250172_ATT11_Drawings.pdf

PDF 4 MB Posted

Attached to
Tinker AFB MACBOA WWYK250172 Replace Walls of Iszard Pool
Solicitation number
FA813726R0016
Issued by

About this file

This document is a set of 35% design construction drawings for a federal military construction project at Tinker Air Force Base, Oklahoma.

The project, designated WWYK250172, involves replacing the walls of the Iszard Pool House (Building B5730). The scope of work includes demolishing and removing existing 6-inch concrete masonry unit (CMU) privacy fencing at 8 feet tall and wood privacy fencing (1x6 wood slats at 8 feet tall), then replacing both with new 8-foot-tall metal shadow-style privacy fencing in Patrician Bronze color. The project also requires replacing a 9-foot-wide double utility gate with a new double 8-foot-tall metal panel gate, removing and replacing downspouts and gutters with appropriate drainage to storm drains or splash blocks, repairing and repainting interior and exterior CMU walls, patching cracked brick veneer at building corners, providing new concrete sidewalks and pads to egress gates, installing new "egress only" gates with metal panels, and replacing the roof system with an 80-mil white PVC membrane meeting ASTM and ASHRAE reflectivity standards. The electrical work includes removing and installing new lighting poles, LED fixtures, GFCI receptacles, panelboards, conduits, and related equipment. The construction drawings were prepared by the 72nd Air Base Wing Civil Engineer Directorate and include site plans, utilities, structural plans and details, architectural demolition and new work plans, roof demolition and new work details, and electrical demolition and new work plans. The design is at 35% completion as of February 2, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

WWYK250172

REPLACE WALLS OF THE

ISZARD POOL HOUSE,

B5730

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

PL

AC

E

W

AL

LS

O

F

TH

E

IS

ZA

RD

P

OO

L H

OU

SE

B5

FE

B

TE

PA

-S R

M

G-101

F

BA

KE

R

B

SH

AN

N

O N

T:

\E ng r\D es ig n\ s\

\2

2\ 0_

Su pp or t\0

_3 _D ra w in gs

\P D

F

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 16

SITE PLAN AND UTILITIESC-101

3 GENERAL NOTESS-001

4 GENERAL NOTESS-002

5 STRUCTURAL GENERAL NOTESS-003

6 S-004 7 S-101 8 S-501

9 ARCHITECTURAL DEMOLITIONAD-101

10 ARCHITECTURAL NEW WORKA-101

STRUCTURAL DETAILS

SPECIAL INSPECTIONS

STRUCTURAL PLAN AND DETAILS

ROOF DEMOLITION

ROOF NEW WORK

ROOF DETAILS

RD-101

R-101 R-501

ARCHITECTURAL NEW WORKA-102

ELECTRICAL DEMOLITION PLAN

ELECTRICAL NEW WORK PLAN

ED-101

E-101

57025703

M cN ar ne y Av e.

TWINING DR.

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

62501W 62501E

TWINING DR.

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT

LOCATION

(FUTURE

HAUL ROUTE)

(F

UT

UR

E

HA

UL

R

OU

TE

FUTURE

TRUCK GATE

FUTURE

HAUL ROUTE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

TINKER AFB, OK

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATEGENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

DEMOLISH AND REMOVE MASONRY PRIVACY FENCE (6" CMU AT 8 FEET TALL).

REPLACE WITH 8'-0" TALL SHADOW STYLE PRIVACY FENCE.

DEMOLISH AND REMOVE WOOD PRIVACY FENCE (1x6 WOOD SLATS AT 8 FEET

TALL) REPLACE WITH 8'-0" TALL SHADOW STYLE PRIVACY FENCE.

REMOVE AND REPLACE WOOD UTILITY GATE W/ CONCRETE PAD. REFER DETAIL

2/C-101 & 3/C-101

PROVIDE EGRESS GATE, TO MATCH SHADOW STYLE PRIVACY FENCE. PROVIDE

CONCRETE SIDEWALK FROM GATE TO EXISTING SIDEWALK. REFER DETAIL 2/C-101

METAL MAN GATE, EXISTING TO REMAIN

LOW ORNAMENTAL PICKET METAL POOL FENCE, EXISTING TO REMAIN

BATH HOUSE ENTRY SIDEWALK LEADING TO MCNARNEY AVE, EXISTING TO

REMAIN.

SIDEWALK LEADING TO NORTH DRIVE, EXISTING TO REMAIN.

PARKING SPACES AT NORTH DRIVE, EXISTING TO REMAIN.

SIDEWALK LEADING TO TWINING DR CROSSWALK & CHILDREN'S CENTER, B5510,

EXISTING TO REMAIN.

C-101

SITE PLAN AND UTILITIES

NTS

35%

DESIGN

W W

YK

RE

PL

AC

E

W

AL

LS

O

F

TH

E

IS

ZA

RD

P

OO

L H

OU

SE

B5

FE

B

TE

PA

-S R

M

L

LU

KE

C-101

F

BA

KE

R

B

SH

AN

N

O N

T:

\E ng r\D es ig n\ s\

\2

2\ 0_

Su pp or t\0

_3 _D ra w in gs

\P D

F

SI

TE

P

LA

N

AN

D

UT

ILI

TI

ES

02 16

C-101

SIDEWALK DETAIL

NTS

C-101

SLOPED SLAB BASE DETAIL

3/4"=1'-0"

122'-8"

'-8

6 6

1. ALL MATERIALS, EQUIPMENT AND CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE

OKLAHOMA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY

CONSTRUCTION.

2. SUBGRADE SHALL BE COMPACTED TO 98% MODIFIED PROCTOR DENSITY.

3. BASE SHALL BE COMPACTED TO 98% MODIFIED PROCTOR DENSITY.

4. SIDEWALK WIDTH SHALL BE AS SPECIFIED IN THE WORK ORDER. MINIMUM = 5' - 0", MAXIMUM = 10' - 0".

5. TOOLED OR SAWED JOINTS SHALL BE SPACED AT THE WIDTH DIMENSION.

6. EXPANSION JOINTS SHALL BE PLACED EVERY 10TH JOINT OR 50', WHICHEVER IS LESS.

7. CROSS SLOPE ALL SIDEWALKS 1/8" PER FOOT IN THE DIRECTION OF NATURAL DRAINAGE. IF DRAINAGE

IS AWAY FROM SIDEWALK IN BOTH DIRECTIONS, THEN THE SIDEWALK SHALL BE CROWNED.

5" PCC

4" Compacted Aggregate Base 4" Scarified & Compacted Subgrade

1'-6"

10"

SLOPED CONCRETE PAVING

COMPACTED AGGREGATE BASE

COMPACTED SUBGRADE

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

PL

AC

E

W

AL

LS

O

F

TH

E

IS

ZA

RD

P

OO

L H

OU

SE

B5

FE

B

TE

PA

-S R

M

L

LU

KE

S-001

F

BA

KE

R

B

SH

AN

N

O N

T:

\E ng r\D es ig n\ s\

\2

2\ 0_

Su pp or t\0

_3 _D ra w in gs

\P D

F

GE

NE

RA

L N

OT

ES

03 16

& AND

@ AT

AB ANCHOR BOLT

ABV ABOVE

ADDL ADDITIONAL

ALT ALTERNATE

ARCH ARCHITECT(URAL)

ATR ALL THREAD ROD

B/ BOTTOM OF

BF BRACED FRAME

BLDG BUILDING

BLKD BLOCKED

BLKG BLOCK(ING)

BLW BELOW

BM BEAM

BN BOUNDARY NAILING

BRG BEARING

BTM BOTTOM

BP BASE PLATE

C= CAMBER

CFS COLD-FORMED STEEL

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLR CLEAR(ANCE)

CMU CONCRETE MASONRY

UNIT

CNTR CENTER(ED)

COL COLUMN

CONC CONCRETE

CONST CONSTRUCT(ION)

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

CSK COUNTERSINK

d PENNY(NAILS)

DBL DOUBLE

DIA, Ø DIAMETER

DO DITTO

DWG DRAWING(S)

DWL DOWEL(S)

(E) EXISTING

EA EACH

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

EMBED EMBED(ED)(MENT)

EN EDGE NAILING

EQ EQUAL

EQUIP EQUIPMENT

ESR EVALUATION SERVICE

REPORT

ES EACH SIDE

EW EACH WAY

EXT EXTERIOR

FDN FOUNDATION

FF FINISHED FLOOR

FG FINISH GRADE

FLR FLOOR

FN FIELD NAILING

FO FACE OF

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FOS FACE OF STUD

FP FULL PENETRATION

FRMG FRAMING

FS FAR SIDE

FT FOOT(FEET)

FTG FOOTING

GA GAUGE(GAGE)

GALV GALVANIZE(D)

GL GLUE LAMINATE

GLB GLUE LAMINATED

BEAM

GR GRADE

GYP GYPSUM

H HORIZONTAL

HD HOLDOWN

HDG HOT DIPPED

GALVANIZED

HDR HEADER

HGR HANGER

HK HOOK

HSS HOLLOW STRUCTURAL

SECTION

HT HEIGHT

IAPMO INTERNATIONAL

ASSOCIATION OF

PLUMBING AND

MECHANICAL

OFFICIALS

ID INSIDE DIAMETER

IJ ISOLATION JOINT

IN INCH(ES)

