26-044-RFP_-_LOA_-_Terminal_Ramp_Control_Procedures_-_Attachement_1.pdf
PDF 2 MB Posted
- Attached to
- Ramp Tower Services
- Solicitation number
- 26-044-RFP
- Issued by
- Bell County, Kentucky
About this file
This is a Letter of Agreement regarding Terminal Ramp Control Procedures between the Cincinnati Air Traffic Control Tower, Robinson Aviation, and the Kenton County Airport Board, effective July 14, 2022. The agreement establishes guidelines, procedures, and responsibilities for controlling aircraft movement adjacent to, into, and out of the Terminal Ramp Area at Cincinnati/Northern Kentucky International Airport. The CVG Ramp Tower, operated by Robinson Aviation, maintains control of all aircraft movement within the designated Terminal Ramp Area and must provide access to all operators in a reasonable, uniform, and non-discriminatory manner. The CVG Ramp Tower operates on a 24/7 schedule, with changes to operational times communicated to the Kenton County Airport Board and the Cincinnati Air Traffic Control Tower. Aircraft entering the Terminal Ramp Area use frequencies 130.9 for Ramp 1 and Ramp 2, or 130.375 for Ramp 3, while aircraft exiting the area contact Ground Control on 121.7. The agreement specifies that all ramp spots are multi-directional except during specific runway operations, with inbound and outbound aircraft utilizing designated spots based on whether the airport is operating 18 South or 36 North procedures.
The agreement includes provisions for holding procedures coordinated on an individual basis and incorporates procedures for Group V or larger taxi routes handled in accordance with the Aircraft Operating Restriction Letter of Agreement. The document includes a detailed terminal area map showing movement and non-movement areas, ramp locations, spot designations, and hazard zones for aircraft operations. The agreement replaced the previous Cincinnati-Tower/Delta Air Lines/Kenton County Airport Board Letter of Agreement dated July 1, 2021, and was signed by Lyndon M. Bertke (Air Traffic Manager, Cincinnati Air Traffic Control Tower), Candace McGraw (Chief Executive Officer, Kenton County Airport Board), and Hope Allen (Manager, CVG Ramp Control, Robinson Aviation, Inc.), with all parties executing the document on June 21-22, 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CINCINNATI AIR TRAFFIC CONTROL TOWER
and
ROBINSON AVIATION
and
KENTON COUNTY AIRPORT BOARD
LETTER OF AGREEMENT
EFFECTIVE: July 14, 2022
SUBJECT: Terminal Ramp Control Procedures
1. PURPOSE. To establish guidelines, procedures and responsibilities for controlling the flow of aircraft adjacent, into and out of the Terminal Ramp Area.
2. CANCELLATION. The Cincinnati-Tower/Delta Air Lines/Kenton County Airport Board
Letter of Agreement dated July 1, 2021, Subject Terminal Ramp Control Procedures.
3. RESPONSIBILITIES. Cincinnati Air Traffic Control Tower (Tower) and Robinson
Aviation (through the operation of the CVG Ramp Tower) will ensure all individuals responsible for the movement of aircraft adjacent to, and into and out of, the terminal ramp area be familiar with these procedures. Robinson Aviation (through CVG Ramp Tower) will provide access to all operators in a reasonable, uniform and non-discriminatory manner.
4. PROCEDURES.
a. CVG Ramp Tower has control of all aircraft movement within the Terminal Ramp Area as depicted on Attachment 1.
b. CVG Ramp Tower will instruct aircraft to hold short of the spots and contact Tower.
c. Group V or larger taxi routes and coordination will be handled in accordance with the
Aircraft Operating Restriction LOA.
d. CVG Ramp Tower typically operates on a 24/7 schedule. Changes to scheduled operations times will be communicated to the Kenton County Airport Board and Tower.
e. All Spots are multi-directional, except:
(1) When on 18 South Operation:
(a) Inbound aircraft enter Spots 4 and 14
(b) Outbound aircraft exit Spots 3 and 15
(2) When on 36 North Operation:
(a) Inbound aircraft enter Spots 3 and 15
(b) Outbound aircraft exit Spots 4 and 14
f. Frequencies:
(1) Aircraft entering the Terminal Ramp Area:
a. Ramp 1 and Ramp 2 = 130.9
b. Ramp 3 = 130.375
(2) Aircraft exiting the Terminal Ramp Area will contact Ground Control on 121.7
CINCINNATI AIR TRAFFIC CONTROL TOWER
and
ROBINSON AVIATION
and
KENTON COUNTY AIRPORT BOARD
EFFECTIVE: July 14, 2022
g. Ramp Hold Procedures will be coordinated on an individual basis.
Lyndon M. Bertke Candace McGraw Air Traffic Manager Chief Executive Officer Cincinnati Air Traffic Control Tower Kenton County Airport Board
Hope Allen Manager, CVG Ramp Control Robinson Aviation, Inc. (RVA)
Candace McGraw (Jun 21, 2022 18:05 GMT+1) Candace McGraw
Lyndon M. Bertke (Jun 21, 2022 14:10 EDT) Lyndon M. Bertke
Hope D Allen (Jun 22, 2022 06:39 EDT) https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAoeJ7gSCJlEz8MUAHSfbM7Ub2HZRp32Ti https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAoeJ7gSCJlEz8MUAHSfbM7Ub2HZRp32Ti https://cvgairport.na2.adobesign.com/verifier?tx=CBJCHBCAABAAoeJ7gSCJlEz8MUAHSfbM7Ub2HZRp32Ti
KY
. 2
DONALDSON HIGHWAY
DONALDSON HIGHWAY
CLAY DRIVE
LO
O
M
IS
R O
AD
LO
O M
IS
R
O
AD
BARKLEY DRIVE
LO
G
AN
R
O
AD
TERMINAL DRIVE
TERMINAL LOOP ROAD
LI
N
C O
LN
R
O
AD
SPENCE DRIVE
LINCOLN ROAD
LI
N
C O
LN
R
O
AD
KENTO
N RO
AD
EAST SERVICE ROAD
INTERSTATE 275
LO
O
M
IS
R O
AD
AIRPARK DRIVE
R12
R
R 8X
R
R9
R
A 0-
A300 -600
B747 -8
B747-8
B747 -8
B747-8
A300 -600
B747 -8
R5
R4
R3
R2
R1
R
R
B747 -8
A18
A13A13A
A11 A11A
A14 A16
737 HAZARD
737 HAZARD
737 HAZARD 737 HAZARD
737 HAZARD
737 HA
ZARD
737 HAZARD
737 HAZARD
737 HAZARD 737 HAZARD
737 HAZARD
737 HA
ZARD
STOP
ST
OP
STOP
STOP
ST
OP
YIELD TO AIRCRAFT
YI
EL
D
TO
A
IR
CR
AF
TYIELD TO AIRCRAFT
YIELD TO AIRCRAFT
5789101112
57891011
YIELD TO AIRCRAFTYIELD TO AIRCRAFT
S T
O P
S T
O P
STOP
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
S T
O P
S T
O P
S T
O P
S T
O P
S
T
O
P
A2
A12A6 A8 A10
STOP
STOP
S T
O P
S T O P
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
S T O P
YIELD TO AIRCRAFT
STOP
YIELD TO AIRCRAFT
STOP
STOP
ST
OP
STOP
STOP
ST
OP
STOP
YIELD TO AIRCRAFT
STOP
STOP
STOP
STOP
YIELD TO AIRCRAFT
S T
O P
S T
O P
S
T
O
P
S
T
O
P
YIELD TO AIRCRAFT
YIELD TO
AIRCRAFT
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
S T
O P
S T
O P
S T
O P
S T
O P
STOP
Y
I
E
L
D
Y I
E L
D
YIELD TO AIRCRAFT
YIELD TO AIRCRAFT
S T
O P
STOP
A
A 3 A5 A7 A9
A4
STOP
A22
A21
A21AA19A17A15
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
A14
F1
F2
F3
F1
F2
F3
F4
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12 E12 B13
B12
B11
B10
B9
B8
B7
B6
B5
B4
B3
B2
B1
B17
B16
B15
B14
B13
B12
B11
B10
B9
B8
B7
B6
B5
B4 B3
KENTON COUNTY AIRPORT BOARD LETTER OF AGREEMENT TERMINAL RAMP
CONTROL PROCEDURES
ATTACHEMENT 1 MOVEMENT / NON-MOVEMENT
AREAS TERMINAL AREA MAP
CINCINNATI/NORTHERN KENTUCKY
INTERNATIONAL AIRPORT
U:\03 ANNUAL UPDATES\ACM (PART 139)\EXH 23 LOA TERM RAMP CONTROL\CAD SHEETS\ACM EXH 23 TERM RAMP CONTROL.DWG 6/19/2022 8:08 PM MMILLER
NORTH EXHIBIT 23
CINCINNATI AIR TRAFFIC CONTROL TOWER
AND
ROBINSON AVIATION
AND
CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT
Attachment 1 EFFECTIVE: July 14, 2022
| 2022-06-22T07:19:06-0700 | |
| Agreement certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .