25BA011_Plans.pdf

PDF 34 MB Posted

Attached to
Ice Harbor Dam Charbonneau Park Septic System Upgrades
Solicitation number
W912EF25BA011
Issued by

About this file

These engineering design documents detail a comprehensive septic system upgrade project for the Charbonneau Park at the Ice Harbor Lock and Dam, located across Oregon, Washington, and Idaho. The project involves replacing the existing septic infrastructure with a new treatment system that includes a 3,000-gallon feed tank, two 3,000-gallon surge tanks, and five 3,000-gallon Microfast treatment tanks, totaling 15,000 gallons of treatment capacity. The system will serve multiple facilities including a marina sewage lift station, comfort station, and camp sites, with new electrical infrastructure, blower systems, pumps, and control panels to manage wastewater treatment and distribution.

The design documents, prepared by the U.S. Army Corps of Engineers Walla Walla District in August 2025, provide detailed technical specifications for tank placement, piping configurations, electrical systems, and site layouts. Key components include a new drainfield lift station, underground power and control wiring, float switch systems for tank management, and a comprehensive electrical infrastructure with multiple panels and transformers. The project involves demolishing existing septic infrastructure and installing a modern, more efficient wastewater treatment system that will improve environmental management and operational capabilities at the Charbonneau Park facility.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

W

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

F

IL

E N

O

M

IC

H A

E L

F R

A N

N S

E N

P

.E

C O

V E

R S

H E

E T

A N

D L

O C

A T

IO

N

M A

P S

G-001

N B

A K

K E

J O

'N E

L

IH

G

-1 -0

-1 /5

N B

A K

K E

D S

P

D

:2

:4

P

M

/2 /2

H L

G -0

X X

X .d g n

SEPTIC SYSTEM UPGRADE

CHARBONNEAU PARK

SNAKE RIVER, OREGON, WASHINGTON AND IDAHO

ICE HARBOR LOCK AND DAM

W912EF25BA011

AUGUST 2025

WALLA WALLA DISTRICT

NORTH NORTH

NORTH

IDAHO

WASHINGTON

OREGON

NEVADA UTAH

WYOMING

MONTANA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C O

LU

M B

IA

R

IV

E R

WALLA WALLA

RIVER

S N

A K E R

IV

E R

WASHINGTON

OREGON

PASCO

KENNEWICK

RICHLAND

HERMISTONUMATILLA

WALLA

WALLA

WAITSBURG

CONNELL

KAHLOTUS

STARBUCK

Y A K

IM

A R

IV

E R

C O

L U

M B

IA

R

IV

E R

MILL

CREEK

T O

U C

H E T R

IV

E R

W

ALLA W

ALLA RIVER

of Engineers

US Army Corps

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

D1

VICINITY MAP

SCALE: NTS

D7

LOCATION MAP

SCALE: NTS

project documents within the scope of their employment as required by ER 1110-1-8152.

The initials or signatures and registration designations of individuals appear on these This project was designed by the Walla Walla District of the U.S. Army Corps of Engineers.

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

SUBMITTED BY:

APPROVED BY:

WALLA WALLA DISTRICT

CHIEF OF DESIGN BRANCH

MARCUS PALMER, P.E.

WALLA WALLA DISTRICT

CHIEF OF GEOSPATIAL SECTION

JEFFREY LYON, P.E.

WALLA WALLA DISTRICT

CHIEF OF MECHANICAL DESIGN SECTION

KEVIN RENSHAW, P.E.

WALLA WALLA DISTRICT

CHIEF OF ELECTRICAL DESIGN SECTION

LEVI VAN STEDUM, P.E.

WALLA WALLA DISTRICT

CHIEF OF ENGINEERING & CONSTRUCTION DIVISION

DWAYNE WESTON, P.E.

WALLA WALLA DISTRICT

CHIEF OF STRUCTURAL DESIGN SECTION

JULIO MORELOS, P.E.

WALLA WALLA DISTRICT

CHIEF OF GEOTECHNICAL DESIGN SECTION

MICHAEL FRANSSEN, P.E.

G13

SITE MAP

SCALE: NTS

A

A

LOCATION

PROJECT

HMU

BIG FLAT

LAKE

DALTON

FRANKLIN COUNTY

REEF

ROGER'S

LOCK AND DAM

ICE HARBOR

PARK

CHARBONNEAU

LANDING

LEVEY

A-

9-

1B

-3

A-

9- 1B -4

D7

G13

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

M

IC

H A

E L

F R

A N

N S

E N

P

H

E E

T I

N D

E X

G-002

N B

A K

K E

J O

'N E

-1 -0

-1 /5

B

A K

K

P

D

:2

:5

P

M

/2 /2

H L

G -0

X X

X .d g n

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS

J

J

J

J

J

EXISTING DRAINFIELD

#1, BREAKERS 2, 4 AND 6.

SUPPLIED FROM WELLHOUSE

POWER TO PANEL CQ3 IS

MARINA SEWAGE LIFT STATION

DRAINFIELD

ABANDONED

WATER LINE

EXISTING SEPTIC TANKS

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

M

IC

H A

E L

F R

A N

S S

E N

P

N E

R A

L S

IT

E

P L

A N

G-101

G F

R E

N C

H

J W

E

-1 -1

-0

/1

O

'N E

P

D

:2

:3

P

M

/2 /2

H L

G -1

X X

X .d g n

NORTH

SEWAGE LINE

DRAINFIELD LIFT STATION

60' 120'0

AND STAGING AREA

CONTRACTOR'S STORAGE

ELECTRICAL LINE

ELECTRICAL LINE

ACCESS ROAD

WORK SITE LOCATION

NEW TREATMENT SYSTEM

STATION WORK SITE

MARINA SEWAGE LIFT

STATION WORK SITE

DRAINFIELD LIFT

U

S

SSS

SSS

S

S

U

U

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DRAWINGS FOR LOCATIONS OF IRRIGATION LINES.

IRRIGATION LINES NOT SHOWN FOR CLARITY. SEE SUPPLEMENTAL 2.

FOR THIS PROJECT.

SEE V-101 FOR SURVEY CONTROL POINT DATA AND DATUM INFORMATION 1.

GENERAL SHEET NOTES

A1

GENERAL SITE PLAN: CHARBONNEAU PARK

1"=60'SCALE:

STORAGE/WORK AREA

JUNCTION BOX

MANHOLE

FENCE

SANITARY SEWER

WATER

ELECTRICAL

LEGEND

W

S

J

C-101

A1

MD101

J15

MD102

H1

E-101

A1

M-101

G3

M-101

H15

E-101

A13

S-101

E13

CO

CO

CO

CO

S

S

J

SSS

VSCOSS

J

J

J

J

CO

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

JE

F

F R

E Y

L Y

O N

P

D C

O N

T R

O L

P O

IN

T

S

T O

P O

G R

A P

H

IC

S U

R V

E Y

V-101

G F

R E

N C

H

R

J O

N

-1 -1

-1

S O

W A

R

P

D

:2

:2

P

M

/2 /2

H L

V

-1 X

X X

.d g n

80' 160'0

NORTH

LIFT STATION

DRAINFIELD

SURVEY BOUNDARY

AND PANEL

ELECTRICAL TRANSFORMER

TRANSFORMER

ELECTRICAL

485.90

POST FENCE

486.66

POST

486.93

POST

487.20

POST

EL 460.74

E 2058773.22

N 341844.51

CHARB-21

EL 462.30

E 2059512.48

N 341902.02

CHARB-3

EL 470.45

E 2059888.83

N 341571.11

CHARB-2

EL 479.89

E 2059873.07

N 341220.26

CHARB-1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

PLAN: TOPOGRAPHIC SURVEY AND CONTROL POINTS

1"=80'SCALE:

UNIT OF MEASURE: US SURVEY FOOT.4.

VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88).3.

AMERICAN DATUM 1983 (NAD83).

HORIZONTAL DATUM: STATE PLANE, WASHINGTON SOUTH ZONE, NORTH 2.

ENGINEERS, WALLA WALLA DISTRICT.

TOPOGRAPHIC SURVEY DATA WAS COLLECTED IN JULY 2024 BY CORPS OF 1.

GENERAL NOTES

CONTROL POINT DATA

UNKNOWN VAULTSEWER CLEANOUT

UNKNOWN MANHOLESEWER MANHOLE

ELECTRICAL PANELVALVE

TRANSFORMERMANHOLE

HANDHOLECONTROL POINT

LEGEND

LIFT STATION

MARINA SEWAGE

STATION

PARK CHECK-IN

VAULTS

LOCATION

DRAINFIELD

BLDGS

TREATMENT

WATER

OLD DRAINFIELD

APPROX.

U

S

CO

J

T

ELEC

U

U

485.0'

.0'

0.0

480.0'

475.

0'

5.0

5.

0'

0.

0'

0.

0'

.0'

0.0

5.0

5.

0'

5.

0'

0.0

0.

0'

.0

0.

0'

460.0'

465.0'

5.

