25388-CBI 100% CD w Add1.pdf
PDF 18 MB Posted
- Attached to
- CBI GJ HVAC/Lighting Upgrade Project
- Solicitation number
- IFB1 REAA 2027000005 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This file contains 100% Construction Document Drawings and Specifications for a mechanical, electrical, and controls renovation project at the Colorado Bureau of Investigation located at 2797 Justice Drive in Grand Junction, Colorado (Project No. 25-388). The scope of work involves the replacement of three Trane Intellipak rooftop VAV units with three AAON gas-fired VAV packaged rooftop units, three P-K Thermific boilers with three Lochinvar Crest Hellcat boilers and new circulation pumps, two shooting range roof-mounted exhaust fans and two gas-fired makeup air units with new units including replacement of exhaust filtration systems, the existing Trane Tracer SC+ Building Automation System (BAS) with a new Alerton Compass 2 BAS including distributed controllers and unitary controls on VAV boxes, and complete replacement of all interior and exterior lighting fixtures and controls. The project includes routing of medium pressure gas piping from the existing gas meter location to new equipment, replacement of all existing sensors and controlled devices, BACnet communication connections for the new RTUs, and EPA and OSHA recertification of the shooting range by an industrial hygienist. The building comprises 38,794 square feet, is classified as Type II-B construction with "B" occupancy, is fully sprinkled with fire alarm systems, and maintains 24/7 secure access. The project documents indicate a Schematic Design dated December 5, 2025, Design Development phase on December 29, 2025 (90% CDS), and 100% Construction Documents dated March 6, 2026.
The project applies 2024 versions of the IBC, IMC, IECC, IPC, IFGC, and the 2023 NEC. All HVAC, electrical, controls, and mechanical equipment must be furnished, set in place, and wired with responsibilities divided between divisions 23 (mechanical contractor) and 26 (electrical contractor). The contractor is responsible for all waste disposal, coordination of staging areas with the owner, verification of equipment dimensions and access requirements prior to ordering, and all demolition including selective cutting and patching. Substitutions of specified equipment are permitted through prior approval with submissions required at least five days before bid, submitted at no cost to the owner, with the contractor responsible for all coordination and associated costs. The contractor must examine the site and drawings carefully and report any errors, omissions, or inconsistencies to the engineer at least five days prior to bidding. A commissioning effort is specified in the construction specifications. The facility requires controlled access coordination with the owner for all personnel during the project, and the contractor must coordinate all building access, including work scheduling and personnel clearances, given the secure nature of the facility.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T1-1
M
EC
H
AN
IC
AL
TI
TL
E
SH
EE
T
DATE: ISSUED FOR:
SHEET NUMBER:
March 06, 2026 - 4:11:54pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E
GW
SB
12/29/2025
25-388
G R
AN
D
J U
N C
TI
O
N , C
O
LO
R
AD
O
11/14/2025 SCHEMATIC DESIGN
SHEET LEGEND
T1-1 TITLE SHEET
M0-1 COVER SHEET
ME1-1 MECHANICAL - EXISTING - FLOOR PLAN
ME1-2 MECHANICAL - EXISTING - VAV PLAN
ME1-3 MECHANICAL - EXISTING - ROOF PLAN
ME2-1 MECHANICAL - EXISTING - VAV SCHEDULES
ME2-2 MECHANICAL - EXISTING - VAV SCHEDULES
M1-2 MECHANICAL - NEW ROOF PLAN
M3-1 MECHANICAL - SCHEDULES AND DETAILS
M3-2 MECHANICAL - BOILER SCHEMATIC
M4-1 MECHANICAL - CONTROLS DIAGRAMS
M4-2 MECHANICAL - CONTROLS DIAGRAMS
E0-1 ELECTRICAL COVER SHEET
EE1-1 LIGHTING - EXISTING - AREA 1 FLOOR PLAN
EE1-2 LIGHTING - EXISTING - AREA 2 FLOOR PLAN
EE1-3 LIGHTING - EXISTING - AREA 3 FLOOR PLAN
E1-1 LIGHTING - AREA 1 FLOOR PLAN
E1-2 LIGHTING - AREA 2 FLOOR PLAN
E1-3 LIGHTING - AREA 3 FLOOR PLAN
E3-1 LIGHTING - FIXTURE SCHEDULES AND DETAILS
ES1-1 LIGHTING - SITE PLAN
ES1-2 LIGHTING - IES PLANS
ES2-1 LIGHTING - SITE DETAILS AND SCHEDULES
ES2-2 LIGHTING - SITE DETAILS AND SCHEDULES
CODE NOTES:
1. APPLICABLE CODES INCLUDE THE 2024 VERSIONS OF THE IBC, IMC, IECC, IPC, IFGC AND THE 2023 VERSION OF THE NEC.
2. THE BUILDING IS CLASSIFIED AS A "B" OCCUPANCY.
3. TOTAL BUILDING AREA IS 38,794 FT2 (FROM THE ORIGINAL CONSTRUCTION DRAWINGS).
4. THE BUILDING IS ASSUMED TO BE CONSTRUCTION TYPE II-B (FROM THE ORIGINAL CONSTRUCTION DOCUMENTS).
5. THE BUILDING IS FULLY SPRINKLED THROUGHOUT AND HAS A FIRE ALARM SYSTEM.
6. THE BUILDING HAS SECURE ACCESS AND IS MANNED 24/7 BY OPERATING PERSONNEL.
7. THIS PROJECT MAY AFFECT THE EXISTING ACCESS/EGRESS FOR THE BUILDING.
GENERAL CONSTRUCTION NOTES:
1. THE SCOPE OF WORK FOR THIS PROJECT WILL INVOLVE THE REPLACEMENT OF ROOFTOP VAV AIR HANDLING UNITS, HVAC CONTROLS, LIGHTING, BOILERS, AND SHOOTING RANGE VENTILATION EQUIPMENT.
2. DEMOLITION INCLUDES THE REMOVAL OF THE EXISTING ROOFTOP UNITS, CONTROLS, AND LIGHTING. THERE WILL BE SELECTIVE CUTTING AND PATCHING REQUIRED AS PART OF THIS PROJECT. REMOVE ALL OLD / ABANDONED EQUIPMENT AND CONTROLS AS NOTED. PATCH TO MATCH
EXISTING.
3. COORDINATE STAGING AREA FOR CONSTRUCTION WITH THE OWNER.
4. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL WASTE DISPOSAL FOR THIS PROJECT. COORDINATE THE LOCATION OF WASTE DUMPSTERS
WITH THE OWNER.
5. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND ACCESS REQUIREMENTS FOR ALL NEW EQUIPMENT PRIOR TO ORDERING MATERIAL.
SCOPE OF NEW WORK:
1. THE WORK WILL INVOLVE THE FOLLOWING:
1.1. REMOVAL OF THREE TRANE INTELLIPAK ROOFTOP UNITS AND REPLACEMENT WITH THREE AAON GAS FIRED VAV PACKAGED ROOFTOP UNITS.
1.2. ROUTING OF MEDIUM PRESSURE (2PSI) GAS PIPING FROM THE EXISTING GAS METER LOCATION TO THE NEW GAS FIRED PACKAGED RTUS.
1.3. REMOVAL OF THREE P-K THERMIFIC BOILERS AND REPLACEMENT WITH THREE LOCHINVAR CREST HELLCAT BOILERS ALONG WITH NEW BOILER
CIRCULATION PUMPS.
1.4. REMOVAL OF TWO SHOOTING RANGE ROOF-MOUNTED EXHAUST FANS AND TWO GAS-FIRED MAKEUP AIR UNITS AND REPLACEMENT WITH NEW
UNITS. REPLACEMENT OF FANS WILL INCLUDE REPLACEMENT OF EXHAUST FILTRATION SYSTEM
1.5. REMOVAL OF THE EXISTING TRANE TRACER SC+ BUILDING AUTOMATION SYSTEM (BAS) AND REPLACEMENT WITH A NEW ALERTON COMPASS 2
BAS INCLUDING NEW DISTRIBUTED CONTROLLERS. THIS WILL INCLUDE REMOVAL OF ALL UNITARY CONTROLS ON THE EXISTING PHOENIX AND TRANE VAV BOXES AND REPLACEMENT WITH ALERTON UNITARY CONTROLS, REMOVAL OF ALL EXISTING SENSORS AND CONTROLLED DEVICES (e.g. VAV DAMPER) AND REPLACEMENT WITH NEW. THE NEW SYSTEM WILL PROVIDE CONTROL LOOPS, SEQUENCES, AND POINTS LIST DATA AS
LISTED IN THE CONSTRUCTION DOCUMENTS.
