KCF Fire Alarm System Upgrades - Project Summary
This file comprises design and construction drawings for fire alarm system upgrades at Kinross Correctional Facility (KCF), a Michigan Department of Technology, Management and Budget (DTMB) project under File No. 472/25257.ABG. The project involves replacement of fire alarm systems across ten buildings at the main campus located at 4533 W Industrial Drive, Kincheloe, Michigan 49788, and one offsite warehouse facility at 16807 S Hugginin Street, Kincheloe, Michigan 49788. The scope includes removal of existing fire alarm components and installation of new systems with fire alarm control panels (FACP), fire alarm booster panels (FAAP), smoke detectors, manual pull stations with key-operated access, horn/strobe devices, flow and tamper switches, duct smoke detectors, and integration with the facility's existing STARNET monitoring system. The affected buildings include the Administration Building, Education Building, Food Service Building, Housing Units A through H, Maintenance Building, Offsite Warehouse (two levels), and Pavilion Building. The project documentation indicates 50% design review submittal on September 12, 2025, 90% review submittal on September 23, 2025, with plan review and bidding scheduled for November 7, 2025.
All electrical work shall comply with Michigan Part 8 and the Michigan Building Code, and installation must be performed by a firm certified by the Michigan Department of Consumer Industries Services, Office of Fire Safety. The fire alarm contractor is responsible for obtaining all necessary permits and paying applicable fees. The contractor must keep existing systems operational during construction, with the proposed fire alarm system becoming operational prior to disabling existing systems. Complete removal of existing fire alarm components shall occur only after new systems have been inspected, approved, and operational for thirty days. All devices removed must be carefully salvaged and returned to the Department of Corrections in good working condition. The contractor is required to provide connection modules for the STARNET II monitoring system for each new fire alarm panel, re-use existing 120-volt AC circuits, and provide new red-colored circuit breakers with locks. All new pull stations must be mounted at 48 inches above finished floor on the latch side of egress doors unless otherwise noted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHIGAN
LAKE
MICHIGAN
LAKE
SUPERIOR
HURON
LAKE
33 G5
30 65
CEDARVILLE
HESSEL
WHITEFISH
POINT
SAULT
STE
MARIE
NATIONAL PARK
ISLE ROYALE
NORWAY
MARENISCO
WHITE PINE
BERGLAND
NEWBERRY
SILVER
CITY
BESSEMER
IRONWOOD
WAKEFIELD
GWINN
HERMANSVILLE
IRON MOUNTAIN
VULCAN
TROUT
WATERSMEET
CREEK
CROSSING
MASS
CITY
BRUCE
ONTONAGON
ROCKLAND
BARAGA
ARNHEIM
CRYSTAL
FALLS
ISHPEMING
MICHIGAMME
L'ANSE
AURA SKANEE
MARQUETTE
NEGAUNEE
MANISTIQUE
ESCANABA
FAYETTE
GARDEN
MUNISING
CURTIS
CITY
GOULD
HARBOR
CALUMET
RIPLEY
CHASSELL
HANCOCK
DELAWARE
LAKE LINDEN
LAURIUM
EAGLE
HARBOR
COPPER
MACKINAC
ISLAND
IGNACE
ST
INDIAN
RIVER
CHEBOYGAN
MACKINAW CITY
PELSTON
ONAWAY
GAYLORD
PETOSKEY
CHARLEVOIX
MANCELONA
KALKASKA
TRAVERSE
CITY
EMPIRE
ELBERTA
ARCADIA
MANISTEE
SCOTTVILLE
BALDWINLUDINGTON
SHELBY
BIG RAPIDS
MOUNT
PLEASANT
CADILLAC
GRAYLING
EAST
TAWAS
ROSCOMMON
LACHINE ALPENA
WOLVERINE
ATLANTA
ROGERS CITYALANSON
CROSS
VILLAGE
BOYNE CITY
BELLAIRE
JORDAN
E.
EASTPORTNORTHPORT
LELAND
BUCKLEY
FIFE
LAKE
FRANKFORT
MESICK
MANTON
BEAR
LAKE
LILLEY
HESPERIA
WHITE
CLOUD
EVART
REMUS
MIDLAND
SAGINAW
BAY
CITY
HARRISVILLE
CURRAN
MIO
OSCODA
TAWAS CITY
WEST
BRANCH
STANDISH
GLADWIN
McBAIN
LAKE CITY
CLARE
CARO
TROUT LAKE
BREVORT
MOHAWK
GRAND MARAIS PARADISE
SENEY
SHINGLETON
HOUGHTON
IRON
RIVER
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI Q U ERIS P E N INSULAM A MOENAMA
FILE NO.: 472 / 25257.ABG
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
w w w .u pe a.
co m
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
1:
:3
PM
KCF FIRE ALARM UPGRADES
STATE OF MICHIGAN DTMB/DOC FILE NO. 472/25257.ABG
G001
COVER SHEET
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
KINROSS CORRECTIONAL FACILITY,
4533 W INDUSTRIAL DR,
KINCHELOE, MI 49788
PROJECT VICINITY MAP SHEET INDEX
NUMBER SHEET NAME
G001 COVER SHEET
E001 ELECTRICAL ABBREVIATIONS
E100 AERIAL VIEW / VICINITY MAP
E101 SITE PLAN
ED101 ADMIN BUILD. FIRE ALARM PLAN DEMO
ED102 EDUCATION BUILD. FIRE ALARM PLAN DEMO
ED103 FOOD SERVICE FIRE ALARM PLAN DEMO
ED104 HOUSE UNIT A & B FIRE ALARM PLAN DEMO
ED105 HOUSE UNIT C & D FIRE ALARM PLAN DEMO
ED106 HOUSE UNIT E & F FIRE ALARM PLAN DEMO
ED107 HOUSE UNIT G & H FIRE ALARM PLAN DEMO
ED108 MAINT. BUILD. FIRE ALARM PLAN DEMO
ED109 OFFSITE WAREHOUSE FIRE ALARM PLAN DEMO
ED110 OFFSITE WAREHOUSE FIRE ALARM PLAN - SECOND FLOOR DEMO
ED111 PAVILION FIRE ALARM PLAN DEMO
E102 ADMIN BUILD. FIRE ALARM PLAN
E103 EDUCATION BUILD. FIRE ALARM PLAN
E104 FOOD SERVICE FIRE ALARM PLAN
E105 HOUSE UNIT A & B FIRE ALARM PLAN
E106 HOUSE UNIT C & D FIRE ALARM PLAN
E107 HOUSE UNIT E & F FIRE ALARM PLAN
E108 HOUSE UNIT G & H FIRE ALARM PLAN
E109 MAINT. BUILD. FIRE ALARM PLAN
E110 OFFSITE WAREHOUSE FIRE ALARM PLAN
E111 OFFSITE WAREHOUSE FIRE ALARM PLAN - SECOND FLOOR
E112 PAVILION FIRE ALARM PLAN
E501 ELECTRICAL DETAILS
E502 ELECTRICAL DETAILS
E503 FIRE ALARM RISER ADMIN BUILDING
E504 FIRE ALARM RISER EDUCATION BUILDING
E505 FIRE ALARM RISER FOOD SERVICE BUILDING
E506 FIRE ALARM RISER HOUSING UNIT A & B
E507 FIRE ALARM RISER HOUSING UNIT C & D
E508 FIRE ALARM RISER HOUSING UNIT E & F
E509 FIRE ALARM RISER HOUSING UNIT G & H
E510 FIRE ALARM RISER MAINTENANCE BUILDING
E511 FIRE ALARM RISER OFFSITE WAREHOUSE
E512 FIRE ALARM RISER PAVILION BUILDING
E601 ELECTRICAL SCHEDULES
Project Contact List for KCF Fire Alarm – File No. 472/25257.ABG
STATE OF MICHIGAN – DTMB
ALAN GOSCHKA, AIA – PROJECT DIRECTOR (517) 388-3489
EMAIL: GOSCHKAA@MICHIGAN.GOV
DAN HALL – FIELD REPRESENTATIVE (517) 256-4938
EMAIL: HALLD22@MICHIGAN.GOV
STATE OF MICHIGAN – DEPARTMENT OF CORRECTIONS
AMOS WOODS – (906) 495-2282
EMAIL: WOODSA@MICHIGAN.GOV
BEN VERWAY – FACILITY REPRESENTATIVE (517) 388-2171
EMAIL: VERWAYB@MICHIGAN.GOV
KEN CORWIN – FIRE SAFETY SUPERVISOR
EMAIL: CORWINK@MICHIGAN.GOV
CRAIG WALLIS – FIRE SAFETY INSPECTOR
EMAIL: WALLISC1@MICHIGAN.GOV
PROFESSIONAL SERVICE CONTRACTOR
JEREMY GAGNON – PRIMARY CONTACT
ASSOCIATE | PROJECT/OFFICE MANAGER
U.P. ENGINEERS & ARCHITECTS, INC.
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
(906) 635-0511
EMAIL: JGAGNON@UPEA.COM
PAUL MARTTILA, P.E. – ELECTRICAL ENGINEER
U.P. ENGINEERS & ARCHITECTS, INC.
100 PORTAGE STREET
HOUGHTON, MI 49931
(906) 315-1342
EMAIL: PMARTTILA@UPEA.COM
PROJECT SUMMARY:
THE PROJECT INCLUDES: REPLACEMENT OF FIRE ALARM SYSTEMS FOR 10
BUILDINGS AT KCF
ALL ELECTRICAL WORK WILL BE IN ACCORDANCE WITH THE MICHIGAN PART 8
AND MICHIGAN BUILDING CODE.
THE MAIN PROJECT SITE ADDRESS IS:
KINROSS CORRECTIONAL FACILITY, 4533 W INDUSTRIAL DR,
KINCHELOE, MI
49788
OFFSITE WAREHOUSE ADDRESS IS:
16807 S HUGGININ ST,
KINCHELOE, MI
49788
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
FAAP
FACP
ELECTRICAL ABBREVIATIONS, SYMBOLS AND NOTES
ABBREVIATIONS AND SYMBOLS LEGEND NOTES & DETAILS
ELR
CARBON MONOXIDE DETECTOR
1. IT SHALL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO NOTIFY OTHER
CONTRACTORS TO ARRANGE CLEARANCES AND ACCESS OPENINGS FOR ALL LARGE ELECTRICAL
EQUIPMENT.
2. IT SHALL BE UNDERSTOOD THAT THE ACT OF SUBMITTING A BID BY THE CONTRACTOR
CARRIES WITH IT THE AGREEMENT TO ALL ITEMS AND CONDITIONS REFERRED OR INDICATED OR
IMPLIED ON THE DRAWINGS AND THE SPECIFICATIONS AND NO CONSIDERATION WILL BE
GRANTED FOR ANY ALLEGED MISUNDERSTANDING OF MATERIALS TO BE FURNISHED FOR WORK
TO BE DONE.
3. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH RULES AND REGULATIONS OF THE
LATEST EDITION OF THE OCCUPATIONAL SAFETY AND HEALTH ACT, NATIONAL ELECTRICAL CODE, STATE ELECTRICAL CODE, LOCAL MUNICIPAL CODE AND ANY OTHER BOARD HAVING
JURISDICTION OVER THE ELECTRICAL INSTALLATION.
4. THE ELECTRICAL CONTRACTOR SHALL NOT ASSUME THAT ANY DRAWING OR
SPECIFICATION FORMING A PART OF THE CONTRACT DOCUMENTS AUTHORIZES THE VIOLATION
OF ANY CODE, REGULATION OR STANDARD. WHERE CONFLICTS ARISE, IT SHALL BE DEEMED THAT
THE CONTRACTOR HAS ESTIMATED THE COST OF ALL WORK TO BE COMPLETED IN ACCORD WITH
THE PREVAILING CODE.
5. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR ELECTRICAL WORK AND
SHALL PAY ALL REQUIRED FEES AND SALES OR USE TAX AND FINES AS APPLICABLE TO THIS
BRANCH OF WORK.
6. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL DELIVER TO THE OWNER
WITHOUT COST ALL REQUIRED CERTIFICATES OF INSPECTION AND APPROVAL.
7. THE INTENT AND OBJECT OF THESE SPECIFICATIONS AND DRAWINGS IS TO INCLUDE A
COMPLETE WIRING SYSTEM FROM SERVICE PANEL TO EACH AND EVERY OUTLET INDICATED OR
SPECIFIED, INCLUDING CONNECTING ALL ELECTRICAL DEVICES AND/OR EQUIPMENT FURNISHED
BY THE OWNER OR OTHER CONTRACTORS.
8. THE DRAWINGS, WHICH CONSTITUTE A PART OF THE CONTRACT, ARE DIAGRAMMATIC AND
INDICATE THE GENERAL ARRANGEMENT OF CIRCUITS AND OUTLETS, LOCATION OF SWITCHES,
PANELBOARD AND OTHER WORK, BUT EXTREME ACCURACY IS NOT GUARANTEED AND FIELD
VERIFICATION OF ALL LOCATIONS AND DIMENSIONS IS DIRECTED.
9. GROUND ALL EQUIPMENT INCLUDING CONDUIT, RECEPTACLES, LIGHTING, MOTORS, PIPING
AS PER ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE, AND AS SHOWN ON THESE DRAWINGS.
10. PROVIDE ONLY MATERIALS THAT ARE NEW OF THE TYPE AND QUALITY SPECIFIED, WHERE
UNDERWRITERS LABORATORIES HAVE ESTABLISHED STANDARDS FOR SUCH MATERIALS,
PROVIDE ONLY MATERIALS BEARING THE U.L. LABEL.
11. ARCHITECTURAL DRAWINGS SHOWING DIMENSIONS FOR ELECTRICAL DEVICES TAKE
PRECEDENCE OVER THE ELECTRICAL DRAWINGS.
12. SYSTEMS SHALL BE FREE FROM SHORTS AND GROUNDS. TEST FOR MECHANICAL AND
ELECTRICAL DEFECTS. VERIFY CORRECT CONNECTION OF HOT, NEUTRAL AND GROUND
CONDUCTORS. ALL CONDUCTORS SHALL BE COLOR CODED AND LABELED WITH ZONE
IDENTIFICATION FOR THE CASE OF LIGHTING.
13. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE SPECIFIED
REQUIREMENTS, WITHIN THREE DAYS AFTER RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE,
REMOVE THE NON-COMPLYING ITEMS FROM THE JOB AND REPLACE WITH NEW ITEMS MEETING
THE REQUIREMENTS. COSTS FOR REPAIR OF NON-COMPLIANCE WORK SHALL BE BY THE
CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER.
14. UPON COMPLETION OF THE WORK, THOROUGHLY CLEAN ALL DEVICES AND EQUIPMENT.
15. ALL TELECOM, TV CABLE AND DATA CABLE SHALL BE DEDICATED RUNS FROM THE OUTLET
LOCATIONS TO THE BACKBOARD LOCATION.
16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE
PROJECT DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE
BIDDING CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND
COORDINATED PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK
ASSIGNMENTS TO SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING
CONTRACTOR.
LUMINARE - SURFACE MOUNT FLUORESCENT OR INCANDESCENT
LUMINARE - RECESSED FLUORESCENT OR INCANDESCENT
LUMINARE - STANDARD FLUORESCENT STRIP LIGHT
LIGHT FIXTURE - RECESSED FLUORESCENT OR LED
HEAT DETECTOR
DUAL LEVEL SWITCHING - SWITCH OUTER (2) LAMPS SEPARATE
FROM CENTER LAMP
FIRE ALARM HORN/STROBE (CEILING MOUNTED)
FIRE ALARM BOOSTER PANEL
FIRE ALARM SPEAKER
END OF LINE RESISTOR
FIRE ALARM HORN/STROBE (WALL MOUNTED)
MAGNETIC DOOR HOLD OPEN
GONG
DUCT SMOKE DETECTOR
TAMPER SWITCH
FLOW SWITCH
FIRE ALARM HORN/STROBE (WALL MOUNTED)
MANUAL PULL STATION
SMOKE DETECTOR
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
FIRE SAFETY AND ALARM SYMBOLS
GENERAL NOTES:
PHOTO CELL
OCCUPANCY SENSOR (WALL MOUNTED)
PANEL - RECESSED
PANEL - SURFACE MOUNT
AUTOMATIC TRANSFER SWITCH (ATS)
DISCONNECT
NORMALLY OPEN SWITCH
NORMALLY CLOSED SWITCH
CIRCUIT BREAKER WITH SIZE AS NOTED
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
FUSED SWITCH
ELECTRIC METER
GROUND
IN-LINE FUSE
TRANSFORMER
STARTER DISCONNECT
THERMOSTAT
CONNECTION TO MOTOR
FUSED DISCONNECT
DISCONNECT
TELEPHONE/DATA OUTLET. PROVIDE 1"CONDUIT WITH PULL
STRING PER LOCATION. DATA CABLES AND TERMINATIONS BY
OTHERS.
SWITCH - PILOT
SWITCH - DIMMER
TYPICAL DEVICE MOUNTING HEIGHT
NOTE:
VERIFY HEIGHTS SHOWN COMPLY WITH LOCAL BUILDING CODE.
47"
1'-6"
6"
MAX.
SYMBOL
EXIT
BOTTOM OF
FINISHED CEILING
SYMBOL
FIRE ALARM
SYMBOL
LIGHTING SWITCH
SYMBOL
120V CONVENIENCE
RECEPTACLE
SYMBOL
TELEPHONE AND
COMPUTER
TOP OF FINISHED FLOOR
47"
6'-8"SYMBOL
FIRE ALARM
MANUAL PULL
STATION
OCCUPANCY SENSOR (CEILING MOUNTED)
ABBREVIATIONS
LIGHTING SYMBOLS
SWITCH - PUSH BUTTON
SWITCH - TIME CLOCK
SWITCH - SINGLE POLE, TIMED
SWITCH - SINGLE POLE, KEYED
SWITCH - FOUR WAY
SWITCH - THREE WAY
SWITCH - SINGLE POLE
A AMPERES
AV PANELBOARD AV
AV AUDIO/VIDEO
A/V AUDIO/VIDEO
C PANELBOARD KPP-C
C.B. CIRCUIT BREAKER
GFCI GROUND FAULT CIRCUIT INTERUPTING
GFI GROUND FAULT CIRCUIT INTERUPTING
KVA KILO-VOLT AMPS (ELECTRIC POWER)
QT QUAD TUBE (FLUORESCENT LAMP)
TT TWIN TUBE (FLUORESCENT LAMP)
TYP TYPICAL
V VOLT
4W FOUR WIRE
3ø THREE PHASE
JUNCTION BOX
JUNCTION BOX
TELEVISION CABLE OUTLET
CLOCK - WALL MOUNTED
AMPLIFIER
INTERCOM
SPEAKER - CEILING MOUNTED
SPEAKER - WALL MOUNTED
WIRELESS ACCESS POINT (WAP)
TELEPHONE/DATA OUTLET - FLOOR MOUNTED
POLE RECEPTACLE
ISOLATED GROUND RECEPTACLE
TOP SWITCHED RECEPTACLE
GROUND FAULT INTERUPTING RECEPTACLE. PROVIDE WEATHER-
PROOF WHILE IN USE COVER WHERE LOCATED OUTDOORS.
QUAD RECEPTACLE (GFI PROTECTED WHERE REQUIRED)
FLOOR RECEPTACLE (GFI PROTECTED WHERE REQUIRED)
DUPLEX RECEPTACLE
MISCELLANEOUS SYMBOLSSWITCHES AND RECEPTACLE SYMBOLS
TELEPHONE, DATA AND COMMUNICATION SYMBOLS
CO
F
S
F
F
FS
S D
S
TS
F
H
J
J
D
S
SS
SP
S
ST
S3
S4
SK
S
IG
G
PC
L
N E
M
T
M
C
A
IC
S
S
TV
A
LIGHT FIXTURE - EMERGENCY (WALL MOUNT)
LIGHT FIXTURE - EXIT/EMERGENCY (DIRECTIONAL ARROWS
WHERE INDICATED ON PLANS) (WALL OR CEILING MOUNT)
OSS
COUNTERTOP RECEPTACLE (GFCI WHERE REQUIRED)CTR
LIGHT FIXTURE - SURFACE FLUORESCENT OR LED
C
B
TC
F
F
SECURITY CAMERA (OUTDOOR/INDOOR PER PLAN)
DOOR ALARM KEYPAD. PROVIDE 1"CONDUIT WITH PULL STRING PER
LOCATION. DATA CABLES AND TERMINATIONS BY OTHERS.