0'

.0'

.0

.0'

.0

.0

.0

.0

ELEC

ELEC

T

ELEC

T

ELEC

J

U

U U

JJ

CO

U

U

ELEC

ELEC

ELEC

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

M

IC

H A

E L

F R

A N

S S

E N

P

IT

E P

L A

N

S E

P T

IC

S

Y S

T E

M

C-101

G F

R E

N C

H

J W

E

-1 -1

-1

O

'N E

P

D

:2

:4

P

M

/2 /2

H L

C

-1 X

X X

.d g n

30' 60'0

NORTH

COMFORT STATION

EXISTING 3000 GAL SEPTIC TANK

ROAD

EXISTING 6000 GAL SEPTIC TANK

CONCRETE SLAB

ELECTRICAL

LIFT STATION

DRAINFIELD

N 342049.4395

E 2059366.0873

EL 461.4021

CO

447.74

COCO

448.45

EOG

PP#_

448.83

ELPNL

449.54

EOG

449.64

EOG

449.65

EOG

449.93

EOG

450.41

EOG

450.52

EOG

CO

450.52

COCO

450.68

EOG

450.72

EOG

450.79

EOG ST

450.82

PAD ST

450.84

EOG

451.06

EOG

451.07

PAD

451.22

SIGN

451.24

PAD

451.26

PAD CL

PP#_

451.30

ELPNL

451.32

PAD ST

451.38

PAD CL

451.40

PAD

451.49

PAD

W

W

PP#_

451.78

ELPNL

451.82

PAD

451.88

EOG

451.95

PAD ST

451.95

PAD CL

452.09

PAD

452.09

BLDG

452.09

BLDG ST

452.09

BLDG

S

453.92

VLT

S

454.11

VLT

N 342013.3565

E 2059420.1282

EL 459.2212

PP#_

459.86

ELPNL

N 342053.2627

E 2059311.9242

EL 460.8879

E

463.71

JBOX ELUG

D

465.01

MHSD

465.46

MHS

D

465.89

MHS

VSD

466.07

MH

CO

466.29

COCOSD

466.40

MH

SD

467.77

MH

H

476.83

HH

H

478.40

HH

H

478.64

HH

D

479.08

MHS

479.65

CURBSTOP

479.65

CURBSTOP

479.65

CURBSTOP

479.65

CURBSTOP

481.59

SIGN END

E

481.68

JBOX

E

482.03

JBOX

482.16

PAD

482.20

PAD CL

PAD ST

482.34

PAD

482.38

PAD ST

482.40

SIGN ST

482.45

PAD

482.46

PAD

482.47

PAD CL

482.48

PAD

482.50

PAD CL

482.50

PAD

CO

482.52

CO

H

482.54

HH

482.55

PAD ST

483.12

PAD

483.17

PAD

CO

483.17

COCO

H

483.31

HH

483.31

SIGN

PP#_

483.32

ELPNL

483.37

SIGN

483.38

JNTCST

483.40

PAD CL

483.43

CURBSTOP

483.46

PAD ST

483.50

CURBSTOP

483.51

CURBSTOP

483.61

CURBSTOP

483.64

CURBSTOP

483.68

CURBSTOP

483.70

CURBSTOP

483.78

CURBSTOP

483.80

CURBSTOP

483.82

CURBSTOP

483.84

CURBSTOP

484.40

BLDG

484.58

BLDG CL

484.60

BLDG

484.70

BLDG ST

PP#_485.03

ELPNL

COCO

485.14

CO

PP#_

485.48

ELPNL

DRAINFIELD

ABANDONED

EXISTING DRAINFIELD

LINE

EXISTING SEWER

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

PLAN: TREATMENT SYSTEM LOCATION

1"=30'SCALE:

PRIOR TO BEGINNING EXCAVATION.

TOPOGRAPHIC SURVEY. CONTRACTOR TO FIELD VERIFY UTILITY LOCATIONS

SEPTIC TANK TO DRAINFIELD ARE APPROXIMATE AND WERE LOCATED AFTER

LOCATIONS OF EXISTING WATER LINE AND EXISTING SEWER LINE FROM 1.

GENERAL SHEET NOTES

G-101

A1

MINOR CONTOUR

MAJOR CONTOUR

ELECTRICAL

EXISTING FEATURESSANITARY SEWER

NEW FEATURESWATER LINE

LEGEND

C-401

A1

EL 460.635'

N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

M

IC

H A

E L

F R

A N

S S

E N

P

N K

S

E L

E V

A T

IO

N

S

T R

E A

T M

E N

T

C-201

G F

R E

N C

H

J W

E

-1 -1

-1

O

'N E

P

D

:3

:0

P

M

/2 /2

H L

C

-2 X

X X

.d g n

2' 0" 4' 0" 8' 0"0

UNITS

MICROFAST

MANIFOLD TO

DISTRIBUTION

OUTLET TO

FEED TANK

FINISHED GRADE

7'-2" 12'-7"

AGGREGATE BASE

TREATMENT TANK

MICROFAST UNIT

3.0 UNIT

MICROFAST

OUT PORT

INSPECTION/PUMP

AGGREGATE BASE

VALVE BOXES

1' 0" 2' 0" 4' 0"0

T

Y P

OUT PORT

INSPECTION/PUMP

4" PVC SCH 40

TANKS

EXISTING SEPTIC

INLET FROM

/8

2" PVC VENT 2" PVC VENT

2" PVC VENT

LIFTING RING, TYP

SCH 40

8" PVC

SCH 40

8" PVC

SCH 40

8" PVC

SURGE TANK 2SURGE TANK 1

INSPECTION/PUMPOUT PORT, TYP

SCREEN OR SMALLER, TYP.

NOTE: TO BE #4 MESH

SCREEN VENT COVER.

TERMINATION CAP MESH

FINISHED GRADE

FEED TANK

3000 GALLON

1'-5 1/4 " 2'-5 3/16 "

EL. 462.06

EL. 461.40

EL 454.15

12'-7"

5'-0" MIN 5'-0" MIN

T

Y P

M

IN

M

IN

PVC PIPING

HOLES TO FIT 2"

SCH 40

2" PVC VENT

EL 460.3

EL 460.179

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET KEYNOTES

INTERIOR BOTTOM OF THE TANK, AND CENTERLINE WITH THE TANKS.

INSTALL 8" HORIZONTAL INTERCONNECTING PVC PIPE 2 INCHES ABOVE THE 3.

SEE M-103 AND M-104.2.

DISTRIBUTION MANIFOLD. SEE C-401 FOR LAYOUT OF MANIFOLD.1.

SEE MECHANICAL SHEETS FOR PIPING AND PUMP DETAILS.4.

INSTALLED AT THE SAME ELEVATION AS THE FEED TANK.

ALL SURGE TANKS AND MICROFAST UNIT TREATMENT TANKS ARE TO BE 3.

FOLLOW MANUFACTURER'S INSTRUCTIONS FOR SECURING ACCESS.2.

FINAL GRADE IS 8" OVER TANKS. SEE D15/C-501.1.

GENERAL SHEET NOTES

C-401

A1

A8

SECTION: SURGE TANKS AND FEED TANK

1/4"=1'-0"SCALE: C-401

A1

G1

PROFILE: TANKS

3/4"=1'-0"SCALE:

EL. 460

EL. 455 EL. 455

EL. 460

0-5-10 5 10 15

G17

DETAIL: PLUMBING EXIT

3/4"=1'-0"SCALE:

NOTE: INSPECTION COVER, CHAIN, AND PVC NOT SHOWN

2'0 1' 4'C-201

A8

G17

XXX.X'

460.

0'

465.0'

460.0'

5.

0'

0.

0'

ELEC

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

M

IC

H A

E L

F R

A N

S S

E N

P

P

A N

T

R E

A T

M E

N T

S Y

S T

E M

C-401

G F

R E

N C

H

J W

E

-1 -1

-1

O

'N E

P

D

:3

:4

P

M

/2 /2

H L

C

-4 X

X X

.d g n

10' 20'0

NORTH

EXISTING ROAD

UTILITY CROSSING SEE C-501

ELEVATION EST. 458.5'

SEPTIC LINE

TIE INTO EXISTING

5'

ABANDONED DRAIN FIELD

BOUNDARY OF

APPROXIMATE

3000 GALLON FEED TANK

5'-0"

5'-0"

3'-6"

3'-6"

'-0

BLOWER PADS

TREATMENT TANK 5

MICROFAST UNIT

ELECTRICAL CONCRETE SLAB

4" X 8" X 4" WYE WITH CLEANOUT

CONNECT TO EXISTING SEWER LINE

3'-6"

3'-6"

"6'-0"

EL. 461.90

E 2059290.02

N 342075.25

PIPE.

PLACE. CAP ENDS OF

IS TO BE ABANDONED IN

EXISTING SEWER LINE

THIS SECTION OF THE

SURGE TANK 1

SURGE TANK 2

TREATMENT TANK 4

MICROFAST UNIT

TREATMENT TANK 3

MICROFAST UNIT

TREATMENT TANK 1

MICROFAST UNIT

TREATMENT TANK 2

MICROFAST UNIT

SEE NOTE 3

PP#_

459.86

ELPNL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

PLAN: TREATMENT SYSTEM LOCATION

1/8"=1'-0"SCALE:

DO NOT USE AS BACKFILL.

DURING EXCAVATION. DISPOSE OF ALL EXCAVATED DRAIN FIELD MATERIAL.

ABANDONED DRAIN FIELD MATERIAL WILL MOST LIKELY BE ENCOUNTERED 4.

INVERT ELEVATION IS APPROXIMATELY AT 457.5'.3.

BOUNDARY OF ABANDONED DRAIN FIELD IS NOT MARKED IN FIELD.2.

MAY DIFFER.

ALL ELEVATIONS ARE ASSUMED FROM AS-BUILTS, ACTUAL SITE CONDITIONS 1.

