About this file
The document is a Bid Form for the Melbourne Airport Authority (MAA) Taxiway A Rehabilitation - Phase 2 project at the Melbourne Orlando International Airport in Florida. The bid encompasses five separate bid schedules detailing comprehensive airport infrastructure rehabilitation, including milling and overlay of approximately 125,000 square yards of asphalt pavement, surface treatment of 105,000 square yards, installation of 58,000 tons of asphalt, pavement marking, drainage system improvements, airfield lighting and sign component replacements, and grassing. The project involves multiple construction phases with detailed line items for tasks such as pavement demolition, excavation, base course preparation, asphalt surfacing, conduit installation, and edge light replacements. Sealed proposals are due on Tuesday, May 20, 2025, at 2:00 PM, with a non-mandatory pre-bid meeting scheduled for Thursday, April 24, 2025, at 10:00 AM, followed by a mandatory site visit.
The bid requires a bid bond or certified check for 5% of the total bid amount and includes a Disadvantaged Business Enterprise (DBE) goal of 10%. A Public Construction Bond for 100% of the awarded contract amount will be required prior to contract execution, and bids cannot be withdrawn for 60 calendar days after the scheduled receipt time. The Melbourne Airport Authority reserves the right to reject all proposals with or without cause and to waive technical errors and informalities. While no specific budget range is explicitly stated, the extensive scope suggests a substantial infrastructure investment. Interested contractors can obtain detailed bid documents and contact the Procurement Manager, Summer Wyllie-Vitt, at 321-723-6227 ext. 163 for additional information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTRACTOR | ||||||
| BID SCHEDULE 1 | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 1 | C-100-1 | CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) | 1 | LS | $0.00 | |
| 2 | C-102-1 | TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL | 1 | LS | $0.00 | |
| 3 | C-102-2 | DEWATERING | 1 | LS | $0.00 | |
| 4 | C-105-1 | MOBILIZATION (LIMITED TO 10% OF CONSTRUCTION SUBTOTAL) | 1 | LS | $0.00 | |
| 5 | C-106-1 | SAFETY, SECURITY AND MAINTENANCE OF AIRPORT OPERATIONS | 1 | LS | $0.00 | |
| 6 | P-100-1 | CONSTRUCTION SURVEY | 1 | LS | $0.00 | |
| 7 | P-101-1 | PAVEMENT DEMOLITION (2" MILLING) | 469 | SY | $0.00 | |
| 8 | P-101-2 | PAVEMENT DEMOLITION (3.5" MILLING) | 19,822 | SY | $0.00 | |
| 9 | P-101-3 | PAVEMENT DEMOLITION (3.5" - 4" VARIABLE MILLING) | 3,270 | SY | $0.00 | |
| 10 | P-101-5 | JOINT AND CRACK REPAIR | 12,506 | LF | $0.00 | |
| 11 | P-101-6 | REMOVE 30" MITERED END SECTION | 1 | EA | $0.00 | |
| 12 | P-152-1 | STRIPPING AND STOCKPILING (6" DEPTH) | 33,763 | SY | $0.00 | |
| 13 | P-152-2 | UNCLASSIFIED EXCAVATION | 3,178 | CY | $0.00 | |
| 14 | P-152-3 | OFFSITE BORROW EXCAVATION | 2,691 | CY | $0.00 | |
| 15 | P-154-1 | 6" STABILIZED SUBGRADE | 11,782 | SY | $0.00 | |
| 16 | P-154-2 | 10" STABILIZED SUBGRADE | 2,359 | SY | $0.00 | |
| 17 | P-211-1 | LIMEROCK BASE COURSE, 6" DEPTH | 11,059 | SY | $0.00 | |
| 18 | P-211-2 | LIMEROCK BASE COURSE, 9" DEPTH | 3,654 | SY | $0.00 | |
| 19 | P-211-3 | LIMEROCK BASE COURSE, 12" DEPTH | 1,931 | SY | $0.00 | |
| 20 | P-211-4 | LIMEROCK BASE COURSE, 17" DEPTH | 438 | SY | $0.00 | |
| 21 | P-341-1 | MEMBRANE INTERLAYER (GLASPAVE 25) | 21,695 | SF | $0.00 | |
| 22 | P-401-1 | ASPHALT SURFACE COURSE - TAXIWAY PAVEMENT | 5,907 | TON | $0.00 | |
| 23 | P-403-1 | ASPHALT SURFACE COURSE - TAXIWAY SHOULDER PAVEMENT | 3,262 | TON | $0.00 | |
| 24 | P-403-2 | ASPHALT LEVELING COURSE - TAXIWAY PAVEMENT | 2,922 | TON | $0.00 | |
| 25 | P-602-1 | EMULSIFIED ASPHALT PRIME COAT | 17,082 | SY | $0.00 | |
| 26 | P-620-1 | PAVEMENT MARKING, PERMANENT, TYPE III BEADS | 18,162 | SF | $0.00 | |
| 27 | P-620-2 | PAVEMENT MARKING, PERMANENT, NO BEADS | 13,034 | SF | $0.00 | |
| 28 | P-620-3 | PAVEMENT MARKING, TEMPORARY, NO BEADS | 18,162 | SF | $0.00 | |
| 29 | P-620-4 | SURFACE PREPARATION | 51,198 | SF | $0.00 | |
| 30 | P-620-5 | PAVEMENT MARKING REMOVAL | 588 | SF | $0.00 | |
| 31 | P-620-6 | SURFACE PAINTED HOLD POSITION MARKINGS | 4 | EA | $0.00 | |
| 32 | T-904-1 | SODDING | 19,158 | SY | $0.00 | |
| 33 | D-701-3 | CONSTRUCT 30" RCP, CLASS V | 59 | LF | $0.00 | |
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 1 (cont.) | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 34 | D-701-7 | CONSTRUCT 30" MITERED END SECTION | 1 | EA | $0.00 | |
| 35 | L-108-1 | NO. 8, 5 KV, L-824 TYPE ‘C’ CONDUCTOR | 8,050 | LF | $0.00 | |
| 36 | L-108-2 | NO. 4 BARE COPPER COUNTERPOISE WIRE | 5,565 | LF | $0.00 | |
| 37 | L-108-4 | ¾” x 10’ COPPER-CLAD GROUND ROD SECTION | 39 | EA | $0.00 | |
| 38 | L-110-1 | 2” PVC SCH. 40 CONDUIT IN UNPAVED AREA INCL. TRENCH & BACKFILL | 430 | LF | $0.00 | |
| 39 | L-110-4 | 2” PVC SCH. 40 CONDUIT IN EXISTING PAVED AREA, INCL. TRENCH & PAVEMENT REPAIR | 84 | LF | $0.00 | |
| 40 | L-110-5 | 2” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 5,000 | LF | $0.00 | |
| 41 | L-110-7 | 4” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 52 | LF | $0.00 | |
| 42 | L-110-10 | 2W4 CONCRETE-ENCASED DUCT | 26 | LF | $0.00 | |
| 43 | L-115-1 | REMOVE EXIST. L-867 JUNCTION CAN (JC) | 3 | EA | $0.00 | |
| 44 | L-115-2 | 12” DIA L-867 ADJUSTABLE JC IN PROPOSED PAVED SHOULDER | 4 | EA | $0.00 | |
| 45 | L-125-1 | REMOVE EXIST. TW EDGE LIGHT AND BASE | 62 | EA | $0.00 | |
| 46 | L-125-2 | NEW BASE-MOUNTED LED-TYPE ELEVATED TAXIWAY EDGE LIGHT IN PAVED SHOULDER | 84 | EA | $0.00 | |
| 47 | L-125-4 | REMOVE EXIST. L-858 SIGN AND CONC. PAD | 6 | EA | $0.00 | |
| 48 | L-125-6 | RELOCATE EXIST. L-858 SIZE 3, 2-MODULE LIGHTED SIGN TO NEW CONC. PAD | 1 | EA | $0.00 | |
| 49 | L-125-8 | RELOCATE EXIST. L-858 SIZE 3, 4-MODULE LIGHTED SIGN TO NEW CONC. PAD | 1 | EA | $0.00 | |
| 50 | L-125-11 | NEW L-858 SIZE 3, 1-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 2 | EA | $0.00 | |
| 51 | L-125-12 | NEW L-858 SIZE 3, 2-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 4 | EA | $0.00 | |
| 52 | L-125-14 | NEW L-858 SIZE 3, 3-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 2 | EA | $0.00 | |
| 53 | L-125-17 | ALL AIRFIELD LIGHTING WORK NOT INCLUDED IN OTHER BID ITEMS | 1 | LS | $0.00 | |
| TOTAL BID SCHEDULE 1 | $0.00 | |||||
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 2 | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 1 | C-100-1 | CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) | 1 | LS | $0.00 | |
| 2 | C-102-1 | TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL | 1 | LS | $0.00 | |
| 3 | C-102-2 | DEWATERING | 1 | LS | $0.00 | |
| 4 | C-105-1 | MOBILIZATION (LIMITED TO 10% OF CONSTRUCTION SUBTOTAL) | 1 | LS | $0.00 | |
| 5 | C-106-1 | SAFETY, SECURITY AND MAINTENANCE OF AIRPORT OPERATIONS | 1 | LS | $0.00 | |
| 6 | P-100-1 | CONSTRUCTION SURVEY | 1 | LS | $0.00 | |
| 7 | P-101-2 | PAVEMENT DEMOLITION (3.5" MILLING) | 1,317 | SY | $0.00 | |
| 8 | P-101-3 | PAVEMENT DEMOLITION (3.5" - 4" VARIABLE MILLING) | 2,331 | SY | $0.00 | |
| 9 | P-101-4 | FULL DEPTH PAVEMENT DEMOLITION | 3,189 | SY | $0.00 | |
| 10 | P-101-5 | JOINT AND CRACK REPAIR | 2,506 | LF | $0.00 | |
| 11 | P-152-1 | STRIPPING AND STOCKPILING (6" DEPTH) | 26,161 | SY | $0.00 | |
| 12 | P-152-2 | UNCLASSIFIED EXCAVATION | 1,418 | CY | $0.00 | |
| 13 | P-152-3 | OFFSITE BORROW EXCAVATION | 3,719 | CY | $0.00 | |
| 14 | P-152-4 | TREE CLEARING | 4 | AC | $0.00 | |
| 15 | P-211-2 | LIMEROCK BASE COURSE, 9" DEPTH | 2,901 | SY | $0.00 | |
| 16 | P-211-4 | LIMEROCK BASE COURSE, 17" DEPTH | 2,743 | SY | $0.00 | |
| 17 | P-341-1 | MEMBRANE INTERLAYER (GLASPAVE 25) | 7,615 | SF | $0.00 | |
| 18 | P-401-1 | ASPHALT SURFACE COURSE - TAXIWAY PAVEMENT | 1,270 | TON | $0.00 | |
| 19 | P-403-1 | ASPHALT SURFACE COURSE - TAXIWAY SHOULDER PAVEMENT | 601 | TON | $0.00 | |
| 20 | P-403-2 | ASPHALT LEVELING COURSE - TAXIWAY PAVEMENT | 205 | TON | $0.00 | |
| 21 | P-602-1 | EMULSIFIED ASPHALT PRIME COAT | 5,645 | SY | $0.00 | |
| 22 | P-620-1 | PAVEMENT MARKING, PERMANENT, TYPE III BEADS | 5,870 | SF | $0.00 | |
| 23 | P-620-2 | PAVEMENT MARKING, PERMANENT, NO BEADS | 3,791 | SF | $0.00 | |
| 24 | P-620-3 | PAVEMENT MARKING, TEMPORARY, NO BEADS | 5,870 | SF | $0.00 | |
| 25 | P-620-4 | SURFACE PREPARATION | 15,991 | SF | $0.00 | |
| 26 | P-620-5 | PAVEMENT MARKING REMOVAL | 1,962 | SF | $0.00 | |
| 27 | P-620-6 | SURFACE PAINTED HOLD POSITION MARKINGS | 1 | EA | $0.00 | |
| 28 | T-904-1 | SODDING | 24,044 | SY | $0.00 | |
| 29 | L-108-1 | NO. 8, 5 KV, L-824 TYPE ‘C’ CONDUCTOR | 5,520 | LF | $0.00 | |
| 30 | L-108-2 | NO. 4 BARE COPPER COUNTERPOISE WIRE | 2,130 | LF | $0.00 | |
| 31 | L-108-4 | ¾” x 10’ COPPER-CLAD GROUND ROD SECTION | 13 | EA | $0.00 | |
| 32 | L-110-1 | 2” PVC SCH. 40 CONDUIT IN UNPAVED AREA INCL. TRENCH & BACKFILL | 885 | LF | $0.00 | |
| 33 | L-110-4 | 2” PVC SCH. 40 CONDUIT IN EXISTING PAVED AREA, INCL. TRENCH & PAVEMENT REPAIR | 120 | LF | $0.00 | |
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 2 (cont.) | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 34 | L-110-5 | 2” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 1,065 | LF | $0.00 | |
| 35 | L-110-6 | 3” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 12 | LF | $0.00 | |
| 36 | L-110-7 | 4” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 27 | LF | $0.00 | |
| 37 | L-110-8 | 2W2 CONCRETE-ENCASED DUCT | 54 | LF | $0.00 | |
| 38 | L-110-10 | 2W4 CONCRETE-ENCASED DUCT | 4 | LF | $0.00 | |
| 39 | L-115-1 | REMOVE EXIST. L-867 JUNCTION CAN (JC) | 4 | EA | $0.00 | |
| 40 | L-115-2 | 12” DIA L-867 ADJUSTABLE JC IN PROPOSED PAVED SHOULDER | 1 | EA | $0.00 | |
| 41 | L-115-3 | 12” DIA L-867 JC IN UNPAVED AREA | 1 | EA | $0.00 | |
| 42 | L-125-1 | REMOVE EXIST. TW EDGE LIGHT AND BASE | 24 | EA | $0.00 | |
| 43 | L-125-2 | NEW BASE-MOUNTED LED-TYPE ELEVATED TAXIWAY EDGE LIGHT IN PAVED SHOULDER | 42 | EA | $0.00 | |
| 44 | L-125-4 | REMOVE EXIST. L-858 SIGN AND CONC. PAD | 4 | EA | $0.00 | |
| 45 | L-125-9 | RELOCATE EXIST. L-858 SIZE 3, 4-MODULE LIGHTED SIGN TO EXIST. CONC. PAD | 1 | EA | $0.00 | |
| 46 | L-125-11 | NEW L-858 SIZE 3, 1-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 4 | EA | $0.00 | |
| 47 | L-125-13 | NEW L-858 SIZE 3, 2-MODULE LED-TYPE SIGN ON EXIST. (PH. 1) CONC. PAD | 2 | EA | $0.00 | |
| 48 | L-125-14 | NEW L-858 SIZE 3, 3-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 1 | EA | $0.00 | |
| 49 | L-125-15 | NEW L-858 SIZE 3, 3-MODULE LED-TYPE SIGN ON EXIST. (PH. 1) CONC. PAD | 1 | EA | $0.00 | |
| 50 | L-125-17 | ALL AIRFIELD LIGHTING WORK NOT INCLUDED IN OTHER BID ITEMS | 1 | LS | $0.00 | |
| TOTAL BID SCHEDULE 2 | $0.00 | |||||
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 3 | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 1 | C-100-1 | CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) | 1 | LS | $0.00 | |
| 2 | C-102-1 | TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL | 1 | LS | $0.00 | |
| 3 | C-102-2 | DEWATERING | 1 | LS | $0.00 | |
| 4 | C-105-1 | MOBILIZATION (LIMITED TO 10% OF CONSTRUCTION SUBTOTAL) | 1 | LS | $0.00 | |
| 5 | C-106-1 | SAFETY, SECURITY AND MAINTENANCE OF AIRPORT OPERATIONS | 1 | LS | $0.00 | |
| 6 | P-100-1 | CONSTRUCTION SURVEY | 1 | LS | $0.00 | |
| 7 | P-101-2 | PAVEMENT DEMOLITION (3.5" MILLING) | 29,358 | SY | $0.00 | |
| 8 | P-101-3 | PAVEMENT DEMOLITION (3.5" - 4" VARIABLE MILLING) | 2,915 | SY | $0.00 | |
| 9 | P-101-4 | FULL DEPTH PAVEMENT DEMOLITION | 7,634 | SY | $0.00 | |
| 10 | P-101-5 | JOINT AND CRACK REPAIR | 17,287 | LF | $0.00 | |
| 11 | P-101-6 | REMOVE 30" MITERED END SECTION | 2 | EA | $0.00 | |
| 12 | P-101-7 | REMOVE 36" MITERED END SECTION | 1 | EA | $0.00 | |
| 13 | P-101-8 | REMOVE 36" HEADWALL | 1 | EA | $0.00 | |
| 14 | P-152-1 | STRIPPING AND STOCKPILING (6" DEPTH) | 109,533 | SY | $0.00 | |
| 15 | P-152-2 | UNCLASSIFIED EXCAVATION | 31,309 | CY | $0.00 | |
| 16 | P-152-3 | OFFSITE BORROW EXCAVATION | 100 | CY | $0.00 | |
| 17 | P-154-1 | 6" STABILIZED SUBGRADE | 24,953 | SY | $0.00 | |
| 18 | P-154-2 | 10" STABILIZED SUBGRADE | 8,843 | SY | $0.00 | |
| 19 | P-211-1 | LIMEROCK BASE COURSE, 6" DEPTH | 23,419 | SY | $0.00 | |
| 20 | P-211-2 | LIMEROCK BASE COURSE, 9" DEPTH | 3,752 | SY | $0.00 | |
| 21 | P-211-3 | LIMEROCK BASE COURSE, 12" DEPTH | 7,858 | SY | $0.00 | |
| 22 | P-211-4 | LIMEROCK BASE COURSE, 17" DEPTH | 4,222 | SY | $0.00 | |
| 23 | P-341-1 | MEMBRANE INTERLAYER (GLASPAVE 25) | 35,020 | SF | $0.00 | |
| 24 | P-401-1 | ASPHALT SURFACE COURSE - TAXIWAY PAVEMENT | 10,472 | TON | $0.00 | |
| 25 | P-403-1 | ASPHALT SURFACE COURSE - TAXIWAY SHOULDER PAVEMENT | 6,129 | TON | $0.00 | |
| 26 | P-403-2 | ASPHALT LEVELING COURSE - TAXIWAY PAVEMENT | 3,698 | TON | $0.00 | |
| 27 | P-602-1 | EMULSIFIED ASPHALT PRIME COAT | 39,251 | SY | $0.00 | |
| 28 | P-620-1 | PAVEMENT MARKING, PERMANENT, TYPE III BEADS | 17,375 | SF | $0.00 | |
| 29 | P-620-2 | PAVEMENT MARKING, PERMANENT, NO BEADS | 21,768 | SF | $0.00 | |
| 30 | P-620-3 | PAVEMENT MARKING, TEMPORARY, NO BEADS | 17,375 | SF | $0.00 | |
| 31 | P-620-4 | SURFACE PREPARATION | 58,357 | SF | $0.00 | |
| 32 | P-620-5 | PAVEMENT MARKING REMOVAL | 2,555 | SF | $0.00 | |
| 33 | P-620-6 | SURFACE PAINTED HOLD POSITION MARKINGS | 4 | EA | $0.00 | |
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 3 (cont.) | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 34 | T-904-1 | SODDING | 80,885 | SY | $0.00 | |
| 35 | D-701-1 | CONSTRUCT 18' RCP, CLASS V | 27 | LF | $0.00 | |
| 36 | D-701-2 | CONSTRUCT 24" RCP, CLASS V | 67 | LF | $0.00 | |
| 37 | D-701-3 | CONSTRUCT 30" RCP, CLASS V | 114 | LF | $0.00 | |
| 38 | D-701-4 | CONSTRUCT 36" RCP, CLASS V | 100 | LF | $0.00 | |
| 39 | D-701-6 | CONSTRUCT 24" MITERED END SECTION | 1 | EA | $0.00 | |
| 40 | D-701-7 | CONSTRUCT 30" MITERED END SECTION | 2 | EA | $0.00 | |
| 41 | D-701-8 | CONSTRUCT 36" MITERED END SECTION | 2 | EA | $0.00 | |
| 42 | D-751-1 | MODIFIED FDOT TYPE D INLET | 1 | EA | $0.00 | |
| 43 | D-751-3 | FDOT TYPE G INLET | 1 | EA | $0.00 | |
| 44 | D-751-4 | FDOT STORM MANHOLE, TYPE J, ALT B BOTTOM, 4X4 | 1 | EA | $0.00 | |
| 45 | L-108-1 | NO. 8, 5 KV, L-824 TYPE ‘C’ CONDUCTOR | 61,250 | LF | $0.00 | |
| 46 | L-108-2 | NO. 4 BARE COPPER COUNTERPOISE WIRE | 8,900 | LF | $0.00 | |
| 47 | L-108-3 | 12" DEEP TRENCH FOR COUNTERPOISE WIRE OVER EXISTING 3" AND 4" CONDUITS | 725 | LF | $0.00 | |
| 48 | L-108-4 | ¾” x 10’ COPPER-CLAD GROUND ROD SECTION | 55 | EA | $0.00 | |
| 49 | L-110-1 | 2” PVC SCH. 40 CONDUIT IN UNPAVED AREA INCL. TRENCH & BACKFILL | 400 | LF | $0.00 | |
| 50 | L-110-2 | 3” PVC SCH. 40 CONDUIT IN UNPAVED AREA INCL. TRENCH & BACKFILL | 5,160 | LF | $0.00 | |
| 51 | L-110-4 | 2” PVC SCH. 40 CONDUIT IN EXISTING PAVED AREA, INCL. TRENCH & PAVEMENT REPAIR | 91 | LF | $0.00 | |
| 52 | L-110-5 | 2” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 8,170 | LF | $0.00 | |
| 53 | L-110-6 | 3” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 25 | LF | $0.00 | |
| 54 | L-110-7 | 4” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 90 | LF | $0.00 | |
| 55 | L-110-8 | 2W2 CONCRETE-ENCASED DUCT | 179 | LF | $0.00 | |
| 56 | L-110-9 | 2W3 CONCRETE-ENCASED DUCT | 102 | LF | $0.00 | |
| 57 | L-110-10 | 2W4 CONCRETE-ENCASED DUCT | 173 | LF | $0.00 | |
| 58 | L-115-1 | REMOVE EXIST. L-867 JUNCTION CAN (JC) | 6 | EA | $0.00 | |
| 59 | L-115-2 | 12” DIA L-867 ADJUSTABLE JC IN PROPOSED PAVED SHOULDER | 7 | EA | $0.00 | |
| 60 | L-115-3 | 12” DIA L-867 JC IN UNPAVED AREA | 1 | EA | $0.00 | |
| 61 | L-115-4 | 16” DIA L-867 ADJUSTABLE JC IN PROPOSED PAVED SHOULDER | 1 | EA | $0.00 | |
| 62 | L-115-5 | CONVERT EDGE LT. TO JC BY REMOVING FIXTURE & REPLACING W/ BASE PLATE | 1 | EA | $0.00 | |
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 3 (cont.) | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 63 | L-115-6 | REMOVE ELECTRICAL HANDHOLE | 5 | EA | $0.00 | |
| 64 | L-115-7 | PROPOSED 4-CAN HANDHOLE | 2 | EA | $0.00 | |
| 65 | L-115-8 | PROPOSED 3-CAN HANDHOLE | 2 | EA | $0.00 | |
| 66 | L-125-1 | REMOVE EXIST. TW EDGE LIGHT AND BASE | 102 | EA | $0.00 | |
| 67 | L-125-2 | NEW BASE-MOUNTED LED-TYPE ELEVATED TAXIWAY EDGE LIGHT IN PAVED SHOULDER | 119 | EA | $0.00 | |
| 68 | L-125-4 | REMOVE EXIST. L-858 SIGN AND CONC. PAD | 11 | EA | $0.00 | |
| 69 | L-125-8 | RELOCATE EXIST. L-858 SIZE 3, 4-MODULE LIGHTED SIGN TO NEW CONC. PAD | 2 | EA | $0.00 | |
| 70 | L-125-10 | NEW L-858 SIZE 2, 3-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 1 | EA | $0.00 | |
| 71 | L-125-11 | NEW L-858 SIZE 3, 1-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 4 | EA | $0.00 | |
| 72 | L-125-14 | NEW L-858 SIZE 3, 3-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 6 | EA | $0.00 | |
| 73 | L-125-16 | NEW L-858 SIZE 3, 4-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 1 | EA | $0.00 | |
| 74 | L-125-17 | ALL AIRFIELD LIGHTING WORK NOT INCLUDED IN OTHER BID ITEMS | 1 | LS | $0.00 | |
| TOTAL BID SCHEDULE 3 | $0.00 | |||||
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 4 | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 1 | C-100-1 | CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) | 1 | LS | $0.00 | |
| 2 | C-102-1 | TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL | 1 | LS | $0.00 | |
| 3 | C-102-2 | DEWATERING | 1 | LS | $0.00 | |
| 4 | C-105-1 | MOBILIZATION (LIMITED TO 10% OF CONSTRUCTION SUBTOTAL) | 1 | LS | $0.00 | |
| 5 | C-106-1 | SAFETY, SECURITY AND MAINTENANCE OF AIRPORT OPERATIONS | 1 | LS | $0.00 | |
| 6 | P-100-1 | CONSTRUCTION SURVEY | 1 | LS | $0.00 | |
| 7 | P-101-2 | PAVEMENT DEMOLITION (3.5" MILLING) | 20,740 | SY | $0.00 | |
| 8 | P-101-3 | PAVEMENT DEMOLITION (3.5" - 4" VARIABLE MILLING) | 3,527 | SY | $0.00 | |
| 9 | P-101-5 | JOINT AND CRACK REPAIR | 13,272 | LF | $0.00 | |
| 10 | P-152-1 | STRIPPING AND STOCKPILING (6" DEPTH) | 31,500 | SY | $0.00 | |
| 11 | P-152-2 | UNCLASSIFIED EXCAVATION | 3,891 | CY | $0.00 | |
| 12 | P-152-3 | OFFSITE BORROW EXCAVATION | 74 | CY | $0.00 | |
| 13 | P-154-1 | 6" STABILIZED SUBGRADE | 11,031 | SY | $0.00 | |
| 14 | P-154-2 | 10" STABILIZED SUBGRADE | 2,851 | SY | $0.00 | |
| 15 | P-211-1 | LIMEROCK BASE COURSE, 6" DEPTH | 10,342 | SY | $0.00 | |
| 16 | P-211-2 | LIMEROCK BASE COURSE, 9" DEPTH | 2,814 | SY | $0.00 | |
| 17 | P-211-3 | LIMEROCK BASE COURSE, 12" DEPTH | 2,240 | SY | $0.00 | |
| 18 | P-211-4 | LIMEROCK BASE COURSE, 17" DEPTH | 1,239 | SY | $0.00 | |
| 19 | P-341-1 | MEMBRANE INTERLAYER (GLASPAVE 25) | 19,595 | SF | $0.00 | |
| 20 | P-401-1 | ASPHALT SURFACE COURSE - TAXIWAY PAVEMENT | 6,153 | TON | $0.00 | |
| 21 | P-403-1 | ASPHALT SURFACE COURSE - TAXIWAY SHOULDER PAVEMENT | 2,838 | TON | $0.00 | |
| 22 | P-403-2 | ASPHALT LEVELING COURSE - TAXIWAY PAVEMENT | 3,620 | TON | $0.00 | |
| 23 | P-602-1 | EMULSIFIED ASPHALT PRIME COAT | 16,635 | SY | $0.00 | |
| 24 | P-620-1 | PAVEMENT MARKING, PERMANENT, TYPE III BEADS | 9,339 | SF | $0.00 | |
| 25 | P-620-2 | PAVEMENT MARKING, PERMANENT, NO BEADS | 11,556 | SF | $0.00 | |
| 26 | P-620-3 | PAVEMENT MARKING, TEMPORARY, NO BEADS | 9,339 | SF | $0.00 | |
| 27 | P-620-4 | SURFACE PREPARATION | 31,153 | SF | $0.00 | |
| 28 | P-620-5 | PAVEMENT MARKING REMOVAL | 1,238 | SF | $0.00 | |
| 29 | P-620-6 | SURFACE PAINTED HOLD POSITION MARKINGS | 2 | EA | $0.00 | |
| 30 | T-904-1 | SODDING | 18,373 | SY | $0.00 | |
| 31 | D-701-1 | CONSTRUCT 18" RCP, CLASS V | 77 | LF | $0.00 | |
| 32 | D-701-5 | CONSTRUCT 18" MITERED END SECTION | 7 | EA | $0.00 | |
| 33 | D-751-2 | MODIFIED FDOT TYPE G INLET | 1 | EA | $0.00 | |
| 34 | L-108-1 | NO. 8, 5 KV, L-824 TYPE ‘C’ CONDUCTOR | 8,730 | LF | $0.00 | |
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 4 (cont.) | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 35 | L-108-2 | NO. 4 BARE COPPER COUNTERPOISE WIRE | 4,860 | LF | $0.00 | |
| 36 | L-108-4 | ¾” x 10’ COPPER-CLAD GROUND ROD SECTION | 25 | EA | $0.00 | |
| 37 | L-110-1 | 2” PVC SCH. 40 CONDUIT IN UNPAVED AREA INCL. TRENCH & BACKFILL | 940 | LF | $0.00 | |
| 38 | L-110-4 | 2” PVC SCH. 40 CONDUIT IN EXISTING PAVED AREA, INCL. TRENCH & PAVEMENT REPAIR | 68 | LF | $0.00 | |
| 39 | L-110-5 | 2” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 3,790 | LF | $0.00 | |
| 40 | L-110-7 | 4” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 124 | LF | $0.00 | |
| 41 | L-110-10 | 2W4 CONCRETE-ENCASED DUCT | 69 | LF | $0.00 | |
| 42 | L-115-1 | REMOVE EXIST. L-867 JUNCTION CAN (JC) | 7 | EA | $0.00 | |
| 43 | L-115-2 | 12” DIA L-867 ADJUSTABLE JC IN PROPOSED PAVED SHOULDER | 5 | EA | $0.00 | |
| 44 | L-115-3 | 12” DIA L-867 JC IN UNPAVED AREA | 6 | EA | $0.00 | |
| 45 | L-125-1 | REMOVE EXIST. TW EDGE LIGHT AND BASE | 57 | EA | $0.00 | |
| 46 | L-125-2 | NEW BASE-MOUNTED LED-TYPE ELEVATED TAXIWAY EDGE LIGHT IN PAVED SHOULDER | 63 | EA | $0.00 | |
| 47 | L-125-4 | REMOVE EXIST. L-858 SIGN AND CONC. PAD | 5 | EA | $0.00 | |
| 48 | L-125-8 | RELOCATE EXIST. L-858 SIZE 3, 4-MODULE LIGHTED SIGN TO NEW CONC. PAD | 1 | EA | $0.00 | |
| 49 | L-125-11 | NEW L-858 SIZE 3, 1-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 2 | EA | $0.00 | |
| 50 | L-125-12 | NEW L-858 SIZE 3, 2-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 1 | EA | $0.00 | |
| 51 | L-125-14 | NEW L-858 SIZE 3, 3-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 1 | EA | $0.00 | |
| 52 | L-125-17 | ALL AIRFIELD LIGHTING WORK NOT INCLUDED IN OTHER BID ITEMS | 1 | LS | $0.00 | |
| TOTAL BID SCHEDULE 4 | $0.00 | |||||
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 5 | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 1 | C-100-1 | CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) | 1 | LS | $0.00 | |
| 2 | C-102-1 | TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL | 1 | LS | $0.00 | |
| 3 | C-102-2 | DEWATERING | 1 | LS | $0.00 | |
| 4 | C-105-1 | MOBILIZATION (LIMITED TO 10% OF CONSTRUCTION SUBTOTAL) | 1 | LS | $0.00 | |
| 5 | C-106-1 | SAFETY, SECURITY AND MAINTENANCE OF AIRPORT OPERATIONS | 1 | LS | $0.00 | |
| 6 | P-100-1 | CONSTRUCTION SURVEY | 1 | LS | $0.00 | |
| 7 | P-101-1 | PAVEMENT DEMOLITION (2" MILLING) | 6,947 | SY | $0.00 | |
| 8 | P-101-2 | PAVEMENT DEMOLITION (3.5" MILLING) | 3,840 | SY | $0.00 | |
| 9 | P-101-3 | PAVEMENT DEMOLITION (3.5" - 4" VARIABLE MILLING) | 2,406 | SY | $0.00 | |
| 10 | P-101-5 | JOINT AND CRACK REPAIR | 6,855 | LF | $0.00 | |
| 11 | P-152-1 | STRIPPING AND STOCKPILING (6" DEPTH) | 10,423 | SY | $0.00 | |
| 12 | P-152-2 | UNCLASSIFIED EXCAVATION | 1,558 | CY | $0.00 | |
| 13 | P-152-3 | OFFSITE BORROW EXCAVATION | 788 | CY | $0.00 | |
| 14 | P-154-1 | 6" STABILIZED SUBGRADE | 7,931 | SY | $0.00 | |
| 15 | P-154-2 | 10" STABILIZED SUBGRADE | 97 | SY | $0.00 | |
| 16 | P-211-1 | LIMEROCK BASE COURSE, 6" DEPTH | 7,353 | SY | $0.00 | |
| 17 | P-211-3 | LIMEROCK BASE COURSE, 12" DEPTH | 76 | SY | $0.00 | |
| 18 | P-341-1 | MEMBRANE INTERLAYER (GLASPAVE 25) | 9,775 | SF | $0.00 | |
| 19 | P-401-1 | ASPHALT SURFACE COURSE - TAXIWAY PAVEMENT | 2,515 | TON | $0.00 | |
| 20 | P-403-1 | ASPHALT SURFACE COURSE - TAXIWAY SHOULDER PAVEMENT | 1,617 | TON | $0.00 | |
| 21 | P-403-2 | ASPHALT LEVELING COURSE - TAXIWAY PAVEMENT | 607 | TON | $0.00 | |
| 22 | P-602-1 | EMULSIFIED ASPHALT PRIME COAT | 7,428 | SY | $0.00 | |
| 23 | P-620-1 | PAVEMENT MARKING, PERMANENT, TYPE III BEADS | 7,577 | SF | $0.00 | |
| 24 | P-620-2 | PAVEMENT MARKING, PERMANENT, NO BEADS | 12,205 | SF | $0.00 | |
| 25 | P-620-3 | PAVEMENT MARKING, TEMPORARY, NO BEADS | 7,577 | SF | $0.00 | |
| 26 | P-620-4 | SURFACE PREPARATION | 31,038 | SF | $0.00 | |
| 27 | P-620-5 | PAVEMENT MARKING REMOVAL | 1,100 | SF | $0.00 | |
| 28 | P-620-6 | SURFACE PAINTED HOLD POSITION MARKINGS | 8 | EA | $0.00 | |
| 29 | T-904-1 | SODDING | 7,831 | SY | $0.00 | |
| 30 | D-701-1 | CONSTRUCT 18" RCP, CLASS V | 8 | LF | $0.00 | |
| 31 | D-701-5 | CONSTRUCT 18" MITERED END SECTION | 1 | EA | $0.00 | |
| 32 | D-751-4 | FDOT STORM MANHOLE, TYPE J, ALT B BOTTOM, 4X4 | 1 | EA | $0.00 | |
| 33 | L-108-1 | NO. 8, 5 KV, L-824 TYPE ‘C’ CONDUCTOR | 9,855 | LF | $0.00 | |
| 34 | L-108-2 | NO. 4 BARE COPPER COUNTERPOISE WIRE | 2,390 | LF | $0.00 | |
| CONTRACTOR | 0 | |||||
| BID SCHEDULE 5 (cont.) | ||||||
| INDEX | PAY ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | EXTENDED TOTAL |
| 35 | L-108-4 | ¾” x 10’ COPPER-CLAD GROUND ROD SECTION | 26 | EA | $0.00 | |
| 36 | L-110-1 | 2” PVC SCH. 40 CONDUIT IN UNPAVED AREA INCL. TRENCH & BACKFILL | 325 | LF | $0.00 | |
| 37 | L-110-5 | 2” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 2,045 | LF | $0.00 | |
| 38 | L-110-6 | 3” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 8 | LF | $0.00 | |
| 39 | L-110-7 | 4” PVC SCH. 40 CONDUIT IN PROPOSED PAVED SHOULDER, INCL. TRENCH & BACKFILL | 8 | LF | $0.00 | |
| 40 | L-110-8 | 2W2 CONCRETE-ENCASED DUCT | 6 | LF | $0.00 | |
| 41 | L-115-1 | REMOVE EXIST. L-867 JUNCTION CAN (JC) | 9 | EA | $0.00 | |
| 42 | L-115-2 | 12” DIA L-867 ADJUSTABLE JC IN PROPOSED PAVED SHOULDER | 3 | EA | $0.00 | |
| 43 | L-115-3 | 12” DIA L-867 JC IN UNPAVED AREA | 1 | EA | $0.00 | |
| 44 | L-115-5 | CONVERT EDGE LT. TO JC BY REMOVING FIXTURE & REPLACING W/ BASE PLATE | 4 | EA | $0.00 | |
| 45 | L-125-1 | REMOVE EXIST. TW EDGE LIGHT AND BASE | 51 | EA | $0.00 | |
| 46 | L-125-2 | NEW BASE-MOUNTED LED-TYPE ELEVATED TAXIWAY EDGE LIGHT IN PAVED SHOULDER | 69 | EA | $0.00 | |
| 47 | L-125-3 | REMOVE AND SAFEGUARD EXIST. RUNWAY GUARD LIGHT AND REINSTALL ON NEW ADJUSTABLE BASE IN PAVED SHOULDER | 8 | EA | $0.00 | |
| 48 | L-125-4 | REMOVE EXIST. L-858 SIGN AND CONC. PAD | 10 | EA | $0.00 | |
| 49 | L-125-5 | RELOCATE EXIST. L-858 SIZE 2, 3-MODULE LIGHTED SIGN TO NEW CONC. PAD | 2 | EA | $0.00 | |
| 50 | L-125-6 | RELOCATE EXIST. L-858 SIZE 3, 2-MODULE LIGHTED SIGN TO NEW CONC. PAD | 1 | EA | $0.00 | |
| 51 | L-125-7 | RELOCATE EXIST. L-858 SIZE 3, 3-MODULE LIGHTED SIGN TO NEW CONC. PAD | 1 | EA | $0.00 | |
| 52 | L-125-10 | NEW L-858 SIZE 2, 3-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 4 | EA | $0.00 | |
| 53 | L-125-12 | NEW L-858 SIZE 3, 2-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 3 | EA | $0.00 | |
| 54 | L-125-14 | NEW L-858 SIZE 3, 3-MODULE LED-TYPE SIGN ON NEW CONCRETE PAD | 2 | EA | $0.00 | |
| 55 | L-125-17 | ALL AIRFIELD LIGHTING WORK NOT INCLUDED IN OTHER BID ITEMS | 1 | LS | $0.00 | |
| TOTAL BID SCHEDULE 5 | $0.00 | |||||
| BID SUMMARY | ||||||
| CONTRACTOR | 0 | |||||
| SUB-TOTAL BID SCHEDULE 1 (NUMBERS AND WORDS): | $0.00 | |||||
| DOLLARS AND CENTS | ||||||
| SUB-TOTAL BID SCHEDULE 2 (NUMBERS AND WORDS): | $0.00 | |||||
| DOLLARS AND CENTS | ||||||
| SUB-TOTAL BID SCHEDULE 3 (NUMBERS AND WORDS): | $0.00 | |||||
| DOLLARS AND CENTS | ||||||
| SUB-TOTAL BID SCHEDULE 4 (NUMBERS AND WORDS): | $0.00 | |||||
| DOLLARS AND CENTS | ||||||
| SUB-TOTAL BID SCHEDULE 5 (NUMBERS AND WORDS): | $0.00 | |||||
| DOLLARS AND CENTS | ||||||
| TOTAL BID (BID SCHEDULES 1-5) (NUMBERS AND WORDS): | $0.00 | |||||
| DOLLARS AND CENTS |
&L&G&C&"Arial,Bold"&10TAXIWAY A REHABILITATION - PHASE 2
BID FORM
(continued) &L&9AVCON, INC.&C&"Calibri,Regular"&9BF-&P of &N&R&9APRIL 2025 &"-,Bold Italic"ADDENDUM 3 - 5/20/2025
File details come from the government source that posted it. Updated .