INT INTERIOR

JST JOIST

JT JOINT

L LONG (LENGTH)

LB POUND(S)

LLH LONG LEG

HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LW LIGHTWEIGHT

MAX MAXIMUM

MECH MECHANICAL

MEZZ MEZZANINE

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTL METAL

(N) NEW

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NS NEAR SIDE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

P/C PRECAST

PEMB PREENGINEERED

METAL BUILDING

PLATE

PLY PLYWOOD

PLF POUNDS PER LINEAR

FOOT

PNL PANEL

P/S PRESTRESS(ED)

PSF POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE

INCH

PT PRESSURE TREATED

R RADIUS

RBS REDUCED BEAM

SECTION

RCP REINF CONC PIPE

REF REFERENCE

REINF REINFORCE(ING)(MENT

REQD REQUIRED

RF ROOF

RO ROUGH OPENING

RTU ROOF TOP UNIT

SC SLIP CRITICAL

SCHED SCHEDULE

SHTG SHEATHING

SIM SIMILAR

SMS SHEET METAL SCREW

SOG SLAB ON GRADE

SPEC SPECIFICATION(S)

SQ SQUARE

STD STANDARD

STGR STAGGER(ED)

STIFF STIFFEN(ER)

STL STEEL

STRUCT STRUCTURAL

SYMM SYMMETRICAL

SW SHEAR WALL

T&B TOP & BOTTOM

T&G TONGUE & GROOVE

THK THICK(NESS)

THRD THREAD(ED)

TN TOE NAIL(ING)

T/CONC TOP OF CONCRETE

T/PARAPET TOP OF PARAPET

T/STEEL TOP OF STEEL

TOW TOP OF WALL

TOF TOP OF FTG/FDN

T/ TOP OF

TRANS TRANSVERSE

TYP TYPICAL

UNBLKD UNBLOCKED

UNO UNLESS NOTED

OTHERWISE

V VERTICAL

VIF VERIFY IN FIELD

W WIDTH (WIDE)

W/ WITH

WD WOOD

W/O WITHOUT

WP WORK POINT

WT WEIGHT

WWF WELDED WIRE FABRIC

X-STG EXTRA STRONG

XX-STG DOUBLE EXTRA

STRONG

YD YARD

ABBREVIATIONSGENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH LOCAL

STANDARDS AND APPLICABLE PROVISIONS OF THE UFC 3-301-01 (IBC 2024).

ANY DEVIATION FROM THE APPROVED CONTRACT STRUCTURAL DRAWINGS

SHALL ONLY BE MADE AFTER WRITTEN APPROVAL BY THE ENGINEER OF

RECORD.

ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE

WORKING DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF

THE ENGINEER OF RECORD AND WORK SHALL NOT PROCEED UNTIL WRITTEN

DIRECTION IS PROVIDED BY THE ENGINEER OF RECORD.

PROJECT SPECIFICATIONS ARE PART OF THE CONSTRUCTION DOCUMENTS AND

ARE TO BE USED IN CONJUNCTION WITH THE PROJECT DRAWINGS.

NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER THESE

GENERAL NOTES AND TYPICAL DETAILS IN CASE OF CONFLICT.

DETAILS LABELED "TYPICAL" APPLY TO SITUATIONS OCCURRING THAT ARE THE

SAME OR SIMILAR TO THOSE SPECIFICALLY SHOWN. SUCH DETAILS APPLY

WHEREVER THEY OCCUR, EVEN WHEN NOT SPECIFICALLY REFERENCED ON THE

DRAWINGS.

WHERE NO CONSTRUCTION DETAILS ARE SHOWN, NOTED, AND DON'T APPEAR

TO ALIGN WITH TYPICAL DETAILS, CONTACT THE STRUCTURAL ENGINEER OF

RECORD.

IN NO CASE SHALL WORKING DIMENSIONS BE SCALED FROM PLANS, SECTIONS

OR DETAILS ON THESE STRUCTURAL DRAWINGS.

ELEVATIONS GIVEN ON THE STRUCTURAL DRAWINGS ARE REFERENCED FROM

FINISHED FLOOR, UNLESS OTHERWISE NOTED.

THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE

FINISHED STRUCTURE, UNLESS OTHERWISE NOTED. THEY DO NOT INDICATE THE

MEANS OR METHODS OF CONSTRUCTION. THE CONTRACTOR SHALL PERFORM

ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE, WORKMEN, AND

OTHER PERSONS DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE,

BUT ARE NOT LIMITED TO THE DESIGN, ERECTION, AND REMOVAL OF

TEMPORARY BRACING, SHORING, FALSEWORK, ETC. THE CONTRACTOR SHALL

SUPERVISE AND DIRECT THE WORK AND BE SOLELY RESPONSIBLE FOR ALL

CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND

PROCEDURES. OBSERVATION VISITS BY THE ENGINEER OF RECORD OR THEIR

DELEGATE DO NOT CONSTITUTE INSPECTION OR APPROVAL OF THE ABOVE

ITEMS.

VERIFICATION: THE DETAILING AND DIMENSIONS OF EXISTING STRUCTURES DO

NOT NECESSARILY REPRESENT THE AS-CONSTRUCTED CONDITIONS. THE

CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND SITE

CONDITIONS BEFORE STARTING WORK. NOTIFY THE ENGINEER OF RECORD

IMMEDIATELY OF ANY DISCREPANCIES. IN INSTANCES WHERE DISCREPANCIES

ARE IDENTIFIED, WORK SHALL NOT PROCEED UNTIL WRITTEN DIRECTION IS

PROVIDED BY THE ENGINEER OF RECORD.

THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DETAILS,

DIMENSIONS AND SITE CONDITIONS TO AVOID THE INTERFERENCE OF

MATERIALS EMBEDDED IN CONCRETE OR MASONRY INCLUDING BUT NOT LIMITED

TO REINFORCING STEEL, PRESTRESSING STEEL AND HARDWARE,

MISCELLANEOUS STEEL AND CONDUITS.

PRIOR TO BEGINNING EXCAVATION, THE CONTRACTOR SHALL LOCATE AND

PROTECT UNDERGROUND OR CONCEALED UTILITIES WHERE NEW WORK IS

BEING PERFORMED. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING

EXISTING UTILITIES IN THE WORK AREA AND SHALL REPAIR ANY DAMAGE

CAUSED BY THEIR OPERATIONS AT THEIR COST.

CONSTRUCTION MATERIALS SHALL BE EVENLY DISTRIBUTED IF PLACED ON

FLOORS OR ROOFS DURING CONSTRUCTION. LOADS SHALL NOT EXCEED THE

DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR

BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH.

CONCRETE SLAB ON GRADE IS TO HAVE REACHED IT'S FULL 28-DAY

COMPRESSIVE STRENGTH BEFORE LOADING.

PROVIDE A LIST OF ALL PROPOSED SUBSTITUTIONS AND MANUFACTURER'S ICC

ES REPORTS TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL

BEFORE FABRICATION OR INSTALLATION.

OPENINGS, POCKETS, SLEEVES, BLOCK-OUTS, ETC. SHALL NOT BE PLACED IN

SLABS, FOUNDATIONS, ETC. UNLESS SPECIFICALLY DETAILED ON THESE

STRUCTURAL DRAWINGS. THE ENGINEER OF RECORD SHALL BE NOTIFIED WHEN

OTHER DRAWINGS SHOW OPENINGS, POCKETS, SLEEVES, BLOCK-OUTS, ETC.

THAT ARE NOT SHOWN ON THESE STRUCTURAL DRAWINGS.

NO STRUCTURAL MEMBER SHALL BE CUT OR MODIFIED FOR PIPES, DUCTS, ETC.,

UNLESS SPECIFICALLY SHOWN ON THESE STRUCTURAL DRAWINGS.

THESE STRUCTURAL DRAWINGS ILLUSTRATE THE NEW STRUCTURAL MEMBERS.

REFER TO ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR

NON-STRUCTURAL ITEMS WHICH REQUIRE SPECIAL PROVISIONS DURING

CONSTRUCTION OF THE STRUCTURAL MEMBERS.

REFER TO ARCHITECTURAL DRAWINGS FOR FLOOR DEPRESSIONS, SLOPES,

DRAINS, CURBS, PADS, EMBEDDED ITEMS, NON-BEARING PARTITIONS, AND

LOCATION AND DETAILS FOR ALL MISCELLANEOUS HANDRAILS, LADDERS,

HANGERS AND STEEL GRATINGS. REFER TO MECHANICAL AND ELECTRICAL

DRAWINGS FOR SLEEVES AND HANGARS FOR PIPES, DUCTS, AND EQUIPMENT.

SEE PLUMBING, FIRE PROTECTION, MECHANICAL, ELECTRICAL AND

MANUFACTURER'S DRAWINGS FOR TYPE, SIZE, LOCATION, ANCHORAGE

REQUIREMENTS AND PADS FOR ALL EQUIPMENT. MANUFACTURER'S TEMPLATES

SHOWING ANCHOR BOLT LOCATIONS SHALL BE OBTAINED FOR ALL EQUIPMENT.

COORDINATE WITH THE EQUIPMENT SUPPLIER PRIOR TO PLACING SLABS, WALLS

AND FOUNDATIONS.

THESE STRUCTURAL DRAWINGS INDICATE ONLY THE APPROXIMATE LOCATION

OF MECHANICAL, ELECTRICAL AND OTHER EQUIPMENT AS WELL AS THEIR

RELATED AUXILIARY FRAMING NECESSARY TO SUPPORT THE EQUIPMENT. THE

FINAL POSITIONING OF THESE ITEMS IS DEPENDENT UPON THE EQUIPMENT

PROVIDED. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WORK

BETWEEN SUBCONTRACTORS IN THIS REGARD AND PROVIDING NECESSARY

INFORMATION AND DIMENSIONS IN A TIMELY MANNER TO ALL PARTIES INVOLVED.

OBSERVATION VISITS TO THE SITE BY THE ENGINEER OF RECORD OR THEIR

DELEGATE SHALL NOT CONSTITUTE REQUIRED SPECIAL INSPECTIONS NOTED

HEREIN.

THE CONCRETE SLABS ON GRADE HAVE NOT BEEN DESIGNED TO SUPPORT

CONSTRUCTION EQUIPMENT. THE CONTRACTOR IS RESPONSIBLE FOR THE

DESIGN OF THE SLAB WHERE CONSTRUCTION EQUIPMENT IS TO BE PLACED

THAT EXCEED THE DESIGN FLOOR LIVE LOAD. ANY DAMAGE TO THE CONCRETE

SLAB AS A RESULT OF CONSTRUCTION EQUIPMENT IS THE RESPONSIBILITY OF

THE CONTRACTOR AND SHALL BE REPAIRED AT THEIR COST. CONCRETE SLAB

ON GRADE IS TO HAVE REACHED IT'S FULL 28-DAY COMPRESSIVE STRENGTH

BEFORE LOADING.

-26 -35 -35

-16

DESIGN CRITERIA

1.

A.

B.

C.

2.

A.

B.

C.

A.

B.

C.

D.

E.

F.

G.

A.

B.

C.

D.

E.

F.

G.

H.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

THE DESIGN CRITERIA SHALL CONFORM TO THE PROVISIONS OF THE UFC 3-301-01, AND STANDARDS REFERENCED

THEREIN.

INTERNATIONAL BUILDING CODE (IBC) - 2024 EDITION

MINIMUM DESIGN LOADS FOR BUILDING AND OTHER STRUCTURES - ASCE 7-22

RISK CATEGORY OF BUILDING II

DESIGN LOADS:

ROOF DEAD LOAD

ROOF LIVE LOAD

FLOOR LIVE LOAD

3. SNOW DESIGN CRITERIA:

RISK CATEGORY

GROUND SNOW LOAD, p g MINIMUM ROOF SNOW LOAD, p s SNOW EXPOSURE FACTOR, C e SNOW LOAD IMPORTANCE FACTOR, I s THERMAL FACTOR, C t SLOPE FACTOR, C s

4. WIND DESIGN CRITERIA (IBC 1603.1.4):

RISK CATEGORY

DESIGN WIND SPEED (V ULT)

DESIGN WIND SPEED (V ASD)

EXPOSURE CATEGORY

TOPOGRAPHIC FACTOR (K zt) GCpi

GUST EFFECT FACTOR (G)

WIND BASE SHEAR (V W)

CORNER EDGE DISTANCE a = 4'-0" POSITIVE AND NEGATIVE VALUES SIGNIFY PRESSURES ACTING TOWARD AND AWAY FROM SURFACES, RESPECTIVELY.

5. SEISMIC DESIGN CRITERIA (IBC 1603.1.5):

RISK CATEGORY

IMPORTANCE FACTOR, I e

SITE CLASS

Ss

SMS

SDS

S1

SM1

SD1

SEISMIC DESIGN CATEGORY (SDC)

SEISMIC RESISTING SYSTEM

SEISMIC BASE SHEAR

RESPONSE COEFFICIENT (Cs)

RESPONSE MODIFICATION COEFF (R)

ANALYSIS PROCEDURE

6. FLOOD DESIGN DATA: NOT REQUIRED, NOT IN FLOOD ZONE.

7. SPECIAL LOADS: NO SPECIAL LOADS

8. ROOF DRAIN LOAD DATA:

A. 15 MINUTE RAIN INTENSITY

B. 60 MINUTE RAIN INTENSITY

10PSF+PEMB SELF WEIGHT

20 PSF (NON-REDUCIBLE)

150 PSF (CONCRETE SLAB ON GRADE)

II

18 PSF

13 PSF

1.0 1.0 1.0 1.0

II

109 MPH

85 MPH

C 0.85 +/- 0.18 0.85

4.2 KIPS PER FENCE POST

II

1.00 D 0.32g 0.36g 0.24g 0.081g 0.17g 0.11g B

STEEL SYSTEMS NOT SPECIFICALLY DESIGNED FOR

SEISMIC RESISTANCE (BUILDING), GROUND SUPPORTED

CANTILEVER FENCES (FENCE).

32.0 KIPS (BUILDING), 0.192*W (FENCE)

0.08 (BUILDING) 0.192 (FENCE)

3.0 (BUILDING) 1.25 (FENCE)

EQUIVALENT LATERAL FORCE

7.8 IN/HR

3.94 IN/HR

BUILDING COMPONENTS AND CLADDING

GROSS WIND PRESSURES (1.0W)

ZONE DESCRIPTION

EFFECTIVE AREA (FT

10 100 500

EFFECTIVE AREA (FT )

10 100 1000

16 161'

ROOF INT

ROOF EDGE

ROOF CORNER

WALL CORNER

-55 -35

-28 -22 -35 -22

1 ROOF MID -42 -26

-74 -35 26 20 26 20

-24 -24 16 16 16 16 16 16

4 WALL INTERIOR

POSITIVE PRESSURES (PSF) NEGATIVE PRESSURES (PSF)

) 22

SOILS AND FOUNDATIONS

1.

2.

3.

4.

5.

6.

7.

8.

9.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

GEOTECHNICAL DESIGN CRITERIA

STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR ANY

GEOTECHNICAL ASPECT OF THIS PROJECT.

OWNER SHALL EMPLOY A GEOTECHNICAL ENGINEER LICENSED IN THE STATE OF

JURISDICTION TO PERFORM NECESSARY TESTING AND INSPECTIONS FOR

QUALITY CONTROL AND TO ENSURE THAT THE REQUIREMENTS OF THE

GEOTECHNICAL REPORT ARE COMPLIED WITH. TEST REPORTS SHALL BE

SUBMITTED DIRECTLY TO THE ARCHITECT AND ENGINEER FROM THE

GEOTECHNICAL ENGINEER, WITH A COPY TO THE CONTRACTOR.

FILLED EXCAVATIONS OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS,

EXISTING FOUNDATIONS, ETC., OR ANY UNUSUAL SOILS CONDITIONS

ENCOUNTERED DURING SITE CLEARING OR EXCAVATION SHALL BE BROUGHT TO

THE ATTENTION OF THE ARCHITECT IMMEDIATELY. DO NOT PROCEED UNTIL

WRITTEN INSTRUCTIONS TO REMEDY ARE RECEIVED. ABANDONED FOOTINGS,

NEW OR EXISTING UTILITIES, ETC., THAT INTERFERE WITH NEW CONSTRUCTION

SHALL BE REROUTED OR REMOVED AS DIRECTED BY THE ARCHITECT.

SLOPE ALL EXTERIOR FINISHED GRADES AWAY FROM THE BUILDING TO ENSURE

NO PONDING OF WATER OCCURS AROUND BUILDINGS.

INSTALL ALL UNDERSLAB PIPING AND ELECTRICAL WORK AND RECOMPACT ANY

DISTURBED COMPACTED MATERIAL BEFORE PLACEMENT OF CONCRETE SLAB ON

GRADE.

CONTRACTOR IS RESPONSIBLE FOR ALL SHORING, CRIBBING, SHEET PILING, ETC.

AS REQUIRED TO SAFELY RETAIN EXCAVATIONS AND TRENCHES DURING

CONSTRUCTION. CONTRACTOR SHALL RETAIN A PROFESSIONAL ENGINEER

LICENSED IN THE STATE OF JURISDICTION TO DESIGN ALL SHORING, TIE BACKS,

ETC. WHERE SHORING IS TO BE PERMANENT, THE DESIGN MUST MEET ALL

REQUIREMENTS OF THE BUILDING CODE.

EXCAVATION DEPTH AND SIDEWALL INCLINATION SHALL NOT EXCEED THOSE

SPECIFIED IN LOCAL, STATE OR FEDERAL REGULATIONS INCLUDING THOSE

DEFINED IN SUBPART P OF CHAPTER 27, 29 CFR PART 1926 (OF FEDERAL

REGISTER). EXCAVATIONS MAY NEED TO BE WIDENED AND SLOPED, OR

TEMPORARILY BRACED TO MAINTAIN OR DEVELOP A SAFE WORK ENVIRONMENT.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ASSESSING STABILITY UNDER

"MEANS AND METHODS."

REFER TO THE ARCHITECTURAL PLANS FOR PERIMETER INSULATION

REQUIREMENTS.

SOIL DESIGN PARAMETERS (SHALLOW FOUNDATIONS):

MINIMUM DEPTH OF BOTTOM OF FOOTINGS = 2'-0" BELOW LOWEST ADJACENT

GRADE

MINIMUM WIDTH OF COLUMN FOOTINGS = 2'-0"

MINIMUM WIDTH OF CONTINUOUS FOOTINGS = 1'-6"

FROST DEPTH = 2'-0"

ALLOWABLE NET VERTICAL BEARING PRESSURE FOR ISOLATED/PAD

FOOTINGS = 1500 PSF

ALLOWABLE NET VERTICAL BEARING PRESSURE FOR CONTINUOUS

FOOTINGS = 1500 PSF

COEFFICIENT OF FRICTION BETWEEN SOIL AND CONCRETE = 0.25 (ULTIMATE

VALUE)

PASSIVE EARTH PRESSURE = 150 PCF (SANDY CLAY)

UNIT WEIGHT = 120 PCF (SANDY CLAY)

SOIL SITE CLASS = D

THE FOUNDATION DESIGN IS BASED UPON THE IBC PRESUMPTIVE LOAD-BEARING VALUES.

SHOP DRAWINGS AND PRODUCT DATA

1.

2.

3.

4.

5.

6.

7.

8.

THE REVIEW OF SHOP DRAWINGS AND OTHER SUBMITTALS IS ONLY FOR REVIEW

OF GENERAL COMPLIANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND

THE INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS. IT IS THE

GENERAL CONTRACTOR'S RESPONSIBILITY TO REVIEW THE SHOP DRAWINGS

PRIOR TO SUBMITTING TO THE ARCHITECT. THE GENERAL CONTRACTOR IS

RESPONSIBLE FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND

DIMENSIONS, SELECTING FABRICATION PROCESSES AND TECHNIQUES OF

CONSTRUCTION; COORDINATING THE WORK WITH THAT OF ALL OTHER TRADES;

AND PERFORMING THE WORK IN A SAFE AND SATISFACTORY MANNER.

SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS IN

ADDITION TO ANY ITEMS REQUIRED BY THE SPECIFICATIONS. THE SUBMITTALS,

TESTING & INSPECTION MATRIX IS PROVIDED AS A GUIDE ONLY, AND MAY NOT BE

ALL-INCLUSIVE. CONSTRUCTION DOCUMENTS SHALL NOT BE REPRODUCED FOR

USE AS SHOP DRAWINGS.

THE GENERAL CONTRACTOR SHALL REVIEW AND STAMP ALL SHOP DRAWINGS

AND PRODUCT DATA FOR CONFORMANCE WITH THE CONSTRUCTION

DOCUMENTS PRIOR TO SUBMITTAL. ANY SHOP DRAWINGS OR PRODUCT DATA

NOT REVIEWED AND STAMPED BY THE GENERAL CONTRACTOR WILL BE

RETURNED WITHOUT REVIEW. THE CONTRACTOR SHALL CLOUD OR FLAG ALL

ITEMS NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS FROM THE ORIGINAL CONTRACT

DRAWINGS SHALL BE CLOUDED BY THE MANUFACTURER OR FABRICATOR. THE

STRUCTURAL ENGINEER RESERVES THE RIGHT TO ALLOW OR NOT ALLOW ANY

CHANGES TO THE ORIGINAL CONTRACT DRAWINGS AT ANY TIME BEFORE OR

AFTER SHOP DRAWING REVIEW.

THE SHOP DRAWINGS DO NOT REPLACE THE ORIGINAL CONTRACT DRAWINGS.

ITEMS OMITTED OR SHOWN INCORRECTLY AND WHICH ARE NOT NOTED AS

ALLOWED BY THE STRUCTURAL ENGINEER OR ARCHITECT ARE NOT TO BE

CONSIDERED CHANGES TO THE ORIGINAL CONTRACT DRAWINGS.

SHOP DRAWINGS WILL BE RETURNED FOR RESUBMITTAL IF MAJOR ERRORS OR

OMISSIONS ARE FOUND DURING REVIEW.

SUBMIT NOT MORE THAN FIVE (5) SETS FOR ANY ONE SUBMITTAL. ONE COPY

WILL BE RETAINED BY THE STRUCTURAL ENGINEER AND THE BALANCE

RETURNED.

ALLOW A MINIMUM OF FIVE WORKING DAYS FOR REVIEW OF SHOP DRAWINGS BY

THE STRUCTURAL ENGINEER.

CONTINUOUS WALL

OR PAD FOUNDATION

(N) STEEL COLUMN

F 2.0

(-1'-4") FOOTING TAG

SHEAR WALL

FOOTING STEP

CMU WALL

CONCRETE WALL

HEADERH-X

MOMENT CONNECTION

CANTILEAVER CONNECTION

STEP IN SLAB

DECK SPAN DIRECTION

S

SYMBOLS

WOOD/STEEL WALL

GIRDER

(E) STEEL COLUMN

JOIST

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

PL

AC

E

W

AL

LS

O

F

TH

E

IS

ZA

RD

P

OO

L H

OU

SE

B5

FE

B

TE

PA

-S R

M

L

LU

KE

S-002

F

BA

KE

R

B

SH

AN

N

O N

T:

\E ng r\D es ig n\ s\

\2

2\ 0_

Su pp or t\0

_3 _D ra w in gs

\P D

F

GE

NE

RA

L N

OT

ES

04 16

CAST IN PLACE CONCRETE

1.

2.

A.

B.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF ACI 301,

"SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS" AND ACI 318,

"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE", EXCEPT AS

MODIFIED BY THE CONTRACT DOCUMENTS.

CONCRETE SHALL BE READY MIXED CONCRETE IN ACCORDANCE WITH ASTM C94.

MINIMUM 28 DAY COMPRESSIVE STRENGTH SHALL BE 4000 PSI EXCEPT AS FOLLOWS:

FOUNDATIONS 3,000 PSI

CONCRETE EXPOSED TO FREEZE/THAW CYCLE 4,500 PSI

CEMENT SHALL CONFORM TO ASTM C150, TYPE I, TYPE II,

CONCRETE EXPOSED TO SOIL SHALL HAVE TYPE II CEMENT AND A MAXIMUM W/C

RATIO OF 0.5. AGGREGATE PER ASTM C33. MAXIMUM 4" SLUMP FOR ALL

CONCRETE. DO NOT TAMP SLABS (USE ROLLER BUG, VIBRATING SCREED OR BULL

FLOAT ONLY). CONCRETE CONTAINING SUPERPLASTICIZING ADMIXTURE SHALL HAVE

FIELD-VERIFIED 3" MAXIMUM SLUMP PRIOR TO ADDING ADMIXTURE AND 8" MAXIMUM

SLUMP AT PLACEMENT. MIX DESIGNS SHALL BE DESIGNED BY THE CONCRETE

PRODUCTION FACILITY IN ACCORDANCE WITH ACI 301 AND APPROVED BY THE

STRUCTURAL ENGINEER PRIOR TO CONSTRUCTION. PROVIDE AIR-ENTRAINING

ADMIXTURE AT ALL CONCRETE EXPOSED TO FREEZE/THAW CYCLES AT A RATE

ADEQUATE TO PROVIDE 6.0% AIR AT POINT OF PLACEMENT. DO NOT ALLOW AIR

CONTENT OF INTERIOR TROWEL FINISHED SLABS TO EXCEED 3.0%.

CONCRETE SHALL BE FREE OF CALCIUM CHLORIDE. NO FLY ASH ADDITIVES SHALL BE

PERMITTED IN CONCRETE FLATWORK OR ARCHITECTURALLY EXPOSED CONCRETE.

WHEN USED, FLY ASH SHALL CONFORM TO ASTM C618, CLASS F OR C. FLY ASH SHALL

NOT REPLACE MORE THAN 25% OF CEMENT BY WEIGHT.

CONTINUOUS SPECIAL INSPECTION: REQUIRED FOR DESIGN STRENGTHS EXCEEDING

2500 PSI.

PROVIDE SLEEVES FOR UTILITY OPENINGS IN CONCRETE BEFORE PLACING

CONCRETE. DO NOT CUT ANY CONFLICTING REINFORCING.

NO CONSTRUCTION JOINTS OTHER THAN THOSE SHOWN ON THE DRAWINGS SHALL

BE INSTALLED WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER. PROVIDE 3/4"

CHAMFER AT ALL EXTERIOR CORNERS AND EDGES OF PERMANENTLY EXPOSED

CONCRETE.

DO NOT SUBJECT CONCRETE TO ANY PROCEDURE THAT WILL CAUSE SEGREGATION.

DEPOSIT CONCRETE AS NEAR AS PRACTICABLE TO THE FINAL POSITION TO AVOID

SEGREGATION.

CONCRETE FOOTINGS AND PADS MAY BE POURED AGAINST NEAT EXCAVATIONS

PROVIDED THE REQUIRED CONCRETE COVERAGE FOR REINFORCING IS MAINTAINED.

MECHANICALLY VIBRATE ALL CONCRETE WHEN PLACED, EXCEPT THAT SLABS ON

GRADE NEED BE VIBRATED ONLY AROUND EMBEDDED ITEMS AND UNDERFLOOR

DUCTS, ETC. MECHANICALLY VIBRATE ONLY THE TOP 5 FEET OF DRILLED PIER

CONCRETE. REVIBRATE TOP OF DRILLED PIER 15 MINUTES AFTER PLACING

CONCRETE.

MIXING AND DELIVERY AS MEASURED FROM BATCH TIME TO COMPLETION OF

DISCHARGE FROM TRUCK SHALL NOT EXCEED 90 MINUTES. WHEN AIR TEMPERATURE

IS ABOVE 90 DEG F (32 DEG C), REDUCE MIXING, DELIVERY TIME AND DISCHARGE TO

60 MINUTES.

CURE EXPOSED CONCRETE FOR A MINIMUM OF 7 DAYS IN ACCORDANCE WITH ACI

308.1 PROCEDURES IN ORDER TO PREVENT CRACKING. CURE WITH CURING AND

SEALING COMPOUND, MOIST CURING, MOISTURE-RETAINING COVER CURING, OR

COMBINATIONS THEREOF. IF CURING COMPOUND IS USED, APPLY AT A RATE

SPECIFIED BY THE MANUFACTURER. CONCRETE SHALL BE MAINTAINED ABOVE 50

DEGREES F AND IN A MOIST CONDITION FOR A MINIMUM OF 7 DAYS AFTER

PLACEMENT.ALL CONCRETE SHALL BE TESTED BY AN INDEPENDENT TESTING AGENCY

AND RESULTS REPORTED TO THE ARCHITECT.

FOR PLACEMENT OF CONCRETE IN EITHER HOT OR COLD WEATHER CONDITIONS

FOLLOW THE ACI STANDARD PROCEDURES.

REINFORCING BARS, ANCHOR BOLTS, REBAR DOWELS, AND OTHER CONCRETE

INSERTS SHALL BE WELL SECURED IN POSITION PRIOR TO PLACEMENT OF CONCRETE

AND STABBING INTO WET CONCRETE IS NOT ALLOWED.

CHAMFER: 3/4 INCH ON EXPOSED CORNERS.15.

REINFORCING

1.

2.

3.

4.

5.

6.

REINFORCING AND ACCESSORIES SHALL BE DETAILED, FABRICATED AND

INSTALLED PER ACI 315, ACI 318 AND CRSI "MANUAL OF STANDARD PRACTICE

FOR REINFORCED CONCRETE CONSTRUCTION.

REINFORCING BARS SHALL BE MADE USING NEW BILLET STEEL IN

ACCORDANCE WITH ASTM A615 GRADE 60 f y = 60 KSI. WELDED WIRE FABRIC PER

ASTM A185, WIRE PER ASTM A82, FABRICATED IN FLAT SHEETS (NOT ROLLED)

WELDING OF REINFORCING IS NOT PERMITTED UNLESS SPECIFICALLY

DETAILED. WELDED SHALL BE ACCORDING TO AWS D1.4.

ALL REINFORCING SHALL BE COLD BENT.

PROVIDE CLASS B SPLICES IN REINFORCING FOR CONTINUOUS REINFORCING.

PROVIDE STANDARD 90 DEGREE HOOKS IN ACCORDANCE WITH ACI 318 UNLESS

SPECIFICALLY DETAILED. REFER TO TYPICAL DETAIL FOR REQUIRED LAP

LENGTHS.

MAINTAIN THE FOLLOWING REINFORCEMENT COVERAGE FOR REINFORCING

STEEL UNLESS NOTED OTHERWISE.

CAST AGAINST OR PERMANENTY

EXPOSED TO SOIL: 3 INCHES

EXPOSED TO SOIL OR WEATHER:

NO. 6 AND LARGER: 2 INCHES

NO. 5 AND SMALLER: 1-1/2 INCHES

NOT EXPOSED TO SOIL OR WEATHER

NO. 11 AND SMALLER 1" WALL, 1-1/2" SLAB

COLUMNS (TO TIES) 1 1/2"

BEAMS (TO STIRRUPS) 1 1/2"

SUSPENDED SLABS 3/4"

ALL OTHER PER LATEST EDITION OF ACI 318

BAR SIZE:

TOP OTHER

#3

#4

#5

#6

#7

#8

#9

#10

#11

BAR SPLICES

CONCRETE f' c

3 KSI

27" 21"

36" 28"

47" 36"

56" 43"

81" 62"

92" 71"

105" 81"

117" 90"

129" 100"

TOP OTHER

4 KSI

25" 19"

33" 25"

39" 30"

48" 37"

70" 54"

81" 62"

91" 71"

100" 77"

112" 87"

TOP OTHER

5 KSI

23" 18"

30" 23"

36" 28"

43" 33"

53" 49"

73" 56"

81" 63"

90" 69"

100" 78"

ONE

LAYER

TWO

LAYERS

15" 15"

21" 23"

30" 35"

43" 66"

58" 90"

87" 135"

111" 171"

140" 217"

173" 268"

MASONRY

9. STAGGER ALTERNATE SPLICES A MINIMUM OF ONE LAP LENGTH. LAP

WELDED WIRE FABRIC SO THAT THE OVERLAP BETWEEN OUTERMOST

CROSS WIRES OF EACH SHEET IS NOT LESS THAN THE CROSS WIRE SPACING

BUT NOT LESS THAN 6 INCHES. ALL SPLICE LOCATIONS SUBJECT TO

APPROVAL AND SHALL BE MADE IN ACCORDANCE WITH THE DRAWINGS.

EXTEND ALL HORIZONTAL REINFORCING CONTINUOUS AROUND CORNERS

AND INTERSECTIONS OR PROVIDE BENT CORNER BARS TO MATCH AND LAP

WITH HORIZONTAL BARS AT CORNERS AND INTERSECTIONS OF FOOTINGS

AND WALLS.

10. REINFORCING BAR SPACINGS GIVEN ARE MAXIMUM ON CENTERS. DOWEL ALL

VERTICAL REINFORCING TO FOUNDATION. SKEW HOOKS AS REQUIRED FOR

CONCRETE COVER. SECURELY TIE ALL BARS IN POSITION BEFORE PLACING

CONCRETE. "WET STICKING" OF DOWELS IS NOT PERMITTED.

11. SPLICED BARS SHALL BE PLACED AT THE SAME EFFECTIVE DEPTH UNLESS

NOTED OTHERWISE. REINFORCING BARS NOTED "CONTINUOUS" OR WITH

LENGTH NOT SHOWN SHALL BE FULLY CONTINUOUS AND SPLICED ONLY AS

SHOWN, OR WHERE APPROVED BY THE ENGINEER.

12. REINFORCING BAR HOOKS SHALL BE STANDARD ACI HOOKS UNLESS NOTED

OTHERWISE.

NOTES:

- #14 AND #18 BARS CANNOT BE LAP SPLICED.

- FOR LIGHTWEIGHT CONCRETE MULTIPLY SPLICE LENGTH BY 1.3.

- FOR EPOXY-COATED REINFORCEMENT, MULTIPLY SPLICE LENGTH

BY 1.5.

- FOR CLEAR SPACING BETWEEN SPLICES OF LESS THAN 2 BAR

DIAMETERS, OR CLEAR COVER OVER BARS BEING SPLICED

LESS THAN 1 BAR DIAMETER, MULTIPLY SPLICE LENGTH BY 1.5.

- SPLICE LENGTHS SHOWN OR CALCULATED ARE MINIMUMS. ROUND

UP AS REQUIRED TO ACHIEVE MINIMUM SPLICE LENGTH.

- TOP BARS ARE DEFINED AS ANY HORIZONTAL REINFORCEMENT

PLACES SUCH THAT MORE THAN 12" OF FRESH CONCRETE IS

CAST BELOW THE BARS BEING PLACED.

7.

8.

PROVIDE CONTINUOUS HORIZONTAL WALL AND CONTINUOUS FOOTING

REINFORCEMENT WITH 90 DEGREE BENDS AT CORNERS AND

INTERSECTIONS AS SHOWN ON TYPICAL DETAILS.

ALL CONCRETE SLAB ON GRADE, RAISED CONCRETE SLAB, AND MAT

REINFORCING IS TO BE SUPPORTED ON BOLSTERS AND CHAIRS SPACED

NO FURTHER THAN 4 FEET ON CENTER. REINFORCING SHALL BE

LOCATED 1 1/2" INCHES MINIMUM CLEAR FROM TOP OF SLAB.

REINFORCED MASONRY (CMU)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

13.

14.

15.

16.

17.

18.

19.

IBC.

A.

B.

MASONRY WORK SHALL CONFORM TO ALL REQUIREMENTS OF THE IBC

CHAPTER 21, ACI 530/ASCE5/TMS 402 "BUILDING CODE REQUIREMENTS FOR

MASONRY STRUCTURES".

HOLLOW CONCRETE MASONRY UNITS SHALL CONFORM TO ASTM C90, NET

COMPRESSIVE STRENGTH OF 2000 PSI PER ASTM C140. F'M USED IN DESIGN =

2,000 PSI.

MORTAR SHALL CONFORM TO ASTM C270, TYPE S WITH 28 DAY COMPRESSIVE

STRENGTH OF 1800 PSI, TESTED PER ASTM C780. ALL MASONRY BELOW GRADE

SHALL HAVE MORTAR CONFORMING TO TYPE M, WITH 28 DAY COMPRESSIVE

STRENGTH OF 2,500 PSI. MASONRY CEMENT, PRE-MIXED MORTAR AND

RETARDANT ADDITIVES SHALL NOT BE USED.

GROUT SHALL CONFORM TO ASTM C476, FINE OR COARSE GROUT, WITH 28 DAY

COMPRESSIVE STRENGTH OF 2,500 PSI WITH A MAXIMUM AGGREGATE SIZE OF

3/8". GROUT SHALL BE FREE OF FLY ASH AND CHLORIDE.

GROUTING SHALL BE STOPPED 1-½ INCHES BELOW THE TOP OF A COURSE

FORMING A KEY AT POUR JOINTS.

REMOVE OVERHANGING MORTAR AND OTHER OBSTRUCTIONS AND DEBRIS

FROM THE INSIDES OF THE CELL WALLS.

CONCRETE MASONRY UNITS SHALL BE LAID IN RUNNING BOND UNLESS

OTHERWISE NOTED. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR

INFORMATION REGARDING MASONRY FINISHES, COLORS, SEALANTS, ETC.

ALL CELLS AND COURSES WITH REINFORCING AND ADDITIONAL GROUT SPACES

AS REQUIRED BY THE DRAWINGS SHALL BE FILLED SOLID WITH GROUT. LIMIT

MAXIMUM GROUT LIFT TO 5'-0" FOR LOW LIFT GROUTING PROCEDURES AND

12'-8" FOR HIGH LIFT GROUTING PROCEDURES. EACH GROUT POUR STOPPING 1

~8 INCHES BELOW THE TOP COURSE OF LIFT. PLACE GROUT CONTINUOUSLY.

DO NOT INTERRUPT GROUTING FOR MORE THAN ONE HOUR. MECHANICALLY

VIBRATE GROUT IN VERTICAL SPACES IMMEDIATELY AFTER POURING AND AGAIN

ABOUT 5 MINUTES LATER. RODDING OF GROUT IS NOT ACCEPTABLE.UNLESS

NOTED OTHERWISE ON THE DRAWINGS, PROVIDE VERTICAL MASONRY

CONTROL JOINTS SUCH THAT NO STRAIGHT RUN OF WALL EXCEEDS 20'-0".

COORDINATE LOCATIONS WITH ARCHITECT.

FOR COLD WEATHER AND HOT WEATHER CONSTRUCTION AND PROTECTION

REQUIREMENTS COMPLY WITH ALL REQUIREMENTS OF ACI 530.1/ ASCE 6/ TMS

602 "SPECIFICATIONS FOR MASONRY STRUCTURES".

PERFORM TESTS AND INSPECTIONS AND PREPARE REPORTS. ALLOW

INSPECTORS ACCESS TO SCAFFOLDING AND WORK AREAS, AS NEEDED TO

PERFORM TESTS AND INSPECTIONS. RETESTING OF MATERIALS THAT FAIL TO

MEET SPECIFIED REQUIREMENTS SHALL BE DONE AT CONTRACTORS EXPENSE.

INSPECTIONS: [LEVEL 1 / LEVEL II] SPECIAL INSPECTIONS ACCORDING TO THE

BEGIN MASONRY CONSTRUCTION ONLY AFTER INSPECTORS HAVE

VERIFIED PROPORTIONS OF SITE PREPARED MORTAR.

PLACE GROUT ONLY AFTER INSPECTORS HAVE VERIFIED COMPLIANCE

OF GROUT SPACES AND OF GRADES, SIZES, AND LOCATIONS OF

REINFORCING.

PRIOR TO CONSTRUCTION PERFORM 1 SET OF MORTAR, GROUT, AND PRISM

TESTS.

TEST 1 ADDITIONAL SET OF MORTAR, GROUT, AND PRISM TESTS FOR EACH 5,000

SQ. FT. OF WALL AREA OR PORTION THERE OF.

MORTAR TEST: (PROPERTY SPECIFICATION): FOR EACH MIX PROVIDED,

ACCORDING TO ASTM C780. TEST MORTAR FOR COMPRESSIVE STRENGTH.

GROUT TEST: (COMPRESSIVE STRENGTH): FOR EACH MIX PROVIDED,

ACCORDING TO ASTM C1019.

PRISM TEST: FOR EACH TYPE OF CONSTRUCTION PROVIDED, ACCORDING TO

ASTM C1314 AT 28 DAYS.

POST-INSTALLED ANCHORS SHALL BE INSTALLED ACCORDING TO TYPICAL

DETAILS AND MANUFACTURER REQUIREMENTS.

TESTING AND INSPECTION: OWNER WILL ENGAGE SPECIAL INSPECTORS TO

1.

2.

3.

4.

5.

A.

B.

C.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

STRUCTURAL STEEL SHALL BE DETAILED, DESIGNED, FABRICATED AND ERECTED

IN ACCORDANCE WITH THE REQUIREMENTS OF AISC SPECIFICATION FOR THE

DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL BUILDINGS, AISC

MANUAL OF STEEL CONSTRUCTION (ALLOWABLE STRESS DESIGN), AISC CODE OF

STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES, AND THE AWS

STRUCTURAL WELDING CODE. ALL CODES AND MANUALS SHALL BE THE LATEST

ADOPTED EDITIONS.

STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING ASTM DESIGNATIONS:

WIDE FLANGE SHAPES: A992 (FY = 50 KSI)

CHANNELS AND ANGLES: A36 (FY = 36 KSI)

PLATES: A572 GR 50 (FY = 50 KSI)

HOLLOW STRUCTURAL SECTIONS: A500 GRADE C (FY = 50 KSI)

ANCHOR RODS: F1554 (GRADE PER DETAILS)

BOLTS: F3125 GRADE A325-TC OR GRADE F1852-TC

WELDING ELECTRODES: E70XX

ANCHOR BOLTS AND PLAIN THREADED RODS AND ANCHORS SHALL BE ASTM A36

OR A307, GRADE A.BOLTS, ANCHOR BOLTS, EXPANSION BOLTS, ETC., SHALL BE

INSTALLED WITH STEEL WASHERS.

WHERE CONNECTIONS ARE NOT FULLY DETAILED IN DRAWINGS INCLUDE ALL

STEEL-TO-STEEL CONNECTIONS AND STEEL-TO-STEEL PORTION OF ALL

CONNECTIONS TO OTHER MATERIALS. DESIGN CONNECTIONS FOR SPECIFIC

FORCES WHERE SHOWN ON THE DRAWINGS. WHERE SPECIFIC FORCES ARE NOT

SHOWN, DESIGN SHALL BE FOR MAXIMUM CONDITIONS BASED ON CAPACITIES OF

CONNECTING MEMBERS

CONNECTION MATERIALS FOR STRUCTURAL STEEL SHALL CONFORM TO THE

FOLLOWING DESIGNATIONS:

BEAM OR COLUMN STIFFENER PLATES SHALL BE OF THE SAME YIELD STRESS,

FY OF STEEL AS THE STRUCTURAL ELEMENT.

ALL BOLTED CONNECTIONS ARE TO BE ERECTED WITH HIGH STRENGTH

TENSION CONTROL BOLTS.

HARDENED STEEL WASHERS ASTM F436 OR F959 AT TENSION CONTROL

CONNECTIONS.

BOLTS SHALL BE ASTM A325N. ALL HIGH-STRENGTH BOLTS SHALL BE TIGHTENED

TO THE SNUG-TIGHT CONDITION AS DEFINED BY AISC UNLESS NOTED OTHERWISE.

ALL STRUCTURAL STEEL AND ANY PORTION THEREOF EXPOSED TO WEATHER,

LOCATED IN NON-AIR-CONDITIONED SPACES, EXPOSED TO MOISTURE OUTSIDE

THE BUILDING ENVELOPE, LOCATED INSIDE EXTERIOR CFS STUD WALLS, AND

SPECIFIED AS GALVANIZED IN THE PLANS AND DETAILS SHALL BE HOT DIPPED

GALVANIZED. PROVIDE BOLTS, NUTS AND WASHERS THAT ARE HOT DIPPED

GALVANIZED ACCORDING TO ASTM A153, CLASS C. ALL NUTS, BOLTS, WASHERS,

AND OTHER CONNECTION HARDWARE USED IN THE CONNECTIONS OF HOT-

DIPPED GALVANIZED MEMBERS SHALL ALSO BE HOT-DIPPED GALVANIZED.

WELDING ELECTRODES SHALL CONFORM TO AWS D1.1, GRADE E70XX. E90 SERIES

ELECTRODES SHALL BE USED FOR ASTM A706 REINFORCING BARS. ALL WELDING

SHALL BE DONE BY WELDERS HOLDING VALID CERTIFICATES ISSUED BY AN

ACCEPTED TESTING AGENCY AND HAVING CURRENT EXPERIENCE IN TYPE OF

WELDS SHOWN ON THE DRAWINGS OR NOTES. ALL WELDING PER AMERICAN

WELDING SOCIETY STANDARDS. CONTRACTOR MAY SHOP WELD OR FIELD WELD

AT THEIR DISCRETION. SHOP WELDS OR FIELD WELDS SHALL BE SHOWN ON SHOP

DRAWINGS. FULL PENETRATION WELDS SHALL BE TESTED AND CERTIFIED BY AN

INDEPENDENT TESTING LABORATORY.

SPLICING OF STRUCTURAL STEEL MEMBERS IS NOT ALLOWED UNO.

STRUCTURAL STEEL SHALL BE CLEANED OF RUST, LOOSE MILL SCALE, AND

OTHER FOREIGN MATERIALS WHERE REQUIRED FOR FABRICATION, FITTING UP OR

WELDING. PROVIDE PAINT AS REQUIRED IN THE SPECIFICATIONS.

PROVIDE WASHERS FOR CONNECTIONS WITH STANDARD OVERSIZE AND SHORT-

SLOTTED HOLES. FOR LONG-SLOTTED HOLES PROVIDE WASHERS OR A

CONTINUOUS BAR OF SUFFICIENT SIZE TO COMPLETELY COVER THE SLOT. FOR

LONG-SLOTTED HOLES PROVIDE PLATE WASHERS OR BARS WITH A MINIMUM 5/16

INCH THICKNESS.

DO NOT FIELD CUT ANY STRUCTURAL STEEL MEMBERS IN CONFLICT WITH THE

WORK WITHOUT APPROVAL BY THE ENGINEER OR UNLESS SPECIFICALLY SHOWN

ON THE CONSTRUCTION DOCUMENTS.

PROVIDE STRUCTURAL STEEL SHOP DRAWINGS FOR ARCHITECTS AND

ENGINEERS REVIEW PRIOR TO FABRICATION.

WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS OR AT A SHOP

CERTIFIED TO DO SUCH WORK USING THE ELECTRIC ARC WELDING PROCESS AND

SHALL CONFORM TO AISC AND AWS STANDARDS.

ALL HOLES IN STEEL MEMBERS SHALL BE DRILLED OR PUNCHED. TORCH CUT

HOLES ARE NOT ALLOWED.

TEMPORARY BRACING DESIGNED BY OTHERS SHALL BE REQUIRED TO INSURE

THE ALIGNMENT AND STABILITY OF THE STRUCTURAL STEEL DURING ERECTION

AND SHALL REMAIN IN PLACE UNTIL PERMANENT CONDITIONS AS SHOWN ON THE

CONSTRUCTION DOCUMENTS ARE IN PLACE.

PROVIDE GROUT FOR BASE PLATES THAT IS NON-SHRINK, NON-METALIC GROUT

WITH A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 5000 PSI.

STRUCTURAL STEEL

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

PL

AC

E

W

AL

LS

O

F

TH

E

IS

ZA

RD

P

OO

L H

OU

SE

B5

FE

B

TE

PA

-S R

M

L

LU

KE

S-003

F

BA

KE

R

B

SH

AN

N

O N

T:

\E ng r\D es ig n\ s\

\2

2\ 0_

Su pp or t\0

_3 _D ra w in gs

\P D

F

ST

RU

CT

UR

AL

G

EN

ER

AL

NO

TE

S

05 16

STRUCTURAL GENERAL NOTES

ACI RAP-1 REPAIRS

SURFACE PREPARATION:

CLEAN THE SURFACE AREA 1/2 IN. WIDE ON EACH SIDE OF THE CRACK WITH WIRE

BRUSH. REMOVE CONTAMINANTS BY HIGH-PRESSURE WATER, “OIL-FREE”

COMPRESSED AIR, OR POWER VACUUMS. WHEN USING WATER TO CLEAN OUT THE

CRACK, BLOW OUT THE CRACK WITH OIL-FREE, COMPRESSED OR HEATED AIR TO

ACCELERATE DRYING. WHERE CONCRETE SURFACES ADJACENT TO THE CRACK ARE

DETERIORATED, “V”-GROOVE THE CRACK UNTIL SOUND CONCRETE IS REACHED. “V”

GROOVES CAN ALSO BE USED WHEN HIGH INJECTION PRESSURES REQUIRE A

STRONGER CAP SEAL.

REPAIR PROCEDURE:

PORT INSTALLATION:

INSTALL THE ENTRY PORTS ONLY AFTER PROPER SURFACE PREPARATION. TWO

TYPES OF ENTRY PORTS MAY BE USED FOR THE INJECTION PROCESS:

SURFACE-MOUNTED; OR SOCKET-MOUNTED. ENTRY PORTS CAN BE ANY TUBELIKE

DEVICE THAT PROVIDES FOR THE SUCCESSFUL TRANSFER OF THE EPOXY RESIN

UNDER PRESSURE INTO THE CRACK. PORT SPACING IS TYPICALLY 8 IN. ON CENTER,

WITH INCREASED SPACING AT WIDER CRACKS. PORT SPACING MAY ALSO BE

ADJUSTED BASED ON THE THICKNESS OF THE CONCRETE ELEMENT.

SURFACE-MOUNTED ENTRY PORTS ARE NORMALLY ADEQUATE FOR MOST CRACKS,

BUT SOCKET-MOUNTED PORTS ARE USED WHEN CRACKS ARE BLOCKED, SUCH AS

WHEN CALCIFIED CONCRETE IS ENCOUNTERED. ENTRY PORTS CAN ALSO BE

CONNECTED BY A MANIFOLD SYSTEM WHEN SIMULTANEOUS INJECTION OF MULTIPLE

PORT LOCATIONS IS ADVANTAGEOUS.

INSTALL THE CAP SEAL:

THE CAP SEAL CONTAINS THE EPOXY AS IT IS INJECTED UNDER PRESSURE INTO THE

CRACK. WHEN CRACKS PENETRATE COMPLETELY THROUGH A SECTION, CAP SEALS

PERFORM BEST WHEN INSTALLED ON BOTH SIDES OF THE CRACKED ELEMENT,

ENSURING CONTAINMENT OF THE EPOXY. CAP SEALS SHALL BE INSTALLED USING

EPOXIES, POLYESTERS, PARAFFIN WAX, OR SILICONE CAULK. THE SELECTION OF THE

CAP SEAL MATERIAL SHOULD CONSIDER THE FOLLOWING CRITERIA, SUBJECT TO THE

TYPE OF CRACK TO BE REPAIRED: NON-SAG CONSISTENCY (FOR VERTICAL OR

OVERHEAD); MOISTURE TOLERANCE; WORKING LIFE; AND RIGIDITY (MODULUS OF

ELASTICITY). CONCRETE TEMPERATURE CHANGES AFTER INSTALLATION OF THE CAP

SEAL BUT PRIOR TO INJECTION MAY CAUSE THE CAP SEAL TO IF THIS OCCURS, THE

CAP SEAL MUST BE REPAIRED PRIOR TO RESIN INJECTION. PRIOR TO PROCEEDING

WITH INSTALLATION OF THE CAP SEAL, MARK THE LOCATION OF THE WIDEST

PORTION OF THE CRACK AND PAY CLOSE ATTENTION TO THE FOLLOWING: USE ONLY

MATERIALS THAT HAVEN'T EXCEEDED THEIR SHELF LIFE; ACCURATE BATCHING OF

COMPONENTS; SMALL BATCHES TO KEEP MATERIAL FRESH, AND DISSIPATE HEAT;

PORT SPACING; AND CONSISTENT APPLICATION OF THE MATERIAL (1 IN. WIDE X

3/16IN. THICK) OVER THE LENGTH OF THE CRACK.

INJECT THE EPOXY:

FOR A SUCCESSFUL EPOXY INJECTION, START WITH THE PROPER BATCHING AND

MIXING OF THE EPOXY COMPONENTS IN STRICT ACCORDANCE WITH THE

MANUFACTURER'S REQUIREMENTS. PRIOR TO STARTING THE ACTUAL INJECTION, BE

SURE THAT THE CAP SEAL AND PORT ADAPTER ADHESIVE HAVE PROPERLY CURED

SO THEY CAN SUSTAIN THE INJECTION PRESSURES. START THE INJECTION AT THE

WIDEST SECTION OF A HORIZONTAL CRACK. (BE SURE TO LOCATE AND MARK THESE

AREAS BEFORE INSTALLING THE CAP SEAL.) VERTICAL CRACKS ARE TYPICALLY

INJECTED FROM THE BOTTOM UP. CONTINUE THE INJECTION UNTIL REFUSAL. IF AN

ADJACENT PORT STARTS BLEEDING, CAP THE PORT BEING INJECTED AND CONTINUE

INJECTION AT THE FURTHEST BLEEDING PORT. HAIRLINE CRACKS ARE SOMETIMES

NOT WELL SUITED TO “PUMPING TO REFUSAL.” IN THOSE CASES, TRY INJECTING THE

EPOXY AT INCREASED PRESSURE (APPROXIMATELY 200 PSI) FOR 5 MIN. CLOSER

PORT SPACING CAN ALSO BE CONSIDERED. WHEN INJECTION INTO A PORT IS

COMPLETE, CAP IT IMMEDIATELY. HIGHER PRESSURE CAN BE USED FOR INJECTING

VERY NARROW CRACKS OR INCREASING THE RATE OF INJECTION. USE OF HIGHER

PRESSURE SHOULD BE MANAGED WITH CARE TO PREVENT A BLOWOUT OF THE CAP

SEAL OR PORTS.

REMOVE PORTS AND CAP SEAL:

UPON COMPLETION OF THE INJECTION PROCESS, REMOVE THE PORTS AND CAP

SEAL BY HEAT, CHIPPING, OR GRINDING. COMPLETE REMOVAL IS REQUIRED FOR A

SUBSEQUENT APPLICATION OF A COSMETIC COATING, PREPARE THE CONCRETE

SURFACE BY GRINDING.

QUALITY ASSURANCE:

TO ENSURE THAT THE INJECTION HAS BEEN SUCCESSFUL, QUALITY ASSURANCE

MEASURES INCLUDE TEST CORES OR NON-DESTRUCTIVE EVALUATION (NDE).

ACI RAP-1 REPAIRS CONTINUE

TEST CORES:

CORE LOCATIONS SHOULD BE CHOSEN TO AVOID CUTTING

REINFORCING STEEL, DRILLING CORES IN AREAS OF HIGH STRESS, OR

CREATING CORE HOLES BELOW THE WATERLINE. THE ENGINEER

SHOULD DETERMINE CORE LOCATIONS WHEN THESE TYPES OF

CONDITIONS EXIST; BE SURE THE EPOXY HAS SET BEFORE EXTRACTING

A CORE; TAKE CORES (NORMALLY 2 IN. DIAMETER) TO CHECK THAT THE

PENETRATION OF THE EPOXY IS ADEQUATE; INSPECT THE CORE

VISUALLY TO DETERMINE THE PENETRATION OF THE EPOXY INTO THE

CRACK; CORES CAN BE FURTHER TESTED FOR COMPRESSIVE AND

SPLIT TENSILE STRENGTH PER ASTM C 42; AND SUBSEQUENTLY, PATCH

THE REMOVED-CORE AREA (AFTER PROPER SURFACE PREPARATION)

WITH AN EXPANSIVE CEMENTITIOUS OR EPOXY GROUT COMPATIBLE

WITH THE EXISTING SUBSTRATE CONCRETE AND THE SURROUNDING

ENVIRONMENT.

METHODS FOR NONDESTRUCTIVE EVALUATION:

IMPACT ECHO (IE); ULTRASONIC PULSE VELOCITY (UPV); AND SPECTRAL

ANALYSIS OF SURFACE WAVES (SASW).

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

PL

AC

E

W

AL

LS

O

F

TH

E

IS

ZA

RD

P

OO

L H

OU

SE

B5

FE

B

TE

PA

-S R

M

L

LU

KE

S-004

F

BA

KE

R

B

SH

AN

N

O N

T:

\E ng r\D es ig n\ s\

\2

2\ 0_

Su pp or t\0

_3 _D ra w in gs

\P D

F

SP

EC

IA

L I

NS

PE

CT

IO

NS

06 16

INSPECT FORMWORK FOR SHAPE, LOCATION AND

DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED.

STATEMENT OF QUALITY ASSURANCE /

SPECIAL INSPECTIONS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

QUALITY ASSURANCE / SPECIAL INSPECTION IS REQUIRED IN ACCORDANCE WITH THE

UFC 3-301-01 AS SUMMARIZED BELOW.

THE SPECIAL INSPECTORS MUST BE QUALIFIED TO PERFORM THE TYPES OF

INSPECTION SPECIFIED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INFORM THE SPECIAL INSPECTOR

OR INSPECTING AGENCY AT LEAST ONE WORKING DAY PRIOR TO PERFORMING ANY

WORK THAT REQUIRES SPECIAL INSPECTION. ALL WORK PERFORMED WITHOUT

SPECIAL INSPECTION IS SUBJECT TO REMOVAL.

THE SPECIAL INSPECTOR(S) SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE

WITH THE CONTRACT DOCUMENTS AND SUBMIT RECORDS OF INSPECTION TO THE

ARCHITECT, ENGINEER OF RECORD AND AUTHORITY HAVING JURISDICTION.

SPECIAL INSPECTIONS SHALL BE PERFORMED BY A CERTIFIED OR QUALIFIED SPECIAL

INSPECTOR(S), AS DETERMINED AND TO THE SATISFACTION OF THE ARCHITECT,

ENGINEER OF RECORD AND AUTHORITY HAVING JURISDICTION.

PERIODIC SPECIAL INSPECTION IS DEFINED AS THE PART-TIME OR INTERMITTENT

INSPECTION OF THE WORK BY AN APPROVED INSPECTOR WHO IS PRESENT IN THE

AREA WHERE THE WORK HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION

OF WORK. CONTINUOUS SPECIAL INSPECTION IS DEFINED AS THE FULL-TIME

INSPECTION OF THE WORK BY AN APPROVED INSPECTOR WHO IS CONTINUOUSLY

PRESENT AND MONITORING THE WORK PERFORMED. IN ALL CASES, THE INSPECTION

SHALL BE COORDINATED AND PERFORMED SO THAT WORK CAN BE CORRECTED PRIOR

TO OTHER RELATED WORK PROCEEDING AND COVERING THE INSPECTED WORK.

ASSOCIATED TESTING SHALL BE PERFORMED AS INDICATED IN THE FOLLOWING TABLES

BY AN APPROVED AND ACCREDITED AGENCY AS DETERMINED AND TO THE

SATISFACTION OF THE ARCHITECT, ENGINEER OF RECORD AND AUTHORITY HAVING

JURISDICTION.

SPECIAL INSPECTION AND ASSOCIATED TESTING REPORTS SHALL BE SUBMITTED TO

THE ENGINEER OF RECORD, CONTRACTOR, AUTHORITY HAVING JURISDICTION, AND

ARCHITECT WITHIN ONE WEEK OF INSPECTION OR WITHIN ONE WEEK OF TEST

COMPLETION.

AT THE CONCLUSION OF CONSTRUCTION, A FINAL REPORT SHALL BE SUBMITTED BY

THE SPECIAL INSPECTOR(S) WHICH DOCUMENTS THE REQUIRED SPECIAL INSPECTIONS

AND CORRECTION OF PREVIOUSLY NOTED DISCREPANCIES. THE FINAL REPORT SHALL

BE SUBMITTED TO THE ENGINEER OF RECORD, CONTRACTOR, AUTHORITY HAVING

JURISDICTION AND ARCHITECT.

WORK REQUIRING SPECIAL INSPECTION THAT IS INSTALLED OR COVERED WITHOUT THE

APPROVAL OF THE SPECIAL INSPECTOR IS SUBJECT TO REMOVAL OR EXPOSURE.

REFER TO THE FOLLOWING TABLES AND SPECIFICATIONS FOR SPECIFIC

INSPECTION/TESTING REQUIREMENTS AND FREQUENCIES.

DEFINITION OF "PERIODIC" AND "CONTINUOUS" SPECIAL INSPECTIONS; CONTINUOUS

INSPECTION IS THE FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL

INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA

WHERE THE WORK IS BEING PERFORMED; PERIODIC INSPECTION IS THE PART-TIME OR

INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN

APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS

BEEN OR IS BEING PERFORMED AND AT THE COMPLETION OF THE WORK. WHERE

"PERIODIC" SPECIAL INSPECTION IS REQUIRED, "PART-TIME" OR "INTERMITTENT" MEANS

THAT INSPECTION OF THE TASK NEEDS TO BE PERFORMED FROM TIME TO TIME DURING

THE PROGRESS OF THE TASK. THE PERIOD OF TIME BETWEEN INSPECTIONS VARIES

GREATLY FOR DIFFERENT TYPES OF WORK DEPENDING ON THE TYPE OF INSPECTION

DONE. THE PERIOD OF TIME BETWEEN INSPECTIONS ALSO DEPENDS ON THE PACE OF

THE CONSTRUCTION, THE NUMBER OF WORKERS, AND THE QUALITY OF THE

WORKMANSHIP, AND OTHER FACTORS. IT IS THE RESPONSIBILITY OF THE SPECIAL

INSPECTOR TO PROVIDE INSPECTIONS AT AN APPROPRIATE FREQUENCY AND AT

APPROPRIATE TIMES DURING CONSTRUCTION. THE INSPECTOR MUST HAVE ADEQUATE

EXPERIENCE AND EXHIBIT GOOD JUDGEMENT IN DETERMINING THE FREQUENCY AND

TIMING OF INSPECTIONS

1. INSPECTION OF REINFORCING STEEL,

INCLUDING PLACEMENT.

REQUIRED VERIFICATION AND INSPECTION

OF CONCRETE CONSTRUCTION

VERIFICATION AND INSPECTION

INSPECTION TASKS PRIOR TO WELDING

TABLE N5.4-1, AISC 360-16

INSPECTION TASKS PRIOR TO WELDING

WELDING PROCEDURES SPECIFICATIONS (WPSs) AVAILABLE

MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE

FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)

- JOINT PREPARATION

- DIMENSIONS (ALIGNMENT, ROOT OPENING,

ROOT FACE, BEVEL)

- CLEANLINESS (CONDITION OF STEEL SURFACES)

- SHIELDING GAS TYPE/FLOW RATE

- TACKING (TACK WELD QUALITY AND LOCATION)

- BACKING TYPE AND FIT (IF APPLICABLE)

CONFIGURATION AND FINISH OF ACCESS HOLES

CHECK WELDING EQUIPMENT

THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY

WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED.

STAMPS, IF USED SHALL BE THE LOW-STRESS TYPE.

MATERIAL IDENTIFICATION (TYPE/GRADE)

WELDER IDENTIFICATION SYSTEM

FIT-UP OF FILLET WELDS

- DIMENSIONS (ALIGNMENT, GAPS, AT ROOT)

- CLEANLINESS (CONDITION OF STEEL SURFACES)

-…

This is the start of the file's text. The full file is on GovTribe.