These are construction plans for a nutrient reduction wetland project in Carroll County, Iowa, prepared by Bolton & Menk, Inc. on behalf of the Iowa Department of Agriculture and Land Stewardship (IDALS). The project, identified as IDALS No. CAR833409A and located at the Thrills Hills Wetland site, involves construction of a 3.5-acre wetland pool designed to treat water from an existing ditch system using a solar-powered pump system. The scope of work includes excavation of approximately 13,310 cubic yards of general material, placement of 4,790 cubic yards of earthfill for embankments and dam construction, installation of 250 linear feet of 18-inch reinforced concrete pipe (RCP) for the pumped inlet and 130 linear feet of 36-inch RCP for the outlet, installation of 954 linear feet of 8-inch dual-wall HDPE pipe, construction of one modified SW-513 concrete outlet structure (78 inches by 78 inches) and one SW-401 pump basin structure, placement of a solar-powered 3-phase, 3-horsepower pump system providing 340 gallons per minute at 11.25 feet of total dynamic head, installation of six anti-seep collars, placement of 29.3 tons of Class E riprap, and seeding of 2.4 acres (1.5 acres structure seeding and 0.9 acres buffer seeding). The project design includes a normal water level elevation of 1217.00 feet with a maximum 100-year pool depth of 2.0 feet and average depth of 1.2 feet, with the auxiliary spillway set at elevation 1218.50 feet. A pre-construction meeting must occur within 7 days of contract award, with construction scheduled for completion by September 1, 2027, and all seeding work to be completed by December 15, 2027. The bidders' meeting is scheduled for October 6, 2026, at 11:00 AM at Carroll Public Library, with virtual attendance available, and bids are due October 27, 2026, at 3:00 PM.
The estimated construction cost range is $175,000 to $275,000. All bidders must be registered with the Iowa Department of Inspections, Appeals & Licensing prior to contract execution. Bid security of 10 percent of the bid price is required, and the successful bidder must furnish a Performance/Payment Bond equal to 100 percent of the contract price. Written technical questions regarding the project must be submitted to Brandon Short, P.E., of Bolton & Menk with a copy to Tracy Bruun at tracy.blocker@iowaagriculture.gov by 3:00 PM on October 14, 2026, for inclusion in a final addendum. The project plans incorporate NRCS Construction Practice Standard 656 (Constructed Wetland) with a Job Class III designation for a watershed area exceeding 300 acres, with an effective treated watershed of 671.6 acres and a pumped watershed area of 2,105.6 acres. The design incorporates a pump peak flow of 0.78 cubic feet per second capturing 32 percent of the watershed flow, and includes provisions for compliance with all applicable federal, state, and local laws and ordinances, NRCS standards, Iowa Statewide Urban Standard Specifications for Public Improvements, and Iowa Department of Transportation Standard Specifications for Highway and Bridge Construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARTHUR
N. NEU
MUNICIPAL
AIRPORT
280TH ST
230TH ST
250TH ST
RO
BI
N A
V E
O
LY
M
PI
C A
V E
250TH ST
N O
BL
E
A V
E
Q
UA
IL
A
V E
200TH ST
235TH ST
240TH ST
225TH ST
N O
BL
E
A V
E
M
ES
Q
UI
TE
A
V E
232ND ST
O
RA
N G
E A
V E
PH
O
EN
IX
A V
E
PE
EB
LE
A
V E
N O
BL
E
A V
E
M A
HO
G
A N
Y A
V E
272ND ST
Q
UA
IL
A
V E
230TH ST
240TH ST
KI
TT
YH
A
W K
A V
E
265TH ST
260TH ST
IV
Y
A V
E
UN
IO
N A
V E
O
LY
M
PI
C A
V E
RO
BI
N A
V E
180TH ST
PH
O
EN
IX
A V
E215TH ST
IV
Y
A V
E
210TH ST
280TH ST
TIM
BE
R A
V E
V
EL
V
ET
A V
E
TIM
BE
R A
V E
O
LY
M
PI
C A
V E
Q
UA
IL
A
V E
Q
UA
RT
Z
A V
E
250TH ST
RO
BI
N A
V
E 250TH ST
JA
D
E A
V E
245TH ST
JA
D E
A V
E
270TH ST 270TH ST
TIM
BE
R A
V E
M A
HO
G
A N
Y A
V E
Q
UA
IL
A
V E
190TH ST
M A
HO
G
A N
Y A
V E
210TH ST
200TH ST
JA
D
E A
V E
PH
O
EN
IX
A V
E
280TH ST280TH ST
280TH ST
KI
TT
YH
A
W K
A V
E
220TH ST
UN
IO
N A
V E
255TH ST
265TH ST
SY
C
A M
O
RE
A V
E 270TH ST
220TH ST
M A
HO
G
A N
Y A
V E
N O
BL
E
A V
E
230TH ST
240TH ST
PE
EB
LE
A
V E
260TH ST
265TH ST
260TH ST
270TH ST
220TH ST220TH ST
235TH ST
IV
Y A
V E
KI
TT
YH
A
W K
A V
E
250TH ST
255TH ST
SY
C
A M
O
RE
A V
E
TW
ILI
G
HT
A V
E
SY
C
A M
O
RE
A V
E
190TH ST
UN
IO
N A
V E
210TH ST
PH
O
EN
IX
A V
E
180TH ST
190TH ST
RO
BI
N A
V E
G
RA
N
ITE
A V
E
IRIS RD
JA
D
E A
V E
KI
TT
YH
A
W K
A V
E
180TH ST
180TH ST
KI
TT
YH
A
W K
A V
E
210TH ST
210TH ST
220TH ST
215TH
ST
O
LY
M
PI
C A
V E
235TH
ST
235TH
ST
A V
E
RA
N C
H
205TH
ST
HA
W
TH
O
RN
E
A V
E
HA
W
TH
O
RN
E A
V E
HA
W
TH
O
RN
E
A V
E
245TH ST
Q
UA
RT
Z
A
VE
LA
RE
D O
A V
E
N O
BL
E
A V
E
CARROLL
HALBUR
GLIDDEN
WILLEY
MAPLE
RIVER
JCT.
ROSELLE
SWAN
LAKE
STATE
PARK
G L I D D E N
G R A N T
R O S E L L E
R I C H L A N D
M A P L E
R I V E R
P L E A S A N T
V A L L E Y
7 8 9
161718
19 20 21
32 33
7 8 9 10 11 12
131415161718
20 21 22 23 24
2526272829
31 32 33
7 8 9 10 11 12
131415161718
19 20 21 22
2627282930
31 32 33 34 35 36
123456
7 8 9 10 11 12
151617
19 20 21 22 23 24
252627282930
31 32 33 34 35 36
123456
7 8 9 10 11 12
131415161718
19 20 21 22 23 24
252627282930
31 32 33 34 35 36
7 8 9
161718
19 20 21
282930
31 32 33
POP.
10103
POP.
POP.
