Addendum 1 is a supplemental document for RFQ 250342, issued by the Massachusetts Military Division for the installation of traffic gates at Camp Edwards, specifically on Turpentine Road. The addendum addresses five key questions from a site visit, providing clarifications on gate support post specifications, receiver post dimensions, spoils removal, traffic management, and hinge types. Notable changes include requiring a minimum 4" galvanized steel gate support post for Gate #1 with a retractable support, and permitting box hinges instead of sealed hinges.
The procurement falls under the Small Business Purchasing Program (SBPP), which provides preference to Massachusetts small businesses with fewer than 50 employees and gross revenues under $15 million. Contractors must obtain security clearance, provide a 5% bid bond, and a 50% payment bond, and comply with Davis-Bacon and Massachusetts Department of Labor Standards wage rates. The project requires electronic bid submission via COMMBUYS by March 5, 2025, with award notification expected March 7 and a contract start date of March 10. Bidders must demonstrate 5 years of similar gate installation experience and ensure workers complete a 10-hour OSHA-approved construction safety course, with payment structured as a Fee For Service via Electronic Funds Transfer.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25-250342 Install Traffic Gates at Turpentine Road
Addendum #1 Date: 4 March 2025
Questions and Answers:
The following are answers and clarifications based on questions posed at the Site Visit:
Q1. – Will the 3in Pipe specified for the support post on Gate #1 (60ft Span) be adequate?
A1. – See section 3.2.2.2 below.
Q2. – Do the Receiver Posts need to be 3in?
A2. – Receiver Posts may be 2” provided it can hold the gate arm in the open position.
Q3. – What is the requirement for spoils?
A3. – Soil, rock and fill spoils from excavation may be removed to Dig site 3 adjacent to Turpentine Road. All Concrete excess, including chute wash debris, shall be removed off Base.
Q4. – Will a Police Detail be required. How will Traffic be routed?
A4. – a police Detail will not be required for this project; however, a trained flagman will be required to route traffic around the work area as needed. Traffic safety signage shall be used to warn oncoming traffic of work ahead. Traffic may be routed through the road median as needed to accomplish the work.
Q5. – Can Box hinges be used instead of Sealed hinge?
A5. - Box Hinges may be used
REF: Please note the following changes to the Contract Documents:
3.2.2.2 – Gate #1 shall have a minimum 4” galvanized steel gate support post. with a retractable support at each end. The retractable support shall be capable of swinging up parallel to the gate arm when gate is in the open position without interfering with the receiver post. The retractable support shall have a wheel at the bottom to facilitate movement. The support is in addition to the specified receiver posts.
3.2.2.4 – Box hinges shall be allowed.
END OF ADDENDUM #1