26-10_CAR833409A_Doc CC Proposal-Acknowledge-Affidavit (UPLOAD).pdf

PDF 207 KB Posted

Attached to
26-10 Car833409A (Carroll)
Solicitation number
009-RFB-WRBWL-CY26-10
Issued by
Carroll County, Iowa

About this file

This is a Proposal and Schedule of Prices document and Affidavit for a nutrient reduction wetland construction project issued by the Iowa Department of Agriculture & Land Stewardship, Division of Soil Conservation and Water Quality in Carroll County. The project, designated CAR833409A, involves construction of a wetland system to treat water from an existing ditch using a solar panel-powered pump system. The scope of work includes selective clearing, excavation and grading of approximately 19,861 cubic yards, installation of 835 linear feet of tile and outlet pipe, placement of 29 tons of riprap, construction of one Modified SW-513 concrete outlet structure and one lift station with SW-401 concrete structure, solar pump system installation, and seeding of 2.4 acres. The bid submission deadline is 3:00 PM on October 27, 2026, with bid opening occurring on the same date. All work except seeding must be completed by September 1, 2027, with seeding to be completed by December 15, 2027. A pre-bid meeting is scheduled for October 6, 2026 at 11:00 AM at Carroll Public Library with virtual attendance available. Written technical questions must be submitted to Brandon Short, P.E. of Bolton & Menk by 3:00 PM on October 14, 2026.

Bid security of 10% of the bid price is required with the proposal submission. The successful bidder must furnish a Performance Bond equal to 100% of the contract award within fourteen days of receiving the Notice-of-Award. Liquidated damages are assessed at $175.00 per day for delays in completing all work except seeding and $125.00 per day for delays in completing seeding activities. The estimated construction cost range is $175,000 to $275,000. All bidders must be registered with the Iowa Department of Inspections, Appeals & Licensing prior to contract execution. The contract term commences within 7 days of the preconstruction meeting as approved by the Division and extends through the respective completion deadlines. Bidders must submit a notarized affidavit confirming they have examined contract documents, carefully prepared their proposal, and have not engaged in collusion or fraud related to the bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Car833409A Nutrient Reduction Wetland Project DOCUMENT CC Bid No. 26-10 PROPOSAL AND SCHEDULE OF PRICES

CC-1

Time and Date for Bid Submissions: 3:00 PM, 10/27/2026

BIDDER LOGIN –

https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa

Time and Date of Bid Opening: 3:00 PM, October 27, 2026

Bid Opening TEAMS: +1 469-998-7627, Code 910454647#

Project Description and Location: Car833409A Nutrient Reduction Wetland Project Section 09, Township 83 North, Range 34 West Carroll County, Iowa

PROPOSAL AND SCHEDULE OF PRICES

Proposal of ____________________________________________________________________________________________ (PRINT Name of Bidder: COMPANY & CONTACT)

Located at (FULL Address)

(Telephone Number)

Amount of Proposal Guarantee

Description of Work Specified Completion Date Liquidated Damages

10% of Base Bid

All Work Except Seeding

September 1, 2027

$175.00 Per Day

Seeding - Buffer Seeding – Structure

December 15, 2027 December 15, 2027 $125.00 Per Day

Seeding must be done within the respective seeding period

The undersigned hereby agrees, if awarded the contract, to execute the proposed contract and to furnish satisfactory Performance Bond in an amount not less than one hundred percent (100%) of the contract award within fourteen (14) days from the date when Notice-of-Award is received, and to provide all supervision, labor, materials, and equipment required to complete the project designated above, for the prices hereinafter set forth, in strict compliance with the Contract Documents prepared by the Division.

Further, the parties agree and acknowledge as follows:

• The amount of loss or damages likely to be incurred by Division are uncertain and said loss is incapable or very difficult to quantify and estimate;

• The amount specified for liquidated damages herein bear a reasonable relationship to, and are not plainly or grossly disproportionate to, the probable loss likely to be incurred by Division in connection with any delay on part of the Contractor;

• The amount of liquidated damages fixed herein bears a reasonable relationship to Division’s anticipated losses and/or actual losses;

• The amount of liquidated damages herein fairly approximates Division’s loss at the time of making of this Agreement;

• The amount of liquidated damages fixed herein are fair and reasonable and it approximates to the extent possible the actual loss to Division as a result of any delay on the part of Contractor; and

• Division and Contractor are sophisticated parties and negotiated this Agreement at arm’s length.

https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa

CC-2

Now therefore, in consideration of the mutual obligations set forth herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows:

• Contractor will commence the work after the Preconstruction Conference and by the Construction Start Date approved by Division in the Construction Progress Schedule.

• Contractor will complete the work within the specified time period identified in the contract, or as amended, or be responsible for liquidated damages per day as set forth in the above table.

• The liquidated damages may be withheld from payments made to the Contractor by the Division upon written notice that liquidated damages have begun to accrue, and such damages are in addition to other remedies available as provided for in this contract and applicable law.

A Proposal Guarantee in the amount stipulated herein is included with this proposal, to be forfeited to the Division, if the undersigned fails or refuses to execute the contract and furnish satisfactory Performance Bond, if awarded the contract.

By _______________________________________________ (Signed)

( PRINT NAME)

(Title) (Date)

In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________

In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________

In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________

CC-3

THE FOLLOWING AFFIDAVIT MUST BE COMPLETED AND NOTARIZED, OR THIS BID WILL BE REJECTED

AFFIDAVIT

The signatory, being duly sworn, does depose and say that the undersigned is an authorized representative of:

(Name of Firm)

Located at ____________________________________________________________________________________ hereinafter referred to as “Bidder” and does hereby affirm to have personal knowledge that said Bidder has thoroughly examined the Contract Documents, carefully prepared the Proposal and Schedule of Prices form, and has checked the same in detail before submitting; and that said Bidder, or the agents, officers, or employees thereof, have not, either directly or indirectly, entered into any agreement, participated in any collusion or fraud, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.

(Signed)

(PRINT name)

Subscribed and sworn to before me this _________ day of ________________________________, 20____

(Signed, Notary)

My Commission Expires _______________, 20______

Must include notary stamp