TIM
BE
R A
V E
30 30
M iddle
River
Racc oon
SWAN
LAKE
STATE
PARKN20
E35
E35
E45N38
E45
E53
N38
N18 E53
E53
N14
N20
E37
N38
N44
E46
E46
N14
N33
N44
E53
N41
‒‒81
‒‒112 ‒‒
SWAN LAKE STATE PARK
CARROLL COUNTY
25 30 29
323136
6 5
CARROLL ARMORY
CARROLL, CARROLL COUNTY
12-14-2001
PROJECT DATUM: STATE PLANE
HORIZONTAL: IOWA NORTH
VERTICAL: NAVD 1988
MY LICENSE RENEWAL DATE IS
PAGES OR SHEETS COVERED BY THIS SEAL:
LICENSE NUMBER: DATE:
I OWA
LI
CE
NS
ED
PROFESS IONAL ENG
INEER
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT PERSONAL SUPERVISION
AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
29449
12/31/2026
ALL SHEETS
BRANDON C.
SHORT
29449
BRANDON C. SHORT, PE
CARROLL COUNTY, IA
CONSTRUCTION PLANS FOR
IDALS NO. CAR833409A
NUTRIENT REDUCTION WETLAND
CARROLL COUNTY, IOWA
SEPTEMBER 2026
THE SPECIFICATIONS AS PREPARED BY IOWA DEPARTMENT OF AGRICULTURE
AND LAND STEWARDSHIP AND BOLTON & MENK, INC. SHALL BE CONSIDERED
AS PART OF THIS DOCUMENT. NATURAL RESOURCES CONSERVATION SERVICE
CONSTRUCTION SPECIFICATIONS SHALL APPLY.
THE CURRENT EDITION OF THE "IOWA STATEWIDE URBAN STANDARD
SPECIFICATIONS FOR PUBLIC IMPROVEMENTS" SHALL GOVERN.
IOWA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION" AND ALL CURRENT GENERAL
SUPPLEMENTAL SPECIFICATIONS AND MATERIALS INSTRUCTIONAL
MEMORANDUM SHALL GOVERN AS REFERENCED.
ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE
COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT.
GOVERNING SPECIFICATIONS
NOTES
1. IF A CULTURAL RESOURCE IS IDENTIFIED DURING
CONSTRUCTION, STOP WORK IMMEDIATELY AND NOTIFY
THE LOCAL NATURAL RESOURCES CONSERVATION SERVICE
OFFICE.
2. THERE IS NO GUARANTEE THAT THE WETLAND WILL FILL OR
REMAIN FILLED WITH WATER.
R-34W
PROJECT
LOCATION
T-
N
CONSERVATION PRACTICE STANDARDS USED:
656 - CONSTRUCTED WETLAND
NRCS JOB CLASS: III
300 AC > WATERSHED AREA
TO THE BEST OF MY PROFESSIONAL KNOWLEDGE,
JUDGEMENT, AND BELIEF, THESE PLANS MEET APPLICABLE
NRCS STANDARDS AND APPLICABLE LAWS AND
REGULATIONS.
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
A0
1.
dw g 9/
/2
9:
:0
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
A.01
TITLE SHEET
MILESSCALE
0 1 2
R-33WR-35W
T-
N
T-
N T-
N
R-34W R-33WR-35W
SHEET INDEX
SHEET NUMBER SHEET TITLE
A.01 TITLE SHEET
A.02 PLAN OVERVIEW SHEET
A.03 EXISTING CONDITIONS
B.01 OUTLET STRUCTURE DETAIL
B.02 TRASH GUARD DETAIL
B.03 PUMP BASIN & SOLAR ARRAY DETAILS
B.04 CPDT INSTALLATION & ANTI-SEEP COLLAR
DETAILS
C.01 ESTIMATED QUANTITIES
D.01 GRADING OVERVIEW
D.02 EMBANKMENT PLAN & PROFILE
D.03 EMBANKMENT (CONT.) & AUXILIARY SPILLWAY
D.04 DIVERSION BERMS
K.01 SEEDING PLAN
M.01 PUMPED INLET & OUTLET PIPES
M.02 POND OUTLET PIPE
R
THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY
LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO
THE GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR
THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA."
THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING IOWA ONE CALL BY
PHONE AT 811, OR ON THE WEB AT
HTTP://WWW.IOWAONECALL.COM/. THIS IS REQUIRED BY LAW.
TICKET# ___________.
TICKET NUMBER MUST BE PROVIDED TO THE ENGINEER AND IDALS PRIOR
TO COMMENCEMENT OF WORK.
NRCS, IDALS, and the engineer make no representation as to the existence or nonexistence of any utility, public and/or private, buried or overhead, except as shown on the drawings. Where utilities are shown on the drawings, the location, depth and/or height are approximate. The exact location, depth and/or height must be determined by the utility company and/or the land owner prior to any construction within the project vicinity.
brandon.short Text Box 9/29/2026
OUTLET PIPE
36" RCP
OUTLET STRUCTURE
MODIFIED SW-513
78" x 78"
OUTLET PIPE INVERT
ELEV. 1207.50
10 FT EMBANKMENT
TOP ELEV. 1220
NWL = 1217.00
PUMPED INLET PIPE
18" RCP
EXCAVATE TO 1216.00
DESIGN 100-YEAR POOL HWL = 1218.80
CONSTRUCTION ACCESS
FROM PHOENIX AVE.
WEST DIVERSION BERM
TOP ELEV. 1216.50
SOLAR PUMP BASIN
PROPOSED EASEMENT BOUNDARY
30 FT AUXILIARY SPILLWAY
ELEV. 1218.50
122012 22 1222 1222
120812081212
1220 1214
1218 1218
PRESERVE EXISTING
15" CULVERT
RE-LAY POND OUTLET PIPE
8" HDPE
POND OUTLET PIPE INVERT
ELEV. 1207.50
EXISTING PRIVATE POND
SOLAR PANELS
EXCAVATE ADDITIONAL 1 FT
ELEV. 1215.00
EAST DIVERSION BERM
TOP ELEV. 1216.50
BASE FLOW RETURN PIPE
8" DUAL WALL HDPE
10" CMP TILE OUTLET
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
A0
2.
dw g 9/
/2
9:
:1
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
A.02
PLAN OVERVIEW SHEET
R
FEETSCALE
0 50 100
HORZ.
DESIGN CRITERIA VALUE UNIT REQUIREMENT
PUMPED WATERSHED AREA 2105.6 ACRES
PUMP PEAK FLOW 0.78 CFS
PUMP PERCENT CAPTURE 32%
EFFECTIVE TREATED WATERSHED 671.6 ACRES
SURFACE WATERSHED AREA 50.4 ACRES
POOL NORMAL WATER LEVEL (NWL) ELEV 1217.00 FT
DESIGNED WETLAND POOL AREA (@ NWL) 3.5 ACRES
POOL TO WATERSHED RATIO 0.5 % Range 0.5% to 2% of watershed area
MAXIMUM POOL DEPTH 2.0 FT
AVERAGE POOL DEPTH 1.2 FT
DEEP WATER AREA (DEPTH > 3 FT) 0.0 ACRES
PERCENT DEEP WATER TO POOL AREA 0.0 % Less than 25%
POOL STORAGE VOLUME AT NWL 4.1 ACRE-FT
OVERFLOW ELEVATION 1218.50 FT
POOL STORAGE VOLUME AT OVERFLOW 9.5 ACRE-FT
PRIMARY WEIR ELEVATION 1217.00 FT Modified SUDAS SW-513 Outlet Structure PRIMARY WEIR WIDTH 24 FT 4 Sides with 6 FT Wide Openings
TOTAL EASEMENT AREA 6.8 ACRES
AREA OF BUFFER 3.3 ACRES
RATIO BUFFER AREA TO NWL POOL AREA 1.0 Less than 4
AVERAGE CAPTURE FLOW 0.23 CFS
25-YEAR STORM HWL IN POOL 1218.06 FT
25-YEAR PEAK INFLOW 112 CFS
25-YEAR PEAK OUTFLOW 87 CFS
100-YEAR STORM HWL IN POOL 1218.72 FT
100-YEAR PEAK INFLOW 171 CFS
100-YEAR PEAK OUTFLOW 109 CFS
WETLAND
POOL DEPTH ELEV INCREMENTAL
AREA
CUMULATIVE
VOLUME
CUMULATIVE
VOLUME
(FT) (FT) (FT2
) (FT3
) (AC-FT)
0.0 1215.0 356
0.5 1215.5 5,920 1,569 0.04
1.0 1216.0 136,041 37,059 0.85
1.5 1216.5 139,466 105,936 2.43
2.0 1217.0 152,192 178,851 4.11
2.5 1217.5 155,747 255,835 5.87
3.0 1218.0 159,336 334,606 7.68
3.5 1218.5 162,957 415,179 9.53
4.0 1219.0 167,469 497,786 11.43
4.5 1219.5 171,353 582,491 13.37
5.0 1220.0 176,943 669,565 15.37
122412261228
1232123412361238
361238
1222 12
12101212
12121214 12141216
1212 1212
PRESERVE EXISTING 15" CMP CULVERT
ELEV. 1219.65
2" REBAR LAND MARKER
ELEV. 1222.30
BROKEN HEAD MAG NAIL
REMOVE EXISTING POND OUTLET PIPE
(SEE NOTE)
FEMA NFHL 1% HAZARD BOUNDARY
ELEV. ≈ 1215
FEMA NFHL 0.2% HAZARD BOUNDARY
ELEV. ≈ 1216
NOTES:
1. THE ENTIRE POND OUTLET PIPE MUST
BE REMOVED AND DISPOSED OF.
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
A0
3.
dw g 9/
/2
9:
:3
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
A.03
EXISTING CONDITIONS
R
FEETSCALE
0 40 80
HORZ.
704706
CONTROL POINTS
POINT NORTHING EASTING ELEVATION DESCRIPTION
700 3473835.060 4567313.018 1231.32 1/2" REBAR LAND MARKER
704 3473795.626 4567279.458 1228.24 1/2" REBAR LAND MARKER
706 3473841.885 4566874.564 1233.89 1/2" REBAR LAND MARKER
707 3473855.733 4565991.066 1229.28 5/8" REBAR LAND MARKER
708 3471209.088 4567274.982 1278.96 1/2" REBAR LAND MARKER
712 3471228.555 4565964.019 1284.18 1/2" REBAR LAND MARKER
715 3473266.255 4566865.429 1219.65 1/2" REBAR LAND MARKER
716 3472991.157 4567300.782 1222.30 BROKEN HEAD MAG NAIL
718 3473815.518 4565990.723 1223.34 1/2" REBAR LAND MARKER
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
B0
1.
dw g 9/
/2
9:
:4
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
B.01
OUTLET STRUCTURE DETAIL
TOP OF STRUCTURE ELEVATION (SEE PROFILE)
A B.01
A
6" SUMP
OUTLET PIPE FL ELEV (SEE PROFILE)
PRECAST OPENING ELEVATION
PROVIDE FLEXIBLE, WATERTIGHT GASKET FOR PIPE OPENINGS
SEE SUDAS FOR SW-513 DETAILS
PRECAST STRUCTURE SHALL BE ONE SECTION OR
PROVIDE WATERTIGHT SEAL BETWEEN SECTIONS.
78" WALL
WIDTH
78" WALL WIDTH
1.25'
SEE SUDAS FOR SW-513 DETAILS
OUTLET PIPE
BEDDING PER SUDAS78" WALL WIDTH
2 LF 12" DUAL-WALL HDPE
12" HICKENBOTTOM INTAKE
OR APPROVED EQUAL
2 LF 12" DUAL-WALL HDPE
12" HICKENBOTTOM INTAKE OR APPROVED EQUAL
12" 90° ELBOW
EXCAVATED WETLAND POOL
EXCAVATE 1 FT ADDITIONAL AROUND INTAKE
PLACE RIP RAP IN 3-FT DIA. CIRCLE AROUND INTAKE
UNDERLAY WITH GEOTEXTILE (1.5 TN)
PLACE RIP RAP IN 6-FT DIA. CIRCLE AROUND INTAKE
UNDERLAY WITH GEOTEXTILE (1.5 TN)
AGRI DRAIN IN-LINE
WATER LEVEL CONTROL
STRUCTURE OR
APPROVED EQUAL
ATTACH TO CONCRETE
STRUCTURE
AGRI DRAIN IN-LINE WATER LEVEL CONTROL
STRUCTURE OR APPROVED EQUAL
STUB IN 12" PIPE
BACKFILL MIN. 1 FT AROUND
WCS WITH 1" CLEAN ROCK
NORMAL WATER LEVEL
9" INLET OPENING
ON ALL SIDES
6" x 6" CENTER
PIER ON ALL
SIDES
STRUCTURE LID PER SUDAS
FIT WITH SW-604 TYPE 5 CASTING
3 FT
SECTION
MODIFIED SW-513
OUTLET STRUCTURE
PLAN
MODIFIED SW-513
OUTLET STRUCTURE
NOT TO SCALE
NOT TO SCALE
NOTES:
1. ALL FASTENERS SHALL BE GALVANIZED OR STAINLESS
STEEL.
2. HICKENBOTTOM INTAKE, WATER LEVEL CONTROL
STRUCTURE, DUAL-WALL HDPE, ELBOW, TRASH GUARD,
CASTING, AND ALL HARDWARE AND APPURTENANCES
SHOWN ON THIS PAGE OR REQUIRED FOR INSTALLATION
ARE SUBSIDIARY TO THE OUTLET STRUCTURE.
36" RCP OUTLET PIPE
OPENINGS FOUR
SIDES WITH
CENTER PIERS
8" HDPE BASE FLOW RETURN PIPE
BASEFLOW RETURN PIPE FL ELEV (SEE PROFILE)
8" BASEFLOW RETURN PIPE
ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
B0
1.
dw g 9/
/2
9:
:4
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
B.02
TRASH GUARD DETAIL
TRASH GUARD FOR WETLAND OUTLET STRUCTURE
48"
SHEET STEEL
SHEET STEEL
SHEET STEEL
90"
GROUND CONTACT
TREATED POST 4"x4"
OUTLET
STRUCTURE
12" MIN
SPACE
BELOW
GUARD
24"
CONCRETE FOOTINGS
MIN 12" DIAMETER
4 FT MIN.
EMBEDMENT
NOTE: TRASH GUARD AND APPURTENANCES ARE TYPICAL FOR ALL SIDES OF OUTLET STRUCTURE. QUANTITIES
AND DIMENSIONS FOR STEEL SHEETS PER SIDE OF STRUCTURE ARE AS FOLLOWS:
1 - STEEL SHEET - 90" x 24" x 3/8" 2 - STEEL SHEETS - 48" x 24" x 3/8"
ANGLE IRON--EITHER WELDED OR BOLTED--ON TOP AND BOTTOM OF EACH SHEET AS BRACE.
BOLT TRASH GUARD ONTO ANGLE IRON ANCHORED TO OUTLET STRUCTURE.
PROVIDE THREE POSTS WITH CONCRETE FOOTINGS ON EACH SIDE
GRADE AS NECESSARY TO ALLOW FLOW OF WATER UNDER TRASH GUARD WITH 12" MINIMUM CLEARANCE.
ALL FASTENERS SHALL BE GALVANIZED OR STAINLESS STEEL
NOT TO SCALE
STRUCTURE
OPENING
SEE CONNECTION TO
STRUCTURE DETAIL
GRADE BELOW TRASH GUARD TO
PROVIDE 12" MINIMUM SPACE
BETWEEN BOTTOM OF STEEL AND
TOP OF RIP RAP (TYP. ALL SIDES)
CONCRETE STRUCTURE
SHEET STEEL
4" x 4" x 3/8" ANGLE
3/8" BOLT WITH CONCRETE ANCHOR
BOLTS SHALL BE PLACED IN THE CENTER OF THE WALL (TYP)
TRASH GUARD CONNECTION TO STRUCTURE
ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
B0
1.
dw g 9/
/2
9:
:5
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
B.03
PUMP BASIN & SOLAR ARRAY DETAILS
3.5' 21' 3.5'
Included in kit Included in kit
10.5'
17'
4.5' to 5'
DPC2500
solar drive
250'
Solar + -
Solar disconnect
SOLAR ARRAY SUPPORT INSTALLATION DETAILS
NOTE:SOLAR PANELS SHALL BE INSTALLED IN THE LOCATION SHOWN ON A.03 AND
M.03 WITH A SOUTHWARD ORIENTATION.
SOLAR POWERED PUMP SYSTEM (BID ITEM 15) SHALL INCLUDE THE FOLLOWING:
· SOLAR PANELS
· SOLAR DRIVE
· 3-PHASE, 3 HP AXIAL PUMP (CARRY CP-04 WITH 17° IMPELLER OR APPROVED EQUAL,
PROVIDING 340 GPM AT 11.25 FT TDH)
· FLOAT SWITCH
· MOUNTING CLAMPS FOR CONTROLLER
· SOLAR PANEL MOUNTING KIT
· STEEL PIPE EXTENDERS
· WIRED GENERATOR PLUG
· LIGHTNING & SURGE PROTECTOR
· WIRING FOR PANELS, PUMP, AND CONTROLLER
CONTRACTOR SHALL PROVIDE THE FOLLOWING, SUBSIDIARY TO BID ITEM 15:
· STEEL PIPE FOR MOUNTING
· CONCRETE AND ROCK BEDDING FOR MOUNTING POLES
· PVC DISCHARGE PIPE
· CHECK VALVE
PUMP BASIN (BID ITEM 14) SHALL INCLUDE THE FOLLOWING:
· PUMP BASIN (MODIFIED SW-401, SEE DETAILS)
· STEEL LID WITH STAND
MOUNT PUMP CONTROLLER TO
SOLAR POSTS
SOLAR ARRAY SUPPORT
INSTALLATION DETAILS
NOT TO SCALE
PUMP WIRING DIAGRAM
NOT TO SCALE
15 FT
8 FT
PUMP CONTROLLER AND
SOLAR PANELS SHALL BE
ENTIRELY ABOVE THE
ELEVATION 1221.00
115 FT
INSTALL SOLAR DRIVES NEXT TO PUMPS
ON POSTS ABOVE 1221.00
PLACE 6" CLEAN 1" ROCK IN BOTTOM OF HOLE
FILL HOLE WITH CONCRETE
MIN. 12" DIAMETER
FLOW
NOT TO SCALE
SW-401 PUMP BASIN ELEVATION
EXTERIOR MASTIC &
FABRIC WRAP
ALL JOINTS - 9" WIDE
4'
16.5'
MIN. 12"
18" RCP
FL EL = 1207.00
PAINTED STEEL LID WITH ACCESS HATCH
TOP EL = 1220.00
8" PVC PUMP OUTLET
EL = 1218.00
EXISTING GROUND
APPROX. EL = 1218
NORMAL POOL = 1217.00
EMBANKMENT & WAVE BERM
8" MIN. CLASS I BEDDING MATERIAL
SUMP = 1201.50
SUDAS SW-401 STRUCTURE
2 FT
PLACE REVETMENT
SEE M.01
FLOAT ELEVATION
ON OFF
1207.50 1203.50
INSTALL PUMP CONTROL PANELS
ADJACENT TO PUMP BASIN OR ON
EMBANKMENT. MOUNT ON
POSTS ABOVE ELEVATION 1220.00
INSTALL CHECK VALVE
FLEXIBLE WATERTIGHT SEAL
4'
16.5'
18" RCP
FL EL = 1207.00
PAINTED STEEL LID WITH ACCESS HATCH
TOP EL = 1220.00
8" PVC PUMP OUTLET
EL = 1218.00
8" MIN. CLASS I BEDDING MATERIAL
SUMP = 1201.50
SUDAS SW-401 STRUCTURE
FLEXIBLE WATERTIGHT SEALS
NOT TO SCALE
SW-401 PUMP BASIN SECTION
ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
B0
1.
dw g 9/
/2
9:
:5
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
B.04
CPDT INSTALLATION & ANTI-SEEP COLLAR DETAILS
FLAT BOTTOM TRENCH INSTALLATION
FILL TRENCH TO 6" ABOVE TOP OF PIPE WITH CRUSHED STONE OR GRAVEL
MEETING THE REQUIREMENTS IN TABLE 2. BEDDING MATERIAL SHALL BE
INCIDENTAL TO THE PIPE INSTALLATION.
PREFFERED TRENCH INSTALLATION BOTTOM
CORRUGATED POLYETHYLENE DRAINAGE TUBING
MATERIAL & INSTALLATION NOTES
NOT TO SCALE
SOURCE: ASTM F449
TRAPEZOIDAL GROOVE, "V" GROOVE, & CIRCULAR GROOVE
NOT TO SCALE
SOURCE: ASTM F449
6" MIN FOR
OPEN TRENCH
INSTALLATION
R
6" M
IN
A B G
0.
5R
0.
R
TRENCH WIDTH MEASURED
AT TOP OF PIPE
90° "V" GROOVE
90°
THE CIRCULAR GROOVE SHALL BE A
MINIMUM 0.35R DEEP AND SHALL
MATCH THE OUTSIDE CURVE
SHAPE OF THE DEFLECTED CPDT.
THE TRAPEZOIDAL GROOVE SHALL
BE SHAPED AND ADJUSTED SUCH
THAT POINTS A, B, & C WILL TOUCH
THE UNDEFLECTED CPDT FOR EACH
SIZE INSTALLED.
TRAPEZOIDAL GROOVE
CIRCULAR GROOVE
UNDISTURBED SOIL
UNDISTURBED SOIL
TRENCH WIDTH MEASURED
AT TOP OF PIPE
4" M
IN
SEE TABLE 2 FOR
BEDDING MATERIAL
NOTE: THIS IS AN ALLOWED ALTERNATIVE INSTALLATION FOR CPDT
1. ALL CPDT AND CONNECTORS FURNISHED SHALL BE IN COMPLIANCE WITH MATERIAL STANDARDS ASTM F405 AND F667, AS
APPLICABLE, AND SHALL BE CLASSIFIED AS HEAVY-DUTY UNDER THOSE STANDARDS.
2. EXCEPT MODIFIED HEREIN OR OTHERWISE APPROVED BY ENGINEER, ALL CPDT SHALL BE INSTALLED IN COMPLIANCE WITH THE
ASTM 449 STANDARD PRACTICE.
3. FOR PIPES 6” DIAMETER AND SMALLER A 90° V GROOVE BOTTOM MAY BE USED, FOR ALL LARGER PIPE A TRAPEZOIDAL BOTTOM OR A CIRCULAR BOTTOM CONFORMING TO THE OUTSIDE DIAMETER OF THE PIPE SHALL BE USED. PRIOR TO THE INSTALLATION OF CPDT, CONTRACTOR MUST PROVE TO ENGINEER THAT THE INSTALLATION REQUIREMENTS, INCLUDING THE
SHAPE OF THE TRENCH BOTTOM, WILL BE ACCOMPLISHED.
4. WHERE TRENCH BOTTOM IS IN FIRM UNDISTURBED SOIL, SHAPE TRENCH BASE GROOVE. WHERE EXCESS CUT OCCURS, OVEREXCAVATE AND PLACE MINIMUM THREE (3) INCH THICK, GRAVELLY SAND BEDDING TO RESTORE GRADE. THIS BEDDING SHALL MEET THAT REQUIRED FOR TRENCH INSTALLATION TYPE 3 ON PLAN SHEET C.02. IF DUE TO CONTRACTOR ERROR THIS MATERIAL AND WORK IS SUBSIDIARY TO THE INSTALLATION OF THE PIPE. CONTRACTOR MAY SUBSTITUTE PIPE BEDDING ROCK
AS THE BEDDING MATERIAL.
5. NATIVE SOILS MAY BE USED AS BACKFILL MATERIAL UNLESS UNSTABLE TRENCH CONDITIONS PREVENT THE TRENCH BOTTOM HOLDING THE SHAPED GROOVE. IF TRENCH BOTTOM WILL NOT HOLD GROOVE SHAPE CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY. A FLAT BOTTOM TRENCH INSTALLATION WILL THEN BE ASSUMED. THE REQUIRED BEDDING MATERIAL WILL BE
PAID UNDER THE TILE TRENCH STABILIZATION AND CRADLING ROCK BID ITEM.
6. MINIMUM TRENCH WIDTH IS PIPE OUTSIDE DIAMETER PLUS FOUR (4) INCHES FOR PLOWED INSTALLATION AND PIPE OUTSIDE
DIAMETER PLUS TWELVE (12) INCHES FOR OPEN TRENCH INSTALLATION.
7. ALL LATERAL CONNECTIONS, ELBOWS, TEES, ALIGNMENT CURVES, START HOLES AND ALL PORTIONS OF THE TRENCH NOT MEETING THE GROOVED TRENCH INSTALLATION REQUIREMENTS SHALL BE FILLED TO A MINIMUM OF SIX (6) INCH COVER OVER THE PIPE WITH GRADED CRUSHED STONE OR GRAVEL AS SHOWN ON TABLE 2 OF THIS SHEET. UNLESS DUE TO CONTRACTOR ERROR THIS BEDDING MATERIAL WILL BE PAID UNDER THE TILE TRENCH STABILIZATION AND CRADLING ROCK BID ITEM.
8. MANUFACTURER'S ENDCAPS SHALL BE INSTALLED AT THE TERMINATION OF EACH LINE UNLESS A CONNECTION TO AN EXISTING
DRAIN IS MADE.
9. WITH THE INSTALLATION OF THE FIRST REACH OF CPDT ON THE PROJECT, CONTRACTOR IS REQUIRED TO WORK WITH THE
ENGINEER TO CHECK AND CONFIRM THAT THE PIPE STRETCH, IF ANY, DOES NOT EXCEED 5%.
10. ALIGNMENT TURNS MAYBE MADE USING EITHER A MANUFACTURED FITTING OR CURVING THE LINE WITH A 25' MINIMUM
RADIUS.
R25'
PI
X °
PT
PT
Table 1 Maximum Allowable Buried Depth to Flowline of CPDT
Nominal Pipe Diameter (IN)
Pipe Quality
(ASTM)
Trench Width at Top of the Pipe (FT)
12" 18" 24" 30" or Greater
Standard 13 7 5.5 5
Heavy-duty Any 10 7 6
Standard 10 7 5.5 5
Heavy-duty Any 9.5 6.5 6
Standard 10 7 5.5 5
Heavy-duty Any 10 7 6
10 Heavy-duty ... 9 7 6 12 Heavy-duty ... 9 7 6 15 Heavy-duty ... ... 7 6
Table 2 Acceptable Bedding Material and Compaction Requirements
Description Percentage Passing Sieve Sizes Minimum
Standard Density (%)
Maximum Compaction Layer Height
(IN.)1" 3/4" No. 4
Crushed Stone Crushed Gravel* 100% > 95% < 5% Dumped 18
* Class 1 Bedding Material Per SUDAS 3010.202A is an Allowable Substitute
DEGREES Δ DELTA
20° 4.41 30° 6.7 45° 10.36 60° 14.43 70° 17.51 80° 20.98 90° 25
ALTERNATIVE 1: RCP ANTI-SEEP COLLAR
NOT TO SCALE
1/2" X 2" SLOTTED HOLES
FOR 3/8" DIA. BOLTS
CONTINUOUS WELD
BETWEEN BAND
AND COLLAR.
HEIGHT
PER
PLANS
HEIGHT
PER
PLANS
WIDTH SHOWN ON PLANS
SLOTTED HOLES
@ 8" O.C.
CONTINUOUS WELD
BETWEEN BAND
AND COLLAR.
BAND
BOTTOM OF BAND
2" 2"
BAND
A
A
12"
TOP OF BAND
BOTTOM OF COLLAR
CORRUGATED METAL SHEET WELDED
TO CENTER OF SMOOTH METAL
BAND WITH MASTIC APPLIED FOR
SEALANT AROUND THE PIPE.
OPTIONAL SUBSTITUTE -
CAST-IN-PLACE CONCRETE BAND.
ANTI-SEEP COLLAR DETAILS
ALTERNATIVE 2: COMPOSITE BENTONITE AGGREGATE COLLAR
NOT TO SCALE
12" ID
RCP
TRENCH WIDTH (SEE PLANS)
5 FT MIN. COLLAR WIDTH
FT
C O
LL
AR
TH
IC
KN
ES
S
NOTES:
1. COMPOSITE BENTONITE AGGREGATE (CBA) SHALL
BE AQUABLOK OR APPROVED EQUAL.
2. COLLAR SHALL EXTEND 1.75 FT BELOW BOTTOM OF
PIPE AND 1.75 FT ABOVE TOP OF PIPE. MINIMUM
DIMENSIONS ARE SHOWN ON THE PROFILE SHEET.
3. COLLAR SHALL BE A MINIMUM OF 5 FT WIDE AND
EXTEND A MINIMUM OF 6" BEYOND EDGE OF
TRENCH. MINIMUM DIMENSIONS ARE SHOWN ON
THE PROFILE SHEET.
4. NO COMPACTION OF CBA IS REQUIRED.
5. EXCAVATE AND BACKFILL THE REMAINDER OF THE
TRENCH AS NOTED IN THE PLANS.
CORRUGATED METAL SHEET
GALVANIZED STEEL
PREFABRICATED HPDE ANTI-SEEP
COLLARS ARE AN ALLOWED ALTERNATIVE.
BAND
ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
C0
1.
dw g 9/
/2
9:
:0
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR ESTIMATED QUANTITIES C.01
Bid Item Sub-Item Description Specifications Plan No. Estimated Quantities No. Page Quantity Unit
1 - Site Stripping & Preparation IA CS-001 3 N/A 1 LS 2 - Crop Damage IA CS-001 3 N/A 0 AC 3 - Structure & Channel Seeding IA CS-006 7 K.01 1.5 AC 4 - Buffer Seeding IA CS-006 7 K.01 0.9 AC 5 - Mobilization & Demobilization IA CS-008 11 N/A 1 LS 6 - Drain Tile Investigation and Removal IA CS-009 14 A.03 4 HR 7 - Excavation (General) IA CS-021 20 D.01 13310 CY 8 - Earthfill (General) IA CS-023 23 D.01, D.04 126 CY 9 - Earthfill (General Dam) IA CS-023 23 D.02-D.03 2767 CY
10 - Earthfill (Dam Core) IA CS-023 23 D.02-D.03 2023 CY 11 - Topsoil Strip, Salvage, and Respread IA CS-026 27 D.01 1635 CY 12 - Reinforced Concrete Pipe
C. 18" Diameter IA CS-031 29 M.01 120 LF D. 36" Diameter IA CS-031 29 M.01 130 LF
13 - SW-401 Pump Basin IA CS-031 29 B.02, M.01 1 EA 14 - Solar Pump System IA CS-031 29 B.03, M.01 1 EA 15 - Modified SW-513 Outlet Structure (78" x 78") IA CS-031 29 B.01, M.01 1 EA 16 - Concrete Apron, Footing, Bar Guard
A. 18" Diameter IA CS-031 29 M.01 1 EA B. 36" Diameter IA CS-031 29 M.01 1 EA
17 - 8" Dia. Corrugated HDPE Pipe (Dual-Wall, Non-Perforated) IA CS-046 36 B.04, M.02 954 LF 18 - CMP Tile Outlets (20 LF Each)
A. 10" Diameter IA CS-051 39 M.02 2 EA 19 - Anti-Seep Collars IA CS-051 39 M.01 6 EA 20 - Riprap (Class E) IA CS-061 43 M.01 29.3 TN
361238
12221224122612281232123412361238
22 1222
1222 1222
12181217 1216
122012201216
WEST DIVERSION BERM
TOP ELEV. 1216.50
4:1 SIDE SLOPE
EAST DIVERSION BERM
TOP ELEV. 1216.50
4:1 SIDE SLOPE
EXCAVATE TO 1216.00
POOL EXCAVATION GRADED TO
EXISTING SURFACE AT 4:1 SIDE SLOPE
10 FT WIDE EMBANKMENT
TOP ELEV. 1220.00
4:1 SIDE SLOPE
30 FT WIDE AUXILIARY SPILLWAY
CREST ELEV. 1218.50
3:1 SIDE SLOPE
PLACE EXCESS
SPOIL MATERIAL
EXCAVATE ADDITIONAL 1 FT
100 FT x 100 FT
ELEV. 1215.00
NORMAL POOL (1217.00)
100-YEAR HWL (1218.57)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
MINIMUM 6" TOPSOIL LAYER
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
5, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
D0
1.
dw g 9/
/2
9:
:0
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
D.01
GRADING OVERVIEW
R
FEETSCALE
0 40 80
HORZ.
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00
.4
.4
.1
.0
.8
.2
.6
.2
.9
.9
.8
.7
.7
.6
.2
.9
.1
.3
.2
.9
.1
.0
.7
.3
.8
.5
.1
.9
.8
.7
.7
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
STA: 0+89.25
ELEV: 1217.00
OVERBUILD
ELEV: 1220.07
OVERBUILD
ELEV: 1220.11
OVERBUILD
ELEV: 1220.14
OVERBUILD
ELEV: 1220.14
OVERBUILD
ELEV: 1220.17
OVERBUILD
ELEV: 1220.24
10 FT WIDE EMBANKMENT
TOP ELEV. 1220.00
AUXILIARY SPILLWAY SURFACE
EXISTING SURFACE
BOTTOM OF CORE TRENCH
5 FT BELOW EXISTING GRADE
NWL & TOP OF DAM CORE
ELEV. 1217.00
POOL EXCAVATION ELEV. 1216.00
STA: 0+89.25
ELEV: 1220.00
STA: 1+10.00
ELEV: 1220.00
STA: 1+61.24
ELEV: 1220.00
18" RCP PUMP INLET PIPE
SEE M.01
0+
1+
2+00
3+00
4+00
5+00
6+00
7+00
8+00
BP: 0+00.00
PC: 1+19.13
PT
: 2
+2 0.
PC
: 8
+4 0.
12181219
BEGIN EMBANKMENT AND WAVE BERM
30 FT AUXILIARY SPILLWAY
SEE D.03
18" RCP PUMPED INLET PIPE
SEE M.01
MODIFIED SW-401
PUMP BASIN
SEE B.02
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
D0
2.
dw g 9/
/2
9:
:2
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
R
FEETSCALE
0 25 50
HORZ.
FEETSCALE
0 5 10
VERT. D.02
EMBANKMENT PLAN & PROFILE
10 FT WIDE TOP (4.5 FT ABOVE NWL)
10 FT WAVE BERM (AT NWL)
5 FT MIN. CORE TRENCH WIDTH
(TOP AND BOTTOM)
NORMAL WATER LEVEL
TOP OF CORE TRENCH
AT NWL
1:1 MAX SLOPES
4:1
4:1
EMBANKMENT CROSS SECTION
NOTE: ONLY BUILD WAVE
BERM ADJACENT TO POOL
BOTTOM OF CORE TRENCH
5 FT BELOW EXISTING GRADE
EXCAVATED POOL
NOT TO SCALE
NOTE: EMBANKMENT SHALL BE
OVER-BUILT BY 5% OF FILL HEIGHT.
THE OVERBUILD FILL VOLUME IS NOT
INCLUDED IN THE PLAN QUANTITIES.
EMBANKMENT
8+00 9+00 10+00 11+00 11+50
.7
.9
.0
.7
.0
.4
.7
.0
.3
.5
.4
.4
.6
.5
.8
.2
.1
.1
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
STA: 11+18.47
ELEV: 1217.00
OVERBUILD
ELEV: 1220.15
OVERBUILD
ELEV: 1220.08
OVERBUILD
ELEV: 1220.07
10 FT WIDE EMBANKMENT
TOP ELEV. 1220.00
EXISTING SURFACE
BOTTOM OF CORE TRENCH
5 FT BELOW EXISTING GRADE
NWL & TOP OF DAM CORE
ELEV. 1217.00
POOL EXCAVATION ELEV. 1216.00
STA: 11+18.47
ELEV: 1220.00
36" RCP OUTLET PIPE
SEE M.01
7+
8+
9+00
10+00
+0
11+50
PC: 8+40.96
PT: 8+95.13
PC: 9+65.95
PT: 10+13.81
EP: 11+50.00
1216 >>>>>>>>>>
15 12
17 12
19 12
12161217
END EMBANKMENT AND WAVE BERM
36" RCP OUTLET PIPE
SEE M.01
MODIFIED SW-513
OUTLET STRUCTURE
SEE B.01
-0+50 0+00 1+00 2+00 2+75
.9
.9
.9
.8
.1
.0
.7
.7
.7
.4
.5
.3
.9
.8
STA: 0+35.29
EL: 1218.50
STA: 0+63.13
EL: 1218.50
STA: 0+98.82
EL: 1217.96
STA: 1+43.98
EL: 1217.73
0.00% -1.50% -0.52%
10 FT EMBANKMENT
EXCAVATED POOL
NWL = 1217.00
EXISTING SURFACE
30 FT WIDE AUXILIARY SPILLWAY
CREST ELEV. 1218.50
WAVE BERM
0+
1+00
2+00
2+25
BP: 0+00.00
PC: 0+34.07
PT
: 0
+9 8.
EP
: 2
+2 5.
221224
PUMPED INLET PIPE
SEE M.01
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
D0
2.
dw g 9/
/2
9:
:3
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
R
FEETSCALE
0 25 50
HORZ.
FEETSCALE
0 5 10
VERT. D.03
EMBANKMENT (CONT.) & AUXILIARY SPILLWAY
R
30 FT BOTTOM
3:1 SIDES
TOP OF EMBANKMENT
EXISTING
GROUND
AUXILIARY SPILLWAY SECTION THROUGH EMBANKMENT
EMBANKMENT AUXILIARY SPILLWAY
NOTE: EMBANKMENT SHALL BE
OVER-BUILT BY 5% OF FILL HEIGHT.
THE OVERBUILD FILL VOLUME IS NOT
INCLUDED IN THE PLAN QUANTITIES.
-0+75 0+00 1+00 2+00 2+75
.7
.4
.2
.9
.7
.5
.3
.4
.5
.9
.5
.5
.5
.5
.5
.5
.5
.5
STA: 0+18.00
EL: 1216.00
STA: 0+20.00
EL: 1216.50
STA: 2+04.05
EL: 1216.50
EXISTING SURFACE 10 FT DIVERSION BERM
TOP ELEV. 1216.50
EXCAVATED POOL
NWL = 1217.00
EMBANKMENT &
WAVE BERM
4:1 0+00 1+00 2+00 2+25
BP
: 0
+0 0.
EP
: 2
+2 5.
12161217121812191220
PUMPED INLET PIPE
SEE M.01
0+00 1+00 2+00
BP
: 0
+0 0.
EP
: 2
+0 0.
1215 12
18 12
-0+75 0+00 1+00 2+00 2+75
.7
.3
.2
.5
.4
.3
.3
.1
.9
.5
.5
.5
.5
.5
.5
.5
STA: 0+23.00
EL: 1216.00
STA: 0+25.00
EL: 1216.50
STA: 1+84.02
EL: 1216.50
EXISTING SURFACE
10 FT DIVERSION BERM
TOP ELEV. 1216.50
EXCAVATED POOL
NWL = 1217.00
EMBANKMENT &
WAVE BERM
4:1
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
D0
2.
dw g 9/
/2
9:
:3
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
R
FEETSCALE
0 25 50
HORZ.
FEETSCALE
0 5 10
VERT. D.04
DIVERSION BERMS
R
WEST DIVERSION BERM EAST DIVERSION BERM
10 FT WIDE TOP
6" BELOW NWL
NORMAL WATER LEVEL
DIVERSION BERM CROSS SECTION
EXISTING/EXCAVATED
GROUND SURFACE
4:1 SIDE SLOPES
SEED EMBANKMENT
STRUCTURE SEEDING
SEED AUXILIARY SPILLWAY
AND SURROUNDING AREA
STRUCTURE SEEDING
SEED 4:1 SLOPES WITH STRUCTURE SEEDING
TO 1 FT BELOW NORMAL POOL
SEED TO EASEMENT BOUNDARY
BUFFER SEEDING
SEED TO EXISTING FIELD EXTENTS
BUFFER SEEDING
SEED TO EXISTING FIELD EXTENTS
BUFFER SEEDING
SEED EMBANKMENT
STRUCTURE SEEDING
SEED 4:1 SLOPES TO 1 FT
BELOW NORMAL POOL
STRUCTURE SEEDING
SEEDING AREAS
BUFFER SEEDING 0.9 AC
STRUCTURE SEEDING 1.5 AC
NOTE: ANY ADDITIONAL
DISTURBED AREAS SHALL BE
SEEDED WITH BUFFER SEEDING.
DO NOT SEED POOL
12221224 12261228
1232123412361238
1222 12
241226
1210 1210
1212 1212
121512201220
12161216
12171218
12191219
12201216121712181219
SEED WAVE BERM
STRUCTURE SEEDING
SEED WAVE BERM
STRUCTURE SEEDING
DO NOT SEED DIVERSION BERM
DO NOT SEED DIVERSION BERM
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
BUFFER SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
K0
1.
dw g 9/
/2
9:
:4
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
K.01
SEEDING PLAN
R
FEETSCALE
0 40 80
HORZ.
-0+50 0+00 1+00 2+00 3+00
.5
.8
.3
.5
.5
.1
.8
.2
.6
.1
.4
.1
.8
.5
.1
ST
A
0+
" A
PR
O
N , F
O O
TI
N
G, B
AR
G
U
AR
D
FL
O U
T
.5
(1 8"
S W
120' - 18" RCP @ 1.30%
120 LF - 18" RCP
@ 1.30% 6444
PU
M
P
BA
SI
N
(S
TA
+6
4) M
O
DI
FI
ED
S W
-4
(4 8i n)
TO
P
.0
FL
IN
7.
(1
8" N
E)
EXCAVATED POOL
NWL = 1217.00
EMBANKMENT
TOP ELEV. 1220.00EXISTING SURFACE
-1.30%
VPI: 0+44.02
EL: 1208.55
VPI: 1+63.63
EL: 1207.00
ANTI-SEEP COLLARS
6 FT HEIGHT x 10.25 FT WIDTH
SEE B.04
121012
121212
121412
1216 12
122212
20 12
20 12
STA 0+44
18" APRON, FOOTING, BAR GUARD
FL OUT = 1208.55 (18" SW)
0+00 1+00 2+00 2+25
BP
: 0
+0 0.
EP
: 2
+2 5.
PUMP BASIN (STA 1+64)
MODIFIED SW-401 (48in)
TOP = 1219.00
FL IN = 1207.00 (18" NE)
RIP RAP
7.9 TONS
PLACE SOLAR PANELS
ABOVE ELEV. 1221.00
RIP RAP
4.0 TONS
30 FT AUXILIARY SPILLWAY
SEE D.03
-0+50 0+00 1+00 2+00 3+00
.0
.8
.9
.8
.6
.6
.1
.8
.2
.7
.4
.1
.8
.5
128' - 36" RCP @ 1.17%
128 LF - 36" RCP
@ 1.17% 7851
-1.17%
VPI: 0+50.66
EL: 1210.00
VPI: 1+78.38
EL: 1208.50
O U
TL
ET
S
TR
U
CT
U
RE
(S
TA
+5
1) M
O
DI
FI
ED
S W
-5
SE
E
B.
TO
P
.2
O
PE
N
IN
G:
7.
CA
ST
IN
G
SW
-6
T
YP
E
FL
O
U T
.0
(3
6" N
E)
FL
O U
T
.0
(8 " N
W
ST
A
1+
" A
PR
O
N , F
O O
TI
N
G, B
AR
G
U
AR
D
FL
IN
8.
(3 6"
S W
EXCAVATED POOL
NWL = 1217.00
EMBANKMENT
TOP ELEV. 1220.00
EXISTING SURFACE
ANTI-SEEP COLLARS
7.5 FT HIGH x 12 FT WIDE
SEE B.04
20 12
16 12
18 12
10 12
12 12
121214
14 12
16 12
>> >> >> >> >>0+00 1+00 2+00 2+25
BP
: 0
+0 0.
EP
: 2
+2 5.
OUTLET STRUCTURE (STA 0+51)
MODIFIED SW-513
SEE B.01
TOP = 1218.25
OPENING = 1217.00
CASTING = SW-604 TYPE 5
FL OUT = 1210.00 (36" NE)
FL OUT = 1209.00 (8" NW)
STA 1+78
36" APRON, FOOTING, BAR GUARD
FL IN = 1208.50 (36" SW)
RIP RAP
1.5 TONS
8" HDPE POND OUTLET PIPE
SEE M.02
RIP RAP
10.8 TONS
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
M
.d w g
9/
/2
9:
:5
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
FEETSCALE
0 25 50
HORZ.
FEETSCALE
0 5 10
VERT. M.01
PUMP INLET & OUTLET PIPES
R
R
PUMPED INLET PIPE OUTLET PIPE
-0.20%
VPI: 0+25.00
EL: 1209.00 VPI: 4+14.32
EL: 1208.22
ST
A
0+
M O
DI
FI
ED
S
W -5
SE
E B.
FL
O U
T
.0
(3 6"
N E)
FL
O
U T
.0
(8
" N W
369' - 8" HDPE @ 0.20%
369 LF - 8" HDPE
@ 0.20% 9425
20' - 10" CMP @ 0.20%
20 LF - 10" CMP
@ 0.20% 1494
EXCAVATED POOL
NWL = 1217.00
EMBANKMENT
TOP ELEV. 1220.00
EXISTING GROUND SURFACE
0+00
1+00
2+00
3+00 4+00
4+25
BP: 0+00.00
PC: 0+29.18
PT: 0+42.85
PC: 0+87.61
PT: 1+20.63
PC: 3+55.05
PT: 3+94.32
EP: 4+25.00
12061208
OUTLET STRUCTURE (STA 0+51)
MODIFIED SW-513
SEE B.01
TOP = 1218.25
OPENING = 1217.00
CASTING = SW-604 TYPE 5
FL OUT = 1210.00 (36" NE)
FL OUT = 1209.00 (8" NW)
RIP RAP
1.5 TONS
8" HDPE POND OUTLET PIPE
SEE M
.02
RIP RAP
10.8 TONS
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
M
.d w g
9/
/2
9:
:0
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
R
FEETSCALE
0 25 50
HORZ.
FEETSCALE
0 5 10
VERT. M.02
-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00
.9
.6
.0
.8
.3
.3
.0
.4
.0
.6
.9
.3
.4
.2
.0
.4
.3
.2
.5
.4
.2
.0
.6
.6
.6
.7
.2
.9
.7
.5
.2
.0
.7
.5
.2
.0
.7
.5
.2
.0
.8
.5
.3
.0
.8
.5
.3
.0
.8
.6
-0.98%
VP
I:
0+
.0
EL
: 1
3.
VP
I:
6+
.1
EL
: 1
7.
ST
A 6+
L F
CM
P
TI
LE
O U
TL
ET
FL
IN
7.
(1
0" S
ST
A
0+
CO
N
N
EC
T
TO
E
XI
ST
IN
G O
U
TL
ET
S
TR
U
CT
U
RE
FL
O U
T
.3
(8 " N
20' - 10" HDPE @ 0.98%
20 LF - 10" CMP
@ 0.98%
EXISTING SURFACE
REUSE EXISTING OUTLET STRUCTURE
20 LF CMP TILE OUTLET
ST
A
3+
BE
GI
N C
U
RV
E
F T
RA
DI
U S
FL
IN
0.
(8
" W
FL
O
U T
.1
(8
" E
ST
A
3+
EN
D
CU
RV
E
F T
RA
DI
U S
FL
IN
9.
(8
" S
FL
O
U T
.6
(8
" N
ST
A
0+
4°
B
EN
D
FL
IN
3.
(8 " S
FL
O U
T
.1
(8 " E
580' - 8" HDPE @ ???
580 LF - 8" DUAL-WALL, NON-PERF. HDPE
(FLEXCORR OR APPROVED EQUAL)
@ 0.98% 9010
0+
1+
BP: 0+00.00
PC: 0+29.18
PT: 0+42.85
PC: 0+87.61
PT: 1+20.6312
18 1210
12101206
12081212
0+00
1+00
2+00
3+00
4+00
5+00
6+00
6+42.19
BP: 0+00.00
PI: 0+30.00
PC
: 3
+3 9.
PT: 3+89.31
EP: 6+42.19
STA 0+10
CONNECT TO EXISTING
OUTLET STRUCTURE
FL OUT = 1213.38 (8" N)
STA 6+10
20 LF CMP TILE OUTLET
FL IN = 1207.50 (10" S)
STA 3+89
END CURVE
40 FT RADIUS
FL IN = 1209.66 (8" S)
FL OUT = 1209.66 (8" N)
STA 3+39
BEGIN CURVE
40 FT RADIUS
FL IN = 1210.16 (8" W)
FL OUT = 1210.16 (8" E)
36" RCP OUTLET PIPE
SEE M.01
RIP RAP
5.1 TONS
NORMAL POOL (1217.00)
100-YEAR HWL (1218.80)
PROPOSED EASEMENT BOUNDARY
RIP-RAP
EXCAVATE TO 1216.00
STRUCTURE SEEDING
LEGEND
SHEET
B ol to n
M en k, In c.
6, A ll Ri gh ts
R es er ve d c H:
\I
DA
LS
\2
5X
0\
CA
D\
C3 D\
M
.d w g
9/
/2
9:
:0
AM
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
DATEDESCRIPTION REV IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
CAR833409A - THRILLS HILLS WETLAND
BCS
NVD
JPR
25X.137945.000
1.0 PERMIT PLANS 05/29/20261519 BALTIMORE DRIVE
AMES, IA 50010
Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR
R
FEETSCALE
0 25 50
HORZ.
FEETSCALE
0 5 10
VERT. M.03
POND OUTLET PIPE
POND OUTLET PIPE
| Sheets and Views |
| A.01 TITLE SHEET |
| A.02 PLAN OVERVIEW SHEET |
| A.03 EXISTING CONDITIONS |
| B.01 OUTLET STRUCTURE DETAIL |
| B.02 TRASH GUARD DETAIL |
| B.03 PUMP BASIN & SOLAR ARRAY DETAILS |
| B.04 CPDT INSTALLATION & ANTI-SEEP COLLAR DETAILS |
| C.01 ESTIMATED QUANTITIES |
| D.01 GRADING OVERVIEW |
| D.02 EMBANKMENT PLAN & PROFILE |
| D.03 EMBANKMENT (CONT.) & AUXILIARY SPILLWAY |
| D.04 DIVERSION BERMS |
| K.01 SEEDING PLAN |
| M.01 PUMP INLET & OUTLET PIPES |
| M.02 RETURN PIPE |
| M.03 POND OUTLET PIPE |
| 2026-09-29T09:53:39-0500 | |
| Brandon Short |
File details come from the government source that posted it. Updated .