GENERAL SHEET NOTES

C-101

A1

G1

C-201

A15

C-501

C-501

E17

EXISTING FEATURES

NEW FEATURES

SANITARY SEWER

EDGE OF ROAD

WATER

ELECTRICAL

MINOR CONTOUR

MAJOR CONTOUR

LEGEND

C-501

E10

M-102

J7

M-103

H1

C-501

A9

M-104

H1

C-501

F4

C-501

F1

C-201

A8

C-501

H15

462.0'

461.0'

460.0'

.0

.0

.0

.0

.0

.0

10" 10"

MIN 2'-0"

V A

R

IE

S

M

IN

10" 10"

2'-0"

MIN 2'-0"

V A

R

IE

S

M

IN

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

M

IC

H A

E L

F R

A N

S S

E N

P

T A

IL

S

T

R E

N C

H

IN

G A

N D

S U

R F

A C

IN

G

C-501

G F

R E

N C

H

J W

E

-1 -1

-1

O

'N E

P

D

:3

:5

P

M

/2 /2

H L

C

-5 X

X X

.d g n

6" 1' 0" 2' 0"0

EXISTING SEWER LINE

4" PVC SCH 40

8" X 4" X 8" 45° WYE PVC SCH 40

8" PVC ELBOW SCH 40

8" PVC CLEANOUT SCH 40

TREATMENT TANKS

FROM MICROFAST UNIT

4'-10"

2 1/2" THICK CONCRETE

2" THICK CONCRETE

3'-6"

EXISTING SEWER LINE

CLEANOUT

NEW SEWER LINE

TANKS

TO MICROFAST

FINISHED GRADE

2" PVC

10" 10"

1' 2'0

1' 2'0

2" PVC

2" PVC

THRUST BLOCK

THRUST BLOCK

FROM SEPTIC TANKS

L

IF

T S

T A T

IO

N

T O D

R A

IN

F

IE

COMPACTED BACKFILL

AGGREGATE BASE

TOPSOIL

SEEDING

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

FINISH GRADE

EXISTING GROUND

COMMON FILL

COMPACTED BACKFILL

MARKING TAPE

TRACER WIRE

PIPE BEDDING MATERIAL

SUBGRADE

PVC SEWER PIPE

BACKFILL

PIPE BEDDING

IRRIGATION LINE

SUBGRADE

EXISTING GROUND

FINISHED GRADE

FINISH GRADE

EXISTING GROUND

COMMON FILL

COMPACTED BACKFILL

MARKING TAPE

TRACER WIRE

PIPE BEDDING MATERIAL

SUBGRADE

PVC SEWER PIPE

ELECTRICAL CONDUIT

H15

SECTION: FINISHED GRADE OVER TANKS

SCALE: NOT TO SCALE

SEE M-105 AND M-106 FOR PIPING THROUGH BLOWER PADS.3.

MAY DIFFER.

ALL ELEVATIONS ARE ASSUMED FROM AS BUILTS, ACTUAL SITE CONDITIONS 2.

ACCORDING TO SPEC.

MATCH EXISTING SURFACING AFTER BACKFILLING TRENCHES. SEED 1.

GENERAL SHEET NOTES

H8

DETAIL: TYPICAL SEWER TRENCH

SCALE: NOT TO SCALE

A1

DETAIL: SEWER TRENCH WITH UTILITY CROSSING

SCALE: NOT TO SCALE

SHEET KEYNOTES

ENCASE SEWER WITH CAST IRON PIPE AND GROUT BOTH ENDS.1.

A9

DETAIL: DOWNSTREAM SEWER CONNECTION

1"=1'-0"SCALE: C-401

A1

A15

DETAIL: DOUBLE BLOWER PAD

3/4"=1'-0"SCALE: 2'0 1' 4'C-401

H1

E17

DETAIL: SINGLE BLOWER PAD

3/4"=1'-0"SCALE: C-401

A1

2'0 1' 4'

NOTE: STUBS NOT SHOWN

NOTE: STUBS NOT SHOWN

E10

DETAIL: UPSTREAM SEWER CONNECTION

1"=1'-0"SCALE: 0 1' 2'6"C-401

A1

F1

THRUST BLOCK

DETAIL: END

1"=1'-0"SCALE:

M4

DETAIL: CONDUIT CROSSING

1"=1'-0"SCALE:

C-401

A1

C-401

A1

F4

DETAIL: THRUST BLOCK

1"=1'-0"SCALE:

C-401

2'-0" 2'-0"

4'-0"

6" 6"

6 3/4"

6"

7/8 " (TYP)

WELDED WIRE FABRIC 6X6 - W4.0 X W4.0

SEE NOTE 3

GALVANIZED THREADED RODS

ASTM F1554 GRADE 36

(4) 5/8" DIA. X 4" EMBEDMENT

6'-0" ELECTRICAL STRUT

BACK TO BACK 1 5/8"

LOCATION PER PLAN

SEE NOTE 1

BASE PL

STANDARD HOLE SIZE

ANCHOR BOLT WITH A

N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

JU

L

IO

M

O R

E L

O S

P

D S

T R

U T

C O

N N

E C

T

IO

N

E L

E C

T R

IC

A

L C

O N

C R

E T

E S

L A

B

S-101

N B

A K

K E

E W

A L

T

-1 -5

-1

B

R O

P

D

:3

:3

P

M

/2 /2

H L

S

-1 X

X X

.d g n

6" 1' 0" 2' 0"0

6" 1' 0" 2' 0"0

3" 6" 1' 0"0

3" 6" 1' 0"0

C O

V E

R

/2

M

IN

C

L E

A R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

CONCRETE SLAB ON GRADE

ELECTRICAL STRUTS

CONDUIT STUB-UP LOCATIONS

ELECTRICAL STRUTS

BACK TO BACK

ELECTRICAL STRUT

SEE NOTE 2

A13

SECTION: ELECTRICAL CONCRETE SLAB

1 1/2"=1'-0"SCALE:

E13

PLAN: ELECTRICAL EQUIPMENT PAD

1 1/2"=1'-0"SCALE:

E8

DETAIL: ELECTRICAL STRUT CONNECTION

3"=1'-0"SCALE:

A8

SECTION: ELECTRICAL STRUT CONNECTION

3"=1'-0"SCALE:

G-101

A1

PRINTED INSTRUCTIONS.

INSTALL POST-INSTALLED ADHESIVE ANCHORS PER MANUFACTURERS 3.

WELD TO BE SIZED PER MANUFACTURER.2.

ORIENTATION AND COMPATIBLE WITH BACK TO BACK DOUBLE STRUT.

BASE PLATE TO BE 1 5/8" SERIES GRADE 45 GALVANIZED SQUARE 1.

GENERAL SHEET NOTES

E8

A8

A13

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

K E

V

IN

R E

N S

H A

W P

E D

T A

N K

A N

D P

U M

P S

P L

A N

A N

D S

E C

T

IO

N

M-102

N B

A K

K E

M M

C L

E

-1 -3

-1

H

A Y

P

D

:3

:4

P

M

/2 /2

H L

M

-1 X

X X

.d g n

2" PVC PIPE SCH 40

6" 1' 0" 2' 0"0

86"

/1

CV-2

BV-2

AS-1

VALVE BOX

8 INCHES ABOVE TANK

BE APPROXIMATELY

FINISHED GRADE TO

AGGREGATE BASE

NOTE 1

OPENING PORT. SEE

AFFIX TO CONCRETE

EL. 455.15 - FFS1

EL. 455.36 - FFS2

EL. 458.65 - FFS3

EL. 459.07 - FFS4

SCH 40

SWITCH STAND

2" PVC FLOAT

SEE NOTE 2

BASE PLATE

POWER AND CONTROL BOX

FEED TANK PUMP

AND CONTROL BOX

FEED TANK PUMP POWER

1" ELECTRICAL CONDUIT

EL. 454.15

1" ELECTRICAL CONDUIT

2" PVC UNION SCH 40

FTP-1

FTP-2

1' 0" 2' 0" 4' 0"0

NORTH

FTP-2

SEE NOTE 3

INSPECTION/PUMPOUT PORT

Ø 24" MINIMUM

INSPECTION/PUMPOUT PORT

Ø 24" MINIMUM

SURGE TANK 2

INLET FROM

FEED TANK

THROUGH 5

TREATMENT TANKS 2

TO MICROFAST UNIT

TREATMENT TANK 1

TO MICROFAST

BV-4

TREATMENT TANK 1

TO MICROFAST UNIT

FEED TANK

SCH 40 PIPE

1 1/4" PVC

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A7

SECTION: FEED TANK AND PUMPS

1"=1'-0"SCALE:

J7

PLAN: FEED TANK AND PUMPS

3/4"=1'-0"SCALE:

FLOW TO MICROFAST TANKS

C-401

A1

EL. 461.40

EL. 462.06

PIPING DETAILS.

SEE SHEET M-901 FOR FEED TANK TO MICROFAST UNIT TREATMENT TANKS 5.

PUMP INSTALLATION PER MANUFACTURER'S REQUIREMENTS.4.

RISER.

FLOAT OPERATION AND ADEQUATE CLEARANCE FROM THE TANK LID OR

AND PREVENT MOVEMENT. INSTALL AT A HEIGHT THAT ENSURES PROPER

BRACKET TO MAINTAIN VERTICAL ALIGNMENT OF THE FLOAT SWITCH TREE

AS STAINLESS STEEL BOLTS OR CONCRETE ANCHORS. POSITION THE

USING CORROSION-RESISTANT FASTENERS SUITABLE FOR CONCRETE, SUCH

TO SECURE THE TOP OF THE FLOAT SWITCH TREE. ATTACH THE BRACKET

PROVIDE AND INSTALL A SUPPORT BRACKET AT THE CONCRETE TANK PORT 3.

ANCHOR TO TANK FLOOR UNLESS OTHERWISE DIRECTED.

MOUNTING BRACKET. BASE PLATE IS FOR STABILIZATION ONLY, DO NOT

FLANGE IS PLUMB AND CENTERED RELATIVE TO FLOAT TREE AND UPPER

FASTENERS. APPLY ADHESIVE PER MANUFACTURER INSTRUCTIONS. ENSURE

FOR SUBMERGED AND CORROSIVE ENVIRONMENTS, AND STAINLESS STEEL

IRON BASE PLATE USING MARINE-GRADE, WATERPROOF ADHESIVE SUITABLE

VERTICAL FLOAT SWITCH TREE IN FEED TANK. SECURE FLANGE TO CAST

PROVIDE AND INSTALL 2 INCH PVC SQUARE FLANGE SOCKET AT BASE OF 2.

