26_035_LH_ Addendum 1.pdf

PDF 410 KB Posted

Attached to
26-035-LH Macon-Bibb County Radio Shop Project (2/26/2026)
Solicitation number
PE-61100-NONST-2026-000000111
Issued by
Bibb County, Georgia

About this file

This is an Addendum Number One to bidding documents for project 26-305-LH, a radio shop renovation project located at 4520 Knight Road in Macon, Georgia, involving Macon Bibb County. The addendum, issued on February 12, 2026, amends the original project drawings and specifications by adding demolition requirements to Sheet G1.3. The contractor is responsible for all building and site demolition necessary to accomplish the new work depicted on the plans, with reference to the attached existing floor plan drawing EX1.1 dated October 24, 2025.

The addendum specifies that the contractor must remove all debris resulting from demolition operations from the site, with burning of debris on site prohibited. The contractor bears full responsibility for determining the disposal location for all demolished items. No additional pricing terms, bid due dates, site visit requirements, or other contractual modifications beyond these demolition scope clarifications are addressed in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26-305-LH MACON BIBB COUNTY RADIO SHOP

4520 KNIGHT ROAD

MACON, GEORIGA

BTBB #2024-29 February 12, 2026

ADDENDUM NUMBER ONE

Bidders are advised that bidding documents on the above named project are amended as follows:

DRAWINGS

Sht. G1.3, Drawings and Specifications: Add the following:

DEMOLITION

A. The Contractor is responsible for all building and site demolition required to accomplish the new work shown on the plans.

1. Disposal of Debris: Remove from the site all debris resulting from the demolition operations;

burning of debris on site will not be permitted; place of disposal for demolished items shall be the Contractor’s responsibility.

2. Refer to the attached drawing, EX1.1 Existing Floor Plan, dated 10/24/25.

Attachment: EX1.1 Existing Floor Plan

END OF ADDENDUM

File details come from the government source that posted it. Updated .