This is a Pre-Renovation Limited Asbestos and Lead-Containing Paint Survey Report prepared by Atlas Technical Consultants LLC for the Michigan Department of Military & Veterans Affairs, Reserve Forces Support Center, regarding the Waterford Armory located at 2650 Watkins Lake Road in Waterford, Michigan. The survey was conducted from May 27 through June 3, 2025, by State of Michigan Certified Asbestos Inspector Rachel Kasnow (Certification No. A61030) to identify and collect samples of suspect asbestos-containing materials (ACMs) and lead-containing paint (LCP) prior to demolition activities. The inspection included a visual survey of the building structures, identification of 104 homogeneous areas, and collection of 312 asbestos bulk samples and 11 lead-containing paint chip samples. Additionally, six lead dust wipe samples were collected from surfaces within and directly connected to the shooting range area. The report was completed and submitted on June 19, 2025.
Laboratory analysis of the asbestos samples using Polarized Light Microscopy (PLM) by Environmental Testing Laboratories, Inc. (NVLAP #201028-0) identified five samples containing greater than 1 percent asbestos and four additional samples assumed to contain asbestos. All eleven paint chip samples analyzed using Flame AAS by Accurate Analytical Testing Laboratory contained lead levels greater than the laboratory reporting limits, with concentrations ranging from 0.00185 percent to 0.482 percent by weight. Lead dust wipe sampling results indicated that two of the six samples exceeded USEPA HUD standards for floors. The survey noted that any additional suspect materials discovered during renovation or demolition activities must be assumed to contain asbestos until sampling and analysis proves otherwise, and should be handled in accordance with OSHA regulations 29 CFR 1926.1101, the Asbestos Hazard and Emergency Response Act of 1987 (AHERA), and applicable state and local regulations.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-RENOVATION LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY
WATERFORD ARMORY
2650 WATKINS LAKE ROAD
JACKSON, MI 48328
Project #188BS25305
PREPARED FOR:
Michigan Department of Military & Veterans Affairs Reserve Forces Support Center
PREPARED BY:
Atlas Technical Consultants LLC 46555 Humboldt Drive, Suite 100 Novi, Michigan 48377 June 19, 2025
Page | 1
46555 Humboldt Drive, Suite 100 Novi, Michigan 48377
(248) 669-5147 | oneatlas.com
June 19, 2025
Mr. Timothy Cole State of Michigan Buyer Michigan Department of Military & Veterans Affairs Reserve Forces Support Center 3423 N. Martin Luther King Jr. Boulevard Lansing, Michigan 48906-2934
Subject: Pre-Renovation Limited Asbestos and Lead-Containing Paint Survey Waterford Armory 2650 Watkins Lake Road Waterford, MI 48328
Dear Mr. Cole:
Atlas is pleased to present this report detailing the findings of the pre-renovation limited asbestos and lead-containing paint survey performed at the above referenced site. The purpose of this sampling was to identify and collect samples of suspect asbestos containing materials (ACMs) and lead-containing paint (LCP) prior to demolition activities.
The pre-demolition asbestos and limited lead-containing paint sampling was conducted from May 27 through June 3, 2025, by Industrial Hygienist, Ms. Rachel Kasnow, State of Michigan certified asbestos inspector. The sampling was conducted in accordance with sampling criteria specified in the Occupational Safety and Health Administration’s (OSHA) Asbestos Construction Industry Standard (29 CFR 1926.1101), and the Asbestos Hazard and Emergency Response Act of 1987
(AHERA).
If you have any questions, please call us at 248.669.5140.
Respectfully submitted, Rachel Kasnow Kandy Rauser State of Michigan Asbestos Inspector Project Manager Atlas Technical Consultants LLC Atlas Technical Consultants LLC
Page | i
CONTENTS
EXECUTIVE SUMMARY
1. INTRODUCTION
1.1 Purpose
1.2 Pre-Renovation Asbestos Survey
2. GENERAL SITE CONDITIONS
2.1 General Property and Building Information
2.2 Exterior Finish Descriptions
2.3 Interior Building Descriptions
3. PRE-RENOVATION ASBESTOS SURVEY
3.1 Homogeneous Areas
3.2 Hazard Assessment Factors
3.3 Laboratory Analytical Methodology
3.4 Sampling Results
4. LEAD-CONTAINING PAINT SAMPLING
5. LEAD DUST WIPE SAMPLING
6. CONCLUSIONS AND RECOMMENDATIONS
6.1 Asbestos Containing Materials
6.2 Lead-Containing Paint
6.3 Lead Dust Wipe Sampling
7. ASSUMPTIONS AND LIMITATIONS
TABLES
Table 3-1 ACM Sampling Results
Table 4-1 Lead-Containing Paint Sampling Results
Table 5-1 Lead Dust Wipe Sampling Results………………………………………………………….7
APPENDICES
Appendix A Sample Location Drawing Appendix B Photo Log Appendix C Asbestos Laboratory Report Appendix D Lead-Containing Paint Laboratory Report Appendix E Lead Dust Wipe Laboratory Report
SOM
Waterford Armory
Pre-Renovation Limited Asbestos & Lead-Containing Paint Survey June 19, 2025
Page | 2
EXECUTIVE SUMMARY
Atlas representative Ms. Rachel Kasnow, completed the pre-renovation limited asbestos and lead-containing paint survey of the Waterford Armory, at 2650 Watkins Lake Road, in Waterford, Michigan, May 27 through June 3, 2025.
Three hundred and twelve (312) asbestos bulk samples, taken from one hundred and four (104) homogenous areas, were collected and submitted for analysis by Polarized Light Microscopy
(PLM). Of the 312 samples submitted, three hundred and fifty-one (351) sample layers were analysed, and five (5) samples were analysed by point count. The results of laboratory testing indicated that five (5) of the suspect materials contained greater than 1 percent asbestos and four
(4) of the suspect materials were assumed to contain asbestos.
Eleven (11) representative samples of paint, taken from interior and exterior areas of the building, were collected and submitted for analysis by Flame AAS. The results of laboratory testing of the paint chip samples indicated that all eleven (11) samples contained levels of lead greater than the laboratory reporting limits.
Six (6) representative lead dust wipe samples, taken from surfaces within and directly connected to the shooting range area, were collected and submitted for analysis. The results of laboratory testing of the dust wipe samples indicated that two (2) samples contained levels of lead greater than the allowable USEPA HUD standards for floors.
If any additional materials are discovered during renovation/demolition activities, such materials must be assumed to contain asbestos until sampling and analysis proves otherwise.
Page | 3
1. INTRODUCTION
1.1 Purpose
The purpose of this project was to conduct a pre-renovation limited asbestos and lead-containing paint survey of the Waterford Armory located at 2650 Watkins Lake Road, in Waterford, Michigan.
1.2 Pre-Renovation Asbestos Survey
The scope of the pre-renovation asbestos survey included the following:
• Review of existing asbestos reports for the building, if available;
• Survey of the property building(s);
• Identification of accessible suspect asbestos-containing materials (ACMs);
• Collection and analysis of bulk samples of suspect friable and non-friable materials.