1.6. CONNECTION OF THE THREE NEW AAON RTU'S VIA BACNET COMMUNICATION WITH THE NEW ALERTON COMPASS 2 BAS.
1.7. REMOVAL OF ALL EXISTING INTERIOR AND EXTERIOR LIGHTING FIXTURES AND CONTROLS AND REPLACEMENT WITH NEW FIXTURES AND
CONTROLS.
2. THE PROJECT WILL ALSO RECEIVE A COMMISSIONING EFFORT AS SPECIFIED IN THE CONSTRUCTION SPECIFICATIONS .
3. THE SHOOTING RANGE IS TO BE RECERTIFIED TO EPA AND OSHA STANDARDS BY AN INDUSTRIAL HYGIENIST.
PROJECT ACCESS:
1. THE CONTRACTOR IS TO COORDINATE ALL BUILDING ACCESS WITH THE OWNER.
2. THIS IS A SECURE FACILITY WITH CONTROLLED ACCESS THAT WILL REQUIRE SCHEDULING AND COORDINATING WORK ACCESS WITH THE OWNER
FOR ALL PERSONNEL ACCESS DURING THE PROJECT.
PROJECT BUILDING
12/05/2025 DESIGN DEVELOPMENT
12/29/2025 90% CDS
03/06/2026 100% CDS
M0-1
A. SUBSTITUTIONS: SUBSTITUTION OF SPECIFIED EQUIPMENT WILL BE ALLOWED
THROUGH A PRIOR APPROVAL PROCESS INITIATED BY THE CONTRACTOR.
CONTRACTOR SHALL SUBMIT INTENDED SUBSTITUTION AT LEAST FIVE DAYS
PRIOR TO BID FOR APPROVAL FROM ENGINEER. SUBMITTAL SHALL INCLUDE
CAPACITIES, DIMENSIONS AND OPERATING INSTRUCTIONS FOR EACH PIECE OF
EQUIPMENT. SUBSTITUTION SHALL OCCUR AT NO COST TO THE OWNER.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF APPROVED SUBSTITUTION
AND SHALL INCUR ALL COSTS ASSOCIATED WITH THE SUBSTITUTION INCLUDING
STRUCTURAL MODIFICATIONS, SPACE LAYOUT AND REDESIGN COSTS. SEE ALSO
DIVISION I GENERAL REQUIREMENTS.
EXAMINATION OF SITE, DRAWINGS, SPECIFICATIONS:
A. EXAMINE CAREFULLY THE SITE AND CONDITIONS OF THE SITE. PROVIDE ALL
NECESSARY EQUIPMENT AND LABOR TO INSTALL A COMPLETE WORKING SYSTEM
WITHIN THE SITE CONDITIONS.
B. EXAMINE THE DRAWINGS AND SPECIFICATIONS AND 5 DAYS PRIOR TO
BIDDING REPORT ANY ERRORS, OMISSIONS, INCONSISTENCIES, AND CONFLICTS
TO THE ENGINEER TO BE REMEDIED IN AN ADDENDUM TO THE PROJECT PRIOR TO
BID TIME.
C. DRAWINGS ARE DIAGRAMMATIC AND CATALOG NUMBERS GIVEN ARE FOR
REFERENCE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
THE CAPACITY OF THE EQUIPMENT MEETS THE DRAWING REQUIREMENTS AND
SHALL NOT DIMENSION FROM THE MECHANICAL, PLUMBING, OR PIPING
DRAWINGS.
D. THE LATEST ADOPTED VERSIONS OF THE INTERNATIONAL BUILDING CODES
SHALL BE USED AS REQUIRED. THIS WILL ALSO INCLUDE THE LATEST ADOPTED
VERSIONS OF THE MECHANICAL, PLUMBING, AND ENERGY CONSERVATION
CODES. ALL METHODS AND MATERIALS REQUIRED BY THESE CODES SHALL BE
REQUIRED BY THESE SPECIFICATIONS UNLESS INDICATED OTHERWISE. OTHER
APPLICABLE LOCAL CODES AND ORDINANCES SHALL BE AS REQUIRED AND IT
SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO BE KNOWLEDGEABLE OF
THESE REQUIREMENTS.
E. WHERE INSTALLATION PROCEDURES OR ANY PART THEREOF ARE REQUIRED
TO BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE MANUFACTURER
OF THE MATERIAL BEING INSTALLED, PRINTED COPIES OF THESE
RECOMMENDATIONS SHALL BE FURNISHED TO THE ENGINEER PRIOR TO
INSTALLATION. INSTALLATION OF THE ITEM WILL NOT BE ALLOWED TO PROCEED
UNTIL THE RECOMMENDATIONS ARE RECEIVED. FAILURE TO FURNISH THESE
RECOMMENDATIONS CAN BE CAUSE FOR REJECTION OF THE MATERIAL.
44” MOUNTING HEIGHT ABOVE
FINISHED FLOOR TO CENTER OF DEVICE
A AMPS
A.D. ACCESS DOOR
AAV AIR ADMITTANCE VALVE
ABV ABOVE
AC AIR CONDITIONING UNIT
AC ABOVE COUNTER
AD AREA DRAIN (SEE SYMBOLS)
A.F.C. ABOVE FINISHED CEILING
A.F.G. ABOVE FINISHED GRADE
AIC AMPERE INTERRUPTING
CAPACITY
AFCI ARC FAULT CIRCUIT
INTERRUPTERS
A.F.F. ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AP ACCESS PANEL OR DOOR
ATS AUTOMATIC TRANSFER SWITCH
AV AUDIO / VIDEO
AVG AVERAGE
AWG AMERICAN WIRE GAGE
BAS BUILDING AUTOMATION SYSTEM
BB BASEBOARD
BD BACK DRAFT DAMPER
BFP BACK FLOW PREVENTOR
BL BOILER
BLDG BUILDING
BLW BELOW
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
C CHILLER
CAFCI COMBINATION ARC FAULT
CIRCUIT INTERRUPTERS
CAP CAPACITY
CB CIRCUIT BREAKER
CBV CIRCUIT BALANCING VALVE
CCT CORRELATED COLOR
TEMPERATURE
CKT CIRCUIT
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CL CENTER LINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMP COMPRESSOR
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION
CONTR CONTRACTOR
CRI COLOR RENDERING INDEX
CT COOLING TOWER
CT CURRENT TRANSFORMER
CU CONDENSING UNIT
CU COPPER
CUH CABINET UNIT HEATER
CVB CONSTANT VOLUME BOX
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DB DRY BULB
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGRAM
DIFF DIFFERENTIAL
DISCH DISCHARGE
DIV DIVISION
DN DOWN
DS DUCT SILENCER
DWG DRAWING
DX DIRECT EXPANSION
(E) EXISTING
EA EXHAUST AIR GRILLE/REGISTER
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
ECC ECCENTRIC
EF EXHAUST FAN
EFF EFFICIENCY
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EM EMERGENCY FUNCTION
ENT ENTERING
EMT ELECTRIC METALLIC TUBE
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES END SWITCH
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER
TEMPERATURE
EX EXHAUST
EXPAN EXPANSION
EXT EXTERNAL
F DEGREES FAHRENHEIT
FA FREE AREA
FC FAN COIL UNIT
FC FOOTCANDLE
FCV FLOW CONTROL VALVE
FD FIRE DAMPER
FD FLOOR DRAIN
FIN FINISHED
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLR FLOOR
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FP FIRE PROTECTION
FP FIRE PUMP
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FT FEET
FXC FLEXIBLE CONNECTION
GND GROUND
GA GAUGE
GAL GALLON
GALV GALVANIZED
GEC GROUND ELECTRODE
CONDUCTOR
GFCI / GFI GROUND FAULT CIRCUIT
INTERRUPTER
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRS/LB GRAINS PER POUND
H 2O WATER
HB HOSE BIBB
HD HEAD (SEE SCHEDULES)
HP HEAT PUMP
HP HORSEPOWER
HR HOUR
HT HEIGHT
HTR HEATER
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
ID INSIDE DIAMETER
IG ISOLATED GROUND
IN INCHES
INV INVERT
JBOX JUNCTION BOX
K KELVIN
KW KILOWATT
KVA KILO VOLT - AMPS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LV LAVATORY
LB POUND
LD LINEAR DIFFUSER
LF LINEAR FEET
LIN LINEAR
LIQ LIQUID
LM LUMEN
LRA LOCKED ROTOR AMPS
LV LOUVER
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MD MOTORIZED DAMPER
MDP MAIN DISTRIBUTION PANEL
MED MEDIUM
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUG ONLY
MOCP MAXIMUM OVERCURRENT
PROTECTION
MTD MOUNTED
MUA MAKE-UP AIR UNIT
N NEUTRAL
NC NORMALLY CLOSED
NEG NEGATIVE
NIC NOT IN CONTRACT
NL NIGHT / SECURITY LIGHT - DO
NOT SWITCH
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OCC OCCUPIED
OCP OVER CURRENT PROTECTION
OD OUTSIDE DIAMETER
OL OVERLOAD
ORD OVERFLOW ROOF DRAIN
OZ OUNCE
PBD PARALLEL BLADE DAMPER
PD PRESSURE DROP
PH PHASE
POS POSITIVE PRESSURE
POS POINT OF SALES
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSI POUNDS PER SQUARE INCH
PT PRESSURE TRANSMITTER
PTAC PACKAGED TERMINAL AIR
CONDITIONER
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RA RETURN AIR GRILLE / REGISTER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REL RELIEF
REQD REQUIRED
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RATED LOAD AMPS
RM ROOM
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR GRILLE / REGISTER
SC SHORT CIRCUIT
SCA SHORT CIRCUIT AVAILABLE
SCCR SHORT CIRCUIT CURRENT
RATING
SCH SCHEDULE
SD SMOKE DAMPER
SEF SMOKE EXHAUST FAN
SF SUPPLY FAN
SH SENSIBLE HEAT
SH SHOWER
SP STATIC PRESSURE
SPD SURGE PROTECTION DEVICE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SS SAFETY SHOWER
STD STANDARD
STL STEEL
SYS SYSTEM
TEMP TEMPERATURE
TR TRANSFER GRILLE / REGISTER
TR TAMPER RESISTANT
TT TEMPERATURE TRANSMITTER
TTB TELECOMMUNICATIONS
TERMINAL BACKBOARD
TYP TYPICAL
TX TRANSFORMER
UC UNDERCUT DOOR
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UNOCC UNOCCUPIED
UR URINAL
V VOLTS
VA VOLT AMPERE
VA VALVE
VAV VARIABLE AIR VOLUME UNIT
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VOLT VOLTAGE
VTR VENT THROUGH ROOF
W WIDTH
W WATTS
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WC WATER CLOSET
WG WATER GAUGE
WP WEATHERPROOF
WPIU WEATHERPROOF IN-USE
WSR WITHSTAND RATING
XFMR TRANSFORMER
SUBSTITUTIONS:RESPONSIBLE DIVISION:
UNLESS OTHERWISE INDICATED ALL HEATING, VENTILATING, AIR CONDITIONING, PLUMBING,
AND OTHER MECHANICAL EQUIPMENT, MOTORS, AND CONTROLS SHALL BE FURNISHED, SET
IN PLACE AND WIRED AS FOLLOWS:
ITEM FURNISHED SET POWER CONTROL
WIRED WIRED
EQUIPMENT 23 23 26 --
COMBINATION MAGNETIC
MOTOR STARTERS, MAGNETIC
MOTOR STARTERS, VFD'S AND
CONTACTORS 23(1) 26 26(2) 23
FUSED AND UNFUSED
DISCONNECT SWITCHES,
THERMAL OVERLOAD SWITCHES
AND HEATERS, MANUAL MOTOR
STARTERS 26 26 26 --
MANUAL-OPERATING AND
MULTI-SPEED SWITCHES 23 26 26 26
CONTROLS, RELAYS,
TRANSFORMERS 23 23 26 23
THERMOSTATS (LOW VOLTAGE)
AND TIME SWITCHES 23 23 26 23
THERMOSTATS (LINE VOLTAGE) 23 23 26 26
TEMPERATURE CONTROL PANELS 23 23 26 23
MOTOR AND SOLENOID VALVES,
DAMPER MOTORS, PE & EP
SWITCHES 23 23(2) -- 23(2)
PUSH-BUTTON STATIONS
AND PILOT LIGHTS 23 23(2) -- 23(2)
HEATING, COOLING,
VENTILATION AND AIR
CONDITIONING CONTROLS 23 23 26 23
EXHAUST FAN SWITCHES 23 26 26 23(2)
SUBSCRIPT FOOTNOTES:
1. MOTOR STARTER TO INCLUDE CONTROL TRANSFORMER, HOA SWITCH, (1) NO AND (1)NC
AUXILIARY CONTACT, AND “ON” AND “OFF” PILOT LIGHTS.
2. IF ITEM IS FOR LINE VOLTAGE, SET IN PLACE AND CONNECT UNDER DIVISION 26. WHERE
FACTORY MOUNTED ON EQUIPMENT OR ATTACHED TO PIPING OR DUCTS AND USING LINE
VOLTAGE FURNISH AND SET UNDER DIVISION 23, CONNECT UNDER DIVISION 26.
ABBREVIATIONS:
SECTION THROUGH RETURN DUCT
SECTION THROUGH SUPPLY OR OUTSIDE AIR DUCT
SUPPLY OR OUTSIDE AIR DUCT
ACCESS DOOR (BOTTOM OR SIDE)
ACOUSTICALLY LINED DUCT
FIRE DAMPER, SMOKE DAMPER, FIRE/SMOKE DAMPER
MANUAL VOLUME DAMPER
INCLINED DROP IN DIRECTION OF ARROW
INCLINED RISE IN DIRECTION OF ARROW
TRANSITION, RECTANGULAR TO ROUND
FLEXIBLE DUCT
IN-LINE FAN
TRANSITION, RECTANGULAR
SPIN-IN COLLAR INTO ADAPTER ON TOP OF DUCT
CEILING SUPPLY AIR REGISTER/GRILLE
SIDEWALL SUPPLY AIR REGISTER (SR)
ELBOW TURNED DOWN
ELBOW TURNED UP
ELBOW, RADIUS TYPE
ELBOW, SQUARE OR RECTANGULAR TYPE
WITH AIRFOIL TURNING VANES
CEILING RETURN AIR REGISTER (RR)
OPEN END DUCT
FLEXIBLE CONNECTION
SIDEWALL RETURN AIR REGISTER (RR)
VD
FXC
RR
DD
PIPE DROPPING DOWN
PIPE RISING UP
DIRECTION OF FLOW
RELIEF/SAFETY VALVE
FLOW METER-VENTURI
FLOW METER-ORIFICE
AUTOMATIC AIR VENT (EXTEND
AUTOMATIC FILL VALVE
DISCHARGE TO DRAIN)
MANUAL AIR VENT
CONCENTRIC REDUCER
ECCENTRIC REDUCER
STEAM LEAK DETECTOR
TPV
S
CBV
R D
STRAINER
MV
AV
GAS COCK
AQUASTAT
VB VACUUM BREAKER
EXPANSION LOOP
GAS PRESSURE
STEAM TRAP
ANCHOR
EJ
TT
FS
TH
PT/PS
G
PRESSURE SWITCH
& SYPHON (STEAM)
GAUGE COCK
TRANSMITTER OR
THERMOMETER
EXPANSION JOINT
TEMPERATURE
FLOW SWITCH
GUIDE
A
DIRECTION OF PITCH-RISE OR
DROP
STRAINER WITH BLOW
OFF VALVE
UNION - SCREWED OR FLANGED
FLOAT OPERATED
CO
CD
T
CARBON MONOXIDE
CARBON DIOXIDE
THERMOSTAT
CONTROL VALVE
REGULATOR
TRANSMITTER
PRESSURE
GAUGE WITH
FSD FIRE SMOKE DAMPER
RELIEF VALVE
SOLENOID VALVE
TEMPERATURE/PRESSURE
DIAPHRAGM VALVE
BALANCING VALVE
BALL VALVE
GLOBE VALVE, ANGLE
GATE VALVE, ANGLE
LIFT CHECK VALVE
SWING CHECK VALVE
GATE VALVE
BUTTERFLY VALVE
PLUG VALVE
GLOBE VALVE
CIRCUIT SETTING
BALANCING VALVE
THREE WAY CONTROL VALVE
TWO WAY CONTROL VALVE
PRESSURE REDUCING
VALVE (PRV)
EXISTING EQUIPMENT OR
PIPE TO BE REMOVED.
CS CONDENSER WATER SUPPLY
CR CONDENSER WATER RETURN
R REFRIGERANT LIQUID AND VAPOR LINE
RS REFRIGERANT SUCTION / VAPOR
HWS HOT WATER SUPPLY
HWR HOT WATER RETURN
HPS HEAT PUMP SUPPLY
HPR HEAT PUMP RETURN
V VENT PIPING
D DRAIN
G NATURAL GAS
SMS SNOWMELT SUPPLY
SMR SNOWMELT RETURN
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
LINE DESIGNATION SYMBOLS
MECHANICAL ELEMENTS / VALVING
SMOKE DAMPER
FIRE / SMOKE DAMPERFSD
SD
RH REFRIGERANT HIGH PRESSURE VAPOR
CA COMPRESSED AIR
FD - SD
- FSD
SECTION THROUGH EXHAUST AIR DUCT
HX
S
AIR VENT
HYDRAULIC SEPARATOR
AIR SEPARATOR
HEAT EXCHANGER
DIGITAL SENSOR
OR PUMP
HVAC & DUCTWORK SYMBOLS
POINT OF CONNECTION OF NEW TO EXISTING
M
EC
H
AN
IC
AL
C
O
VE
R S
H
EE
T
DATE: ISSUED FOR:
SHEET NUMBER:
March 06, 2026 - 4:11:56pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E
GW
SB
12/29/2025
25-388
G R
AN
D
J U
N C
TI
O
N , C
O
LO
R
AD
O
11/14/2025 SCHEMATIC DESIGN
12/05/2025 DESIGN DEVELOPMENT
WOMEN
MEN
INTERNET
CRIMES
TACTICAL
EXERCISE
AIC
CURRENT
FILES
LAB/FIELD
CORR
C107
VEST.
COPY
CORR
C113
CLERICAL
CORR
C108
CORR
C117
MEN
WOMEN
AIC
CONFERENCE
CORRIDOR
C116
OPEN OFFICE
STORAGE
SERVER
TRAINING
OPEN OFFICE
BIO VEST.
SEROLOGY
LAB
SHAKEDOWN
SHAKEDOWN
CODIS
SHAKEDOWN
SHAKEDOWN
BIO VEST.
DNA SAMPLE
DNA
EVIDENCE
JAN.
DNA AMP LAB
SEROLOGY
EVIDENCE
COMPUTER
LAB
MECHANICAL
GUN VAULT
LATENTS
EVALUATION
DUSTING
NIBIN
AFIS
FUMING
WORK
STATION
DIGITAL
PHOTO
PROCESSING
FIREARMS
LAB
AMMO
GSR
WORK
WORK
RANGE
CHEM.
INSTRUMENT
CHEM. LAB
CHEM.
EVIDENCE
STORAGE
GAS/LN
STORAGE
CHEM.
SOLVENT
STORAGE
TRACE
ANALYSIS
BIO
VESTIBULE
RANGE
MASTER
TOOL
RESTROOM
JAN.
BIO VEST.
GUN CLEAN
BIO ALCOVE
CORR
C101
CORR
C118
CORR
C104
CORR
C103
CORR
C120
CORR
C105
CORR
C109
LOBBY
CORR
C112
CORR
C111
CONFERENCE
STORAGE
PROCESSING
INTAKE
BLACK BOX
CRIME SCENE
VAN
VEHICLE
PROCESSING
ELECTRIC
INTER.
POLY.
INTER.
TOILET
MONITOR
WOMENS
LOCKERS
MENS
LOCKERS
CORR
C114
STORAGE
COOLER
FREEZER
LIBRARY
LOBBY
CORR
C110
CORR
C106
CORR
C100
ANALYSTS
EQUIP
KITCHEN
BREAK
STORAGE
6 7
FF
A
B
C
DD
B.9
EE
FEC
TRAVEL DISTANCE = 137 FT
REF.
11 12
14 16
AA
BB
CC
DD
FF
B
C
13.5
13.5 16.2
13.7
13.7
B.9
RAMP 1:12
SR
-3 22
SR
-3 22
CD-1
CD-1
CD-1
EG-2
EG-2
EG-2
10Ø10Ø 10 Ø
Ø 10
Ø
14x14
12Ø12Ø
12Ø
CD-1
Ø
EG-1
12Ø
10Ø
6Ø
Ø
6Ø
10Ø
10Ø
Ø
12Ø
Ø
C D
-4
TY
P
CD-4
CD-4
C D
-4
0C D
-4
CD-4
C D
-4
C D
-4
C D
-4
Ø
Ø
Ø
Ø
Ø
10Ø
Ø
Ø
24x12
EG
-3
6Ø
8Ø
EG-1
EG
-2
EG-1
EG-1
20X21
Ø
10Ø 10Ø
10Ø10Ø
Ø
10Ø
10Ø
Ø
20X16
10Ø
10Ø x1
24x12
6Ø
6Ø
6Ø
6Ø
16X16
Ø
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
SR-4
115 8Ø8Ø
EG-1
14X14
EG-3
EG-3
10Ø10Ø
12X12 ROOF OPENING
EG-2
EG-2
EG-1
12Ø
12Ø 12Ø
12Ø 12Ø
12Ø
8Ø 8Ø
8Ø8Ø
Ø
6Ø
6Ø
10X10 ROOF OPENING
EG-1
6Ø 6Ø
EG-1
(TYP 3)
EG-1
EXISTING DROP
FROM MAKEUP
AIR UNIT ON ROOF
UP TO EXISTING
EXHAUST FAN
ON ROOF.
EXISTING DROP
FROM MAKEUP
AIR UNIT ON ROOF
EXISTING DROP
FROM EXHAUST
FAN ON ROOF
EXISTING DROP
FROM EXHAUST
FAN ON ROOF
EXISTING
SUPPLY DROP
FROM AHU ON
ROOF
EX
IS
TI
N
G R
ET
U
R N
D R
O P
FR
O
M A
H U
O N
R O
O F
FILTER BOX TO BE
REPLACED WITH NEW
SIZED FOR NEW
AIRFLOW. TYP OF 4
MECHANICAL
12Ø
12Ø 12Ø
12Ø 12Ø
12Ø
CHEM.
SOLVENT
ANALYSIS
EXISTING DROP
FROM EXHAUST
FAN ON ROOF
EXISTING DROP
FROM EXHAUST
FAN ON ROOF
FILTER BOX TO BE
REPLACED WITH NEW
SIZED FOR NEW
AIRFLOW. TYP OF 4
DATE: ISSUED FOR:
SHEET NUMBER:
March 06, 2026 - 4:11:57pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
ME1-1
M
EC
H
AN
IC
AL
EX
IS
TI
N G
FL
O O
R P
LA
N
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E G
R
AN
D J
U N
C
TI
O N
, C O
LO
R
AD
O
MECHANICAL - EXISTING - FLOOR PLAN
SCALE:
NORTH
SCALE: 1/16" = 1'-0"
GW
SB
12/29/2025
25-388
AS SHOWN
11/14/2025 SCHEMATIC DESIGN
MECHANICAL EXISTING PLAN NOTES:
1. EXISTING INFORMATION SHOWN ON THIS PLAN IS DIAGRAMMATIC. CONTRACTOR SHALL FIELD VERIFY LOCATION OF
EQUIPMENT TO BE REPLACED.
2. REBALANCE AIR TERMINALS AND VAV BOXES TO AIRFLOWS SHOWN ON PLAN AFTER REPLACEMENT OF EXISTING ROOF
TOP EQUIPMENT.
3. ALL DUCTWORK, AIR TERMINALS, AND EQUIPMENT IS EXISTING-TO-REMAIN UNLESS OTHERWISE NOTED.
MECHANICAL - ENLARGED EXISTING MECHANICAL ROOM
SCALE:
NORTH
SCALE: 1/4" = 1'-0"
12/05/2025 DESIGN DEVELOPMENT
MECHANICAL - ENLARGED EXISTING RANGE EXHAUST
SCALE:
NORTH
SCALE: 1/4" = 1'-0"
MECHANICAL GENERAL NOTES:
1. DRAWING IS DIAGRAMMATIC IN NATURE. LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION & INSTALLATION OF MECHANICAL, PLUMBING, & ELECTRICAL. DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE
SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER.
2. COORDINATE FINAL LOCATION OF THERMOSTAT WITH OWNER PRIOR TO INSTALLATION. IF THERMOSTAT IS LOCATED
ON EXTERIOR WALL PROVIDE THERMOSTAT WITH INSULATED BACKING.
3. ROUTE CONDENSATE FROM CONDENSING MECHANICAL EQUIPMENT TO CONDENSATE NEUTRALIZATION KITS.
CONDENSATE FROM NEUTRALIZATION KITS SHALL BE DISCHARGED INDIRECTLY THROUGH AIR GAP TO NEAREST
FLOOR DRAIN.
4. ALL MOTORIZED DAMPERS ON OUTDOOR AIR INTAKES AND EXHAUST SHALL BE PROVIDED WITH CLASS IA MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE RATE OF 4 CFM/FT² AT 1.0 INCH WATER GAUGE WHEN TESTED IN ACCORDANCE
WITH AMCA 500D. (PER 2012 IECC)
5. MECHANICAL CONTRACTOR SHALL FIELD LOCATE EXISTING DUCTWORK PRIOR TO CONSTRUCTION. MECHANICAL CONTRACTOR SHALL COORDINATE TIE IN CONNECTION POINTS OF NEW SUPPLY DIFFUSERS WITH EXISTING
DUCTWORK AS NECESSARY.
6. CONTRACTOR SHALL CLEAN AND SERVICE ALL EXISTING EQUIPMENT TO REMAIN. CONTRACTOR SHALL VERIFY ALL EQUIPMENT TO REMAIN IS PROPERLY FUNCTIONING PRIOR TO RE-USING EQUIPMENT. CONTRACTOR TO ENSURE THAT
FINAL MECHANICAL SYSTEM WILL OPERATE AS INTENDED ON PROVIDED DRAWINGS.
MECHANICAL FLAG NOTES:
1. EXISTING GAS FIRED BOILERS AND BOILER PUMPS TO BE REPLACED WITH NEW. REFER TO EQUIPMENT SCHEDULES
AND BOILER SCHEMATIC FOR SIZE AND CONNECTIONS.
2. EXISTING RANGE FILTER BOXES TO BE REPLACED WITH NEW TO CORRESPOND WITH UPSIZED EXHAUST AIRFLOW.
REFER TO EQUIPMENT SCHEDULES.
MEN
INTERNET
CRIMES
TACTICAL
EXERCISE
AIC
CURRENT
FILES
LAB/FIELD
CORR
C107
VEST.
COPY
CORR
C113
CLERICAL
CORR
C108
CORR
C117
MEN
WOMEN
AIC
CONFERENCE
CORRIDOR
C116
OPEN OFFICE
STORAGE
SERVER
TRAINING
OPEN OFFICE
BIO VEST.
SEROLOGY
LAB
SHAKEDOWN
SHAKEDOWN
CODIS
SHAKEDOWN
SHAKEDOWN
BIO VEST.
DNA SAMPLE
DNA
EVIDENCE
JAN.
DNA AMP LAB
SEROLOGY
EVIDENCE
COMPUTER
LAB
MECHANICAL
GUN VAULT
LATENTS
EVALUATION
DUSTING
NIBIN
AFIS
FUMING
WORK
STATION
DIGITAL
PHOTO
PROCESSING
FIREARMS
LAB
AMMO
GSR
WORK
WORK
RANGE
CHEM.
INSTRUMENT
CHEM. LAB
CHEM.
EVIDENCE
STORAGE
GAS/LN
STORAGE
CHEM.
SOLVENT
STORAGE
TRACE
ANALYSIS
BIO
VESTIBULE
RANGE
MASTER
TOOL
RESTROOM
JAN.
BIO VEST.
GUN CLEAN
BIO ALCOVE
CORR
C101
CORR
C118
CORR
C104
CORR
C103
CORR
C120
CORR
C105
CORR
C109
LOBBY
CORR
C112
CORR
C111
CONFERENCE
STORAGE
PROCESSING
INTAKE
BLACK BOX
CRIME SCENE
VAN
VEHICLE
PROCESSING
ELECTRIC
INTER.
POLY.
INTER.
TOILET
MONITOR
WOMENS
LOCKERS
MENS
LOCKERS
CORR
C114
STORAGE
COOLER
FREEZER
LIBRARY
LOBBY
CORR
C110
CORR
C106
CORR
C100
ANALYSTS
EQUIP
KITCHEN
BREAK
STORAGE
6 7
FF
A
B
C
DD
B.9
EE
FEC
TRAVEL DISTANCE = 137 FT
REF.
11 12
14 16
AA
BB
CC
DD
FF
B
C
13.5
13.5 16.2
13.7
13.7
B.9
RAMP 1:12
24x12
DATE: ISSUED FOR:
SHEET NUMBER:
March 06, 2026 - 4:11:58pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
ME1-2
M
EC
H
AN
IC
AL
EX
IS
TI
N G
VA
V
PL
AN
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E G
R
AN
D J
U N
C
TI
O N
, C O
LO
R
AD
O
MECHANICAL - EXISTING - VAV PLAN
SCALE:
NORTH
SCALE: 1/16" = 1'-0"
GW
SB
12/29/2025
25-388
AS SHOWN
11/14/2025 SCHEMATIC DESIGN
12/05/2025 DESIGN DEVELOPMENT
MECHANICAL GENERAL NOTES:
1. DRAWING IS DIAGRAMMATIC IN NATURE. LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION & INSTALLATION OF MECHANICAL, PLUMBING, & ELECTRICAL. DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE
SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER.
2. COORDINATE FINAL LOCATION OF THERMOSTAT WITH OWNER PRIOR TO INSTALLATION. IF THERMOSTAT IS LOCATED
ON EXTERIOR WALL PROVIDE THERMOSTAT WITH INSULATED BACKING.
3. ROUTE CONDENSATE FROM CONDENSING MECHANICAL EQUIPMENT TO CONDENSATE NEUTRALIZATION KITS.
CONDENSATE FROM NEUTRALIZATION KITS SHALL BE DISCHARGED INDIRECTLY THROUGH AIR GAP TO NEAREST
FLOOR DRAIN.
4. ALL MOTORIZED DAMPERS ON OUTDOOR AIR INTAKES AND EXHAUST SHALL BE PROVIDED WITH CLASS IA MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE RATE OF 4 CFM/FT² AT 1.0 INCH WATER GAUGE WHEN TESTED IN ACCORDANCE
WITH AMCA 500D. (PER 2012 IECC)
5. MECHANICAL CONTRACTOR SHALL FIELD LOCATE EXISTING DUCTWORK PRIOR TO CONSTRUCTION. MECHANICAL CONTRACTOR SHALL COORDINATE TIE IN CONNECTION POINTS OF NEW SUPPLY DIFFUSERS WITH EXISTING
DUCTWORK AS NECESSARY.
6. CONTRACTOR SHALL CLEAN AND SERVICE ALL EXISTING EQUIPMENT TO REMAIN. CONTRACTOR SHALL VERIFY ALL EQUIPMENT TO REMAIN IS PROPERLY FUNCTIONING PRIOR TO RE-USING EQUIPMENT. CONTRACTOR TO ENSURE THAT
FINAL MECHANICAL SYSTEM WILL OPERATE AS INTENDED ON PROVIDED DRAWINGS.
MECHANICAL FLAGNOTES:
1. EXISTING VAV CONTROLLER TO BE REMOVED AND REPLACED WITH NEW ALERTON VAV CONTROLLER AND
CONNECTED TO NEW BMS
2. EXISTING HOT WATER VALVE ACTUATOR TO BE REMOVED AND REPLACED. TIE NEW ACTUATOR TO ALERTON BMS.
CONTRACTOR TO EVALUATE VALVE BODY IN FIELD AND RELACE DAMAGED OR LEAKING UNITS.
3. EXISTING THERMOSTAT TO BE REMOVED AND REPLACED. TIE NEW THERMOSTAT TO ALERTON BMS. NEW THERMOSTATS TO BE HARD WIRED THERMOSTATS WITH SPACE ADJUSTMENT WITHIN A RANGE SET BY OWNER.
4. EXISTING BMS CONTROLLERS AND FRONT END MACHINE TO BE REMOVED AND REPLACED WITH NEW ALERTON
SYSTEM.
7 9
AA AA
BB BB
CC
DD
FF
AA
BB
CC
DD
EE
EXISTING TO REMAIN
EXISTING TO REMAIN
EXISTING 12Ø FLUE
8"Ø EXHAUST
EXISTING 4" PVC FLUE
AND COMBUSTION AIR
AND COMBUSTION AIR
AND COMBUSTION AIR
AND COMBUSTION AIR
EXISTING 6"Ø EXHAUST
FROM BELOW
EXISTING 6"Ø EXHAUST
FROM BELOW
EXISTING 6"Ø EXHAUST
FROM BELOW
EXISTING 10"Ø EXHAUST
FROM BELOW
EXISTING 10"Ø EXHAUST
FROM BELOW
EXISTING MAKE UP AIR
UNIT TO BE REMOVED
AND REPLACED
EXISTING MAKE UP AIR
UNIT TO BE REMOVED
AND REPLACED
EXISTING EXHAUST FAN
TO BE REMOVED AND
REPLACED
EXISTING EXHAUST FAN
TO BE REMOVED AND
REPLACED
EXISTING STROBIC LAB
EXHAUST SYSTEM TO
REMAIN.
EXISTING ROOF TOP AHU TO BE
REMOVED AND REPLACED.
EXISTING CURB TO REMAIN.
EXISTING STROBIC LAB
EXHAUST SYSTEM TO
REMAIN.
EXISTING STROBIC LAB
EXHAUST SYSTEM TO
REMAIN.
EXISTING ROOF TOP AHU TO BE
REMOVED AND REPLACED.
EXISTING CURB TO REMAIN.
EXISTING CONDENSING UNIT TO
FOR SPLIT SYSTEM TO REMAIN.
EXISTING CONDENSING UNIT TO
FOR SPLIT SYSTEM TO REMAIN.
EXISTING TO REMAIN
EXISTING TO REMAIN
EXISTING 4" PVC FLUE
EXISTING 4" PVC FLUE
EXISTING 4" PVC FLUE
EXISTING 12Ø FLUE
EXISTING 12Ø FLUE
EXISTING 12Ø
COMBUSTION AIR.
EXISTING 12Ø
COMBUSTION AIR.
EXISTING 12Ø
COMBUSTION AIR.
EXISTING CONDENSING UNIT TO
FOR SPLIT SYSTEM TO REMAIN.
EXISTING ROOF TOP AHU TO BE
REMOVED AND REPLACED.
EXISTING CURB TO REMAIN.
EXISTING CONDENSING UNIT TO
FOR SPLIT SYSTEM TO REMAIN.
DATE: ISSUED FOR:
SHEET NUMBER:
March 06, 2026 - 4:11:59pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
ME1-3
M
EC
H
AN
IC
AL
P
IP
IN
G
R
O O
F
PL
AN
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E G
R
AN
D J
U N
C
TI
O N
, C O
LO
R
AD
O
MECHANICAL - EXISTING - ROOF PLAN
SCALE:
NORTH
SCALE: 1/16" = 1'-0"
GW
SB
12/29/2025
25-388
AS SHOWN
11/14/2025 SCHEMATIC DESIGN
12/05/2025 DESIGN DEVELOPMENT
MECHANICAL GENERAL NOTES:
1. DRAWING IS DIAGRAMMATIC IN NATURE. LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION & INSTALLATION OF MECHANICAL, PLUMBING, & ELECTRICAL. DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE
SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER.
2. COORDINATE FINAL LOCATION OF THERMOSTAT WITH OWNER PRIOR TO INSTALLATION. IF THERMOSTAT IS LOCATED
ON EXTERIOR WALL PROVIDE THERMOSTAT WITH INSULATED BACKING.
3. ROUTE CONDENSATE FROM CONDENSING MECHANICAL EQUIPMENT TO CONDENSATE NEUTRALIZATION KITS.
CONDENSATE FROM NEUTRALIZATION KITS SHALL BE DISCHARGED INDIRECTLY THROUGH AIR GAP TO NEAREST
FLOOR DRAIN.
4. ALL MOTORIZED DAMPERS ON OUTDOOR AIR INTAKES AND EXHAUST SHALL BE PROVIDED WITH CLASS IA MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE RATE OF 4 CFM/FT² AT 1.0 INCH WATER GAUGE WHEN TESTED IN ACCORDANCE
WITH AMCA 500D. (PER 2012 IECC)
5. MECHANICAL CONTRACTOR SHALL FIELD LOCATE EXISTING DUCTWORK PRIOR TO CONSTRUCTION. MECHANICAL CONTRACTOR SHALL COORDINATE TIE IN CONNECTION POINTS OF NEW SUPPLY DIFFUSERS WITH EXISTING
DUCTWORK AS NECESSARY.
6. CONTRACTOR SHALL CLEAN AND SERVICE ALL EXISTING EQUIPMENT TO REMAIN. CONTRACTOR SHALL VERIFY ALL EQUIPMENT TO REMAIN IS PROPERLY FUNCTIONING PRIOR TO RE-USING EQUIPMENT. CONTRACTOR TO ENSURE THAT
FINAL MECHANICAL SYSTEM WILL OPERATE AS INTENDED ON PROVIDED DRAWINGS.
DATE: ISSUED FOR:
SHEET NUMBER:
March 06, 2026 - 4:11:59pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
ME2-1
M
EC
H
AN
IC
AL
P
IP
IN
G
EX
IS
TI
N G
V
AV
S C
H
ED
U
LE
S
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E G
R
AN
D J
U N
C
TI
O N
, C O
LO
R
AD
O
GW
SB
12/29/2025
25-388
AS SHOWN
11/14/2025 SCHEMATIC DESIGN
1. BOXES PROVIDED WITH DDC UNITARY CONTROLLER.
1. BOXES PROVIDED WITH DDC UNITARY CONTROLLER.
1. HEATING CAPACITY BASED ON 30% PROPYLENE GLYCOL.
2. BOXES PROVIDED WITH DDC UNITARY CONTROLLER, PROPORTIONAL THREE WAY CONTROL VALVE, ROOM SENSOR WITH EXTERNAL ADJUSTMENT.
3. PROVIDE FAN MODEL 03SQ-EMC.
4. PROVIDE FAN MODEL 04SQ-EMC.
5. PROVIDE 2 ROW COIL.
1. BOXES PROVIDED WITH DDC UNITARY CONTROLLER.
NOTES:
SCHEDULES ON THIS SHEET ARE FOR REFERENCE ONLY TO ASSIST WITH EQUIPMENT COUNTS FOR CONTROL DEVICES. REFER TO ME1-2 FOR EXISTING VAV LOCATIONS. FIELD VERIFY INFORMATION PRIOR TO ORDERING EQUIPMENT.
12/05/2025 DESIGN DEVELOPMENT
March 06, 2026 - 4:12:00pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
ME2-2
M
EC
H
AN
IC
AL
P
IP
IN
G
EX
IS
TI
N G
V
AV
S C
H
ED
U
LE
S
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E G
R
AN
D J
U N
C
TI
O N
, C O
LO
R
AD
O
GW
SB
12/29/2025
25-388
AS SHOWN
11/14/2025 SCHEMATIC DESIGN
NOTES:
SCHEDULES ON THIS SHEET ARE FOR REFERENCE ONLY TO ASSIST WITH EQUIPMENT COUNTS FOR CONTROL DEVICES. REFER TO ME1-2 FOR EXISTING VAV LOCATIONS. FIELD VERIFY INFORMATION PRIOR TO ORDERING EQUIPMENT.
1. HEATING COMPACITY BASED ON 30% PROPYLENE GLYCOL.
2. PROVIDE PROPORTIONAL THREE WAY CONTROL VALVE AND ROOM SENSOR.
12/05/2025 DESIGN DEVELOPMENT
7 9
AA AA
BB BB
CC
DD
FF
AA
BB
CC
DD
EE
EXISTING 12Ø FLUE
8"Ø EXHAUST
EXISTING 4" PVC FLUE
AND COMBUSTION AIR
AND COMBUSTION AIR
AND COMBUSTION AIR
AND COMBUSTION AIR
EXISTING 6"Ø EXHAUST
FROM BELOW
EXISTING 6"Ø EXHAUST
FROM BELOW
EXISTING 6"Ø EXHAUST
FROM BELOW
EXISTING 10"Ø EXHAUST
FROM BELOW
EXISTING 10"Ø EXHAUST
FROM BELOW
EXISTING STROBIC LAB
EXHAUST SYSTEM TO
REMAIN.
EXISTING CONDENSING UNIT TO
FOR SPLIT SYSTEM TO REMAIN.
EXISTING 4" PVC FLUE
EXISTING 4" PVC FLUE
EXISTING 4" PVC FLUE
EXISTING 12Ø FLUE
EXISTING 12Ø FLUE
EXISTING 12Ø
COMBUSTION AIR.
EXISTING 12Ø
COMBUSTION AIR.
EXISTING 12Ø
COMBUSTION AIR.
EXISTING CONDENSING UNIT TO
FOR SPLIT SYSTEM TO REMAIN.
SU
PPLY
D U
C T
SU
PPLY
D U
C T
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
Width
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GASGASGASGASGAS
G
AS
G
AS
G
AS
G
AS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
ROUTE GAS DOWN FROM
HIGH ROOF TO LOW
ROOF.
ROUTE GAS UP FROM
LOW ROOF TO HIGH
ROOF.
2"Ø
2" Ø
2" Ø
2"Ø
1- 1/
2" Ø
1-1/2"Ø1-1/2"Ø 1"Ø
1" Ø
1"Ø 1"Ø 1"Ø
1" Ø
1" Ø
G G
G G
GGGGGGGGGGGGGGG
G G
GGGGGGG
G G
GGGG
G G
G G
G G
GG
DATE: ISSUED FOR:
SHEET NUMBER:
March 06, 2026 - 4:12:01pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
M1-2
M
EC
H
AN
IC
AL
R
O O
F
PL
AN
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E G
R
AN
D J
U N
C
TI
O N
, C O
LO
R
AD
O
MECHANICAL - ROOF PLAN
SCALE:
NORTH
SCALE: 1/16" = 1'-0"
GW
SB
12/29/2025
25-388
AS SHOWN
11/14/2025 SCHEMATIC DESIGN
12/05/2025 DESIGN DEVELOPMENT
MECHANICAL GENERAL NOTES:
1. DRAWING IS DIAGRAMMATIC IN NATURE. LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION & INSTALLATION OF MECHANICAL, PLUMBING, & ELECTRICAL. DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE
SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER.
2. COORDINATE FINAL LOCATION OF THERMOSTAT WITH OWNER PRIOR TO INSTALLATION. IF THERMOSTAT IS LOCATED
ON EXTERIOR WALL PROVIDE THERMOSTAT WITH INSULATED BACKING.
3. ROUTE CONDENSATE FROM CONDENSING MECHANICAL EQUIPMENT TO CONDENSATE NEUTRALIZATION KITS.
CONDENSATE FROM NEUTRALIZATION KITS SHALL BE DISCHARGED INDIRECTLY THROUGH AIR GAP TO NEAREST
FLOOR DRAIN.
4. ALL MOTORIZED DAMPERS ON OUTDOOR AIR INTAKES AND EXHAUST SHALL BE PROVIDED WITH CLASS IA MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE RATE OF 4 CFM/FT² AT 1.0 INCH WATER GAUGE WHEN TESTED IN ACCORDANCE
WITH AMCA 500D. (PER 2012 IECC)
5. MECHANICAL CONTRACTOR SHALL FIELD LOCATE EXISTING DUCTWORK PRIOR TO CONSTRUCTION. MECHANICAL CONTRACTOR SHALL COORDINATE TIE IN CONNECTION POINTS OF NEW SUPPLY DIFFUSERS WITH EXISTING
DUCTWORK AS NECESSARY.
6. CONTRACTOR SHALL CLEAN AND SERVICE ALL EXISTING EQUIPMENT TO REMAIN. CONTRACTOR SHALL VERIFY ALL EQUIPMENT TO REMAIN IS PROPERLY FUNCTIONING PRIOR TO RE-USING EQUIPMENT. CONTRACTOR TO ENSURE THAT
FINAL MECHANICAL SYSTEM WILL OPERATE AS INTENDED ON PROVIDED DRAWINGS.
12/29/2025 90% CDS
MECHANICAL FLAG NOTES:
1. ROUTE NEW MEDIUM PRESSURE GAS LINE FROM EXISTING GAS METER LOCATION TO NEW GAS FIRE ROOF TOP
UNITS ON ROOF.
2. VERIFY EXISTING GAS LINE IS SUFFICIENT TO SUPPORT NEW GAS FIRED MAKEUP AIR UNITS.
3. PROVIDE MEDIUM-TO-LOW GAS PRESSURE REGULATOR AND GAS SHUTOFF VALVE AT RTU. REFER TO GAS
CONNECTION TO EQUIPMENT DETAIL FOR MORE INFORMATION.
4. NEW RTU TO BE MOUNTED ON EXISTING CURB WITH ADAPTER CURB.
March 06, 2026 - 4:12:01pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
M3-1
M
EC
H
AN
IC
AL
D
ET
AI
LS
A
N D
S C
H
ED
U
LE
S
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E
GW
SB
12/29/2025
25-388
G R
AN
D
J U
N C
TI
O
N , C
O
LO
R
AD
O
11/14/2025 SCHEMATIC DESIGN
12/05/2025 DESIGN DEVELOPMENT
12/29/2025 90% CDSGAS CONNECTION TO EQUIPMENT DETAIL
March 06, 2026 - 4:12:04pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
M3-2
M
EC
H
AN
IC
AL
BO
IL
ER
S C
H
EM
AT
IC
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E
GW
SB
12/29/2025
25-388
G R
AN
D
J U
N C
TI
O
N , C
O
LO
R
AD
O
11/14/2025 SCHEMATIC DESIGN
12/05/2025 DESIGN DEVELOPMENT
TO GAS METER
PRESSURE GAUGE
TYPICAL
TO VAV'S
HWC'S, UH'S
AND AHU'S
CONNECTOR
FLEXIBLE
NOTE:
FINAL FILL OF SYSTEM SHALL BE WITH A
SOLUTION OF 30% PROPYLENE GLYCOL.
WITH STRAINER
B&G #R-5 ROLAIRTROL
EXPANSION TANK
B&G #D-80 PRESSURIZED
B&G #7
1"
2-1/2"
4" CONCRETE HOUSEKEEPING PAD
1"
3"
4" CONCRETE HOUSEKEEPING PAD BOILER DRAIN
FULL SIZE TO FLOOR
PIPE RELIEF VALVE
DRAIN
3"
SYSTEM FILL
CONNECTIONS
B&G #107 AIR VENT
TYPICAL
HWS
HWR
HWR
HWS
HWR
4"
HWS
HWR
THERMOMETER
TYPICAL4"
GLYCOL FEEDER
3/4"AXIOM #MF300
AIR VENT
STRAINER
APPROXIMATE VOLUME OF SYSTEM IS 410 GALLONS
2-1/2"
12/29/2025 90% CDS
EXISTING CIRCUIT SETTER TO
BE REMOVED. TYPICAL
March 06, 2026 - 4:12:05pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
M4-1
M
EC
H
AN
IC
AL
C
O N
TR
O
LS
D
IA
G
R
AM
S
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E
GW
SB
12/29/2025
25-388
G R
AN
D
J U
N C
TI
O
N , C
O
LO
R
AD
O
11/14/2025 SCHEMATIC DESIGN
12/05/2025 DESIGN DEVELOPMENT
March 06, 2026 - 4:12:07pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
M4-2
M
EC
H
AN
IC
AL
C
O N
TR
O
LS
D
IA
G
R
AM
S
CO
LO
RA
DO
B
UR
EA
U
O F
IN
VE
ST
IG
AT
IO
N
J U
ST
IC
E D
R
IV
E
GW
SB
12/29/2025
25-388
G R
AN
D
J U
N C
TI
O
N , C
O
LO
R
AD
O
11/14/2025 SCHEMATIC DESIGN
Sequence of Operation: VAV TERMINAL UNIT
Building Automation System Interface:
The Building Automation System (BAS) shall send the controller Occupied, and Unoccupied commands. The BAS may also send a Heat/Cool mode, priority shutdown commands, space temperature and/or space temperature setpoint. If communication is lost with the BAS, the controller shall operate using its local setpoints.
Occupied:
The occupancy mode shall be communicated or hardwired to the controller via a binary input. When the unit is in the occupied mode the VAV shall maintain the space temperature at the active occupied heating or cooling setpoint. Applicable ventilation and airflow setpoints shall be enforced. The occupied mode shall be the default mode of the VAV. Applicable ventilation and airflow setpoints shall be enforced. The occupied mode shall be the default mode of the VAV.
Occupied Standby:
The occupancy mode shall be communicated or hardwired to the controller via a binary input, even though the BAS has scheduled the space as occupied. In the occupied standby mode, the active cooling and heating setpoints shall be relaxed (see cooling and heating mode) and both the ventilation airflow and minimum airflow setpoints shall be lowered (see VAV schedule).
Occupied Bypass:
Mode used to temporarily place the unit into the occupied operation. Tenants shall be able to override the unoccupied mode from the space sensor. The override shall last for a maximum of 4 hours (adj.). The tenants shall be able to cancel the override from the space sensor at any time. During the override the unit shall operate in occupied mode.
Heat/Cool Setpoint:
The space temperature setpoint shall be determined either by a local (e.g., thumbwheel) setpoint, the VAV default setpoint or a communicated value. The VAV shall use the locally stored default setpoints when neither a local setpoint nor communicated setpoint is present. If both a local setpoint and communicated setpoint exist, the VAV shall use the communicated value.
Cooling Mode:
When the unit is in cooling mode, the VAV controller shall maintain the space temperature at the active cooling setpoint by modulating the airflow between the active cooling minimum airflow setpoint to the maximum cooling airflow setpoint. The VAV shall use the measured space temperature and the active cooling setpoint to determine the requested cooling capacity of the unit. The outputs shall be controlled based on the unit configuration and the requested cooling capacity.
Based on the VAV controller occupancy mode, the active cooling setpoint shall be one of the following:
Setpoint Default Value Occupied Cooling Setpoint 74.0 deg. F Unoccupied Cooling Setpoint 85.0 deg. F Occupied Standby Cooling Setpoint 78.0 deg. F Occupied Min Cooling Airflow Setpoint See VAV Schedule Occupied Max Cooling Airflow Setpoint See VAV Schedule
Heating Mode:
Reheat shall only be allowed when the supply air temperature is 5.0 deg. F below the configured reheat enable setpoint of 70.0 deg. F (adj.). The reheat shall be enabled when the space temperature drops below the active heating setpoint and the minimum airflow requirements are met. During reheat the VAV shall operate at its minimum heating airflow setpoint and energize the heat as follows:
Setpoint Default Value Occupied Heating Setpoint 71.0 deg. F Unoccupied Heating Setpoint 60.0 deg. F Occupied Standby Heating Setpoint 67.0 deg. F Occupied Min Heating Airflow Setpoint See VAV Schedule Occupied Max Heating Airflow Setpoint See VAV Schedule
Modulating Heat
Single Duct with Discharge Air Reset with Discharge Air Reset Enabled: For units equipped with modulated heat (modulated hot water, PWM or SCR electric): When the zone temperature drops below the active heating setpoint, the air valve modulates to the Air Flow Setpoint Minimum Local Heat, Air Flow Setpoint Minimum, or Ventilation Setpoint Local, whichever is greater. The controller modulates the hot-water valve (or SCR electric heater) to maintain zone temperature at the active heating setpoint. For units with electric heat, the airflow setpoint must be reached before the heat shall be enabled. As the required reheat capacity increases, the Discharge Air Temperature Setpoint Manager increases. When the Discharge Air Temperature Setpoint Manager reaches the Discharge Air Temp Design Setpoint, and the measured discharge air temperature is within 5 F of the Discharge Air Temp Design Setpoint, the airflow shall be allowed increase from the Airflow Setpoint Reset Min Local Heat to the Airflow Setpoint Reset Max Local Heat. If additional heating capacity is still required, the Discharge Air Temperature Setpoint Manager shall be increased to the Discharge Air Temp Reset Max
Local Reheat Control:
Reheat shall only be allowed when the primary air temperature is 5.0 deg. F below the configured reheat enable setpoint of 70.0 deg. F (adj.). The reheat shall be enabled when the space temperature drops below the active heating setpoint and the minimum airflow requirements are met. During reheat the VAV shall operate at its minimum heating airflow setpoint and energize the heat as follows:
Hot Water Analog Reheat:
If the space temperature is below the heating setpoint the hot water reheat valve shall control as required to maintain the active heating setpoint.
Modulating Hot Water Reheat (ANG)
If the space temperature is below the heating setpoint the hot water reheat valve shall modulate as required to maintain space temperature at the active heating setpoint while the VAV operates at its minimum heating airflow setpoint. If the discharge air temperature reaches the design heating discharge air temperature setpoint (adj.), the VAV shall modulate airflow between the minimum heating airflow setpoint and the maximum heating airflow setpoint as required to maintain space temperature at the active heating setpoint.
Air Valve Control:
When the unit is in occupied mode, the ventilation airflow setpoint shall be continuously calculated using the measured CO2 concentration in the space communicated to the VAV controller via the BAS.
Demand Control Ventilation:
When the unit is in unoccupied mode, the ventilation airflow setpoint shall be zero. When the unit is in occupied mode, the ventilation airflow setpoint shall be equal the design outdoor airflow and reset based on occupancy and CO2.
OCCUPANCY SENSOR: When the unit is in occupied mode, and the occupancy sensor indicates that the space is currently unoccupied, the ventilation airflow setpoint shall be the "occupied standby" outdoor airflow (see VAV schedule).
CO2 SENSOR: When the unit is in occupied mode, the ventilation airflow setpoint shall be continuously calculated using the measured CO2 concentration in the return air.
The current ventilation airflow setpoint shall be communicated to the BAS for control of the system outdoor-air intake.
Space Sensor Failure:
If there is a fault with the operation of the zone sensor an alarm shall be annunciated at the BAS. Space sensor failure shall cause the VAV to drive the damper to minimum air flow if the VAV is in the occupied mode, or drive it closed if the VAV is in the unoccupied mode.
Sequence of Operation: HEATING PLANT SYSTEM
System General Description:
The heating plant system controller provides stand-alone control or control from an optional higher level Building Automation System (BAS) . The heating plant control system shall monitor and control the system's boiler(s), pump(s), and control valves as shown on the heating plant flow diagram, in the heating plant points list and as detailed in the sequence of operation listed below.
The heating plant system consists of hot water boiler(s) with its piping configuration arranged as a primary / secondary loop supplying hot water to the facility.
The manifolded hot water distribution pumps are configured as lead / lag control. The factory boiler system controller shall provide stand-alone control or BAS workstation control of the supply heating water temperature setpoint (adj.).
Heating System Enable/Disable:
The heating system shall be enabled/disabled by the heating plant controller as requested by the Building Automation System (BAS) human-interface panel or the BAS time of day schedule. When enabled, the system shall enable the lead boiler, the associated primary boiler pump and enable the lead secondary pump. The heating plant is disabled when all boilers are disabled and there is not an active hot water distribution pump request. When the plant is disabled the hot water pump shall be commanded off.
Hot Water Reset:
The hot water supply temperature setpoint shall be linearly reset from 120.0 deg. F (adj.) to 180.0 deg. F (adj.) as the outside air temperature falls from 60.0 deg. F (adj.) to 0.0 deg. F (adj.)
Boiler Control:
The boiler lead/lag sequence shall be based on a weekly schedule. From the system controller or a BAS workstation, an operator shall be able to manually change the lead/lag sequence.
If the hot water distribution system supply temperature falls more than 25.0 deg. F (adj.) below setpoint for a period longer than 15 minutes (adj.), or if an active boiler signals a failure alarm, the system controller shall enable the lag boiler.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .