26-09_CER962218C_Appendix I - Forms.pdf

PDF 1 MB Posted

Attached to
Cer962218C 26-06 (Cerro Gordo)
Solicitation number
009-RFB-WRBWL_CY26-06
Issued by
Carroll County, Iowa

About this file

This is a Construction & Administration Forms document from the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality, for the Cer962218C Nutrient Reduction Wetland Project (Bid No. 26-06) located in Cerro Gordo County. The project encompasses earthwork, concrete structures, tile installation, and seeding work, with major construction items including site preparation, drain tile investigation, earthwork, topsoil placement, inlet and outlet concrete structures, concrete manholes, tile installation, riprap placement, and turf reinforcement mat application. Construction must commence within seven days of the preconstruction conference and be completed by June 15, 2027, with buffer seeding due by June 30, 2027, and structure seeding due by September 15, 2027. A preconstruction conference is required within seven days prior to the construction start date. The award date referenced is June 21, 2026, with the Notice-of-Award allowing the successful bidder fourteen calendar days to obtain the Performance Bond, submit the Construction Progress Schedule, execute the Contract, and provide a Certificate of Insurance.

The document package includes standard construction forms including the Notice-of-Award (Document LL), Notice-to-Proceed (Document MM), Construction Progress Schedule (Document JJ), Application and Certificate for Payment (Document SS), Change Order Request (Document HH), Construction Contract Amendment (Document II), and Iowa Construction Sales Tax Exemption Certificate (Document QQ). The successful bidder must be registered with the Iowa Department of Inspections, Appeals & Licensing and must comply with Iowa Code Section 91C.7. Materials purchased for the project are exempt from Iowa sales tax under Iowa Code Sections 422.42 and 422.47, provided they are actually used on the construction project. All construction work requires a Performance Bond equal to one hundred percent of the contract price and a Certificate of Insurance. Contract amendments and change orders must be approved by Susan Kozak, Director of the Division of Soil Conservation and Water Quality.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX I

CONSTRUCTION & ADMINISTRATION FORMS

Cer962218C Nutrient Reduction Wetland Project DOCUMENT LL Bid No. 26-06 NOTICE-OF-AWARD

LL-1

June 21, 2026

Contractor name and address

Delivery via email: Contractor Email

RE: NOTICE-OF-AWARD – Cer962218C Nutrient Reduction Wetland Project, Contract 26-06

Dear _______________________________, This is to notify you that the Division of Soil Conservation and Water Quality has determined __________________ is the successful bidder for the Cer962218C Nutrient Reduction Wetland Project.

Award is being made for the base bid of $____________.

In accordance with Item #9 of the Instructions to Bidders, Document BB, you have fourteen (14) calendar days from the date of receipt of this notice to obtain the Performance Bond (Document NN), submit your Construction Progress Schedule (Document JJ) for review, and execute the Contract (Document DD). In addition, the Division must be provided with a Certificate of Insurance pursuant to the General Conditions, Insurance and Related Provisions (Document FF, Part 6-01).

Please note that Iowa Code Section 91C.7, requires that all construction contractors awarded a contract to perform work for the state or an agency of the state must be registered with the Iowa Department of Inspections, Appeals & Licensing. The Division of Soil Conservation and Water Quality cannot execute a contract with your firm unless you provide proof of this registration. Be sure to fill in the Department of Inspections, Appeals & Licensing registration number blank on the Contract (Document DD).

Enclosed are the Contract (Document DD), Construction Progress Schedule form (Document JJ), and the Performance Bond (Document NN). Please complete, sign and return scanned electronic copies along with completed Performance Bond. In addition, we must have the Certificate of Insurance pursuant to the General Conditions and/or Special Conditions.

Congratulations on being the successful bidder. We look forward to working with your company on this project. If you have any questions, please contact Tracy Blocker, (515) 344-6279.

Sincerely, Jake Hansen, Chief Water Resources Bureau Division of Soil Conservation and Water Quality

JH/tab Enclosures

CC:

Cer962218C Nutrient Reduction Wetland Project DOCUMENT MM Bid No. 26-06 NOTICE- TO-PROCEED

MM-1

June 21, 2026

Contractor name and address

Delivery via email: Contractor Email

RE: NOTICE-TO-PROCEED – Cer962218C Nutrient Reduction Wetland Project, Contract 26-06

Dear____________________________, The Division of Soil Conservation and Water Quality received the signed construction Contract (Document DD), the completed Performance Bond (Document NN), and the Certificate of Insurance from your company. These documents were found to be in order and the Division executed this contract with __________ dated xx/xx/xxxx. A scanned copy of the executed Contract and Performance Bond are enclosed.

The Division has accepted the Construction Progress Schedule (Document JJ) included here, with a Construction Start Date of xx/xx/xxxx. A Preconstruction Conference, as required in Item 13 of the Instructions to Bidders (Document BB), must be held within seven (7) days prior to the Construction Start Date established in the Construction Progress Schedule, or earlier if mutually agreed. No work may commence on site prior to the Preconstruction Conference. If the Construction Start Date requires adjustment, that needs to be communicated to the Engineer and Division in a timely manner so as to facilitate scheduling of the Preconstruction Conference.

In accordance with the Contract _____________________ must commence work under this contract for the Cer962218C Nutrient Reduction Wetland Project on or before the Construction Start Date scheduled in the Construction Progress Schedule, but not before the Preconstruction Conference. You have until June 15, 2027 to complete all of the work except for seeding, and until 06/30/2027 to complete buffer seeding and 09/15/2027 to complete the structure seeding.

Also attached is a scanned copy of the Iowa Construction Sales Tax Exempt Certificate and Authorization Letter for this project. Pursuant to Iowa Code Section 423.2(80), this allows you to purchase materials tax free for use on this project. Please read the information provided in the authorization letter. You are authorized with this Notice-to-Proceed to purchase necessary materials for this project and request reimbursement for those items that are stored prior to the Construction Start Date.

If you have any questions, please contact Tracy Blocker, (515) 344-6279.

Sincerely, Jake Hansen, Chief Water Resources Bureau Division of Soil Conservation and Water Quality

JH/tab Attachments

CC:

Cer962218C Nutrient Reduction Wetland Project DOCUMENT JJ Bid No. 26-06 CONSTRUCTION PROGRESS SCHEDULE

JJ-1

STATE OF IOWA

DIVISION OF SOIL CONSERVATION AND WATER QUALITY

CONSTRUCTION PROGRESS SCHEDULE

Project ID: Cer962218C Date: _______________________________

Contractor: ___________

Contract End Dates:

All Construction Work Except Seeding: June 15, 2027 Seeding: Buffer 06/30/2027 Seeding: Structure 09/15/2027

Scheduled Dates:

Anticipated Construction Start Date:

Preconstruction Conference Date Range*:

*Preconstruction Conference must be held prior to Construction Start Date, by no more than seven (7) days

Estimated Completion Date of All Work Except Seeding:

Final Walkthrough should be held prior to Contract End Date for all construction work except seeding

Major Construction Work Item(s) Order of Work Estimated Duration of Work

Site Preparation

Drain Tile Investigation

Earthwork

Topsoil placement

Inlet and Outlet Concrete Structures

Concrete Manholes

Tile installation

Riprap Placement

Turf Reinforcement Map

Seeding

Dates established in this schedule may be adjusted as described in Document FF, Paragraph 3-21.

Cer962218C Nutrient Reduction Wetland Project DOCUMENT JJ Bid No. 26-06 CONSTRUCTION PROGRESS SCHEDULE

JJ-2

FOR THE CONTRACTOR

(Company Representative)

(Date)

(Name of Company)

(Address of Company)

(City, State, Zip code

FOR THE DIVISION

__________________________, Water Resources Bureau Division of Soil Conservation and Water Quality

Accepted

Adjustment Requested

If adjustment is requested, describe below:

END OF DOCUMENT JJ

Cer962218C Nutrient Reduction Wetland Project DOCUMENT SS Bid No. 26-06 APPLICATION AND CERTIFICATE FOR PAYMENT

SS-1

Cer962218C Nutrient Reduction Wetland Project DOCUMENT SS Bid No. 26-06 APPLICATION AND CERTIFICATE FOR PAYMENT

SS-2

Cer962218C Nutrient Reduction Wetland Project DOCUMENT HH Bid No. 26-06 CHANGE ORDER REQUEST

HH-1

STATE OF IOWA

CHANGE ORDER REQUEST

Change Order Request No.

Project ID: Cer962218C Date:

Name of Project: Cer962218C

Location of Project: Cerro Gordo County

Name of Contractor:

Architect/Engineer: Bolton & Menk Inc, 0 P.E.

Contract Plan and Detail Reference:

Change Order Request Drawing No. and Date:

Contract Specification Reference:

Description of Change:

BREAKDOWN OF CHANGE ORDER COST BY BID ITEM:

Item # Description Adjustment Quantity Unit Cost

Total Cost Adjustment

TOTAL $

BREAKDOWN OF CONTRACT COST:

Original Project Contract Amount: $ 0.00 Approved Contract Amendments No. through $ 0.00 Pending Recommended Change Order Requests through $ 0.00 Approved Change Order Requests No. through $ 0.00 This Amendment Request: $ 0.00 Resulting Total Recommended Amount: $ 0.00

Reason for Contract Change:

Cer962218C Nutrient Reduction Wetland Project DOCUMENT HH Bid No. 26-06 CHANGE ORDER REQUEST

HH-2

Change Requested by:

(Signature) (Date)

CONTRACTOR APPROVAL

By:

(Company) (Signature)

(Address) (Date)

IDALS PROJECT REPRESENTATIVE RECOMMENDATIONS

Concur Recommend Rejection (Attach Explanation)

IDALS Project Representative:

(Signature) (Date)

DIVISION OF SOIL CONSERVATION AND WATER QUALITY AUTHORIZATION

Change Order required due to:

Immediate authorization to proceed granted: Yes No

APPROVED: DENIED:

Susan Kozak, Director Susan Kozak, Director Division of Soil Conservation and Water Quality Division of Soil Conservation and Water Quality Iowa Department of Agriculture Iowa Department of Agriculture and Land Stewardship and Land Stewardship

(Date) (Date)

END OF DOCUMENT HH

Cer962218C Nutrient Reduction Wetland Project DOCUMENT II Bid No. 26-06 CONSTRUCTION CONTRACT AMENDMENT

II-1

State of Iowa Iowa Department of Agriculture and Land Stewardship

Cer962218C Nutrient Reduction Wetland Project Construction Contract Amendment

THIS AMENDMENT, made this ______ day of ___________________________, 20____, by and between the State of Iowa, acting through:

Iowa Department of Agriculture and Land Stewardship

Division of Soil Conservation and Water Quality hereinafter called the DIVISION, and

(Name of Company)

(Address)

(City, State, Zip) hereinafter called the CONTRACTOR.

WITNESSETH: That the DIVISION and the CONTRACTOR mutually agree to amend the agreement made the _____day of __________, 20_____, for the Cerro Gordo County Nutrient Reduction Wetland Project (Cer962218C

– Bid No. 26-06) in this Amendment Number _________ as described below:

Description of Amendment:

Contract Plan Sheet(s) and Detail Reference(s):

Amendment No._______ Drawing No. and Date:

Contract Specification Reference(s):

Reason for Revision of Contract Completion Date(s):

Original Contract Completion Date for All Work Except Seeding: June 15, 2027 Current Completion Date for All Work Except Seeding:

Revised Completion Date for All Work Except Seeding, This Amendment:

Original Contract Completion Date for Seeding-Buffer 06/30/2027 Current Completion Date for Seeding-Buffer Revised Completion Date for Seeding-Buffer, Original Contract Completion Date for Seeding-Structure 09/15/2027 Current Completion Date for Seeding-Structure Revised Completion Date for Seeding-Structure, Cer962218C Nutrient Reduction Wetland Project DOCUMENT II Bid No. 26-06 CONSTRUCTION CONTRACT AMENDMENT

II-2

BREAKDOWN OF AMENDMENT CONTRACT COST BY BID ITEM:

Item # Description

Quantity Unit Cost

Total Cost

TOTAL $

BREAKDOWN OF CONTRACT COST:

Original Project Contract Amount: $ 0.00 Approved Contract Amendments No. through $ 0.00 Pending Recommended Change Order Requests through $ 0.00 Approved Change Order Requests No. through $ 0.00 This Amendment Request: $ 0.00 Resulting Total Recommended Amount: $ 0.00

IN WITNESS WHEREOF, the parties hereto have executed this Amendment, in the day and year first above mentioned.

FOR THE DIVISION FOR THE CONTRACTOR

Grant D. Menke, Deputy Secretary Iowa Department of Agriculture and Land Stewardship

(Company Representative)

(Date) (Date)

(Name of Company)

(Address of Company)

(City, State, Zip Code)

CONSENT FROM SURETY

Seal if by a corporation

(Surety Representative)

(Name of Surety)

END OF DOCUMENT II

Cer962218C Nutrient Reduction Wetland Project DOCUMENT QQ Bid No. 26-06 SALES TAX EXEMPTION CERTIFICATE

IOWA

Department of Revenue www.state.ia.us/tax

Designated Exempt Entity Iowa Construction Sales Tax Exemption Certificate

This document may be completed by a designated exempt entity and given to their contractor and/or subcontractor along with an authorization letter. Seller: Keep this certificate in your files. Contractor/Exempt Entity: Keep a copy of this certificate for your records. Do not send this to the Department of Revenue

Designated Exempt Entity Division of Soil Conservation and Water Quality Iowa Department of Agriculture and Land Stewardship Address 1 1305 East Walnut Street Address 2

City Des Moines

State

IA

Zip Code 50319

Construction Project Name Cer962218C Nutrient Reduction Wetland Project Construction Project Number (if used) Job No. 26-06

General Contractor or Subcontractor Name Sample Address 1 123 Construction Ave Address 2 City Dig City

State

IA

Zip Code 55555

Description of contract/subcontract (please print/type clearly)

Construction of Nutrient Reduction Wetland.

The named contractor may purchase building materials used in the contract, exempt from sales tax. This exemption does NOT apply to materials, equipment and supplies consumed by the contractor or subcontractor.

Designated Exempt Entity Authorized Agent ._____________________________________ Date: _____________

Authorization Letter From Division of Soil Conservation and Water Quality - Agriculture and Land Stewardship

Pursuant to Iowa Code Sections: 422.42 (16) & (17), and 422.47 (5), you are authorized to purchase construction materials tax free for the contract specified above.

The exemption certificate (or a copy of the certificate) may be provided to the suppliers of your construction materials and will authorize them to sell you the materials exempt from Iowa sales tax and any applicable local option sales tax and school infrastructure local option sales tax. Complete information on qualifying materials can be found at www.state.ia.us/tax, the Department of Revenue (IDR) website.

It is your responsibility to have records identifying the materials purchased and verifying they were used on this contract. Any materials purchased tax-free and not used on the construction project are subject to sales and applicable local option taxes. Should this occur, the tax must be paid directly by you to IDR in the same calendar quarter the project is completed. E-mail the department at: idrf@idrf.state.ia.us if you have questions on this requirement.

Contractors should be aware that use of the certificate to claim exemption from tax for items not used on this project or that do not qualify for exemption could result in civil or criminal penalties.

31-013 (12/10/02)

END OF DOCUMENT QQ