2. GENERAL SITE CONDITIONS
2.1 General Property and Building Information
General property and building information is presented in the following table:
General Property and Building Information
Date of Inspection: May 27 through June 3, 2025
Inspectors Rachel Kasnow, Inspector # A61030
Property Address: 2650 Watkins Lake Road, Waterford, Michigan 48328
Property Owner Michigan Department of Military & Veterans Affairs
Building Description: Waterford Armory
2.2 Exterior Finish Descriptions
The exterior of the buildings included block and masonry with a flat roof.
2.3 Interior Building Descriptions
The interior finishes of the building included concrete masonry unit (CMU) block walls, wallboard, ceiling tiles/panels, and tiled walls and floors.
3. PRE-RENOVATION ASBESTOS SURVEY
Atlas representative Ms. Rachel Kasnow conducted the pre-renovation asbestos inspection of the property building from May 27 through June 3, 2025. Ms. Kasnow is a State of Michigan Certified
Asbestos Inspector’s (Certification No. A61030). The building was visually inspected for the presence of building materials that are suspected to contain asbestos. Bulk samples of suspect
ACMs were collected and placed into individual containers for transport to a National Voluntary
Lab Accreditation Program (NVLAP)-accredited laboratory for analysis. Materials typically known as non-asbestos items (i.e. fibrous glass, foam rubber, wood, etc.) were not sampled. The asbestos inspection consisted of the following three basic procedures:
Page | 4
> Conducting a visual inspection of the structures;
> Identifying homogeneous areas (HAs) of suspect surfacing, thermal system insulation, and miscellaneous materials; and
> Sampling accessible, friable and non-friable suspect materials.
3.1 Homogeneous Areas
Prior to collecting any samples, homogenous areas (HAs) were identified. A homogeneous sampling area can be described as one or more areas of material that are similar in appearance and texture and that have the same apparent installation date, appearance and function. Actual number of samples collected from each homogeneous sampling area may vary, based on the type of material and professional opinion of the inspector.
3.2 Hazard Assessment Factors
From the list of suspect homogeneous areas, a physical assessment was performed for each material on the list. A physical assessment includes evaluating the condition, assessing the potential for disturbance, and determining the friability of each material. By definition, "friable" materials are those that can be crumbled or reduced to powder by hand pressure when dry. Each material identified was further classified into one of three categories: surfacing materials, thermal systems insulation (TSI) and miscellaneous materials. Each of the three categories have specific sampling requirements, outlined below.
• Surfacing Materials: Refers to spray-applied or troweled surfaces such as plaster ceilings and walls, fireproofing, textured paints, textured plasters, and spray-applied acoustical surfaces.
• Thermal System Insulation: Refers to insulation used to inhibit heat gain or loss on pipes, boilers, tanks, ducts, and various other building components.
• Miscellaneous Materials: Refers to friable and non-friable products and materials that do not fit in any of the above two categories such as resilient floor covering, baseboards, mastics, adhesives, roofing material, caulking, glazing, and siding. This category also contains wallboard and ceiling tile.
All materials were assessed related to their condition in one of the three categories: good (intact), fair (damaged) or poor (significantly damaged) per Title 40 Code of Federal Regulations Part 763.
Material with localized, significant damage was also assessed as poor.
3.3 Laboratory Analytical Methodology
Bulk samples were analyzed by Environmental Testing Laboratories, Inc. (ETL) using polarized-light microscopy (PLM) and dispersion staining (Method Reference: 40 CFR Part 763, Volume 47, No.
103, May 27, 1982, pg. 23376). This laboratory participates in the National Voluntary Laboratory
Accreditation Program (NVLAP #201028-0), a quality assurance program for PLM analysis, and is accredited by the National Institute of Standards and Technology (NIST) as well as accreditation requirements under 15 CFR Part 25.
Positive sample results are reported in percent asbestos by volume of the sample and the type of asbestos material within the sample. Other common non-asbestos components may also be noted on the analytical reports.
Page | 5
3.4 Sampling Results
Bulk samples were collected from the site building and analyzed by polarized light microscopy
(PLM), EPA Method 600/R-93/116. A sample location drawing can be found in Appendix A. A photo log depicting suspect ACMs can be found in Appendix B. Copies of the laboratory analytical report and corresponding chain-of-custody forms are included in Appendix C.
The following table provides a summary of accessible suspect and confirmed ACMs from the Site buildings:
Table 3-1 ACM Sampling Results
Sample ID/Material
Location of Materials Material Estimated Quantity
Asbestos Content
Main Building
1-CC-A,B,C Throughout Poured Concrete Floors 21,061 SF None Detected
2-EJ-A,B,C
Room 100, 101, 103, 104, 117, and 119 Concrete Floor Expansion
Joint 446 SF None Detected
3-EJ-A,B,C Room 100, 101, and 103 Concrete Floor, Soft, Grey
Expansion Joint 345 SF None Detected
4-CMU-A,B,C Throughout CMU Block Wall Mortar 23,630 SF None Detected
5-EJ-A,B,C
Main and South Entrance, South Main Corridor, West
Vestibule and Corridor, Central Main Corridor, Lobby, North Main Corridor, and Rooms 100, 101, 103, 104, 117, and
CMU Block Wall Expansion Joint
845 SF None Detected
6-IC-A,B,C Rooms 100 and 117 Interior Red Fire Stop Caulk 11 LF None Detected
7-IC-A,B,C
Rooms 100, 113, 114, and
Interior Dark Grey Building
Caulk 140 LF None Detected
8-PI-A,B,C Throughout Fiberglass Pipe Insulation 782 LF None Detected
9-SM-
A,B,C,D,E
Rooms 100 and 137 Yellow Painted White, Fluffy
Spray-on Insulation 3,825 SF None Detected
10-Not Sampled
Room 100 Fiberglass HVAC Duct
Insulation
60 SF ASSUMED
11-IC-A,B,C Rooms 100, 119, and 137 Interior Pinkish Brown Pipe
Penetration Mud 3 SF None Detected
12-Not Sampled
Room 100 Black Metal Duct Seam
Sealant of HVAC
125 LF ASSUMED
13-IC-A,B,C Room 101 Interior Tan Brittle Door
Caulk 15 LF None Detected
14-IC-A,B,C Throughout Interior Off-White Door
Caulk 490 LF None Detected
15-PB-A,B,C Room 101 Pressboard Penetration
Hole Filler 1 SF None Detected
16-PI-A,B,C Room 101 Packing Insulation 1 SF None Detected
17-CC-A,B,C
Rooms 101, 102, 106, 107, 133, and 137 Concrete Ceiling 2,757 SF None Detected
Page | 6
Sample ID/Material
Location of Materials Material Estimated Quantity
Asbestos Content
18-RT-A,B,C Room 101 Black Roof Tar 30 SF Point Count:
1.5% Chrysotile
19-CT-A,B,C Rooms 102, 106, and 107 6" x 6" Tan Ceramic Floor
Tile and Grout 728 SF None Detected
20-CTG-
A,B,C
Rooms 102, 106, and 107 6" x 16" Grey Block Wall
Grout 1,750 SF None Detected
21-IC-A,B,C Throughout Interior Tan/Gold Building
Caulk 655 LF None Detected
22-IC-A,B,C Throughout Interior White Building
Caulk 277 LF None Detected
23-IC-A,B,C Room 103 Interior Grey, Brittle Caulk 3 LF None Detected
24-IC-A,B,C Room 104 Interior Brittle Multi-Layer
Sink Caulk 5 LF None Detected
25-CP-A,B,C
Room 104 and
North Vestibule & Associated Corridor
2' x 4' Ceiling Panel with Pinholes and Long Gouges
208 SF None Detected
26-HS-A,B,C Rooms 104 and 105 Heat Shield 2 SF None Detected
27-CT-A,B,C Rooms 104, 134, and 139 4” Beige Speckled Cove Base Ceramic Floor Tile and Grout 149 SF None Detected
28-CT-A,B,C Rooms 104, 134, and 139 1" x 1" Beige Ceramic Floor
Tile and Grout 445 SF None Detected
29-IC-A,B,C
Rooms 104, 105, 107, 134, 139, and 140 Interior White Plumbing
Fixture Caulk 101 LF None Detected
30-CT-A,B,C Rooms 105 and 140 4" Pink Cove Base Ceramic
Tile and Grout 235 SF None Detected
31-CTG-
A,B,C
Room 105 and 140 1" x 1" Off-White Ceramic
Tile Floor Grout 5 SF None Detected
32-PA-A,B,C Room 105 Paper and Adhesive Under
Plumbing Caulk 15 LF None Detected
33-IC-A,B,C Room 106 Interior Light Grey Multi-layer Caulk 110 LF None Detected
34-SU-A,B,C Room 106 and 107 Grey Sink Undercoating 14,452 SF None Detected
35-CP-A,B,C Throughout 2' x 4' Ceiling Panel with
Pinholes and Small Gouges 10,210 SF None Detected
36-WBS-
A,B,C
Throughout Wallboard System 2,730 SF None Detected
37-BM-A,B,C
West Vestibule & Associated Corridor, Central Main Corridor, Lobby, North Main
Corridor, North Vestibule &
Associated Corridor, and Rooms 147, 148, & 153
Interior Multi-Color Brick and Mortar
1,003 SF None Detected
Page | 7
ID/Material
Location of Materials Material Estimated Quantity
Asbestos Content
38-CB-A,B,C
Main Entrance (South Vestibule), South Main
Corridor, West Vestibule &
Associated Corridor, Central Main Corridor, Lobby, North Main Corridor, North Vestibule & Associated Corridor, and Rooms 109, 110, & 136
4" Grey Cove base and Adhesive
5,183 SF None Detected
39-FT-A,B,C
Main Entrance (South Vestibule), South Main
Corridor, West Vestibule &
Associated Corridor, Central Main Corridor, Lobby, North Main Corridor, North Vestibule & Associated Corridor, and Rooms 109, 110, & 136
12"x 12" Light Grey/Blue Mottled with White and Grey
Streaks, Floor Tile and Mastic
60 SF None Detected
40-FT-A,B,C
Main Entrance (South Vestibule), South Main
Corridor, West Vestibule &
Associated Corridor, Central Main Corridor, and
Rooms 109 & 110
12" x 12" Blue/Grey Mottled with White Streaks, Floor
Tile and Mastic 102 SF None Detected
41-FT-A,B,C
Lobby, North Main Corridor, North Vestibule & Associated Corridor, and
Room 109
12" x 12" Blue Mottled Floor Tile and Mastic
15 SF None Detected
42-FT-A,B,C Room 109
12" x 12" Light Grey Mottled with White and Grey
Streaks, Floor Tile and Mastic
940 SF None Detected
43-CC-A,B,C Rooms 110 and 111 Nailed in Cement Boards 1,555 SF None Detected
44-CB-A,B,C Throughout 4" Black Cove Base and
Adhesive 7,524 SF None Detected
45-CM-A,B,C Throughout Yellow Carpet Mastic 750 SF None Detected
46-CC-A,B,C Rooms 115, 116, and 137 Concrete Wall 290 SF None Detected
47-IC-A,B,C Throughout Interior Light Grey Building
Caulk 8,644 LF None Detected
48-SM-A,B,C Throughout White Fluffy Spray-on
Insulation 413 SF None Detected
49-DI-A,B,C Throughout Silver Foil Wrapped Duct
Insulation 150 SF None Detected
Page | 8
ID/Material
Location of Materials Material Estimated Quantity
Asbestos Content
50-DI-A,B,C Throughout Black Plastic Wrapped Duct
Insulation 210 SF None Detected
51-IC-A,B,C Throughout Interior White Multi-Layer
Window Caulk 195 LF None Detected
52-IC-A,B,C Throughout Interior Black Window Caulk 200 LF None Detected
53-SW-A,B,C Room 124 Styrofoam Wallboard
Insulation 75 SF None Detected
54-AD-A,B,C Rooms 125 and 126 Accordion Dividing Wall 250 SF None Detected
55-IC-A,B,C
Main Entrance (South Vestibule), South Main
Corridor, West Vestibule &
Associated Corridor, Central Main Corridor, North Vestibule & Associated Corridor, and Rooms 147, 148, and 152
Interior Black Window Caulk Associated with Windows in
Door Frames 80 LF None Detected
56-CT-A,B,C Room 139 4" x 4" Beige Ceramic Shower Tile and Grout
10 SF None Detected
57-CT-A,B,C Room 140 4" x 4" Pink Ceramic
Shower Tile and Grout 60 SF None Detected
58-FT-A,B,C
West Vestibule &
Associated Corridor and Central Main Corridor
12" x 12" Light Blue with Dark Grey Streaks Floor
Tile and Mastic 160 SF None Detected
59-CB-A,B,C
Lobby and North Main
Corridor 4" Blue Cove Base and
Adhesive 10 SF None Detected
60-Not Sampled
Main Entrance (South Vestibule) & South Main
Corridor
6" x 6" Orange Ceramic Tile
1 SF ASSUMED
61-IC-A,B-C
Main Entrance (South
Vestibule) & South Main Corridor
Interior, Orange, Door Window Caulk
10 LF None Detected
62-PF-A,B,C Room 117 Mudded Fittings Associated with Fiberglass Straight Pipe Insulation
1 Fitting None Detected
63-CM-A,B,C Room 117 Chimney Brick and Mortar 60 SF None Detected
64-WP-A,B,C Room 117 Black Weatherproofing 12 SF None Detected
65-SM-A,B,C Room 119 Light Green Painted Spray-
On Insulation 750 SF None Detected
66-IC-A,B,C Room 117 Interior Brown Firestop
Caulk 6 SF None Detected
67-EC-A,B,C Main Building Exterior Exterior Light Grey Cement
Sidewalk Caulk 150 LF None Detected
68-EC-A,B,C Main Building Exterior Exterior Black Building
Caulk
150 LF
Point Count:
1.25%
Chrysotile
69-EC-A,B,C Main Building Exterior Exterior Medium Grey
Metal Siding Caulk
5 LF
Point Count:
1.5% Chrysotile
Page | 9
ID/Material
Location of Materials Material Estimated Quantity
Asbestos Content
70-EC-A,B,C Main Building Exterior Exterior Red Fire-Stop
Caulk 1 SF None Detected
71-EC-A,B,C Main Building Exterior Exterior Residual Grey Door
Caulk 90 LF None Detected
72-EC-A,B,C Main Building Exterior Exterior Black Window
Caulk
300 LF
Point Count:
1.25%
Chrysotile
73-EC-A,B,C Main Building Exterior Exterior Black Door Caulk 180 LF None Detected
74-CC-A,B,C Main Building Exterior Exterior Cement
Windowsills 85 SF None Detected
75-BM-A,B,C Main Building Exterior Exterior Brick and Mortar 15,000 DG None Detected
76-EC-A,B,C Main Building Exterior Exterior Brown Pipe Penetration Caulk
3 SF None Detected
77-EC-A,B,C Main Building Exterior Exterior White Door Caulk 30 LF None Detected
78-EC-A,B,C Main Building Exterior Exterior Dark Grey Cement
Caulk 40 LF None Detected
79-EC-A,B,C Main Building Exterior Exterior White Building
Caulk 5 LF None Detected
104-RM-
A,B,C
Main Building Roof Main Building Roofing
Material 27,000 SF None Detected
Out Building
80-CC-A,B,C Throughout Poured Concrete Floor 15,625 SF None Detected
81-EJ-A,B,C
Throughout Offices, Open
Garage Space and Loft Area
Concrete Floor Expansion Joint
1,590 LF None Detected
82-CMU-
A,B,C
Throughout CMU Block Wall 9,084 SF None Detected
83-EJ-A,B,C
Throughout Offices, Open
Garage Space and Loft Area
CMU Block Wall Expansion Joint
790 LF None Detected
84-SM-A,B,C
Throughout Offices, Open
Garage Space and Loft Area
Pink Painted Spray-On Insulation
15,625 SF None Detected
85-IC-A,B,C Throughout Interior Grey Door Caulk 135 LF None Detected
86-IC-A,B,C North and South Office White Multi-layer Building
Caulk 60 LF None Detected
87-BM-A,B,C
Throughout Offices, Open
Garage Space and Loft Area
Brick and Mortar 2,320 SF None Detected
88-IC-A,B,C South Office Black Interior Window
Interior Caulk 20 LF None Detected
89-IC-A,B,C South Office Interior Black Window Caulk 15 LF None Detected
90-PI-A,B,C
Open Garage Space, Loft Area, and Storage Area
Fiberglass Straight Pipe Insulation
210 LF None Detected
91-WBS-
A,B,C
Open Garage Space and Loft Area
Wallboard System 2,600 SF None Detected
Page | 10
ID/Material
Location of Materials Material Estimated Quantity
Asbestos Content
92-FT-A,B,C Restroom 12" x 12" Blue/Grey Mottled
Floor Tile and Mastic 60 SF None Detected
93-CB-A,B,C Restroom 4" Blue Cove Base and
Adhesive 32 LF None Detected
94-HS-A,B,C Restroom Heat Shield 1 SF None Detected
95-IC-A,B,C Restroom Interior White Plumbing
Caulk 10 LF None Detected
96-Not Sampled
Restroom and Storage Room
Concrete Ceiling 93 SF ASSUMED
97-WG-A,B,C
Open Garage Space and
Loft Area Interior Second Floor
Window Glaze
260 LF
Point Count:
1.75%
Chrysotile
98-DI-A,B,C
Open Garage Space and
Loft Area Brown Paper Roof Drain
Insulation 5 SF None Detected
99-EC-A,B,C Exterior Exterior Grey Cement Caulk 150 LF None Detected
100-BM-
A,B,C
Exterior Exterior Brick and Mortar 10,000 SF None Detected
101-EC-
A,B,C
Exterior Exterior Black Window
Caulk 15 LF None Detected
102-EC-
A,B,C
Exterior Exterior Multi-layer Door
Caulk 75 LF None Detected
103-RT-
A,B,C
Roof Exterior Roof Tar 15,635 SF None Detected
EA=Exterior Area FS Functional Space NA=Not Applicable ND= None Detected
In the event additional suspect material is discovered during renovation activities, this material should be treated as presumed asbestos-containing material (PACM) in accordance with regulations 29 CFR 1926.1101 and 1910.1001 and other applicable state and local regulations and either sampled to confirm or nullify asbestos content or be treated as ACM and handled accordingly.
Page | 11
4. LEAD-CONTAINING PAINT SAMPLING
Atlas representative Ms. Rachel Kasnow conducted the lead-containing paint (LCP) sampling of the property building from May 27 through June 3, 2025. The sampling included physical sampling of paint coatings that were deemed representative of the predominant paint coatings observed.
Eleven (11) paint chip samples were collected and submitted to Accurate Analytical Testing
Laboratory, 30105 Beverly Road, Romulus, Michigan for lead analysis. Bulk samples were analyzed using the Environmental Protection Agency's Test Method SW 846-7420 and 3050B using Flame AAS to determine lead concentration in percent (%) by weight. Copies of the laboratory analytical report and corresponding chain-of-custody forms are included in Appendix
D.
The following table provides a summary of the LCP sampling:
Table 4-1 Lead-Containing Paint Sampling Results
Sample ID Sample Location Color Lead
Content
Reporting Limit
1-LPC Main Building Doors Gray 0.00185 0.000465
2-LPC Main Building Interior Walls White 0.00997 0.00112
3-LPC Main Building CMU Block Off-White 0.00296 0.00197
4-LPC Main Building CMU Block Yellow 0.0444 0.000820
5-LPC Main Building Cement Green 0.0122 0.00309
6-LPC Main Building Interior Walls White 0.00240 0.000482
7-LPC Outbuilding Metal White 0.482 0.00160
8-LPC Outbuilding Block Red 0.00569 0.00205
9-LPC Outbuilding Interior Walls Pink 0.00266 0.000624
10-LPC Outbuilding CMU Block Pink 0.00266 0.000624
11-LPC Outbuilding Metal Pipes Pink 0.0381 0.00118
Page | 12
5. LEAD DUST WIPE SAMPLING
Lead dust wipe samples were taken by Atlas representative Ms. Linda Shah, within the shooting range area on hard surface floors. Six (6) representative lead dust wipe samples were taken from floor surfaces within and directly connected to the shooting range area and submitted for lead analysis. The results of laboratory testing of the dust wipe samples indicated that two (2) samples contained levels of lead greater than the allowable USEPA HUD standards for floors.
Copies of the laboratory analytical report and corresponding chain-of-custody forms are included in Appendix E.
The following table provides a summary of the lead dust wipe floor sampling:
Table 5-1 Lead Dust Wipe Sampling Results
Dust Wipe Results
Date Of Sampling: 06/10/2025
Sample Number
Location Surface Tested*
Lead Concentration In µg/Ft2
Exceed
USEPA
Standard?
W001 Field Blank N/A N/D N/A
W002 Room 1 Hallway Floor Hard Floor (HF) <5.00 No
W003 Room 2 Shooting Range
Floor; South Entrance Hard Floor (HF) 5.10 No
W004 Room Shooting Range
Floor: Midway Hard Floor (HF) <5.00 No
W005 Room 2 Shooting Range Floor 2/3 of Floor Length
Down Range
Hard Floor
(HF)
10.2 Yes
W006 Room 2 Shooting Range
North Entry Floor Hard Floor
(HF)
313 Yes
USEPA/HUD Standards for Lead Dust Wipes
Floors (µg/ft2 = microgram per square foot) Less than 10 µg/ft2 Windowsills (µg/ft2) Less than 100 µg/ft2 Window troughs (µg/ft2) Less than 100 µg/ft2
Exterior porch floor (µg/ft2) Less than 40 µg/ft2
Page | 13
6. CONCLUSIONS AND RECOMMENDATIONS
6.1 Asbestos Containing Materials
The results of laboratory testing during the pre-renovation asbestos survey conducted at the property indicate that the following materials were found to contain asbestos or assumed to contain asbestos:
Sample ID /Material
Location of Materials
Material Estimated Quantity
Asbestos Content
10-Not Sampled Room 100 Fiberglass HVAC Duct
Insulation
60 SF ASSUMED
12-Not Sampled Room 100 Black Metal Duct Seam
Sealant of HVAC
125 LF ASSUMED
18-RT-A,B,C Room 101 Black Roof Tar 30 SF Point Count:
1.5% Chrysotile
60-Not Sampled
Main Entrance (South Vestibule)
& South Main Corridor
6" x 6" Orange Ceramic Tile
1 SF ASSUMED
68-EC-A,B,C
Main Building
Exterior Exterior Black Building
Caulk
150 LF
Point Count:
1.25% Chrysotile
69-EC-A,B,C
Main Building
Exterior Exterior Medium Grey
Metal Siding Caulk
5 LF
Point Count:
1.5% Chrysotile
72-EC-A,B,C
Main Building
Exterior Exterior Black Window
Caulk
300 LF
Point Count:
1.25% Chrysotile
96-Not Sampled Outbuilding -
Restroom and Storage Room
Concrete Ceiling 93 SF ASSUMED
97-WG-A,B,C
Outbuilding - Open Garage Space and
Loft Area
Interior Second Floor Window Glaze
260 LF
Point Count:
1.75% Chrysotile
If any additional materials are discovered during renovation/demolition activities, such materials must be assumed to contain asbestos until sampling and analysis proves otherwise.
6.2 Lead-Containing Paint
Three (3) representative samples of paint, taken from interior and exterior areas of the building, were collected and submitted for analysis by Flame AAS. The results of laboratory testing during the limited lead-containing paint sampling conducted at the property indicate that two (2) samples contained levels of lead greater than the laboratory reporting limits.
The presence of lead-containing paint requires, under OSHA 1926.62 requirements, that the contractor performing renovation, surface preparation, and other activities that impact or potentially impact the lead- coated components, evaluate potential worker exposures to airborne lead. This evaluation can be based, for the specific activities denoted in 1926.62, on objective data obtained by the contractor on other, similar, worksites within the prior calendar year. In addition, lead-containing paint and lead-coated waste and construction debris must be evaluated and, on a case-by-case basis depending on this evaluation, quantitative analysis be performed on these waste steams to ensure compliance with EPA waste disposal regulations.
Page | 14
The presence of Lead-Containing Paint (LCP) and/or Lead-Based Paint (LBP) does not, in itself, trigger regulatory compliance actions. However, when these materials are disturbed, the requirements of OSHA (1926.1101) and EPA may become operative. Appropriate actions in terms of removal methods, emissions control, worker protection, and waste disposal should be considered by the general contractor and applicable subcontractors while completing renovation activities.
6.3 Lead Dust Wipe Sampling
Lead contaminated dust is an exposure pathway for lead poisoning. Atlas recommends areas that had lead dust levels exceeding allowable USEPA HUD standards be cleaned by a State of Michigan licensed lead abatement contractor. Engineering controls should be evaluated to determine if adjustments are needed to existing HVAC systems or additional systems need to be installed. A routine maintenance schedule including regular cleaning in the impacted areas should be implemented.
7. ASSUMPTIONS AND LIMITATIONS
The results, findings, conclusions, and recommendations expressed in the report are based only on conditions that were noted during the NESHAP inspections conducted from May 19 through
May 21, 2025 performed by Atlas. Selection of sample locations and frequency of sampling were based on EPA Guidance documents, Atlas’s observations, and the assumption that building vintage and renovation history information presented to Atlas allowed the proper designation of homogenous materials for each building.
This document does not contain the elements necessary for an Abatement Work plan, and this document does not contain, nor should it take the place of technical specifications for ACM removal.
Our professional services have been performed, our findings obtained, and our conclusions and recommendations prepared in accordance with customary principles and practices in the fields of environmental science and engineering. This statement is in lieu of other statements either expressed or implied. This report does not warrant against changes to material from future operations or conditions, nor does it warrant against operations or conditions against present
ACM material in locations not investigated.
The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user.
APPENDIX A
SAMPLE LOCATION DRAWING
Asbestos and Lead Paint Chip
Sample Location Map
Main Building (1-54)
PROJECT NUMBER: 188BS25305
DRAWN BY: Rachel Kasnow REVIEWED BY Atlas
FIGURE: 1
DATE: 6/11/2025
4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0
N o v i , M i c h i g a n 4 8 3 7 7
P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7
KEY
Asbestos Sample Location
Lead Paint Chip Sample Location
Positive Materials HA#
Assumed Materials HA#
State of Michigan – Waterford Armory
2650 Watkins Lake Road, Waterford, MI 48328
23-IC-A,B,C
1-CC-B
1-CC-C
39-FT-B
4-CMU-A
11-PM-A
5-EJ-A,B,C
7-IC-A
9-SM-D,E 13-IC-A,B,C
3-EJ-B
2-EJ-B
8-PI-B
2-EJ-A
9-SM-A,B,C
3-EJ-A
7-IC-C
40-FT-B
3-EJ-C
14-IC-A
40-FT-C
15-PB-A,B,C
16-PI-A,B,C
17-CC-A,B,C
18-RT-A,B,C
2-EJ-C
4-CMU-B
21-IC-B
4-CMU-C
36-WBS-A
7-IC-B
45-CM-A
8-PI-A
66-IC-A,B,C
11-PM-B
11-PM-C
46-CC-A,B,C
47-IC-B
14-IC-C
14-IC-B
24-IC-A,B,C
25-CP-A,B,C
43-CC-A,B,C
19-CT-A
22-IC-A
21-IC-A
20-CTG-A,B,C
34-SU-C
19-CT-B,C
33-IC-A,B,C
8-PI-C
30-CT-A,B,C
1-CC-A
41-FT-A,B,C
22-IC-B
22-IC-C
45-CM-B
26-HS-B
26-HS-C
29-IC-A
26-HS-A
29-IC-B
31-CTG-A,B,C
32-PA-A,B,C
27-CT-A,B,C
28-CT-A
28-CT-B,C
29-IC-C
34-SU-B
34-SU-A
35-CP-A
48-SM-A
49-DI-A
50-DI-A
35-CP-B
36-WBS-B
48-SM-B
49-DI-C
53-SW-A,B,C
35-CP-C
36-WBS-C
37-BM-A,B,C
38-CB-C
38-CB-B
39-FT-A
38-CB-A
39-FT-C
40-FT-A
42-FT-A,B,C
44-CB-A
44-CB-C
44-CB-B
45-CM-C
48-SM-E
47-IC-A
47-IC-C
48-SM-C
48-SM-D
48-SM-F
48-SM-G
49-DI-B
50-DI-B
50-DI-C
51-IC-A
52-IC-B
51-IC-C
51-IC-B
52-IC-A
52-IC-C
54-AD-A,B,C
59-CB-A,B,C
10-DI-A,B,C
12-DS-A,B,C
Asbestos and Lead Paint Chip
Sample Location Map
Main Building
PROJECT NUMBER: 188BS25305
DRAWN BY: Rachel Kasnow REVIEWED BY Atlas
FIGURE: 2
DATE: 6/11/2025
4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0
N o v i , M i c h i g a n 4 8 3 7 7
P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7
KEY
Asbestos Sample Location
Lead Paint Chip Sample Location
Positive Materials HA#
Assumed Materials HA#
State of Michigan – Waterford Armory
2650 Watkins Lake Road, Waterford, MI 48328
77-EC-A73-EC-A
71-EC-B
73-EC-B
73-EC-C
78-EC-B,C
62-PF-A,B,C
66-IC-A,B,C
65-SM-C
77-EC-B,C
57-CT-A,B,C
69-EC-C
61-IC-A,B,C
52-IC-C
55-IC-C
58-FT-A,B,C
55-IC-A55-IC-B
56-CT-A,B,C
59-CB-A,B,C
63-CM-A,B,C
64-WP-A,B,C
65-SM-A,B
67-EC-A
68-EC-B
67-EC-B
67-EC-C
72-EC-A
74-CC-A,B,C
75-BM-A,B,C
72-EC-B
72-EC-C
76-EC-A
68-EC-A
71-EC-A
69-EC-A,B
70-EC-A,B,C
68-EC-C
76-EC-B
79-EC-A,B,C
78-EC-A
76-EC-C
104-RM-A,B,C
1-LPC
2-LPC
3-LPC
4-LPC
5-LPC
71-EC-C
60-CT-A,B,C
State of Michigan – Waterford Armory
2650 Watkins Lake Rd, Waterford, MI
48328
Asbestos and Lead Chip Paint
Sample Location Map -
Outbuilding
PROJECT NUMBER: 188BS25305
DRAWN BY: Rachel Kasnow REVIEWED BY Atlas
FIGURE: 3
DATE: 6/11/2025
4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0
N o v i , M i c h i g a n 4 8 3 7 7
P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7
KEY
Asbestos Sample Location
Lead Paint Chip Sample Location
Positive Materials HA#
Assumed Materials HA#
MAP NOT TO SCALE
South Office
North Office
Storage Bathroom
Open Garage
Second Floor Open Loft Space
100-BM-A
84-SM-A
98-DI-A,B,C
103-RT-A
84-SM-D
90-PI-B
90-PI-C
103-RT-B,C
102-EC-A
100-BM-C
102-EC-C
102-EC-B
101-EC-A,B,C
100-BM-B
99-EC-A,B,C
91-WBS-C
97-WG-A
97-WG-B
83-EJ-A,B,C
97-WG-C
89-IC-B,C
94-HS-A,B,C
92-FT-A,B,C
93-CB-A,B,C
95-IC-A
95-IC-B,C
82-CMU-A,B,C
91-WBS-A,B
90-PI-A
89-IC-A
85-IC-A,B
88-IC-A,B,C
87-BM-A,B,C
86-IC-A
86-IC-B
86-IC-C
80-CC-A,B,C
85-IC-C
84-SM-B
84-SM-C
84-SM-E
81-EJ-C
81-EJ-B
81-EJ-A
8-LPC
6-LPC
11-LPC
10-LPC
9-LPC
7-LPC
96-CC-A,B,C
APPENDIX B
PHOTO LOG
State of Michigan - Waterford Armory
Photograph Log 2650 Watkins Lake Road Waterford Township, Michigan 48328
188BS25305
Photograph #1
Homogenous Material Description
HA-1: Poured Concrete Floors
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
20,531 SF
Additional Notes
Photograph #2
HA-2: Concrete Floor Expansion Joint
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
446 LF
Photograph #3
HA-3: Concrete Floor, Soft, Grey Expansion Joint
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
345 LF
Waterford Township, Michigan 48328
Photograph #4
HA-4: CMU Block Wall Mortar
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
22,250 SF
Photograph #5
HA-5: CMU Block Wall Expansion Joint
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
845 LF
Photograph #6
HA-6: Interior Red Fire Stop Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
11 SF
Waterford Township, Michigan 48328
Photograph #7
HA-7: Grey Interior Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
140 LF
Photograph #8
HA-8: Fiberglass Pipe Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
742 LF
Photograph #9
HA-9: Yellow Painted White, Fluffy Spray on Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
3,825 SF
Waterford Township, Michigan 48328
Photograph #10
HA-10: Fiberglass HVAC Duct Insulation
Asbestos Present (Yes/No/Assumed)
Assumed
Total Quantity Present
60 SF
Photograph #11
HA-11: Pinkish Brown Pipe Penetration Mud
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
3 SF
Photograph #12
HA-12: Black Metal Duct Seam Sealant of HVAC
Asbestos Present (Yes/No/Assumed)
Assumed
Total Quantity Present
125 LF
Waterford Township, Michigan 48328
Photograph #13
HA-13: Interior Tan Brittle Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
15 LF
Photograph #14
HA-14: Interior Off-White Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
490 LF
Photograph #15
HA-15: Pressboard Penetration Hole Filler
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
1 SF
Waterford Township, Michigan 48328
Photograph #16
HA-16: Packing Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Photograph #17
HA-17: Concrete Ceiling
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
2,757 SF
Photograph #18
HA-18: Black Roof Tar
Asbestos Present (Yes/No/Assumed)
1.5% Chrysotile (point count)
Total Quantity Present
30 SF
Waterford Township, Michigan 48328
Photograph #19
HA-19: 6" x 6" Tan Ceramic Floor Tile and Grout
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
728 SF
Photograph #20
HA-20: 6" x 16" Grey Block Wall and Grout
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
1,750 SF
Photograph #21
HA-21: Interior Tan/Gold Building Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
655 LF
Waterford Township, Michigan 48328
Photograph #22
HA-22: Interior White Building Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
277 LF
Photograph #23
HA-23: Interior Grey, Brittle Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
3 LF
Photograph #24
HA-24: Interior Brittle Multi-Layer Sink Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
5 LF
Waterford Township, Michigan 48328
Photograph #25
HA-25: 2' x 4' Ceiling Panel with Pinholes and Long Gouges
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
208 SF
Photograph #26
HA-26: Heat Shield
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
2 EA
Photograph #27
HA-27: 4" Beige Speckled Cove Base Ceramic Floor Tile and Grout
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
75 SF
Waterford Township, Michigan 48328
Photograph #28
HA-28: 1" x 1" Beige Ceramic Floor Tile and Grout
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
101 SF
Photograph #29
HA-29: Interior White Plumbing Fixture Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
75 SF
Photograph #30
HA-30: 4" Pink Cove Base Ceramic Tile and Grout
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
69 SF
Waterford Township, Michigan 48328
Photograph #31
HA-31: 1" x 1" Off-White Ceramic Tile Floor and Grout
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
145 SF
Photograph #32
HA-32: Paper and Adhesive Under Plumbing Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
235 SF
Photograph #33
HA-33: Interior Light Grey Multi-Layer Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Waterford Township, Michigan 48328
Photograph #34
HA-34: Grey Sink Undercoating
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
110 SF
Photograph #35
HA-35: 2' x 4' Ceiling Panel with Pinholes and Small Gouges
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
14,152 SF
Photograph #36
HA-36: Wallboard System
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
10,210 SF
Waterford Township, Michigan 48328
Photograph #37
HA-37: Multi-Color Brick and Mortar
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
2,730 SF
Photograph #38
HA-38: 4" Grey Cove Base and Adhesive
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
1,003 LF
Photograph #39
HA-39: 12"x 12" Light Grey/Blue Mottled with White and Grey Streaks, Floor Tile and Mastic
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
5,183 SF
Waterford Township, Michigan 48328
Photograph #40
HA-40: 12" x 12" Blue/Grey Mottled with White Streaks, Floor Tile and Mastic
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Photograph #41
HA-41: 12" x 12"Blue Mottled Floor Tile and Mastic
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
102 SF
Photograph #42
HA-42: 12" x 12" Light Grey Mottled with White and Grey Streaks, Floor Tile and Mastic
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
15 SF
Waterford Township, Michigan 48328
Photograph #43
HA-43: Nailed in Cement Boards
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
940 SF
Photograph #44
HA-44: 4" Black Cove Base and Adhesive
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
1,555 SF
Photograph #45
HA-45: Yellow Carpet Mastic
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
7,524 SF
Waterford Township, Michigan 48328
Photograph #46
HA-46: Concrete Wall
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
750 SF
Photograph #47
HA-47: Interior Light Grey Building Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
290 LF
Photograph #48
HA-48: White Fluffy Spray-on Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
8,344 SF
Waterford Township, Michigan 48328
Photograph #49
HA-49: Silver Foil Wrapped Duct Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
393 SF
Photograph #50
HA-50: Black Plastic Wrapped Duct Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
95 SF
Photograph #51
HA-51: Interior White Multi-Layer Window Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
210 LF
Waterford Township, Michigan 48328
Photograph #52
HA-52: Interior Black Window Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
195 LF
Photograph #53
HA-53: Styrofoam Wallboard Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
300 SF
Photograph #54
HA-54: Accordion Dividing Wall
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
200 SF
Waterford Township, Michigan 48328
Photograph #55
HA-55: Interior Black Window Caulk Associated with Windows in Door Frames
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
75 LF
Photograph #56
HA-56: 4" x 4" Beige Ceramic Shower Tile
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
250 SF
Photograph #57
HA-57: 4" x 4" Pink Ceramic Shower Tile
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
80 SF
Waterford Township, Michigan 48328
Photograph #58
HA-58: 12" x 12" Light Blue with Dark Grey Streaks Floor Tile and Mastic
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
10 SF
Photograph #59
HA-59: 4" Blue Cove Base and Adhesive
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
60 LF
Photograph #60
HA-60: 6" x 6" Orange Ceramic Tile
Asbestos Present (Yes/No/Assumed)
Assumed
Total Quantity Present
160 SF
Waterford Township, Michigan 48328
Photograph #61
HA-61: Interior, Orange, Door Window Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
10 LF
Photograph #62
HA-62: Mudded Fittings Associated with Fiberglass Straight Pipe Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
1 EA
Photograph #63
HA-63: Chimney Brick and Mortar
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Waterford Township, Michigan 48328
Photograph #64
HA-64: Black Weatherproofing
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
12 SF
Photograph #65
HA-65: Green Spray-On Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
750 SF
Photograph #66
HA-66: Interior Brown Firestop Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
6 SF
Waterford Township, Michigan 48328
Photograph #67
HA-67: Exterior Light Grey Cement Sidewalk Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
150 LF
Photograph #68
HA-68: Exterior Black Building Caulk
Asbestos Present (Yes/No/Assumed)
Point Count: 1.25% Chrysotile
Total Quantity Present
Photograph #69
HA-69: Exterior Medium Grey Metal Siding Caulk
Asbestos Present (Yes/No/Assumed)
Point Count: 1.5% Chrysotile
Total Quantity Present
Waterford Township, Michigan 48328
Photograph #70
HA-70: Exterior Red Fire-Stop Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Photograph #71
HA-71: Exterior Residual Grey Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
90 LF
Photograph #72
HA-72: Exterior Black Window Caulk
Asbestos Present (Yes/No/Assumed)
Point Count: 1.25% Chrysotile
Total Quantity Present
300 LF
Waterford Township, Michigan 48328
Photograph #73
HA-73: Exterior Black Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
180 LF
Photograph #74
HA-74: Exterior Cement Windowsills
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
85 SF
Photograph #75
HA-75: Exterior Brick and Mortar
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
15,000 SF
Waterford Township, Michigan 48328
Photograph #76
HA-76: Exterior Brown Pipe Penetration Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
3 SF
Photograph #77
HA-77: Exterior White Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
30 LF
Photograph #78
HA-78: Exterior Dark Grey Cement Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
40 LF
Waterford Township, Michigan 48328
Photograph #79
HA-79: Exterior White Building Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Photograph #80
HA-80: Outbuilding - Poured Concrete Floor
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
15,625 SF
Photograph #81
HA-81: Outbuilding - Concrete Floor Expansion Joint
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
1,590 LF
Waterford Township, Michigan 48328
Photograph #82
HA-82: Outbuilding - CMU Block Wall
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
10,000 SF
Photograph #83
HA-83: Outbuilding - CMU Block Wall Expansion Joint
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
790 LF
Photograph #84
HA-84: Outbuilding - Pink Spray-On Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
15,625 SF
Waterford Township, Michigan 48328
Photograph #85
HA-85: Outbuilding - Interior Grey Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
130 LF
Photograph #86
HA-86: Outbuilding - White Multi-layer Building Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
60 LF
Photograph #87
HA-87: Outbuilding - Brick and Mortar
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
2,320 SF
Waterford Township, Michigan 48328
Photograph #88
HA-88: Outbuilding - Black Interior Window Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
20 LF
Photograph #89
HA-89: Outbuilding - Interior Black Window Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Photograph #90
HA-90: Outbuilding - Fiberglass Straight Pipe Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
210 LF
Waterford Township, Michigan 48328
Photograph #91
HA-91: Outbuilding - Wallboard System
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
2,600 SF
Photograph #92
HA-92: Outbuilding - 12" x 12" Blue/Grey Mottled Floor Tile and Mastic
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Photograph #93
HA-93: Outbuilding - 4" Blue Cove Base and Adhesive
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
32 LF
Waterford Township, Michigan 48328
Photograph #94
HA-94: Outbuilding – Heat Shield
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
1 EA
Photograph #95
HA-95: Outbuilding - Interior White Plumbing Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
10 LF
Photograph #96
HA-96: Outbuilding – Concrete Ceiling
Asbestos Present (Yes/No/Assumed)
Assumed
Total Quantity Present
138 SF
Waterford Township, Michigan 48328
Photograph #97
HA-97: Outbuilding - Interior Second Floor Window Glaze
Asbestos Present (Yes/No/Assumed)
Point Count: 1.75% Chrysotile
Total Quantity Present
260 LF
Photograph #98
HA-98: Outbuilding - Brown Paper Roof Drain Insulation
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
5 SF
Photograph #99
HA-99: Outbuilding - Exterior Grey Cement Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Waterford Township, Michigan 48328
Photograph #100
HA-100: Outbuilding - Exterior Brick and Mortar
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
10,000 SF
Photograph #101
HA-101: Outbuilding - Exterior Black Window Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
Photograph #102
HA-102: Outbuilding - Exterior Multi-layer Door Caulk
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
75 LF
Waterford Township, Michigan 48328
Photograph #103
HA-103: Outbuilding - Exterior Roof Tar
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
15,635 SF
Photograph #104
HA-104: Roofing Material
Asbestos Present (Yes/No/Assumed)
No
Total Quantity Present
27,000 SF
Waterford Township, Michigan 48328
Photograph #1
HA-1: Grey Paint on Metal
Asbestos Present (Yes/No/Assumed)
Total Quantity Present
Photograph #2
LPC-2: White Paint on Drywall
Photograph #3
LPC-3: Off-White Paint on CMU Block
Waterford Township, Michigan 48328
Photograph #4
LPC-4: Yellow Paint on CMU Block
Photograph #5
LPC-5: Green Paint on Cement
Photograph #6
LPC-6: White Paint on Drywall
Waterford Township, Michigan 48328
Photograph #7
LPC-7: White Paint on Metal
Photograph #8
LPC-8: Red Paint on CMU Block
Photograph #9
LPC-9: Pink Paint on Drywall
Waterford Township, Michigan 48328
Photograph #10
LPC-10: Pink Paint on CMU Block
Photograph #11
LPC-11: Pink Paint on Metal
APPENDIX C
ASBESTOS LABORATORY REPORT
Environmental Testing Laboratories, Inc.
37575 W Huron River Drive Romulus, Michigan 48174
(734) 955-6600
Fax: (734) 955-6604
To:
Attention:
Atlas - Novi
46555 Humboldt Dr. Suite 100
Novi, Michigan 48377
Project Location:
State of Michigan
Waterford Armory
Client Project: 188BS25305
279409ETL Job:
Jennifer Fashbaugh
Lab Sample Number Client Sample Number Sample Type Completed
1795753 Asbestos1-CC-A 06/10/2025
1795754 Asbestos1-CC-B 06/10/2025
1795755 Asbestos1-CC-C 06/10/2025
1795756 Asbestos2-EJ-A 06/10/2025
1795757 Asbestos2-EJ-B 06/10/2025
1795758 Asbestos2-EJ-C 06/10/2025
1795759 Asbestos3-EJ-A 06/10/2025
1795760 Asbestos3-EJ-B 06/10/2025
1795761 Asbestos3-EJ-C 06/10/2025
1795762 Asbestos4-CMU-A 06/10/2025
1795763 Asbestos4-CMU-B 06/10/2025
1795764 Asbestos4-CMU-C 06/10/2025
1795765 Asbestos5-EJ-A 06/10/2025
1795766 Asbestos5-EJ-B 06/10/2025
1795767 Asbestos5-EJ-C 06/10/2025
1795768 Asbestos6-IC-A 06/10/2025
This report is intended for use solely by the individual or entity to which it is addressed. This report may not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. It may contain information that is privileged, confidential and otherwise exempt by law from disclosure. If the reader of this information is not the intended recipient or an employee of its intended recipient, you are herewith notified that any dissemination, distribution or copying of this information is strictly prohibited. If you have received this information in error, please notify ETL immediately. Thank you.
Lab Sample Number Client Sample Number Sample Type Completed
1795769 Asbestos6-IC-B 06/10/2025
1795770 Asbestos6-IC-C 06/10/2025
1795771 Asbestos7-IC-A 06/10/2025
1795772 Asbestos7-IC-B 06/10/2025
1795773 Asbestos7-IC-C 06/10/2025
1795774 Asbestos8-PI-A 06/10/2025
1795775 Asbestos8-PI-B 06/10/2025
1795776 Asbestos8-PI-C 06/10/2025
1795777 Asbestos9-SM-A 06/10/2025
1795778 Asbestos9-SM-B 06/10/2025
1795779 Asbestos9-SM-C 06/10/2025
1795780 Asbestos9-SM-D 06/10/2025
1795781 Asbestos9-SM-E 06/10/2025
1795782 Asbestos11-PM-A 06/10/2025
1795783 Asbestos11-PM-B 06/10/2025
1795784 Asbestos11-PM-C 06/10/2025
1795785 Asbestos13-IC-A 06/10/2025
1795786 Asbestos13-IC-B 06/10/2025
1795787 Asbestos13-IC-C 06/10/2025
1795788 Asbestos14-IC-A 06/10/2025
1795789 Asbestos14-IC-B 06/10/2025
1795790 Asbestos14-IC-C 06/10/2025
1795791 Asbestos15-PB-A 06/10/2025
1795792 Asbestos15-PB-B 06/10/2025
1795793 Asbestos15-PB-C 06/10/2025
1795794 Asbestos16-PI-A 06/10/2025
This report is intended for use solely by the individual or entity to which it is addressed. This report may not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. It may contain information that is privileged, confidential and otherwise exempt by law from disclosure. If the reader of this information is not the intended recipient or an employee of its intended recipient, you are herewith notified that any dissemination, distribution or copying of this information is strictly prohibited. If you have received this
1795795 Asbestos16-PI-B 06/10/2025
1795796 Asbestos16-PI-C 06/10/2025
1795797 Asbestos17-CC-A 06/10/2025
1795798 Asbestos17-CC-B 06/10/2025
1795799 Asbestos17-CC-C 06/10/2025
1795800 Asbestos18-RT-A 06/10/2025
1795801 Asbestos18-RT-B 06/10/2025
1795802 Asbestos18-RT-C 06/10/2025
1795803 Asbestos19-CT-A 06/10/2025
1795804…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .