25Q1030_West Scale Calibration_Price Schedule.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
West Region Sites Scale Calibration Repair & Maintenance
Solicitation number
SP451025Q1030
Issued by

About this file

The file is a Price Schedule for a Scale Calibration Repair & Maintenance contract for the Defense Logistics Agency (DLA) Disposition Services' West Region Sites. The solicitation (SP451025Q1030) is a 100% small business set-aside for annual scale calibration services at seven locations: Sierra, San Joaquin, Barstow, Pendleton, San Diego, Lewis, and Tucson. The contract structure includes one base period and two 12-month option periods, with a firm fixed-price pricing model.

The pricing schedule includes annual calibration line items for each site, an unscheduled repair labor rate (21 hours in base period, 35 hours in option periods), and a material cost not-to-exceed $10,000 per period. Quotes are due by 1:00 PM EST on April 17, 2025, and will be evaluated on a Lowest Priced Technically Acceptable (LPTA) basis. Vendors must submit technical documentation verifying certified trained mechanics with experience on the specified equipment, including training certificates, certifications, resumes, or past performance references from the last three years. The NAICS code is 811210 with a size standard of $34.0 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

***CUI***

PRICE SCHEDULE for Scale Calibration Repair & Maintenance, West Region - Annual Service

CLINBASE Period - (12 Months)Unit of IssueQuantityEstimated PriceExtended Price
0001Annual Scale Calibrations SierraEA1
0002Annual Scale Calibrations San JoaquinEA1
0003Annual Scale Calibrations BarstowEA1
0004Annual Scale Calibrations PendletonEA1
0005Annual Scale Calibrations San DiegoEA1
0006Annual Scale Calibrations LewisEA1
0007Annual Scale Calibrations TucsonEA1
0008Unscheduled Repair Labor RateHR21
1009Material CostNTE10000$1.00$10,000.00
TOTAL
OPTION 1 - (12 Months)Unit of IssueQuantityEstimated PriceExtended Price
1001Annual Calibrations SierraEA1
1002Annual Calibrations San JoaquinEA1
1003Annual Calibrations BarstowEA1
1004Annual Calibrations PendletonEA1
1005Annual Calibrations San DiegoEA1
1006Annual Calibrations LewisEA1
1007Annual Calibrations TucsonEA1
1008Unscheduled Repair Labor RateHR35
1009Material CostNTE10000$1.00$10,000.00
TOTAL
OPTION 2 - (12 Months)Unit of IssueQuantityEstimated PriceExtended Price
2001Annual Calibrations SierraEA1
2002Annual Calibrations San JoaquinEA1
2003Annual Calibrations BarstowEA1
2004Annual Calibrations PendletonEA1
2005Annual Calibrations San DiegoEA1
2006Annual Calibrations LewisEA1
2007Annual Calibrations TucsonEA1
2008Unscheduled Repair Labor RateHR35
2009Material CostNTE10000$1.00$10,000.00
TOTAL
TOTAL YEARS$0.00

File details come from the government source that posted it. Updated .