DL
F K KEYED MANUAL PULL STATION
FAAP
FACP
DEMO HEAT DETECTOR
DEMO FIRE ALARM HORN/STROBE (CEILING MOUNTED)
DEMO FIRE ALARM BOOSTER PANEL
DEMO TAMPER SWITCH
DEMO FLOW SWITCH
DEMO FIRE ALARM HORN/STROBE (WALL MOUNTED)
DEMO MANUAL PULL STATION
DEMO SMOKE DETECTOR
DEMO FIRE ALARM ANNUNCIATOR PANEL
DEMO FIRE ALARM CONTROL PANEL
F
F
FS
S
TS
F
H
F K DEMO KEYED MANUAL PULL STATION
FIRE SAFETY AND ALARM DEMO SYMBOLS
SMOKE DETECTOR LOW FREQUENCY SOUNDER BASES
LF
SMOKE DETECTOR WITH LOW FREQUENCY SOUNDER BASES
LF
FIRE ALARM STROBE (CEILING MOUNTED)
FIRE ALARM STROBE (WALL MOUNTED)
S
S
DEMO FIRE ALARM STROBE (CEILING MOUNTED)
DEMO FIRE ALARM STROBE (WALL MOUNTED)
S
S
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
1:
:5
PM
E001
ELECTRICAL
ABBREVIATIONS
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0 7-
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:0
PM
E100
AERIAL VIEW /
VICINITY MAP
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
OFFSITE WAREHOUSE LOCATION
KINROSS (KCF) MAIN CAMPUS
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
MUFFIN GRINDER BLDG
ELECTRICAL STORAGE BLDG
GROUNDS EQUIPMENT STORAGE
MAINTENANCE
SEASONAL STORAGE BLDG
YARD CREW BLDG
YARD
SHACK #1
ADMINISTRATION
EDUCATION
FOOD SERVICE
HOUSING A/B
QUARTERMASTER/LAUNDRY
YARD
SHACK #3 HOUSING C/D
YARD SHACK #4 PAVILION
WOOD BOILER BLDG
WEIGHT
PIT
YARD SHACK #7
GREEN HOUSE
HOUSING E/F
YARD
SHACK #5
EDUCATION
STORAGE SHED
LEGAL STORAGE
SHED
MAINT. STOR. SHED
INSIDE MAINT.
H - 3
HOUSING G/H
YARD SHACK #6
SALLY PORT. BLDG
CAR PORT
YARD
SHACK
REMOTE WAREHOUSE (1.5 MILES NW)
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:2
PM
E101
SITE PLAN
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
1" = 100'-0"1 SITE PLAN
N
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
GENERAL DEMO NOTES
1. ALL EXISTING ELECTRICAL SYSTEMS SHOWN ON PLAN ARE BASED ON
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
COPY RM
MEN'S
STAFF TLT.
WOMEN'S
TLT.
JAN.
WOMEN'S
STAFF TLT.
SOIL
UTILITY
STAFF
TOILET
JAN.
INMATE
TOILET
CENTRAL
SUP. &
STORAGE
EMERGENCY
BODY
SCANNER
STORAGE
STAFF
TOILET
138IT EQUP.
SHAKE
DOWN
CONTROL
CENTER
EMO
DEPUTY
SUITE
DEPUTY
WARDEN
ASST.
DEPUTY
ASST.
DEPUTY
NURSE
SUPT.
HOLDING
CELL
HOLING
CELL
CORRIDOR
PSYCH
OFFICE
DENTAL
SUITE
STAFF
LOUNGE
INSPECTORS
SERVER
ROOM
MEN'S TLT.
VEST.
CONTROL
BUBBLE
WORD
PROCESS
IT EQUIP.
WARDEN
SUITE
MECH.
WAITING
167PROPERTY
MAIL ROOM
ARSENAL
WARDEN
CONF. RM
BUS MGR
OFFICE
WARDEN
OFFICE
CORRIDOR
BUSINESS &
RECORDS
CORRIDOR
SALLY
PORT
NURSE
MEDICAL
SUITE
HUM
OFFICE
CORRIDOR
RECEPTION
CORRIDOR
VIDEO
ROOM
VIDEO
ROOM
CORRIDOR
VISITING
ROOM
PRISONER
WAITING
ROOM
CORRIDOR
MED CAGE
15CD 15CD 15CD
30CD 110CD
F
S
15CD
F
15CD
15CD
15CD
15CD
15CD
30CD
15CD
15CD
15CD
15CD
15CD
15CD
30CD
30CD
15CD 15CD 15CD
30CD
FSTS
PANEL EA. FIRE ALARM
BREAKER #36
F
15CD 15CD
15CD
60CD
30CD
FACP
15CD15CD
30CD
30CD
15CD
15CD
15CD
15CD
IT RACK
15CD
60CD
F F
F F
S
F
S S F
15CD
F
F 15CD S S F
15CDF
F
15CD
S
S F
15CD
S
S
S
F
15CD
F
S
H F
SF
S
F
S
F
F F
F
S
F
S F
F
F
S
S F F S FS
S
F
F
F F F
15CD
F
S
F
S S F
H F
S
F F
S
F
FS
F
F S
FH
15CD
F
F
F
F
15CD
F F
F
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:4
PM
ED101
ADMIN BUILD. FIRE
ALARM PLAN DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 ADMIN BUILDING DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
HEARINGS
GRIEVANCE
CLASSROOM
#1
CLASSROOM
#2
OFFICE
CLASSROOM
#5
INMATE
TOILET
WOMEN'S
MEN'S
J.C.
CLASSROOM
#4
CLASSROOM
#3
IT
229STOR.
CORRIDOR
CLASSROOM
#6
CPC'S
OFFICE
CAUSTIC
CLASSROOM
#7
CORRIDOR
BARBER
SHOP
CHAPLAIN
TREATMENT
DIRECTOR
CLASSIFICATION
OPTOMETERY
LIBRARY
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
MECHANICAL
CORRIDOR
OFFICE
30CD
15CD 15CD
110CD
15CD
15CD
15CD 15CD
110CD
PANEL EC. FIRE ALARM
BREAKER #7
15CD
IT RACK
FAC
P 15CD
15CD
30CD
60CD
60CD
60CD
IT RACK
F
F
30CD
F
30CD
F
60CD
F
60CD
F
15CD
F
F
F
15CD
F F
F S
S
F
15CD
F 15CD
F
F F
F S
F
F
F
H
F FS
TS
S F
30CD F
S
F
15CD
H H
F F F
S
S S
F15CD
F
15CD F
F
15CD
F F
F
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:5
PM
ED102
EDUCATION BUILD.
FIRE ALARM PLAN
DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 EDUCATION BUILDING DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
STORAGE
BARN
VESTIBULE
CLOSET
J.C.
STAFF
TOILET
INMATE
TOILET
STORAGE
263 OFFICE
VEGAN
WALK-IN
COOLER
FREEZER
REFRIDGERATOR
FOOD
SERVICE
COMMISIONARY
MECHANICAL
OFFICE
DINING
ROOM
DISHWASHING
DRY
STORAGE
FOOD PREP
DINING
ROOM
SERVING AREA
RECIEVING
HOOD
FUNDRAISER
ROOM
FA
C
P
30CD
FS
TS
30CD
PANEL ED. FIRE ALARM
BREAKER #6
15CD
EXISTING HOOD CONTROL
PANEL TIE TO FACP
EXISTING HOOD CONTROL
PANEL TO TIE TO FACP
S
SS
SS
SS
S
60CD F
F
60CD
FFF
60CDF
60CD
F
S
S60CDF
SF
F
F
H
15CDF
F
30CD
F
H H
F
H
F15CD F
15CD S
F
H
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:1
PM
ED103
FOOD SERVICE FIRE
ALARM PLAN DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 FOOD SERVICE DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
AREA B AREA A
AREA B AREA A
MECHANICAL
TOILET
CORRIDOR
TOILET
J.C.
TOILET
DAY ROOM
QUIET
ROOM
UTILITY
VESTIBULE
TOILET
VESTIBULE
QUARTER
MASTER
VESTIBULE
JAN.
TOILET
J.C.
OFFICE
JAN.
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
329DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
334 DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
338DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
LOBBY
CORRIDOR
CORRIDOR
J.C.
LAUNDRY
LAUNDRY
TOILET
115CD
S
H H
H
15CD
F F FS TS
60CD
F
60CD
F
H H
H
60CD
F
H
60CD
F
H
15CD
F
S
FAAP
F
30CD
F
S
S
15CD
F
S S
60CD
F
F
S
LF S
LF S
LF
15CD
F
S
LF S
LF
S
LF
15CD
F
S
LF
F
S
LF S
LF
S
LF
S
15CD
F
S
S 60CD
F F
15CD
F
S
LF
S
LF S
LF
15CD
F
F
S H
15CD
F
F H
F
60CD
FFS TS TS
AREA B AREA A
AREA B AREA A
DAY ROOM
MECHANICAL
TOILET
CORRIDOR
TOILET
J.C.
TOILET
283OFFICE
TOILET
VESTIBULE
VESTIBULE
JAN.
JAN.
UTILITY
QUIET
ROOM
TOILET
J.C.
OFFICE
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
DORM
ROOM
LOBBY
CORRIDOR
LAUNDRY
LAUNDRY
15CD
PANEL EJ EXISTING FACP
BREAKER #13 AND #14
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
F
15CD
F
F
S
15CD
F
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
F
15CD
F
S
30CD
F
S
F
S S
15CD
F
60CD
F
F
S
F
15CD
F S
FACP
S
15CD
F
H H
H
15CD
F F FS TS
60CD
F
60CD
F
H H
H
60CD
F
H
60CD
F
H
15CD
F
S
15CD
F
S
S
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:3
PM
ED104
HOUSE UNIT A & B
FIRE ALARM PLAN
DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N 1/8" = 1'-0"1 HOUSING UNIT A DEMO
1/8" = 1'-0"2 HOUSING UNIT B DEMO
EXISTING PARTIAL HEIGHT WALL (TYPICAL)
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
TOILET
VESTIBULE
LAUNDRY
TOILET
OFFICE
LOBBY
VESTIBULE
JAN.
TOILET
MECHANICAL
DAY ROOM
QUIET
ROOM
DORM
ROOM
409 DORM
ROOM
DORM
ROOM
CORRIDOR
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
395 DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
JAN.
UTILITY
JAN.
CORRIDOR
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
UNIT D UNIT C
UNIT D UNIT C
H H
H
15CD
F F FS TS
60CD
F
60CD
F
H H
H
60CD
F
H
60CD
F
H
15CD
F
S
FAAP
F
30CD
F
S
S
15CD
F
S S
60CD
F
F
S
LF S
LF S
LF
15CD
F
S
LF S
LF
S
LF
15CD
F
F
S
LF S
LF
S
LF
S
15CD
F
S
S 60CD
F F
15CD
F
S
LF
S
LF S
LF
15CD
F
F
S
DAY ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
JAN.
UTILITY
JAN.
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
386 DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
VESTIBULE
LOBBY
QUIET
ROOM
OFFICE
TOILET
LAUNDRY
TOILET
VESTIBULE
LAUNDRY
TOILET
JAN.
JAN.
TOILET
TOILET
MECHANICAL
UNIT D UNIT C
UNIT D UNIT C
PANEL EXISTING FACP
BREAKER #13 AND #14
15CD
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
F
15CD
F
F
S
15CD
F
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
F
15CD
F
S
30CD
F
S
F
S S
15CD
F
60CD
F
F
S
F
15CD
F
S
FACP
S
15CD
F
H H
H
15CD
F F FS TS
60CD
F
60CD
F
H H
H
60CD
F
H
60CD
F
H
15CD
F
S
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:4
PM
ED105
HOUSE UNIT C & D
FIRE ALARM PLAN
DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 HOUSING UNIT C DEMO
1/8" = 1'-0"2 HOUSING UNIT D DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
EXISTING PARTIAL HEIGHT WALL (TYPICAL)
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
MECHANICAL
TOILET
TOILET
CORRIDOR
JAN.
TOILET
OFFICE
DAY ROOM
QUIET
ROOM
JAN.
UTILITY
VESTIBULE
JAN.
TOILET
TOILET
JAN.
LAUNDRY
LAUNDRY
LOBBY
DORM
ROOM
DORM
ROOM
475 DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
UNIT F UNIT E
UNIT F UNIT E
CORRIDOR
S
H H
H
30CD
F F FS TS
60CD
F
60CD
F
H H
60CD
F
H
60CD
F
H
15CD
F
S
FAAP
F
30CD
F
S
S
15CD
F
S S
60CD
F
F
S
LF S
LF S
LF
15CD
F
S
LF S
LF
S
LF
15CD
F
F
S
LF S
LF
S
LF
S
15CD
F
S
S 60CD
F F
15CD
F
S
LF
S
LF S
LF
15CD
F
F
S
DAY ROOM
MECHANICAL
TOILET
TOILET
CORRIDOR
JAN.
TOILET
OFFICE
TOILET
VESTIBULE
JAN.
JAN.
UTILITY
QUIET
ROOM
TOILET
JAN.
LAUNDRY
LAUNDRY
LOBBY
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
468DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
DORM
ROOM
UNIT F UNIT E
UNIT F UNIT E
CORRIDOR
PANEL EH EXISTING FACP
BREAKER #13 AND #14
15CD
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
F
15CD
F
F
S
15CD
F
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
F
60CD
F
S
30CD
F
S
F
S S
15CD
F
60CD
F
F
S
F
15CD
F
S
FACP
S
15CD
F
H H
H
30CD
F F FS TS
60CD
F
60CD
F
H H
60CD
F
H
60CD
F
H
15CD
F
S
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:0
PM
ED106
HOUSE UNIT E & F
FIRE ALARM PLAN
DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 HOUSING UNIT E DEMO
1/8" = 1'-0"2 HOUSING UNIT F DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
TOILET
CORRIDOR
JAN.
JAN.
UTILITY
QUIET
ROOM
TOILET
JAN.
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
TOILET
OFFICE
JAN.
MECHANICAL
TOILET
DAY ROOM
VEST.
TOILET
CORRIDOR
LAUNDRY
LOBBY
CORRIDOR
LAUNDRY
UNIT G UNIT H
UNIT G UNIT H
CORRIDOR
PANEL EG EXISTING FACP
BREAKER #13 AND #14
S
LF
S
LF S
LF
15CD
F
F
S
LF
S
LF S
LF
S
LF
S
LF S
LF
30CD
F
S
S
F
15CD
F
S
LF
S
LF S
LF
15CD
F
15CD
F 15CD
F
S
S
S
F
60CD
F
S
15CD
F
FAAP
F
H
60CD
F
60CD
F
H
F
15CD
S
H H
H H
H
60CD
F
60CD
F
H
H
SS
60CD
F
F
30CD
F F FS TS
TOILET
CORRIDOR
QUIET
ROOM
TOILET
JAN.
DORM
ROOM
598 DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
608 DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
JAN.
TOILET
JAN.
MECHANICAL
TOILET
TOILET
VEST.
OFFICE
JAN.
632 INSIDE
PROPERTY/SEARGENT'S
OFFICE
UTILITY
634 UTILITY
TOILET
RUM'S
OFFICE
DAY ROOM
LAUNDRY
LAUNDRY
CORRIDOR
LOBBY
UNIT G UNIT H
UNIT G UNIT H
CORRIDOR
F
15CD
H
60CD
F
60CD
F
H
F
15CD
S
S
60CD
F F
S
F
15CD
F
S
FACP
S
LF
S
LF S
LF
F
15CD
F
H H
H H
H
60CD
F
60CD
F
H
H
30CD
F F FS TS
S S
60CD
F
F
15CD
S 30CD
F
S
S
LF
S
LF S
LF
F
F
F 15CD
S
LF
S
LF S
LF
S
F
15CD
F
15CD
F
S
LF S
LF
S
LF
S H H
F
60CD
60CD
F
F
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:2
PM
ED107
HOUSE UNIT G & H
FIRE ALARM PLAN
DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 HOUSING UNIT G DEMO
1/8" = 1'-0"2 HOUSING UNIT H DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
STORAGE
OUTSIDE
PROPERTY
OFFICE
COLD
RECORDS
STORAGE
TRAINING
ROOM
HTF
MAINTENANCE
LOCK SHOP
BREAK
ROOM
GENERATOR
ELECTRICAL
TOOL
STORAGE
TOILET
PASSAGE
OFFICE
CARPENTER
SHOP
TOILET
TOOL CRIB
STORAGE
PLUMBER
TOOLS
VIDEO
METAL
SHOP
60CD
EOL
MOUNTED TO CEILING IN CARPENTER
SHOP ABOVE STORAGE AREA
EOL
S
F
F
F
S S60CDF 15CD
F
15CD
F
15CD
F S
F
15CD
F
15CD
FS
15CD
F
15CD
F
S H
S
60CDF
F F
S
S
60CDF
H
H 60CDF
60CDF
H
H
H
30CDF 30CD F
HFA
C
P
H
30CD F
60CD
F
H
60CD
F
F
15CD
F
H
15CDF 15CD
F
15CD
F
F
15CD F
F
PANEL EM. FIRE ALARM
BREAKER #13 & #14
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:4
PM
ED108
MAINT. BUILD. FIRE
ALARM PLAN DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 MAINTENANCE BUILDING DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
PLATFORM
OFFICE
OFFICE
STORAGE
230/229
HALLWAY
STORAGE
229/228
HALLWAY
BATHROOM
STORAGE
OFFICE
TOILET
ENTRY
LOUNGE/BREAK
ROOM
BATHROOM
STORAGE
STORAGE
STORAGE
STORAGE
OLD
ELECTRICAL
SERVICE
STORAGE
OLD BOILER
STORAGE
STORAGE
STORAGE
OUTSIDE
LOADING
DOCK
BUILDING 230
BUILDING 229
BUILDING 228
STORAGE
ST
AI
R S
- U P
ST
AI
R S
- U P
STAIRS - UP
F
S
F
F S S F S F
F
S
S
F
F
S F S S F S
F
S
F
S
F
S F S S F S F
S
F
FA
C
P
S
F
F
GENERAL DEMO NOTES
1. ALL EXISTING ELECTRICAL SYSTEMS SHOWN ON PLAN ARE BASED ON
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:5
PM
ED109
OFFSITE
WAREHOUSE FIRE
ALARM PLAN DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
3/32" = 1'-0"1 OFFSITE WAREHOUSE FAP DEMO OVERALL VIEW
N
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
STORAGE
IT ROOM
STORAGE
CAGE WALL
CAGE WALL
STORAGE
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
STAIR
S - D
O W
N
PLATFORM
STAIRS - DOWN
STAIR
S - D
O W
N
S
F
F
GENERAL DEMO NOTES
1. ALL EXISTING ELECTRICAL SYSTEMS SHOWN ON PLAN ARE BASED ON
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:1
PM
ED110
OFFSITE
WAREHOUSE FIRE
ALARM PLAN -
SECOND FLOOR
DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
3/32" = 1'-0"1 OFFSITE WAREHOUSE - SF DEMO (OVERALL 2ND LEVEL)
N
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
INFORMATION PROVIDED TO ENGINEER AND/OR BASED ON SITE INVESTIGATION.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS WHERE
CONNECTING TO EXISTING PRIOR TO STARTING WORK.
2. REMOVE ALL EXISTING DEVICES AND ASSOCIATED WIRE. IF EXISTING IS
SURFACE MOUNTED, ALL CONDUITS, BOXES, & OTHER EXPOSED PIECES OF FIRE
ALARM EQUIPMENT ARE TO BE REMOVED.
3. WHERE SHUT DOWN OF EXISTING SYSTEMS IS REQUIRED, SUCH SHUT-DOWNS
SHALL BE APPROVED BY OWNER AND ENGINEER.
4. THE CONTRACTOR SHALL KEEP ALL EXISTING SYSTEMS IN OPERATION DURING
CONSTRUCTION.
5. PROPOSED FIRE ALARM SYSTEM SHALL BE OPERATIONAL PRIOR TO DISABLING
THE EXISTING SYSTEM. PROVIDE COMPLETE REMOVAL OF ALL EXISTING FIRE
ALARM COMPONENTS PER SPECIFICATIONS AFTER NEW SYSTEMS HAVE BEEN
INSPECTED, APPROVED, & OPERATIONAL FOR 30 DAYS.
6. PATCH, REPAIR, AND PAINT ALL EXISTING WALL AND/OR CEILING SURFACES
WHERE THE EXISTING DEVICES ARE REMOVED, SEE SPECS AND DETAILS. ALL
BLANK COVER PLATES SHALL HAVE VANDAL PROOF FASTENERS & SHALL NOT BE
PAINTED.
8. SPECIAL NOTE: FOR ALL EXISTING FIRE ALARM COMPONENTS: PROVIDE
CAREFUL REMOVAL & DISCONNECTION. SALVAGE ALL DEVICES, EQUIPMENT &
COMPONENTS IN GOOD WORKING CONDITION AND RETURN TO THE DOC.
WEIGHT PIT
TOOL
CORRIDOR
OFFICE
OFFICE
GYMNASIUM
STORAGE
HALL
STAFF
TOLIET
CORRIDOR
CAGE WALLS
RTU #2
RTU #1
30CD
PANEL EXISTING. FACP
BREAKER #17
S
F
60CD
F
60CD
F
60CD
F
60CD
S S
F F
F
15CDF
S
S
30CD
F
S
F
F30CD
F30CD
F15CD
FACP
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:2
PM
ED111
PAVILION FIRE
ALARM PLAN DEMO
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
N
1/8" = 1'-0"1 PAVILION BUILDING DEMO
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
COPY RM
MEN'S
STAFF TLT.
WOMEN'S
TLT.
JAN.
WOMEN'S
STAFF TLT.
SOIL
UTILITY
STAFF
TOILET
JAN.
INMATE
TOILET
CENTRAL
SUP. &
STORAGE
EMERGENCY
BODY
SCANNER
STORAGE
STAFF
TOILET
138IT EQUP.
SHAKE
DOWN
CONTROL
CENTER
EMO
DEPUTY
SUITE
DEPUTY
WARDEN
ASST.
DEPUTY
ASST.
DEPUTY
NURSE
SUPT.
HOLDING
CELL
HOLING
CELL
CORRIDOR
PSYCH
OFFICE
DENTAL
SUITE
STAFF
LOUNGE
INSPECTORS
SERVER
ROOM
MEN'S TLT.
VEST.
CONTROL
BUBBLE
WORD
PROCESS
IT EQUIP.
WARDEN
SUITE
MECH.
WAITING
167PROPERTY
MAIL ROOM
ARSENAL
WARDEN
CONF. RM
BUS MGR
OFFICE
WARDEN
OFFICE
CORRIDOR
BUSINESS &
RECORDS
CORRIDOR
SALLY
PORT
NURSE
MEDICAL
SUITE
HUM
OFFICE
CORRIDOR
RECEPTION
CORRIDOR
VIDEO
ROOM
VIDEO
ROOM
CORRIDOR
VISITING
ROOM
PRISONER
WAITING
ROOM
CORRIDOR
MED CAGE
30CD 110CD
F
S
15CD
F
15CD
15CD
15CD
15CD
15CD
30CD
15CD
15CD
15CD
15CD
30CD
30CD
15CD 15CD
15CD
30CD
FSTS
EXISTING PANEL "EA." FIRE
ALARM BREAKER #36
F
15CD
60CD
30CD
FACP
15CD15CD
30CD
30CD
15CD
15CD
15CD
15CD
IT RACK
15CD
60CD
F F
S
F
S S S
15CD
S
F 15CD S S F
15CD
F
F
15CD
S
S F
15CD
S
S
S
F
15CD
F
S
H S
SF
S
F
S F
S
F S S
S
F
F
S
S F F S FS
S
F
F
F
S
F
S S F
H F
S
F F
S
F
F
S
F
F S
FH
15CD
F
F
F
F
15CD
F F
F
30CD
S
H 15CD S
15CD
S
S
S
FIRE ALARM BOOSTER PANEL
FAAP
K
K K
K
K
K
S
15CD
S
15CD S
TAMPER/VANDAL PROOF
SMOKE DETECTORS
S
S
15CD
S
15CD
F
S
S
S S
S
S
S
S
S
S S
15CD
S
STROBE ONLY
STROBE ONLY
STROBE ONLY
STROBE ONLY
STROBE ONLY
STROBE ONLY
1. PROVIDE MODULE AND CONNECTION TO EXISTING FACILITY " STARNET " SYSTEM FOR
MONITORING OF ALARMS BY CENTRAL CONTROL. PROVIDE FOR EACH NEW FIRE ALARM PANEL.
GENERAL NOTES
2. LOCATE ALL NEW FIRE ALARM PULL STATIONS AT 48" AFF AND ON LATCH SIDE OF EGRESS
DOOR UNLESS OTHERWISE NOTED.
3. RE-USE EXISTING 120-VOLT AC CIRCUITS FOR ALL NEW FIRE ALARM PANELS. PROVIDE NEW
CIRCUIT BREAKERS & BREAKER LOCKS FOR ALL AC CIRCUITS FOR THE FIRE ALARM PANELS &
BOOSTER PANELS. ALL SHALL BE RED IN COLOR.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:4
PM
E102
ADMIN BUILD. FIRE
ALARM PLAN
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
1/8" = 1'-0"1 ADMIN BUILDING PROPOSED NEW FIRE ALARM N
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
HEARINGS
GRIEVANCE
CLASSROOM
#1
CLASSROOM
#2
OFFICE
CLASSROOM
#5
INMATE
TOILET
WOMEN'S
MEN'S
J.C.
CLASSROOM
#4
CLASSROOM
#3
IT
229STOR.
CORRIDOR
CLASSROOM
#6
CPC'S
OFFICE
CAUSTIC
CLASSROOM
#7
CORRIDOR
BARBER
SHOP
CHAPLAIN
TREATMENT
DIRECTOR
CLASSIFICATION
OPTOMETERY
LIBRARY
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
MECHANICAL
CORRIDOR
OFFICE
30CD
15CD 15CD
110CD
15CD
15CD
110CD
PANEL EC. FIRE ALARM
BREAKER #7
15CD
IT RACK
FAAP 15CD
15CD
30CD
60CD
60CD
60CD
IT RACK
F
F
30CD
F
30CD
F 60CD
F
60CD
F
15CD
F
F
F
F S
S
F
F
F S
S
F
F
H
FS
TS
S F
30CD F
S
S
15CD F F
F
S
S F
15CD S
15CD
F F
F
S
FACP S
LF
FAP BOOSTER PANEL
S
LF S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
K
K
F K
K
K
15CD S
F K F
K
S S S S S
S
S
STROBE ONLY
STROBE ONLY
S
S S
1. PROVIDE MODULE AND CONNECTION TO EXISTING FACILITY " STARNET " SYSTEM FOR
MONITORING OF ALARMS BY CENTRAL CONTROL. PROVIDE FOR EACH NEW FIRE ALARM PANEL.
GENERAL NOTES
2. LOCATE ALL NEW FIRE ALARM PULL STATIONS AT 48" AFF AND ON LATCH SIDE OF EGRESS
DOOR UNLESS OTHERWISE NOTED.
3. RE-USE EXISTING 120-VOLT AC CIRCUITS FOR ALL NEW FIRE ALARM PANELS. PROVIDE NEW
CIRCUIT BREAKERS & BREAKER LOCKS FOR ALL AC CIRCUITS FOR THE FIRE ALARM PANELS &
BOOSTER PANELS. ALL SHALL BE RED IN COLOR.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:0
PM
E103
EDUCATION BUILD.
FIRE ALARM PLAN
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
1/8" = 1'-0"1 EDUCATION BUILDING PROPOSED NEW FIRE ALARM
N
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
BARN
VESTIBULE
CLOSET
J.C.
STAFF
TOILET
INMATE
TOILET
STORAGE
263 OFFICE
VEGAN
WALK-IN
COOLER
FREEZER
REFRIDGERATOR
FOOD
SERVICE
COMMISIONARY
MECHANICAL
OFFICE
DINING
ROOM
DISHWASHING
DRY
STORAGE
FOOD PREP
DINING
ROOM
SERVING AREA
RECIEVING
HOOD
FUNDRAISER
ROOM
FA
C
P
30CD
FS
TS
30CD
PANEL ED. FIRE ALARM
BREAKER #6
EXISTING HOOD CONTROL
PANEL TIE TO FACP
EXISTING HOOD CONTROL
PANEL TO TIE TO FACP
S
SS
SS
SS
S
60CD F
F
60CD
FFF
60CDF
60CD
F
S
S60CDF
SF
F
F
H
15CDS
F
30CD
F
H H H
S15CD
S
F
H
30CD
F
FAAP
TRANE UNIT
TRANE UNIT
MAU 2
MAU 1
15CD
S
S
S D
AHU UNIT REQUIRES
S D
AHU UNIT REQUIRES
K K
K K
K
K
F
60CD
F 30CD
S
PROPOSED NEW FIRE
EXTINGUISHER LOCATION
F K
F K
1 PROVIDE WIRING & CONNECTION TO SHUT DOWN AIR
SUPPLY FAN AND EXHAUST UPON ACTIVATION OF DUCT
SMOKE DETECTOR AND EXHAUST SHALL CONTINUE TO RUN
PROPOSED SYSTEM KEYNOTES
2 DUCT SMOKE DETECTORS ARE TO BE LOCATED INSIDE THE
BUILDING (IN CONDITIONED AREA)
1. PROVIDE MODULE AND CONNECTION TO EXISTING FACILITY " STARNET " SYSTEM FOR
MONITORING OF ALARMS BY CENTRAL CONTROL. PROVIDE FOR EACH NEW FIRE ALARM PANEL.
GENERAL NOTES
2. LOCATE ALL NEW FIRE ALARM PULL STATIONS AT 48" AFF AND ON LATCH SIDE OF EGRESS
DOOR UNLESS OTHERWISE NOTED.
3. RE-USE EXISTING 120-VOLT AC CIRCUITS FOR ALL NEW FIRE ALARM PANELS. PROVIDE NEW
CIRCUIT BREAKERS & BREAKER LOCKS FOR ALL AC CIRCUITS FOR THE FIRE ALARM PANELS &
BOOSTER PANELS. ALL SHALL BE RED IN COLOR.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:1
PM
E104
FOOD SERVICE FIRE
ALARM PLAN
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
1/8" = 1'-0"1 FOOD SERVICE PROPOSED NEW FIRE ALARM
N
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
AREA B AREA A
AREA B AREA A
MECHANICAL
TOILET
CORRIDOR
TOILET
J.C.
TOILET
DAY ROOM
QUIET
ROOM
UTILITY
VESTIBULE
TOILET
VESTIBULE
QUARTER
MASTER
VESTIBULE
JAN.
TOILET
J.C.
OFFICE
JAN.
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
329DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
334 DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
338DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
LOBBY
CORRIDOR
CORRIDOR
J.C.
LAUNDRY
LAUNDRY
TOILET
115CD
H H
H
30CD
F
F
FS TS
60CD
F
60CD
F
H H
60CD
F
H
60CD
F
H
S
FA
C
P
F
30CD
F
S
S
15CD
F
S S
60CD
F
F
15CD
F
15CD
F
F
S
15CD
S
S
S 60CD
F F
15CD
F
15CD
F
F
S H
15CD
S
F H
F
60CD
FFS TS TS
PROPOSED FACP
S K
K
K
K
K K
K
F K
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
STROBE ONLY
STROBE ONLY
AREA B AREA A
AREA B AREA A
DAY ROOM
MECHANICAL
TOILET
CORRIDOR
TOILET
J.C.
TOILET
283OFFICE
TOILET
VESTIBULE
VESTIBULE
JAN.
JAN.
UTILITY
QUIET
ROOM
TOILET
J.C.
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
DORM
ROOM
CORRIDOR
DORM
ROOM
LOBBY
CORRIDOR
LAUNDRY
LAUNDRY
15CD
PANEL EJ EXISTING FACP
BREAKER #13 AND #14
F
15CD
F
F
S
15CD
F
F
60CD
F
S
30CD
F
S
F
S S
15CD
F
60CD
F
F
S
F S
FA
A
S
15CD
F
H H
H
30CD
F
F
FS TS
60CD
F
60CD
F
H H
60CD
F
H
60CD
F
H
15CD
S
S
PROPOSED FAA
S
FIRE ALARM BOOSTER PANEL
K
K
K
K
K
K
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
S
LF
F K
1. PROVIDE MODULE AND CONNECTION TO EXISTING FACILITY " STARNET " SYSTEM FOR
MONITORING OF ALARMS BY CENTRAL CONTROL. PROVIDE FOR EACH NEW FIRE ALARM PANEL.
GENERAL NOTES
2. LOCATE ALL NEW FIRE ALARM PULL STATIONS AT 48" AFF AND ON LATCH SIDE OF EGRESS
DOOR UNLESS OTHERWISE NOTED.
3. RE-USE EXISTING 120-VOLT AC CIRCUITS FOR ALL NEW FIRE ALARM PANELS. PROVIDE NEW
CIRCUIT BREAKERS & BREAKER LOCKS FOR ALL AC CIRCUITS FOR THE FIRE ALARM PANELS &
BOOSTER PANELS. ALL SHALL BE RED IN COLOR.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
D O
C
KC
F
Fi re
A la rm S ys te m , U pg ra de s\
D w gs \E le ct ric al
\M
-0
_K
IN
R
O
SS
_F
IR
E_
AL
AR
M
_E
LE
C T_
R
_2
7-
-9
.rv t
/6
/2
2:
:3
PM
E105
HOUSE UNIT A & B
FIRE ALARM PLAN
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
AT
E
OF
M
IC
HI
GA
N
DT
MB
/D
OC
FI
LE
N
O.
2/2
.A
BG
KI
NR
OS
S
CO
RR
EC
TIO
NA
L F
AC
ILI
TY
W
IN
DU
ST
RI
AL
D
R, KI
NC
HE
LO
E, M I 4
M
AS AM JGPM
K C
F
FI
R E
A
LA
R M
U
PG
R A
D
ES
ST
A
TE
O
F M
IC
H
IG
A
N D
TM
B
/D O
C F
IL
E
N O
2/
7.
A B
G
1/8" = 1'-0"1 HOUSING UNIT A PROPOSED NEW FIRE ALARM
1/8" = 1'-0"2 HOUSING UNIT B PROPOSED NEW FIRE ALARM
N
R
EV
IE
W
S U
BM
IT
TA
L
9-
-2
R
EV
IE
W S
U
BM
IT
TA
L 9-
-2
PL
AN
R
EV
IE
W
B
ID
D
IN
G
-0
7-
PARTIAL HEIGHT WALL (TYPICAL)
TOILET
LAUNDRY
TOILET
VESTIBULE
LAUNDRY
TOILET
OFFICE
L…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .