25Q0012 BNLS_Redacted.pdf

PDF 248 KB Posted

Attached to
UPS PREVENTATIVE MAINTENANCE
Solicitation number
N7027225Q0012
Issued by

About this file

This is a Justification for Other Than Full and Open Competition (JOFOC) memo for UPS maintenance services under the simplified acquisition threshold. The document justifies sole-sourcing to Chesapeake Mission Critical for Eaton UPS units maintenance services for the period of February 15, 2025 through February 14, 2026, with one option year.

The justification is based on exclusive licensing agreements and critical equipment considerations. Eaton Corporation is identified as the Original Equipment Manufacturer (OEM) with proprietary rights to drawings and design of the UPS system. The contractor must be an Eaton Authorized Power Specialist (EAPS). The equipment is deemed mission-critical, where improper maintenance could result in mission failure. The requirement supports Department of the Navy operations under PR Number N702721C3014, with Chesapeake Mission Critical identified as the sole authorized provider capable of performing the required services.

View the file

Other files

File Type Posted
25Q0012 ANNEX A PWS.docx DOCX document
25Q0012 ANNEX C PRICING.xlsx XLSX spreadsheet
N7027225Q0012 RFQ.docx DOCX document
25Q0012 ANNEX B EVAL FACTORS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 June 2018)

Date: Dec 2024

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PR Number(s): N702721C3014

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required to include:

a) the name of the required source or brand name

Eaton UPS Units

b) the required delivery date/period of performance and

2025 2026 with 1 option year

c) its intended use.

UPS Maintenance Contract

2. List the source(s) or known vendor(s) who are able to provide the above-described item or service.

Chesapeake Mission Critical

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. _____ Only one responsible source (select all that apply):

1. _____ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

2 Ver 2.0 (01 June 2018) b.

2. _X____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

Eaton Corporation is the OEM and owns all proprietary rights to drawings and design of the UPS system in place. The contractor shall be an Eaton Authorized Power Specialist (EAPS) of the Original Equipment Manufacturer (OEM).

b. Identify the distributors / authorized technical representatives for the item or service.

Provide evidence of the licensing or OEM certification agreement as an attachment to this document.

Eaton Corporation has authorized representatives throughout the world and are the only sources that the OEM will provide rights to drawings and design.

3. X OTHER REASON:

a. X CRITICAL EQUIPMENT: The required item is critical equipment, the failure of which poses a hazard to the operational system, the crew, or the environment.

i. Equipment being supported is direct mission requirement. Improper care of equipment will most certainly impact operations and result in mission failure.

b. _____ STANDARDIZATION / BRAND NAME: only the specified make/model of the

i. Identify Make / Model Number(s): ___________________

ii. Identify other systems with this Make / Model:

c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

3 Ver 2.0 (01 June 2018)

d. _____ OTHER:

4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: ______________________________

b. Required delivery date / Period of Performance: _____________________________

c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.

d. Estimated production lead time: ______________________________

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number: _________________________________________

IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT:

4 Ver 2.0 (01 June 2018)

V. CERTIFICATIONS AND APPROVALS:

Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

File details come from the government source that posted it. Updated .