26-038-LH Lake Tobesofkee Dam Automated Gate System
Solicitation number
PE-61100-NONST-2026-000000114
Issued by
Bibb County, Georgia

About this file

This is a Scope of Work document for a Design-Build Request for Qualifications issued by Macon Bibb County for the Gate Lift Control System project at Lake Tobesofkee Dam located at 6470 Stapleton Road in Macon, Georgia. The selected Design-Build team will provide concurrent design and construction services for a turnkey gate lifting system that meets all project requirements and complies with federal, state, and local regulations. The scope includes site investigations and inventory, preliminary evaluation of dam rehabilitation issues, and development of engineering design plans and construction documents in AutoCAD format with PDF copies. The Design-Build team must replace existing lift motors with new ones and ensure the system includes remote operation and monitoring capabilities, automatic pool elevation maintenance at 360 feet, activity notifications and malfunction alerts, comprehensive activity logging, emergency generator monthly exercise capability, and downstream fishermen alarms. The team is responsible for obtaining all necessary federal, state, and local permits and approvals. The selected Design-Builder must provide its own workspace throughout the project duration and will deliver as-built documents, project closeout assistance, warranties and guarantees, and operator training with Standard Operating Procedures upon completion.

The Scope of Work does not specify pricing terms, response deadlines, award dates, contract term, renewal options, set-asides, or funding sources in this document. The Design-Builder will prepare a proposal detailing the contract sum, proposed substantial completion date, and list of key personnel and suppliers as part of the Design-Builder's Proposal submission. The existing lift motors will remain the property of Macon Bibb County and will be removed and delivered to a location to be determined later. All work shall comply with design, construction, and testing services requirements, with the exception of Special Inspections which will be performed by the Owner.

View the file

Other files

File Type Posted
26_038_LH_ Addendum 1.pdf PDF
26_038_LH Design Build Lift Gate System Upgra.pdf PDF
26_038_LH Attachment A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

3.01 Purpose of the RFQ and Lead Design-Builder Responsibilities Macon Bibb County is soliciting Qualifications for Design-Build project delivery services for the Gate Lift Control System for the Lake Tobesofkee Dam.

The lead Design-Builder will be expected to provide concurrent design and construction turnkey activities for this project resulting in finished, fully usable gate lifting system that satisfies all project requirements and contract terms. All work shall comply with the requirements of federal, state, and local laws, engineering standards and other regulations that may apply. The Design-Builder, as the sole responsible source for total project compliance and construction related performance (including design, and construction services), testing services (with the exception of Special Inspections by Owner), trade contractors and trade supplier contracts.

3.02 Locations of the Project

Lake Tobesofkee Dam 6470 Stapleton Road Macon, GA

NOTE: Throughout the duration of the project, the County WILL NOT provide workspace for the Firm/ Team. The selected Design-Build Team is responsible for/ must provide its own workspace.

3.03 Scope of Work

The following is a preliminary scope of work that may be modified during contract negotiations with the selected Design-Build Team.

Site Inventory and identify scope of dam rehabilitation

1. Site investigations, including survey, subsurface utility investigations, geotechnical investigations, environmental engineering, to verify existing conditions if necessary.

2. Preliminary evaluation of proposed dam rehabilitation issues related to materials needed for the project, equipment needed and provide proposed project timeline, constructability, time, labor and scheduling factors related to project cost.

Draft and complete engineering design and plans for the dam lift gate system

1. Prepare any necessary design plans for Macon Bibb County Staff consideration.

2. Plans will include: Diagram or written description of all components needed for the system. A diagram or description of all electrical and mechanical requirements. Specifics to address the dam gate lift requirements. The components for the dam lift gate system must perform the following functions.

• The ability for remote operation and remote monitoring.

• Must automatically maintain a normal pool elevation of 360 feet.

• Must be capable of providing notifications of activities (Gate Opening and Closing, Power outages, etc.)

• Alerts for all Malfunctions

• Must provide a log of all dam activity.

• Have the ability for monthly exercise of the emergency generator

• Provide an alarm to notify downstream fishermen prior to the gate opening with sufficient time to clear.

• Replace the existing lift motors with new lift motors for the Dam gate lift system.

• Bidder must provide training on the new system and a written Standard Operation

Procedure

3. Work in digital format: AutoCAD; PDF copies shall also be provided.

4. Develop Design-Builder’s Proposal detailing a written scope of the work required to complete the work including all lift gate system functions, contract sum, proposed date of substantial completion and list of key Design-Build personnel and suppliers.

Design Development

1. Based on the approved Design plans, satisfactorily resolve all review comments from federal, state, and local permitting agencies.

2. Documents produced in digital format: AutoCAD software. PDF copies shall also be provided.

Construction Documents

1. Based on the approved design plans, satisfactorily resolve all review comments from prior design phases and prepare and finalize all construction drawings and specifications to minimally include: dam lift gate systems, site utilities, specifics to address the dam lift gate requirements, and components that will form the basis for the project’s Construction Documents sufficiently complete to support the prepared budget, and construct the project.

2. Documents produced in digital format: AutoCAD software. PDF copies shall also be provided.

3. Prepare a construction documents level cost estimate and updated project schedule;

reconcile cost estimate with construction estimate.

Construction / Renovation

1. Install all equipment needed to meet the requirements of the developed plans.

2. Removal and disposal of all existing equipment not needed for the new dam lift gate system. Existing lift motor will remain the property of Macon Bibb County and will be delivered to a later determined location.

Post Construction Phase/Deliverables

1. Prepare as-built documents based on information received from the contractor in AutoCAD or in such a format as the owner requires.

2. Assist in project closeout, establishment of warranties and guarantees.

3. Provide training and Standard Operating Procedures to Macon Bibb Operators.