Newark NJ RFI 03.04.25.pdf
PDF 85 KB Posted
- Solicitation number
- 25-19006839
About this file
This is a Q&A document for an RFI regarding the installation of a Fiber Optic Transmitting System (FOTS) in Newark, NJ. The document addresses four key questions about the project requirements: 1) P&P bonds are required, 2) The fiber specification is 24 strand single mode from OCC, which will be government furnished and looped in hand holes ready to pull, 3) Site access requires Port security escort with timing dependent on Port security protocols, and 4) No watcher/flagger is required and those costs should not be included in the bid.
The associated federal contract opportunity (solicitation #25-19006839) is a small business set-aside under NAICS 238210 with an estimated value between $100,000-$250,000. The work involves installing two new duct bank sections for FOTS, including ground penetrating radar, cable location, utility marking, and installation of 2-4" concrete encased PVC conduit with three 1-1/4" inner ducts. Quotes are due February 27, 2025, by 5:00 PM CT, with site visits requested by February 13 and questions due by February 20. The project duration is estimated at 30 days from notice to proceed, and the contractor must perform at least 51% of the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00002 Amendment - Newark NJ rfi.pdf | ||
| Newark NJ RFI Answered- CD.pdf | ||
| 00001 Amendment - Newark NJ ext rfi nosite.pdf | ||
| EWR FOTS Drawings 19006839.pdf | ||
| EWR FOTS Duct Bank Specifications.pdf | ||
| Newark NJ SOV.xlsx | XLSX spreadsheet | |
| Wage Determination NJ20250031 01.03.2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Newark, NJ - FOTS Fiber Optic Transmitting System RFI
1. Is a bid bond required, or just a P&P bond? P&P bonds are required.
2. Could you clarify the strand count/brand of fiber required? 24 strand single mode from OCC is government furnished looped in hand holes and ready to pull.
3. Could you say more about access – should we expect 1-2 hours to get to the site/gain entry to Newark, etc.? Do we need an escort? Access time will be dependent on Port security. Escort is needed to gain access to construction area.
4. Is a watcher/flagger required? Should we cover those costs in our bid? No