THE TANK LID, PUMP, OR MAINTENANCE ACCESS.

CORROSION-RESISTANT AND POSITIONED TO AVOID INTERFERENCE WITH

A STAINLESS STEEL CARABINER OR QUICK LINK. ENSURE ALL HARDWARE IS

EDGE OF THE CONCRETE TANK. SECURE THE CHAIN TO THE EYE HOOK WITH

ANCHOR. INSTALL THE EYE HOOK APPROXIMATELY 2 INCHES BELOW THE TOP

CONCRETE WITH A CORROSION-RESISTANT EXPANSION OR DROP-IN

ACCESS PORT USING A STAINLESS STEEL EYE HOOK, ANCHORED INTO THE

AFFIX PUMP SUPPORT CHAINS TO THE INTERIOR WALL OF THE CONCRETE 1.

GENERAL SHEET NOTES

INVERT EL. 460.695

INVERT EL 460.309

M-102

J7

A7

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

K E

V

IN

R E

N S

H A

W P

M

R O

F A

S T

A S

S E

M B

L Y

S

IN

G

L E

B L

O W

E R

P L

A N

A N

D S

E C

T

IO

N

M-103

N B

A K

K E

M M

C L

E

-1 -3

-1

H

A Y

P

D

:3

:3

P

M

/2 /2

H L

M

-1 X

X X

.d g n

1' 0" 2' 0" 4' 0"0

DRAINFIELD LIFT STATION.

AND GRAVITY FEEDS TO

EXISTING SEWERLINE,

Ø 4" OUTLET PIPE TO

PIPING

GALVANIZED STEEL

Ø 2" MIN BLOWER

Ø 24" MIN INSPECTION/PUMP OUT PORT

Ø 6" MIN VENT PIPE

Ø 24" MIN INSPECTION PORT

OUT PORT

Ø 24" MIN INSPECTION/PUMP

MANIFOLD

DISTRIBUTION

INLET FROM

SINGLE BLOWER HOUSING

1' 0" 2' 0" 4' 0"0

FINISHED GRADE

FINISHED GRADE

CONCRETE BLOWER PAD

MICROFAST 3.0 UNIT

LEG EXTENSION SEE NOTE 2

FOOT TOP

PIPE LEGS

4" SCH 40 PVC

FOOT BOTTOM

12'-7"

6'-6"

2'-2 1/2 "

2" GALVANIZED STEEL PIPE

SCH 40

2" CPVC

SINGLE BLOWER HOUSING

11'-9"

SCREEN OR SMALLER.

NOTE: TO BE #4 MESH

SCREEN VENT COVER.

TERMINATION CAP MESH

TREATMENT TANK 3

MICROFAST UNIT

INSPECTION/PUMP OUT PORT

4" PVC

M

IN

TREATMENT TANK 3

MICROFAST UNIT

2" GALVANIZED STEEL ELBOW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A14

ISOMETRIC: MICROFAST ASSEMBLY - SINGLE BLOWER

SCALE: NTS

WEDGES ARE NOT PROVIDED BY BIOMICROBICS.

PROVIDE THREE (3) ANCHOR WEDGES FOR EACH LEG EXTENSION. ANCHOR 4.

REQUIREMENTS.

INSTALL TANKS AND EQUIPMENT ACCORDING TO THE MANUFACTURER'S 3.

MANUFACTURER'S INSTALLATION INSTRUCTIONS.

ASSEMBLIES. CUT EACH 4" PVC PIPE TO THE LENGTH SPECIFIED IN THE

EACH MICROFAST 3.0 UNIT REQUIRES SEVEN (7) LEG EXTENSION 2.

INCLUDED.

ALL OTHER ITEMS REQUIRED FOR INSTALLATION AND OPERATION ARE NOT

(D) BLOWER CONTROLS AND ALARMS.

(C) BLOWER ASSEMBLY (DOES NOT INCLUDE AIR LINE OR VENT PIPING)

4" SCHEDULE 40 PVC PIPE LEGS)

(B) FOOT TOP AND FOOT BOTTOM FEET ASSEMBLY (DOES NOT INCLUDE THE

(A) THE MICROFAST SYSTEM SUB-ASSEMBLY

PURCHASE OF THE MICROFAST 3.0 SYSTEM:

THE FOLLOWING EQUIPMENT IS PROVIDED BY BIOMICROBICS, INC. WITH THE 1.

GENERAL SHEET NOTES

C-401

A1

H1

PLAN: MICROFAST ASSEMBLY - SINGLE BLOWER

3/4"=1'-0"SCALE:

A1

SECTION: MICROFAST ASSEMBLY - SINGLE BLOWER

3/4"=1'-0"SCALE: M-103

H1

SHEET KEYNOTES

INSPECTION/PUMP OUT PORT RISER.

TRANSITION TO CPVC PIPING DOWN INTO MICROFAST UNIT THROUGH THE

BLOWER TOWARD THE RISER, TO AVOID HEAT DEGRADATION, THEN

CONTRACTOR TO FIT AND INSTALL 2" GALVANIZED STEEL PIPING FROM THE 1.

M-105

E9

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

K E

V

IN

R E

N S

H A

W P

R O

F A

S T

D U

A L

B L

O W

E R

P L

A N

A N

D S

E C

T

IO

N

M-104

N B

A K

K E

M M

C L

E

-1 -3

-1

H

A Y

P

D

:3

:5

P

M

/2 /2

H L

M

-1 X

X X

.d g n

1' 0" 2' 0" 4' 0"0

MANIFOLD

DISTRIBUTION

INLET FROM

FINISHED GRADEOUT PORT

Ø 24" MIN INSPECTION/PUMP

Ø 6" MIN VENT PIPE

Ø 24" MIN INSPECTION PORT

Ø 24" MIN INSPECTION/PUMP OUT PORT

PIPING

GALVANIZED STEEL

Ø 2" MIN BLOWER

DUAL BLOWER HOUSING

CONCRETE BLOWER PAD

DRAINFIELD LIFT STATION.

AND GRAVITY FEEDS TO

EXISTING SEWERLINE,

Ø 4" OUTLET PIPE TO

INSPECTION/PUMP OUT PORT

STEEL PIPE

2" GALVANIZED

SCH 40

2" CPVC

SCH 40

2" CPVC

TREATMENT TANK 5

MICROFAST UNIT

TREATMENT TANK 4

MICROFAST UNIT

DUAL BLOWER HOUSING

5'- 1/2 "

10'-3 1/2 "

4" PVC SCH 40

/1

/1

SCREEN OR SMALLER.

NOTE: TO BE #4 MESH

SCREEN VENT COVER.

TERMINATION CAP MESH

MICROFAST 3.0 UNIT

MICROFAST UNIT TREATMENT TANK 5

1' 0" 2' 0" 4' 0"0

2" GALVANIZED STEEL TEE

M

IN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A14

ISOMETRIC: MICROFAST ASSEMBLY - DUAL BLOWER

SCALE: NTS

H1

PLAN: MICROFAST ASSEMBLY - DUAL BLOWER

1/2"=1'-0"SCALE:

A1

SECTION: MICROFAST ASSEMBLY - DUAL BLOWER

3/4"=1'-0"SCALE:

C-401

A1

SHEET KEYNOTES

TANK INSPECTION/PUMP OUT PORT RISER.

TRANSITION TO CPVC PIPING DOWN INTO MICROFAST UNIT THROUGH THE

BLOWER TOWARD THE RISER, TO AVOID HEAT DEGRADATION, THEN

CONTRACTOR TO FIT AND INSTALL 2" GALVANIZED STEEL PIPING FROM THE 1.

AND 5 (SERVED BY BLOWER 3) RESPECTIVELY.

UNIT TREATMENT TANKS 1 AND 2 (SERVED BY BLOWER UNIT 1) AND TANKS 4

THE AIR BLOWER PIPING CONFIGURATION SHOWN APPLIES TO MICROFAST 1.

GENERAL SHEET NOTES

M-104

H1

M-104

A1

M-106

G9

24"

37"

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

K E

V

IN

R E

N S

H A

W P

R O

F A

S T

S

IN

G L

E B

L O

W E

R

P L

A N

M-105

N B

A K

K E

M M

C L

E

-1 -3

-1

H

A Y

P

D

:3

:1

P

M

/2 /2

H L

M

-1 X

X X

.d g n

6" 1' 0" 2' 0"0 6" 1' 0" 2' 0"0

6" 1' 0" 2' 0"0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

REFER TO SHEET C-501 FOR BLOWER PAD DETAILS.6.

FOR REFERENCE ONLY.

SIZE AND STYLE MAY VARY FROM THOSE ILLUSTRATED. DIMENSIONS ARE

BLOWER HOUSING TO BE PROVIDED BY BIOMICROBICS WITH THE BLOWERS. 5.

THREAD BLOWER OUTLET TO THE 2" AIR LINE PIPING.

USE AN ENLARGER (ADAPTER) TO CONNECT THE 1-1/2" NATIONAL PIPE TAPER 4.

FOLLOW THE MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION.3.

X 1-1/2" SELF-TAPPING SCREWS.

SECURE THE LOWER BLOWER HOUSING TO THE PAD USING (4) SUPPLIED #13 2.

CONDITIONS BEFORE FABRICATION OR INSTALLATION.

AND SIZE ALL PENETRATIONS TO MATCH FINAL EQUIPMENT LAYOUT AND SITE

PIPING AND ELECTRICAL CONDUIT THROUGH THE BOTTOM. FIELD-LOCATE

COORDINATE AND PROVIDE OPENINGS IN THE BLOWER PAD TO ROUTE AIR 1.

GENERAL SHEET NOTES

E9

PLAN: SINGLE BLOWER HOUSING

1 1/2"=1'-0"SCALE:

E15

FRONT: SINGLE BLOWER HOUSING

1 1/2"=1'-0"SCALE:

A9

SIDE: SINGLE BLOWER HOUSING

1 1/2"=1'-0"SCALE:

M-103

H1

36"

57"

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

K E

V

IN

R E

N S

H A

W P

R O

F A

S T

D U

A L

B L

O W

E R

P L

A N

M-106

N B

A K

K E

M M

C L

E

-1 -3

-1

H

A Y

P

D

:3

:3

P

M

/2 /2

H L

M

-1 X

X X

.d g n

6" 1' 0" 2' 0"0 6" 1' 0" 2' 0"0

6" 1' 0" 2' 0"0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

REFER TO SHEET C-501 FOR BLOWER PAD DETAILS.6.

FOR REFERENCE ONLY.

SIZE AND STYLE MAY VARY FROM THOSE ILLUSTRATED. DIMENSIONS ARE

BLOWER HOUSING TO BE PROVIDED BY MICROBICS WITH THE BLOWERS. 5

THE 2" AIR LINE PIPING.

CONNECT THE DUAL BLOWER OUTLET (2" NATIONAL PIPE TAPER THREAD) TO 4.

FOLLOW THE MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION.3.

X 1-1/2" SELF-TAPPING SCREWS.

SECURE THE LOWER BLOWER HOUSING TO THE PAD USING (4) SUPPLIED #13 2.

CONDITIONS BEFORE FABRICATION OR INSTALLATION.

AND SIZE ALL PENETRATIONS TO MATCH FINAL EQUIPMENT LAYOUT AND SITE

PIPING AND ELECTRICAL CONDUIT THROUGH THE BOTTOM. FIELD-LOCATE

COORDINATE AND PROVIDE OPENINGS IN THE BLOWER PAD TO ROUTE AIR 1.

GENERAL SHEET NOTES

G9

PLAN: DUAL BLOWER HOUSING

1 1/2"=1'-0"SCALE:

G15

FRONT: DUAL BLOWER HOUSING

1 1/2"=1'-0"SCALE:

A9

SIDE: DUAL BLOWER HOUSING

1 1/2"=1'-0"SCALE:

M-104

H1

SERVICES MICROFAST TANKS 4 & 5

SERVICES MICROFAST TANKS 1 & 2

SERVICES MICROFAST TANK 3

SCH 40

8" PVC

X5 1 1/4" PVC SCH 40

PRESSUREGRAVITYPRESSUREGRAVITYGRAVITY / PRESSURE

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

K E

V

IN

R E

N S

H A

W P

IP

IN

G

A N

D I

N S

T R

U M

E N

T A

T

IO

N D

IA

G

R A

M

P R

O C

E S

S F

L O

W D

IA

G

R A

M

M-601

N B

A K

K E

M M

C L

E

-1 -3

-1

H

A Y

P

D

:3

:4

P

M

/2 /2

H L

M

-6 X

X X

.d g n

NOTE 2

SEE

NOTE 2

SEE

NOTE 3

SEE

LIFT STATION

DRAINFIELD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

VALVE VAULT

DOSING TANK

DRAINFIELD

(1000 GAL TANK)

DOSING TANK

DRAINFIELD

MARINA DUMP

INFLUENT FROM

H7

PROCESS FLOW DIAGRAM

SCALE: NTS

A1

PIPING AND INSTRUMENTATION DIAGRAM

SCALE: NTS

LEGEND

SHEET KEYNOTES

DRAINFIELD PUMPS OPERATE ON A LEAD LAG CONFIGURATION.3.

FEED PUMPS OPERATE ALTERNATELY2.

SEPTIC SYSTEM STRAINER PRESENT IN EXISTING 3000 GALLON SEPTIC TANK.1.

SEE M-104 FOR AIR PIPING REQUIREMENTS.3.

SEE M-103 FOR AIR PIPING REQUIREMENTS.2.

PFTE THREAD SEALANT.

THREAD INTO THE FEMALE THREADED BRASS VALVE USING PFTE TAPE OR

SOLVENT-WELDED TO THE PVC PIPE. THE PVC MALE ADAPTER SHALL

BRASS VALVES SHALL BE MADE USING PVC MALE THREADED ADAPTERS

PVC TO BRASS CONNECTIONS (TYP): ALL TRANSITIONS FROM PVC PIPING TO 1.

GENERAL SHEET NOTES

CV-1

BV-1

MSP-1

FTP-2 FTP-1

FFS1

FFS2

FFS3

FFS4

CV-3 BV-3

BV-2CV-2

AS-1

BV-4

BV-5

BV-6

BV-7

BV-8

B-3

B-2

B-1

DFP-2 DFP-1

DFS-3

XX

QUANTITYQTYROTATIONS PER MINUTERPM

HORSEPOWERHPSTANDARD CUBIC FEET PER MINUTESCFM

VOLTAGEVGALLONS PER MINUTEGPM

HERTZHZFEETFT

ABBREVIATIONS

(270 GAL TANK)

MARINA SEWAGE LIFT STATION

AND CAMP SITES

COMFORT STATION

(3000 GAL TANK)

EXISTING SEPTIC TANK DRAINFIELD

(3000 GAL TANK EACH)

TREATMENT TANKS 1 THRU 5

MICOFAST UNIT

(3000 GAL EACH, 9000 GAL TOTAL)

2 SURGE TANKS AND 1 FEED TANK IN SERIES

MANIFOLDS

VALVE

(3000 GAL TANK)

SURGE TANK 1

(3000 GAL TANK)

SURGE TANK 2

(3000 GAL TANK)

FEED TANK

(6000 GAL TANK)

EXISTING SEPTIC TANK

LIFT STATION

MARINA SEWAGE

AND CAMP SITES

COMFORT STATION

DRAINFIELD

TREATMENT TANKS

MICROFAST UNIT

5 X 3000 GAL

(3000 GAL TANK)

EXISTING SEPTIC TANK

(3000 GAL TANK)

SURGE TANK 1

(3000 GAL TANK)

SURGE TANK 2

(3000 GAL TANK)

FEED TANK

SCH 40

2" PVC

MANIFOLDS

VALVE

SCH 40

4" PVC

SCH 40

8" PVC

SCH 40

8" PVC

2" PVC CLASS 160

SCH 40

4" PVC

6" CAST IRON

6" CAST IRON

SCH 40

8" PVC

SCH 40

4" PVC

SCH 40

4" PVC

SCH 40

8" PVC

(6000 GAL TANK)

EXISTING SEPTIC TANK

INVERT EL. 444.4'

PRESSURE

GRAVITY

SCH 40

2" PVC

ANTI-SYPHON

P

V C

S C

H

TANK 1

MICROFAST

TANK 2

MICROFAST

TANK 4

MICROFAST

TANK 5

MICROFAST

TANK 3

MICROFAST

CHECK VALVE

BALL VALVE

PUMP

EXISTING

NEW

AIR RELIEF VALVE

PLUG VALVE

BALL CHECK VALVE

EQUIPMENT TAG

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

K E

V

IN

R E

N S

H A

W

P

E A

T M

E N

T T

A N

K S

P

IP

IN

G

IS

O

M E

T R

IC

F E

E D

T A

N K

T O

M

IC

R O

F A

S T

U N

IT

M-901

A

R

IC

H A

R D

S O

N

M M

C L

E

-1 -3

-1

H

A Y

P

D

:3

:5

P

M

/2 /2

H L

M

-9 X

X X

.d g n

BV-2

BV-3

CV-2

CV-3

TREATM

ENT TANKS

TO M

ICROFAST UNIT

AS-1

FTP-2

FTP-1

BV-4

2" SCHEDULE 40 PVC PIPE

BV-5

BV-6

BV-7

BV-8

2" PVC UNION

2" PVC UNION

2" PVC 45° ELBOW

2" PVC TEE

1 1/4" X 2" PVC COUPLER

1 1/4" SCHEDULE 40 PVC

1 1/4" X 2" PVC COUPLER

4" PVC

2" X 4" PVC COUPLER

2" X 4" PVC COUPLER

1 1/4" X 2" PVC COUPLER

1 1/4" PVC TEE

SEE A1

LIFTING CHAIN

LIFTING CHAIN

FLOAT SWITCH STAND

2" PVC END CAP

1 1/4" PVC CAP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

ISOMETRIC: FEED TANK TO MICROFAST UNIT TREATMENT TANKS PIPING

3/4"=1'-0"SCALE:

TREATMENT TANK 1

MICROFAST UNIT

INFLOW TO

L1

ISOMETRIC: LATERAL TYP

1 1/2"=1'-0"SCALE:

TREATMENT TANK 2

MICROFAST UNIT

INFLOW TO

TREATMENT TANK 3

MICROFAST UNIT

INFLOW TO

TREATMENT TANK 4

MICROFAST UNIT

INFLOW TO

TREATMENT TANK 5

MICROFAST UNIT

INFLOW TO

NTS

NTS

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

E C

T R

IC

A

L L

E G

E N

D S

A N

D S

Y M

B O

L S

E-001

E S

T A

D N

IK

S

S C

H E

IF

-1 -6

-1 /9

S

T A

D

IK

P

D

:3

:1

P

M

/2 /2

H L

E

-0 X

X X

.d g n

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

CONDUIT DOWN

CONDUIT UP

HOME RUN - DESTINATION SHOWN

CONDUIT HASH MARKS DESIGNATION

PHASE CONDUCTOR(S)

GROUND CONDUCTOR

AND/OR NEUTRAL CONDUCTOR

CONDUIT ONLY

CONDUIT AND CONDUCTORS

JUNCTION BOX

CONDUIT, STUBBED WITH END BUSHING

(SPECIAL PURPOSE, AMPERAGE AS INDICATED)

SINGLE RECEPTACLE, SPECIAL PURPOSE - WALL MOUNT

RACEWAY, CONDUCTOR AND CONNECTION IN THIS SECTION.

FURNISHED AND INSTALLED UNDER OTHER SECTIONS.

CONNECTION POINT TO EQUIPMENT SPECIFIED.

480/277V PANELBOARD (PLAN VIEW)

OR EXPOSED ON WALL (RGS IF BELOW 4' AFF).

CONDUIT CONCEALED IN WALL OR ABOVE CEILING (EMT),

(RGS ONLY), OR BURIED BELOW GRADE (SCH 40 PVC)

CONDUIT BURIED OR CONCEALED BELOW SLAB OR ROADWAY

125V, 20A DUPLEX RECEPTACLE

or

J

JR1-r2

SSP1

C.O.

n1

12 INDIVIDUAL #16 AWG CONDUCTORS

LEGEND PLATE

12#16

12C #16

3 sh. tw. pr. #22

A

SHIELDED AND TWISTED)

MULTIPAIR CABLE, 3 PAIRS OF #22 AWG (EACH PAIR

SHEET REFERENCED

LETTER INDICATES DETAIL, NUMBER INDICATES

SHEET REFERENCED

LETTER INDICATES SECTION, NUMBER INDICATES

SHEET REFERENCED

LETTER INDICATES ELEVATION, NUMBER INDICATES

12 CONDUCTORS OF #16 AWG

MULTICONDUCTOR CABLE,

TRANSFORMERXFMR

VOLTAGEV

TERMINAL BLOCKTB

RIGID METAL CONDUITRMC

NORMALLY OPENNO

NORMALLY CLOSEDNC

NORTHN

KILOWATTKW

KILO VOLT AMPSKVA

JUNCTION BOXJB

HORSEPOWERHP

GROUNDGND

GREENGRN

FLOAT SWITCHFS

ELEVATIONEL

DIRECT CURRENTDC

COPPERCU

COMMONCOM

AMERICAN WIRE GAUGEAWG

AUXILARYAUX

ALTERNATING CURRENTAC

AMPEREA, AMP

MAY APPEAR ON THIS SHEET THAT ARE NOT ON THE PLANS.

THIS IS A STANDARD LEGEND SHEET. SOME SYMBOLS OR ABBREVIATIONS 1.

GENERAL NOTES

LEGEND

DRAFTING STANDARDS LEGEND

POWER LEGEND

POWER AND CONTROL

EXISTING DRAINFIELD

LIFT PUMPS

DRAINFIELD

LIFT PUMP

MARINA

REMOVE

REMOVE

JUNCTION BOX

EXISTING

MARINA PUMP

CABLE WHIP TO

REMOVE

NOTE 1

NOTE 2

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

A

IN

F

IE

L D

S U

M P

S

D E

M O

L

IT

IO

N

M A

R

IN

A A

N D

ED201

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:3

:2

P

M

/2 /2

H L

E D

X

X X

.d g n

A1

SCALE: NTS

SECTION: DRAIN FIELD PUMPS

A13

SCALE: NTS

SECTION: MARINA LIFT PUMP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SEE SHEET E-605 FOR DEMOLITION CABLE DETAILS.3.

FROM JUNCTION BOX TO EXISTING MOTOR.

EXISTING JUNCTION BOX TO REMAIN AND BE REUSED. REMOVE CABLE WHIP 2.

CONDUITS TO REMAIN AND BE REUSED.

REMOVE EXISTING DRAINFIELD PUMPS AND POWER WIRES. EXISTING 1.

NO.1 NO.2

CP

P 10

PANELBOARD RO UNIT BOOSTER PUMP STATION

PROVIDED WITH VFD

CONTROLS

PACKAGED UNIT,

PANELBOARD PP

200A

3P

C

,3

G

C

,3

G

C

,3

G

.5

C

,4 G

CLASS JON

ON

OFF

CLASS J

GROUND RODS

C

,3

G

2"C,4#3/0,#4G

2"C,4#3/0

2"C,4#3/0,#4G

200A/3P, SE RATED

MANUAL TRANSFER SWITCH

PANELBOARD

HOUSE NO. 2

WELL PUMP

3P

30A

3P

30A

3P

50A

3P

100A

3P

15A

SPARE

3P

15A

3P

100A

2P

30A

3P

30A

3P

100A

H E

A T

E R

P U

M P

W E

L L

P A

N E

L

3P

20A

3P

15A

3P

15A

LIFT STATION

DRAINFIELD

MB

RUSSELSTOLL MAX GUARD

CONNECTION TO GENERATOR

RECEPTACLE FOR PLUG

200A, 480Y/277V,4P,5W

FOUNDATION

PIPE AND BUILDING

TO UNDERGROUND

MOUNT TRANSFORMER

ELECTRIC COMPANY PAD

480-208Y/120V,3PH,4W

30KVA TRANSFORMER

NOTE 1

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

Y

S T

E M

O N

E L

IN

E

D E

M O

L

IT

IO

N

S E

P T

IC

ED601

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:3

:3

P

M

/2 /2

H L

E D

X

X X

.d g n

A9

SCALE: NTS

DIAGRAM: DEMOLITION ONELINE DIAGRAM

PUMP #1 PUMP #2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DRAWINGS.

REMOVE EXISTING LIFT STATION PUMPS AND MOTORS AS PER MECHANICAL 1.

SSS

SS

S

J

J

J

S

CO

CO

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

V

E R

V

IE

W P

L A

N

S E

P T

IC

S

Y S

T E

M E

L E

C T

R

IC

A L

E-101

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:3

:4

P

M

/2 /2

H L

E

-1 X

X X

.d g n

40' 80'0

NORTH

40' 80'0

LEVEL. CONTRACTOR TO VERIFY LEVEL.

AT EXISTING HIGH WATER ALARM

NEW FLOAT DFS1 TO BE INSTALLED

EXISTING DRAINFIELD LIFT STATION

FOR C008.

TRENCHING LOCATION

SHEET E-201.

STUBBED UP AS SHOWN ON

BE TRENCHED UNDER PAD AND

EQUIPMENT. ALL CONDUITS TO

SYSTEM POWER AND CONTROL

NEW CONCRETE SLAB FOR SEPTIC

FOR COO1 & C014.

TRENCHING LOCATION

PANELBOARD PP

POWER FEED LOCATION

BOX LOCATED WITHIN MARINA SUMP.

NEAREST JUNCTION BOX. JUNCTION

REPLACE PUMP MOTOR WIRING TO

LOCATION OF MARINA PUMP WORK.

NEW SEPTIC SYSTEM TANKS

NORTH

UNDERGROUND POWER LINE

SEWAGE LINE

UNDERGROUND POWER LINE

FEED POWER TO RO BUILDING

REA HIGH VOLTAGE UNDERGROUND

LIFT STATION PUMPS

FEED TO EXISTING DRAINFIELD

UNDERGROUND 480V POWER

FEED POWER TO MAIN COMFORT STATION

REA HIGH VOLTAGE UNDERGROUND

FACILITY FENCE LINE

REVERSE OSMOSIS

LOCATION

MARINA BOAT PUMP

FEED SEWAGE LINE

MARINA LIFT STATION

SEPTIC SYSTEM

MARINA SEWAGE LINE TO

STATION SUMP

MARINA LIFT

SEPTIC SYSTEM

MARINA SEWAGE LINE TO

BOLLARDS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

U

A1

PLAN: ELECTRICAL SITE PLAN

1"=40'SCALE: G-101

A1

A13

PLAN: ELECTRICAL SITE PLAN MARINA

1"=40'SCALE:

PERMITTED. SEE E-201 FOR PULL BOX DETAILS.

INSTALLED AS REQUIRED TO PULL WIRES. WIRE SPLICES ARE NOT

ALL UNDERGROUND CONDUITS SHALL HAVE ACCESSABLE PULLBOXES 1.

GENERAL NOTES

G-101

A1

E-102

A7

E-103

A4

E-203

A1

E-203

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

.E

R O

B U

IL

D

IN

G

P O

W E

R P

L A

N

S E

P T

IC

S

Y S

T E

M E

L E

C T

R

IC

A L

E-102

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:4

:5

P

M

/2 /2

H L

E

-1 X

X X

.d g n

A7

SCALE: NTS

PLAN: RO TREATMENT FACILITY PLAN VIEW

2' 6" 5' 0" 10' 0"0

NORTH

LIFT STATION PUMPS

FEED TO EXISTING DRAINFIELD

UNDERGROUND 480V POWER

C001

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

TRANSFORMER

ELECTRIC COMPANY PAD MOUNT

PANEL PP

TREATMENT BUILDING

EXISTING WELL NO.2

SEPTIC SYSTEM POWER FEED

NEW WALL PENETRATION FOR

AFTER EXITING RO BUILDING

CONDUITS TO BE TRENCHED UNDERGROUND

COMPLETE.

AND REPLACED AFTER TRENCHING IS

FENCE TO BE TEMPORARILY REMOVED

UNDER EXISTING FENCING.

CONDUITS TO BE TRENCHED

ENCLOSURE

NEW ALARM SYSTEM

PANEL P

C001 & C014

RADIO ANTENNA

COAXIAL ANTENNA CABLE C013

NEW WALL PENETRATION FOR

C009

TO EXTERIOR WALL

CONDUITS TO BE ATTACHED

EXISTING FENCING

E-101

A1

CONTRACTOR AND THE GOVERNMENT.

POSITION AND ORIENTATION TO BE COORDINATED BETWEEN THE

MANUFACTURER RECOMENDED FASTENERS FOR CONCRETE. FINAL

NEW RADIO ANTENNA TO BE MOUNTED TO EXTERIOR OF BUILDING WITH 1.

GENERAL NOTES

E-202

A3

EL 460.8879

E 2059311.9242

N 342053.2627

EL 460.8879

E 2059311.9242

N 342053.2627

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

S S

S Y

S T

E M

P L

A N

S E

P T

IC

S

Y S

T E

M E

L E

C T

R

IC

A L

E-103

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:4

:1

P

M

/2 /2

H L

E

-1 X

X X

.d g n

40' 80'0

NORTH

ELECTRICAL CONCRETE SLAB

SURGE TANK

PANEL SSP1

10KVA XFMR

PANEL SSP2

PANELS

BLOWER CONTROL

CONTROL PANELS

FEED TANK PUMP

CONTROL WIRES

FEED PUMP INTERLOCK

C008

POWER

BLOWER MOTOR

C006

POWER AND CONTROL

FEED TANK PUMP

C007

SURGE TANK

FEED TANK

C001 & C014

HOUSING

BLOWER

LARGE

HOUSING

BLOWER

STANDARD

HOUSING

BLOWER

LARGE

TANK

TREATMENT

TANK

TREATMENT

TANK

TREATMENT

TANK

TREATMENT

TANK

TREATMENT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A4

PLAN: SEPTIC SYSTEM POWER AND CONTROLS

1"=5'SCALE: E-101

A1

SEE SHEETS M-105 AND M-106 FOR BLOWER HOUSING PAD DETAILS.1.

M

IN

IM

U M

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

.E

L A

Y O

U T

P O

W E

R A

N D

C O

N T

R O

L S

S E

P T

IC

S

Y S

T E

M

E-201

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:4

:4

P

M

/2 /2

H L

E

-2 X

X X

.d g n

A1

SCALE: NTS

SECTION: ELECTRICAL POWER AND CONTROLS NORTH

A9

SCALE: NTS

SECTION: ELECTRICAL POWER AND CONTROLS SOUTH

J1

SCALE: NTS

DETAIL PLAN: ELECTRICAL POWER AND CONTROLS

A17

SCALE: NTS

DETAIL: U/G PULL BOX TYPICAL

XFMR

SSP1 SSP2

BLOWER

PANEL

BLOWER

PANEL

BLOWER

PANEL

FEED PUMP

CONTROLS

NOTE 1

PAD

EQUIPMENT

ELECTRICAL

PAD

EQUIPMENT

ELECTRICAL

EQUIPMENT PAD

ELECTRICAL

C001

C002

C006

TURNS AWAY

CONDUIT

C002

C002

AWAY

TURNS

CONDUIT

AWAY

TURNS

CONDUIT

C005 C010

C014

C007 C008

C006

C001

C007C008

SSP1 BLOWER

PANEL

BLOWER

PANEL

PANEL

BLOWER

XFMR

10KVA

SSP2

FEED PUMP

CONTROLS

MARKING TAPE

EXISTING GROUND

FINISH GRADE

TRENCH CENTERLINE

COMPACTED SUBGRADE

BACKFILL

COMPACTED

C014

NOTE 7, TYPICAL

NOTE 8

HEAVY DUTY LOCKING STEEL COVER

NOMINAL DIMENSIONS

36" LONG

24" WIDE

30" DEEP8AWG

GROUND WIRE

BARE COPPER

FOR DETAILS

SPECIFICATIONS

ROD, SEE

GROUNDING

FOR DETAILS

SPECIFICATIONS

ROD, SEE

GROUNDING

C004

C014

AWAY

TURNS

CONDUIT

C014

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E-605.

STANDARD DETAIL SHOWN. CONDUIT SIZE AND COUNT TO BE AS SHOWN ON 8.

CONDUIT BODY FITTING. ALL FITTINGS TO BE OUTDOOR RATED WITH SEALS.7.

CAST IN PLACE AS STUBS.

UNDERGROUND CONDUITS TO BE TRENCHED UNDER CONCRETE PAD AND 6.

HORIZONTAL STRUTS TO BE SINGLE 1 5/8" X 1 5/8" STRUT.

INSTRUCTIONS. VERTICAL STRUTS TO BE BACK-TO-BACK DOUBLE STRUT.

APPLICABLE STANDARDS AND MANUFACTURERS RECOMMENDED

AS NEEDED TO SECURE ALL EQUIPMENT AND CONDUIT AS REQUIRED BY

ELECTRICAL STRUT FRAMEWORK LAYOUT TO BE CONFIRMED AND INSTALLED 5.

FOR FEED PUMP CONTROL PANEL DETAILS SEE SHEET E-603.4.

SHEET E-103.

FOR SEPTIC SYSTEM POWER PANELS SSP1 AND SSP2 LOCATIONS, SEE 3.

SUPPLIED WITH THE MICROFAST SYSTEM.

BLOWER CONTROL PANELS ARE MANUFACTURED BY BIOMICROBICS AND 2.

METAL ENCLOSURE. RECEPTACLE TO BE WEATHERPROOF WHILE-IN-USE.

DUPLEX GFCI RECEPTACLE TO BE INSTALLED IN OUTDOOR RATED LOCKABLE 1.

GENERAL NOTES

J11

DETAIL: ELECTRICAL TRENCH, TYP

SCALE: NTS

A1

A9

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

E A

T M

E N

T B

U

IL

D

IN

G

E L

E V

A T

IO

N

E-202

N B

A K

K E

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:4

:5

P

M

/2 /2

H L

E

-2 X

X X

.d g n

FOR C001 & C014

PROPOSED CONDUIT PATH

6" 1' 0" 2' 0"0

EXISTING ELECTRICAL CONDUIT

CONDUIT TO HEATER

EXISTING ELECTRICAL

NOTE 1

NOTE 2

BACK OF ALARM SYSTEM ENCLOSURE

C013 TO EXIT BUILDING THROUGH

PANEL P

CONDUIT PATH TO

PROPOSED C009

NOTE 4

NOTE 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DOOR

PANEL PP

ELECTRICAL

A3

ELEVATION: SEPTIC SYSTEM POWER CONDUIT ROUTING

1"=1'-0"SCALE:

J9

PHOTOGRAPH: INTERIOR VIEW LOOKING WEST

SCALE: NTS

E-102

A7

CONTRACTOR TO VERIFY SAFE CLEARANCES.

FINAL SIZE AND LOCATION TO BE DETERMINED BY THE CONTRACTOR. 4.

CONDUIT SIZE AND COUNT TO BE AS SHOWN ON E-605.3.

CONDUIT BODY FITTING. ALL FITTINGS TO BE OUTDOOR RATED WITH SEALS.2.

CONDUIT TO COVER SEALANT.

PENETRATION. STAINLESS STEEL ESCUTCHEONS TO BE INSTALLED AROUND

AND EXTERIOR ENDS OF THE PENETRATION. CONDUIT TO BE CENTERED IN

OUTDOOR RATED SILICONE CAULKING. SEALANT TO BE APPLIED AT INTERIOR

OVERSIZED 1/4 INCH IN DIAMETER TO ALLOW SEALANT. SEALANT TO BE

NEW CORE DRILLED PENETRATION FOR CONDUIT. PENETRATION TO BE 1.

GENERAL NOTES

PANEL

SYSTEM

ALARM

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

U

M P

L A

Y O

U T

M A

R

IN

A A

N D

D R

A

IN

F

IE

L D

E-203

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:4

:0

P

M

/2 /2

H L

E

-2 X

X X

.d g n

A1

SCALE: NTS

SECTION: DRAIN FIELD PUMPS

A13

SCALE: NTS

SECTION: MARINA LIFT PUMP

LIFT PUMPS

DRAINFIELD

LIFT PUMP

MARINA

EXISTING DRAINFIELD

POWER AND CONTROL

C012

C011

JUNCTION BOX

EXISTING

MARINA PUMP

CABLE WHIP TO

NOTE 1

NOTE 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

TERMINAL BLOCK INSTALLED IN EXISTING JUNCTION BOX.

WIRING TO NEW MOTOR CABLE WHIP. SPLICE TO BE MADE WITH NEW

USE EXISTING JUNCTION BOX TO MAKE SPLICE CONNECTION FROM EXISTING 2.

RESEAL EXISTING CONDUIT PENETRATIONS AS NEEDED.

INSTALL NEW DRAINFIELD PUMP POWER WIRES IN EXISTING CONDUITS. 1.

