- 25-21003734
About this file
This is a blank Schedule of Values (SOV) Excel template provided as part of solicitation #25-21003734 for a fence replacement and lighting project at the ARSR facility in Elwood, IL. The template includes sections for general conditions (travel, per diem, site mobilization, temporary facilities), construction materials, selective demolition, new construction work, rental equipment, and installation testing. Each section allows for itemized entries with columns for quantity, cost per unit, total cost, labor hours/rates, and equipment costs. The template includes standard markup calculations for profit (10-15%), overhead (10-20%), and bond/liability insurance (1-2%).
The template is designed to help contractors provide detailed cost breakdowns for their bids on the fence replacement project, which has an estimated magnitude of $100,000-$250,000. The template references RS Means as the basis for cost estimates and requires contractor and government review signatures. This is a standard bidding document that contractors must complete and submit as part of their proposal package by the March 19, 2025 deadline.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preparing Organization:
Class of work:
Total Measure Units Per Unit Total Man Hrs Total Per unit Total
Travel (# People) $0.00 Perdiem ( # People, for # days) $0.00 Site Mobilization/Demobilization $0.00 Dumpster (# days) $0.00 Temporary Storage (#days) $0.00 Portable Bathroom $0.00
List Major items 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00
List major demolition activities/Tasks 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00 0 0 0 0 $0.00
List major installations tasks/Trades 0 0 0 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
List major rental equipment $0.00 $0.00 $0.00 $0.00 $0.00
List major installation testing activities/tasks $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL $0.00
Profit(10-15%) $0.00 Overhead (10-20%) $0.00 Bond/Liability insurance (1-2%) $0.00
TOTAL $0.00
Revised Government Estimate Date Prepared: SHEET: 1 of 1
Qunatity Cost Labor($/Hr) Equipment
Project: Basis for estimate: RSMEANS
JCN:
Estimator: Checked by:
INSTALLATION TESTING
NEW CONSTRUCTION WORK
SELECTIVE DEMOLITION
CONSTRUCTION MATERIALS
GENERAL CONDITIONS
RENTAL EQUIPMENT
Labor_Material Est
File details come from the government source that posted it. Updated .