PROJECT DESCRIPTION

This document is a Department of Defense (DoD) project description for building envelope/roofing work at a federal facility. The project scope includes the complete replacement of the existing roofing system at building 1771, with demolition of approximately 15,300 square feet of existing roof and installation of a new roof system. The new system shall include metal cap, flashing, pitch pockets, lead vent covers, drain systems, drain covers, and all incidental related work.

OPERATIONAL AND SUPERVISION REQUIREMENTS

The facility will remain operational throughout the entire construction period, requiring the contractor to conduct all operations with minimal interference to normal facility operations. The project allows for a streamlined supervision structure in which a single qualified individual may serve concurrently as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications defined in the project specification for each of the three roles.

View the file

Other files

File Type Posted
Amend 0005.pdf PDF
Amend 0004.pdf PDF
07 52 00 Roofing Spec.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
Roof MACC RFP.pdf PDF
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
26-0422 1771 ROOF REPLACEMENT - SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION: DoW COMMUNITY ONLY

PROJECT DESCRIPTION

The work includes replacement of the existing roofing system at building 1771. The contractor shall demo approximately 15,300 sf existing roof system and install a new roof system to include new metal cap, flashing, pitch pockets, lead vent covers, drain systems, drain covers, and incidental related work.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.