulic Schematic, and Equipment Identification.

Additional documentation requirements include a Maintenance Manual with Preventive Maintenance Procedure and an Operator Manual. For each document type, the contractor must submit three copies (two paper, one electronic) in formats including PDF, DXF, and Microsoft Word/Excel, typically no later than 60 calendar days after contract award. All documentation must be sent to Bob McClure at Rock Island Arsenal, with specific details required for each submission such as standard and optional equipment features, utility schematics, foundation drawings, installation procedures, and operational instructions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 12 Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

D. SYSTEM/ITEM

Pedestal Crane

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Equipment Characteristics

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

7. DD250 REQ

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in either electronic or paper format, no later than 30-calendar-days after award of the contract. The contractor shall provide this information in electronic format using Microsoft Excel format.

The specific data required is:

Identify required info from LMP

PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:

Rock Island Arsenal

ATTN: TARA-LGC

Bob McClure 2744 Rodman Ave (B220-B-D28) Rock Island, IL 61299-6400

15. TOTAL

G. PREPARED BY

Dane Taghon

H. DATE

28-Oct-2025

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Installation Documentation List

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format, a minimum of 60-calendar-days prior to delivery of equipment.

The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

A plainly visible cover sheet shall be provided with the Installation and Preparation Documentation package listing drawings and schematics required for installation.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Tool List

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.

The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

An itemized list of all fixtures, tools, and equipment, whether special or not, required to install, align, and maintain the equipment in this purchase description. NOTE: The contractor is responsible for providing special/custom tools and equipment necessary for installation, moving, and/or set-up as part of the equipment.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Footprint Drawing

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.

The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

A dimensioned drawing shall be provided to accurately depict the layout of system, showing contours. It shall be fully dimensioned and include net operating clearance for moving components which travel beyond the gross contour. The drawing shall distinguish between the base of the equipment at floor level and the gross contour where it may overhang the base. Location of access doors for servicing of the equipment shall also be designated.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Machine Foundation Drawing

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide (3) copies of this information no later than 60-calendar-days after award of contract. Of these, (2) will be paper, and

(1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

The equipment requires a separate foundation, a drawing must be provided for approval. This will show all information necessary for a contractor to perform the required concrete preparation work prior to final installation of the system.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Installation Drawing

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.

The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

This drawing may be combined with either the Foundation Drawing or the Footprint Drawing, providing clarity is maintained. This drawing will provide location dimensions for anchor bolts including both the anchor bolt size and height of anchor bolt concrete surfaces clearly shown.

Dimensions will be from a common baseline, not chain dimensions. This is to prevent tolerance stack-up errors. Locations of the first connection points for all required power sources shall be shown and dimensioned.

Approximate gross weight of each separate component shall be indicated.

This drawing shall show capacity requirements at each utility point of first connection.

PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:

Rock Island Arsenal

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Electrical Schematic

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.

The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Pneumatic Schematic

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.

The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 9 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Hydraulic Schematic

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.

The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

The equipment includes this type of utility and a complete system schematic is required. The total amount of fluid in the system and the amount in the reservoir must be clearly identified along with the type and grade.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 10 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Installation and Preparation Documentation

3. SUBTITLE

Equipment Identification

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.

Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

This document shall consist of the make & model of the equipment with a complete list of standard features, optional features being installed in order to meet the specification, and a list of optional features available for field installation but not included. Each section shall be clearly identified.

Also included will be any technical data or brochures applicable to the equipment being provided.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 11 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Maintenance Manual

3. SUBTITLE

Preventive Maintenance Procedure

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Lubrication Schedule. Procedures and schedules for inspections, adjustments, cleaning, and component replacements.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 12 of 12 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

2. TITLE OF DATA ITEM

Operator Manual

3. SUBTITLE

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).

This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.

ATTN: TARA-LGC

Bob McClure

Dane Taghon

H. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
001
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
002
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
003
SEE BLOCK 16
SEE BLOCK 16
Draft
G. PREPARED BY

File details come from the government source that posted it. Updated .