GENERAL NOTES

E-101

A1

E-101

NO.1 NO.2

CP

RO UNIT BOOSTER PUMP STATION

PROVIDED WITH VFD

CONTROLS

PACKAGED UNIT,

PANELBOARD PP

200A

3P

C

,3

G

C

,3

G

C

,3

G

.5

C

,4 G

CLASS JON

ON

OFF

CLASS J

GROUND RODS

C

,3

G

2"C,4#3/0,#4G

2"C,4#3/0

2"C,4#3/0,#4G

200A/3P, SE RATED

MANUAL TRANSFER SWITCH

PANELBOARD

HOUSE NO. 2

WELL PUMP

3P

30A

3P

30A

3P

50A

3P

100A

3P

15A

SPARE

3P

15A

3P

100A

2P

30A

3P

30A

3P

100A

H E

A T

E R

P U

M P

W E

L L

P A

N E

L

3P

20A

3P

15A

3P

15A

LIFT STATION

DRAINFIELD

1 (20A)

8, 10, 12 (20A)

(100A) MAIN PANELBOARD P

2, 4, 6 (15A)

HEATER (3KW)

CHEMICAL ROOM

3 (20A)

5 (20A)

7 (20A)

9 (20A)

11 (15A)

13 (15A)

15 (15A)

HEATER (5KW)

TREATMENT ROOM

14, 16, 18 (20A)

HEATER (5KW)

TREATMENT ROOM

RECORDER

PANEL

ALARM

17 (15A)

19 (20A)

21 (20A)

23 (20A)

SPARE

SPARE

SPARE

20, 22 (20A)

A/C UNIT

24 (20A)

EXHAUST FAN

26, 28 (20A)

CHLORINATOR

CHEMICAL ROOMS

LIGHTS - TREATMENT AND

LIGHTS - EXTERIOR

AND CHEMICAL ROOMS

RECEPTACLES - TREATMENT

RO CONTROL PANEL

RESERVOIR LEVEL

CONTROLLER

PH AND NITRATE

MB

RUSSELSTOLL MAX GUARD

CONNECTION TO GENERATOR

RECEPTACLE FOR PLUG

200A, 480Y/277V,4P,5W

FOUNDATION

PIPE AND BUILDING

TO UNDERGROUND

MOUNT TRANSFORMER

ELECTRIC COMPANY PAD

480-208Y/120V,3PH,4W

30KVA TRANSFORMER

NOTE 1

NOTE 2NOTE 2NOTE 2

NOTE 3

NOTE 3

NOTE 1

NOTE 5

NOTE 6

NOTE 7

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

E L

IN

E

S E

P T

IC

S

Y S

T E

M

E-601

E S

T A

D N

IK

S

S C

H E

-1 -6

-1

S

T A

D

P

D

:4

:5

P

M

/2 /2

H L

E

-6 X

X X

.d g n

A1

SCALE: NTS

DIAGRAM: ONELINE DIAGRAM

" C, 3#4AWG, #8G4

3P

60A

3P

20A

W /G

STARTER

PANEL/

CONTROL

BLOWER

5.5

BLOWER 1

W /G

3P

20A

W /G

STARTER

PANEL/

CONTROL

BLOWER

5.5

BLOWER 2

W /G

3P

15A

W /G

STARTER

PANEL/

CONTROL

BLOWER

1.5

BLOWER 3

W /G

2P

30A

W /G

1P, 10kVA XFMR

480V-240/120V

2P

60A

2P

15A

2P

15A

2P

15A

2P

20A

18 CIRCUIT

480V 3ɸ3W 100A PANEL

18 CIRCUIT

240V 1ɸ3W 100A PANEL

1P 20A

1P 15A

1P 15A

0.5

P1A

FEED PUMP

W /G

0.5

P1B

FEED PUMP

W /G

NOTE 4

SJE RHOMBUS - IFN41W104H6A8AC10E

CONTROL PANEL

FEED PUMP

W /G

W /G

W /G

W

/G

RECEPTACLE

DUPLEX

SEPTIC SYSTEM POWER PANEL 1 (SSP1)

SEPTIC SYSTEM POWER PANEL 2 (SSP2)

FFS4 (TIMER OVERRIDE)

FFS3 (ALARM)

FFS2 (TIMER ENABLE)

FLOAT SWITCHES

FEED TANK

S P

A R

E

S P

A R

E

2P 30A

3P 20A

S P

A R

E

S P

A R

E

3P 60A

PUMP #1 PUMP #2

W /G

W /G

2P 30A

S P

A R

E

W

/G

2P 15A

S P

A R

E

2P 20A

S P

A R

E

2P 20A

S P

A R

E

1P 15A

S P

A R

E

S P

A R

E

ALARM PANEL POWER

2 #12 W/G

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

NUMBER 9.

USE EXISTING 20A SPARE BREAKER LOCATED IN PANELBOARD P CIRCUIT 7.

ENCLOSURE.

MOUNT DUPLEX RECEPTACLE INSIDE LOCKABLE OUTDOOR RATED 6.

INSTALL NEW WIRE BETWEEN MOTOR DISCONNECT AND NEW PUMP MOTORS.5.

FOR FEED PUMP CONTROL PANEL DETAILS SEE SHEET E-603.4.

SHEET E-101 AND E-103.

FOR SEPTIC SYSTEM POWER PANELS SSP1 AND SSP2 LOCATIONS, SEE 3.

SUPPLIED WITH THE MICROFAST SYSTEM.

BLOWER CONTROL PANELS ARE MANUFACTURED BY BIOMACROBICS AND 2.

(LIFT STATION).

AT HIGH WATER ALARM LEVEL IN THE EXISTING DRAINFIELD DOSING TANK

BE NORMALLY CLOSED AND OPEN ON RISING LEVEL. DFS1 TO BE INSTALLED

TO BE INSTALLED AT "OFF" LEVEL IN THE NEW DOSING FEED TANK. DFS1 TO

PUMPS. FFS1 TO BE NORMALLY OPEN AND CLOSED ON RISING LEVEL. FFS1

INTERLOCK FLOAT SWITCHES FFS1 AND DFS1 TO DISABLE FEED TANK 1.

NEAR PARK ENTRANCE

COLUMBIA REA POLE KA29-R1

UTILITY FEED FROM

METER #18643900

#6396 - 45 KVA

TRANSFORMER

UTILITY

(LOWER)

WELL HOUSE #1

(225A)

2, 4, 6

(100A)

8, 10, 12

WELL PUMP

PANEL ___

SANITATION STATION

WATERCRAFT

COMFORT STATION

DAY USE

(50A)

MAIN

25, 27 (30A)

SHED

MAINTENANCE

1, 3, 5

(70A)

14, 16, 18

DUMP STATION

RV SEWAGE

(40A)

(50A)

PANEL

7, 9, 11

(15A)

HEATER

13, 15, 17

(15A)BAD TERMINAL 19

SPARE WITH

19, 21, 23 22, 24, 26

SPARE

(15A)

1 (20A)

3 (15A)

RECEPTACLE

EXTERIOR

RECEPTACLE

2 (20A)

AIR COMPRESSOR

4 (15A)

LIGHTS

SINGLE PHASE

480: 120/240V

25 KVA

1 (20A)

(100A) MAIN

7 (20A)

AND FLAGPOLE

LIGHTS PUMP HOUSE

GROUP SHELTER

LIGHTS

2 (20A)

RECEPTACLE

4 (20A)

AIR CONDITIONER

PUMP CONTROL AND

6 (20A)

SPRINKLER

8 (20A)

LIGHTS

9 (20A)

3, 5 (10A)

UNIT HEATER

GROUP SHELTER

REEPTACLE

AIR COMPRESSOR

RECEPTACLE

10 (20A)

GROUP SHELTER

RECEPTACLE

PANEL ___

30A FUSES

MAINTENANCE SHED

SINGLE PHASE

480: 120/240V

10 KVA

SINGLE PHASE

480: 120/240V

10 KVA

(50A) MAIN

6 (15A)

CONTROL

SPRINKLER

1, 3 (20A)

PANEL ___

(40A)

MINI LOAD CENTER

RV DUMP STATION

2, 4 (30A)

GRINDER

2, 4 (40A)

(60A)

PANEL CR3

MAIN

1, 3, 5

(20A)

7, 9, 11

ELECTRICAL ENCLOSURE

SANITATION STATION

WATERCRAFT

6 (20A) SYSTEM

WATERCRAFT PUMP-OUT

PUMP-A-HEAD

1, 3 (30A)

PANEL CR3

2, 4 (80A)

MAIN

PANEL CQ3

SINGLE PHASE

480: 120/240V

10 KVA

5, 7 (30A)

(CAMPSITE 1)

ATTENDANT

CAMPGROUND

8, 10 (80A)

BUILDING

RESERVATION

SPARE

12 (20A)

1 (20A)

3 (15A)

SPARE

RECEPTACLES

BUILDING

RESERVATION

PANEL ___

2, 4 (30A) A/C

5 (15A)

SOUTHWEST

RECEPTACLES

7 (15A)

NORTHWEST

RECEPTACLES

6 (15A)

RECEPTACLES EAST

LIGHTS AND

8 (15A)

RECEPTACLES NORTH

(100A)

2, 4, 6

(20A)

8, 10, 12

SPARE

PANEL CQ4

WATER HEATERHEATER

(20A)

MAIN

1, 3, 5

(20A)

14, 16 (40A)

SPARE

PANEL

7, 9 (40A)

(20A)

SPARE

11, 13, 15

COMFORT STATION

DAY USE

(PAVILLION)

GROUP SHELTER

WEST END

17, 19 (40A)

(400A) MAIN

1 (20A)

5 (20A)

4, 6 (30A)

MARINA LIGHTS

7, 9 (20A) 8, 10 (20A)

SEWAGE PUMP 2

13, 15 (20A)

19 (20A)

PANEL PR4

LIGHTS - MENS

HAND DRYER - WOMENS

HAND DRYER - MENS

SEWAGE CONTROL

SINGLE PHASE

480: 120/240V

10 KVA

2 (20A)

LIGHTS - WOMENS

3 (20A)

LIGHTS - PIPE CHASE

RECEPTACLES

12, 14 (20A)

SEWAGE PUMP 1

16, 18 (20A)

SPRINKLER

11 (20A)

RECEPTACLES

GRINDER

5HP SEWAGE

NOTE 1

NOTE 2

NOTE 3

A N

S I

D

F

IN

A L

S E

P T

IC

S

Y S

T E

M U

P G

R A

D E

C H

A R

B O

N N

E A

U P

A R

K

S N

A K

E R

IV

E

R O

R E

G O

N W

A S

H

IN

G T

O N

A N

D I

D A

H O

IC

E

H A

R B

O R

L O

C K

A N

D D

A M

W E

F B

A

A U

G U

S T

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

E N

O

L E

V I

V A

N S

T E

D U

M P

E L

IN

E

M A

R

I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .