250019-Drawings DWGSET-07JUL2026.pdf
PDF 10 MB Posted
- Solicitation number
- FA813726R0021
About this file
Project Summary: WWYK250019 - Fire Sprinkler and Fire Alarm System Replacement
This is a Concept Design document for a federal construction project at Tinker Air Force Base, Building 3221, with project number WWYK250019. The work consists of three primary scopes: (1) removal and replacement of wet-pipe fire sprinkler protection systems in plasma spray booths, exhaust ductwork, and dust collectors with clean agent suppression systems approved for combustible metal dusts and flammable gases; (2) installation of a new building fire alarm and mass notification system; and (3) demolition of the existing fire alarm system. The project is located at Tinker AFB in Oklahoma and is managed by the Air Force Materiel Command, 72nd Air Base Wing Civil Engineer Directorate.
Key technical requirements include coordination with fire protection specialists, compliance with NFPA codes (NFPA 2001, NFPA 70, NFPA 72), UFC standards (UFC 3-600-01, UFC 3-601-02), and Tinker AFB fire protection standards. The suppression system contractor must employ a minimum NICET Level III specialist in special hazard systems to verify sizing and design. All materials must be UL-listed or FM-approved. The fire alarm system shall remain operational during construction, and no building areas shall be occupied until fire alarm devices are installed or fire watch is in place. Construction documents include demolition plans for sprinkler and fire alarm systems, work plans for clean agent installation and fire alarm/mass notification systems, and detailed specifications addressing hydrogen hazards in plasma booths, requiring safety testing prior to work shifts. The project emphasizes coordinated commissioning and simultaneous testing of fire suppression and alarm systems to expedite completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA813726R00210001 SF 30.pdf | ||
| Solicitation Amendment - FA813726R00210001.pdf | ||
| Unedited Spec 28 31 76.pdf | ||
| 250019_Spec Unedited UFGH 21 22 00.00 40.pdf | ||
| SOW REV 7JUL2026.pdf | ||
| 250019_ATT13_Contractor CD.zip | ZIP file | |
| Solicitation - FA813726R0021.pdf | ||
| 250019_ATT11a_Submittal_Register_v4.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
6. THE PURPOSE OF THIS PROJECT IS TO REMOVE THE
WET-PIPE FIRE SPRINKLER PROTECTION FROM THE
WORKSTATION BOOTHS, DUCTWORK, AND DUST
COLLECTORS. THEN TO INSTALL AN APPROPRIATE
SUPPRESSION SYSTEM IN THE BOOTHS, DUCTWORK, AND
DUST COLLECTORS THAT IS APPROVED FOR USE WITH
COMBUSTIBLES METAL DUSTS AND FLAMMABLE GAS.
7. A NEW BUILDING FIRE ALARM AND MASS NOTIFICATION
SYSTEM IS REQUIRED FOR THIS PROJECT. CONTRACTOR
WILL NEED TO UNINSTALL THE EXISTING SYSTEM AFTER
THE NEW SYSTEM IS INSTALLED AND OPERATIONAL.
WWYK250019
REMOVE AND REPLACE
FIRE SPRINKLERS IN PLASMA
BOOTH DUST COLLECTORS, B3221
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
PROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
S
PR
IN
KL
ER
S
IN
P
LA
SM
A
BO
OT
H
DU
ST
C
OL
LE
CT
OR
S
AN
D
RE
PL
AC
E
TH
E
BU
ILD
IN
G
F/ A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
X
XX
G-101
S S
TA
R
R
A M cP H
ER
SO
N
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
\M od el
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 09
F-100 GENERAL NOTES
FD101 B3221 FIRE SPRINKLER DEMOLITION PLAN
4 FD102 B3221 FIRE ALARM DEMOLITION PLAN
5 FD103 B3221 FIRE ALARM DEMOLITION PLAN
6 F-101 B3221 NEW CLEAN AGENT WORK PLAN
7 F-102 B3221 NEW FIRE ALARM AND MASS NOTIFICATION WORK PLAN
8 F-103 B3221 NEW FIRE ALARM AND MASS NOTIFICATION WORK PLAN
9 VARIES ELECTRICAL CLASSIFIED AREAS_RECORD DRAWING
So ld ie r C re ek
3220 3707
43609
W ar eh ou se R d.
Entrance Road "A"
Turbine Dr. Turbine Dr.
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Crutcho Creek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
62501W 62501E
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
(FUTURE
HAUL ROUTE)
(F
UT
UR
E
HA
UL
R
OU
TE
FUTURE
TRUCK GATE
FUTURE
HAUL ROUTE
PROJECT LOCATION
OF
TI
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
S
PR
IN
KL
ER
S
IN
P
LA
SM
A
BO
OT
H
DU
ST
C
OL
LE
CT
OR
S
AN
D
RE
PL
AC
E
TH
E
BU
ILD
IN
G
F/ A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
A M cP H
ER
SO
N
F-100
S S
TA
R
R
B
JI
M O
H
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
\M od el
GE
NE
RA
L N
OT
ES
02 09
SPRINKLER SYSTEM DEMOLITION NOTES:
1.
2.
3.
4.
5.
CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.
THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS
THAT MAY ADVERSELY AFFECT THE ARCHITECTURAL, ELECTRICAL,
AND MECHANICAL SYSTEMS DEMOLITION OR INSTALLATION.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO
STARTING ANY WORK.
THE EXISTING BUILDING SPRINKLER SYSTEM LOCATED OUTSIDE OF
THE WORK AREA SHALL REMAIN OPERATIONAL AT ALL TIMES. THE
FIRE ALARM SYSTEM SHALL MONITOR THE SPRINKLER SYSTEM
WATER FLOW AND VALVE TAMPER DEVICES AT ALL TIMES.
SUPERVISE ALL FIRE PROTECTION IMPAIRMENTS IN ACCORDANCE
WITH UFC 3-601-02. COMPLY WITH THE TINKER AIR FORCE BASE
OUTAGE POLICY AND PROCEDURES.
PERFORM DEMOLITION AND INSTALLATION IN A MANNER THAT SHALL
HAVE LEAST ADVERSE EFFECT ON NORMAL BUILDING OPERATION.
CONTRACTOR SHALL COORDINATE DEMOLITION AND INSTALLATION
WITH THE BUILDING USER AND THE GOVERNMENT.
HOT WORK ASSOCIATED WITH DEMOLITION AND CONSTRUCTION
SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 51B.
SAFEGUARDS FOR HOT WORK OPERATIONS INCLUDE, BUT ARE NOT
LIMITED TO THE RELOCATION OF COMBUSTIBLE STORAGE, THE USE
OF FIRE RESISTIVE BARRIERS TO PROTECT COMBUSTIBLES THAT
CANNOT BE RELOCATED, THE ESTABLISHMENT OF FIRE WATCH AND
THE TERMINATION OF HOT WORK OPERATIONS WHEN FIRE
PROTECTION SYSTEMS ARE OUT OF SERVICE. ADDITIONALLY, HOT
WORK SHOULD NOT BE PERFORMED WHEN ALTERNATIVE METHODS
CAN BE EMPLOYED TO DISMANTLE EXISTING OR ASSEMBLE NEW
SYSTEMS.
THE CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS
SUITABLE FOR THE COMBUSTIBLES PRESENT DURING
CONSTRUCTION. WHERE EXISTING BUILDING EXTINGUISHERS ARE
BLOCKED, REMOVED OR GENERALLY MADE INACCESSIBLE TO THE
BUILDING OCCUPANTS, SUPPLEMENTAL EXTINGUISHERS SHALL BE
PROVIDED SUCH THAT A PORTABLE FIRE EXTINGUISHER IS LOCATED
WITHIN 75 FT OF ALL AREAS OF THE BUILDING. THE CONTRACTOR
SHALL REGULARLY INSPECT (AT LEAST WEEKLY) PORTABLE
EXTINGUISHERS LOCATED WITHIN THE WORK AREA TO ENSURE THAT
THEY ARE CHARGED, FREE FROM DAMAGE AND ACCESSIBLE.
SUPPRESSION SYSTEM GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
CONTRACTOR IS RESPONSIBLE FOR INSTALLATION DESIGN
AND COORDINATION. SIZING OF FIRE SUPPRESSION COMPONENTS
WILL BE CONFIRMED BY THE CONTRACTOR. THE DESIGNER WILL BE
MINIMUM NICET LEVEL III IN SPECIAL HAZARD SYSTEMS.
THESE DRAWINGS ARE CONCEPTUAL IN NATURE AND DEVICE
PLACEMENTS ARE REPRESENTATIVE. CONTRACTOR TO VERIFY AND
PROVIDE FULL DESIGN IN ACCORDANCE WITH APPLICABLE CODES
(UFC, ICC, NFPA, ETC.).
THE FIRE SPRINKLER CONTRACTOR WILL COORDINATE WITH THE
FIRE ALARM CONTRACTOR AND OTHER TRADES FOR PROVISION OF
CONNECTIONS BETWEEN THEIR RESPECTIVE SYSTEMS.
ALL MATERIALS ARE TO BE UL LISTED OR FM APPROVED FOR USE IN
FIRE PROTECTION SYSTEMS.
COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE
TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS
21 22 00 CLEAN AGENT EXTINGUISHING SYSTEMS.
COORDINATE TESTING WITH OTHER TRADES AND BASE PERSONNEL
PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND FIRE ALARM
TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE
COMMISSIONING.
THE BUILDING FIRE PROTECTION WATER SUPPLY IS SERVED BY
EXISTING FIRE PUMPS.
WHERE PIPE PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE
PARTITION, OR FLOORS, AN APPROVED FIRE PENETRATION WILL BE
REQUIRED. COMPLY WITH THE TINKER AFB FIRE PROTECTION
STANDARD.
SLEEVES PENETRATING CONCRETE, MASONRY WALLS OR CONCRETE
FLOORS WILL BE CUT FLUSH WITH EACH SURFACE. SLEEVE SIZES
AND CLEARANCE BETWEEN PIPE AND SLEEVE WILL BE IN
ACCORDANCE WITH NFPA 13.
OUTLETS WILL BE SPACED IN ACCORDANCE WITH NFPA 2001
REQUIREMENTS.
PROVIDE HEAD GUARDS IN AREAS SUBJECT TO DAMAGE OR HEADS
INSTALLED LOWER THAN SEVEN FEET ABOVE FLOOR.
PROVIDE HEAD GUARDS WITH WATER SHIELDS FOR ALL HEADS
INSTALLED BENEATH OPEN GRATED PLATFORMS.
VALVES LOCATED MORE THAN 8 FOOT ABOVE FINISHED FLOOR AND
NOT READILY ACCESSIBLE FROM MEZZANINE WILL BE PROVIDED
WITH CHAIN OPERATORS.
PROVIDE ACCESS DOORS AND SIGNAGE WHERE ACCESS IS
REQUIRED TO CONCEALED SUPPRESSION EQUIPMENT, VALVES, AND
CONTROLS. LOCATIONS TO BE APPROVED BY CONTRACTING
OFFICER.
PROVIDE PERMANENT LABELS ON RISERS TO INDICATE
WHICH ZONE EACH ONE SERVES.
PROVIDE PERMANENT LABELS INDICATING NORMAL OPERATING
POSITION ON ALL VALVES INCLUDING, BUT NOT LIMITED TO,
SECTIONAL VALVES, INSPECTOR'S TEST VALVES, AND DRAIN VALVES.
CONSTRUCTION (SHOP) DRAWINGS AND
CALCULATIONS MUST BE PREPARED BY AN INDIVIDUAL THAT HAS A
CURRENT CERTIFICATION BY THE NATIONAL INSTITUTE FOR CERTIFICATION
IN ENGINEERING TECHNOLOGIES, SPECIAL HAZARD SYSTEMS, LEVEL III, AT
A MINIMUM. THE QFPE MUST REVIEW ALL SUBMITTALS.
THE SUBMITTALS MUST BEAR THE QFPE REVIEW STAMP INDICATING REVIEW
AND APPROVAL PRIOR TO SUBMITTING TO THE GOVERNMENT.
FIRE ALARM AND MASS
NOTIFICATION DEMOLITION NOTES:
1.
2.
3.
4.
5.
6.
CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.
THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS
THAT MAY ADVERSELY AFFECT DEMOLITION OR INSTALLATION.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO
STARTING ANY WORK.
THE BUILDING FIRE ALARM SYSTEM OUTSIDE THE PROJECT AREA
SHALL REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE FIRE
PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO
FIRE ALARM DEVICES SHALL BE DEMOLISHED UNTIL THE BUILDING
OCCUPANTS HAVE BEEN REMOVED FROM THAT PORTION OF THE
BUILDING OR FIRE WATCH IN PLACE OR THE NEW SYSTEM IS
INSTALLED AND OPERATIONAL.
PROVIDE PROTECTION AS REQUIRED TO PREVENT DAMAGE
TO EXISTING EQUIPMENT.
COORDINATE DEMOLITION WITH NEW WORK. IF UNDOCUMENTED
CONDITIONS EXIST, CONTACT THE CONTRACTING OFFICER BEFORE
PROCEEDING.
PROTECT EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO:
STRUCTURES, CEILING, WALLS, EQUIPMENT, UTILITIES, ETC. DAMAGE
TO EXISTING CONDITIONS SHALL BE REPAIRED BY THE CONTRACTOR AT
NO ADDITIONAL COST TO THE GOVERNMENT.
THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION.
COORDINATE WORK WITH GOVERNMENT PRIOR TO COMMENCING
WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR WORKING
AROUND OCCUPANT SCHEDULE AS DETERMINED BY THE
GOVERNMENT AND MAINTAIN MINIMUM IMPACT DUE TO
CONSTRUCTION.
FIRE ALARM AND MASS
NOTIFICATION GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
REPLACE THE EXISTING FIRE ALARM AND MASS NOTIFICATION
SYSTEM AS INDICATED ON THE CONTRACT DOCUMENTS, AS
EVIDENTLY INTENDED AND IN ACCORDANCE WITH NFPA 70,
NFPA 72, UFC 3-600-01 , AND
TINKER AFB FIRE PROTECTION STANDARDS. THE DRAWINGS
ARE DIAGRAMMATIC IN NATURE AND INDICATE GENERAL
ARRANGEMENTS OF SYSTEMS AND WORK, BUT DO NOT INCLUDE ALL
INTERCONNECTIONS BETWEEN OTHER SYSTEMS. PROVIDE CONDUIT,
BACK BOXES, RACEWAY AND WIRING AS REQUIRED TO ACCOMPLISH
THE FUNCTIONS INTENDED AND REQUIRED BY CODE.
COORDINATE WORK WITH THAT OF OTHER TRADES SO AS TO AVOID
CONFLICTS. RESOLVE CONFLICTS THROUGH THE CONTRACTING
OFFICER PRIOR TO ROUGH-IN.
FAILURE TO PROVIDE SUCH COORDINATION PRIOR TO
WORK BEING INSTALLED SHALL NOT BE CAUSE FOR ADDITIONAL
COMPENSATION TO THE CONTRACTOR, AND MAY RESULT IN
REJECTION OF THE WORK.
COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE
TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS
28 31 76 FIRE ALARM AND MASS NOTIFICATION SYSTEM, FIRE
PROTECTION. COORDINATE TESTING WITH OTHER TRADES AND BASE
PERSONNEL PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND
FIRE ALARM TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE
COMMISSIONING.
THE BUILDING FIRE ALARM SYSTEM SHALL
REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE ALL FIRE
PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO
PORTION OF THE BUILDING SHALL BE OCCUPIED UNTIL THE FIRE
ALARM DEVICES HAVE BEEN INSTALLED OR FIRE WATCH IN PLACE,
OR THE NEW SYSTEM IS INSTALLED AND OPERATIONAL.
PROVIDE NEW MATERIALS BEARING LABELS OR MARKING
INDICATING THIRD PARTY TESTING AND APPROVAL SUITABLE FOR
THE APPLICATION INTENDED.
INSTALL FIRE ALARM CABLE IN RED METAL RACEWAY. FREE-RUN CABLE
IS NOT PERMITTED. RACEWAY SHALL BE CONCEALED IN FINISHED
SPACES, AND MAY BE INSTALLED EXPOSED IN UNFINISHED SPACES
SUCH AS MECHANICAL AND ELECTRICAL ROOMS. INSTALL RACEWAY
PERPENDICULAR OR PARALLEL TO THE BUILDING'S STRUCTURAL
COMPONENTS. RACEWAY SHOULD BE 3/4 INCH RED EMT.
PROVIDE PULL AND JUNCTION BOXES AS REQUIRED TO MEET CODE
AND INSTALLATION REQUIREMENTS. PULL AND JUNCTION BOXES
SHALL BE CONCEALED IN FINISHED SPACES. COORDINATE WITH
OTHER TRADES SO AS TO AVOID CONFLICTS. BOXES TO BE RED.
SUPPORT CONDUIT AND BACK BOXES BY MEANS OF ANCHORS,
RODS, HANGERS, ETC., TO MAINTAIN ALIGNMENT AND PREVENT
MOVEMENT. SUPPORT CEILING MOUNTED BACK BOXES WITH "T"
HANGERS OR EQUAL METHOD OF SUPPORT. BACK BOXES SHALL NOT
BE SUPPORTED SOLELY BY CONDUIT.
IDENTIFY CONDUCTORS AT EACH JUNCTION BOX, OUTLET BOX,
CABINET, PULL BOX, ETC., WITH VINYL HEAT SHRINK TAGS
INDICATING PANEL AND CIRCUIT NUMBER, CONTROL WIRE
IDENTIFICATION NUMBER, OR OTHER APPROPRIATE INFORMATION.
WHERE CONDUIT PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE
PARTITION, OR FLOORS, AN APPROVED FIRE PENETRATION WILL BE
REQUIRED. COMPLY WITH THE TINKER AFB FIRE PROTECTION
STANDARD, 2026.
SEAL PENETRATIONS AT FIRE OR SMOKE RATED CONSTRUCTION
WITH FIRESTOPPING SYSTEMS APPROVED AND LISTED FOR THE
RATING OF THE CONSTRUCTION TO BE PENETRATED. PROVIDE
DOCUMENTATION FOR EACH PENETRATION SEALING SYSTEMS FOR
VERIFICATION OF PROPER INSTALLATION. COMPLY WITH THE TINKER
AIR FORCE BASE FIRE PROTECTION STANDARD.
PERFORM WORK ON DE-ENERGIZED SYSTEMS ONLY TO PREVENT
PERSONNEL INJURY AND POTENTIAL SYSTEM FAILURE. WHERE
WORK ON EXISTING SYSTEMS SHALL REQUIRE INTERRUPTION OF
ELECTRICAL SERVICE, TEMPORARY PROVISIONS ACCEPTABLE TO
THE OWNER SHALL BE REQUIRED. COMPLY WITH THE TINKER AIR
FORCE BASE OUTAGE REQUEST POLICY AND PROCEDURES.
CONSTRUCTION (SHOP) DRAWINGS AND CALCULATIONS
MUST PREPARED BY AN INDIVIDUAL THAT HAS A CURRENT
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING
TECHNOLOGIES, FIRE ALARM SYSTEMS, LEVEL III CERTIFICATION, AT
A MINIMUM. THE QUALIFIED FIRE PROTECTION ENGINEER (QFPE)
MUST REVIEW ALL SUBMITTALS. THE SUBMITTALS MUST BEAR
THE REVIEW STAMP OF THE QFPE INDICATING REVIEW AND
APPROVAL PRIOR TO SUBMITTING TO THE GOVERNMENT.
SUBMIT SHOP DRAWINGS AND CALCULATIONS AND PRODUCT DATA
TO THE GOVERNMENT FOR REVIEW, IN A MANNER AS REQUIRED PER
NFPA 72 AND UFC 3-600-01. SUBMIT EQUIPMENT DATA SHEETS
FOR THE COMPLETE INSTALLATION OF THE FIRE ALARM AND
MASS NOTIFICATION SYSTEM. APPROVED SHOP DRAWINGS,
TESTING PLANS, DATA SHEETS, AND CALCULATIONS ARE
REQUIRED PRIOR TO COMMENCEMENT OF WORK.
THE FIRE ALARM AND MASS NOTIFICATION SYSTEM SUBMITTAL
SHALL BE A COMPLETE PACKAGE. PARTIAL SUBMITTALS WILL NOT BE
ACCEPTABLE.
EXISTING BUILDING SCOPE EXTENTS:
1.
2.
UFC 3-600-01, SECTION 34-1.1, EXISTING FACILITIES, MINIMUM REQUIREMENTS:
FACILITIES AS THEY EXIST, MUST MEET THE REQUIREMENTS OF NFPA 101,
FOR EXISTING OCCUPANCIES. FACILITIES THAT DO NOT MEET THE
REQUIREMENTS OF NFPA 101 FOR EXISTING OCCUPANCIES MUST CONFORM
TO ONE OF THE FOLLOWING:
A. UPGRADE THE DEFICIENCY TO MEET THE EXISTING OCCUPANCY
REQUIREMENTS, OR
B. ESTABLISH MANAGEMENT PROTOCOLS TO PROVIDE A LEVEL OF LIFE
SAFETY EQUIVALENT TO THAT REQUIRED BY NFPA 101 FOR
EXISTING OCCUPANCIES, UNTIL AN UPGRADE PROJECT CAN BE
COMPLETED. MANAGEMENT PROTOCOLS MUST BE IN WRITING
AND APPROVED BY THE COMPONENT FIRE PROTECTION
ENGINEER.
UFC 3-600-01, 34-1.2.1, WORK IN EXISTING FACILITIES:
CONFORM TO THE REQUIREMENTS OF THE BUILDING REHABILITATION
CHAPTER OF NFPA 101 FOR DESIGN AND CONSTRUCTION PROJECTS IN
EXISTING BUILDINGS EXCEPT AS SPECIFIED IN UFC 3-600-01.
A. THE ENTIRE FACILITY, AT A MINIMUM, MUST COMPLY WITH THE
APPLICABLE EXISTING OCCUPANCY CHAPTER OF NFPA 101
BEFORE BEGINNING THE PROJECT FOR WORK IN EXISTING
FACILITIES. THE PROJECT MAY INCLUDE BRINGING THE FACILITY
INTO COMPLIANCE WITH THE APPLICABLE OCCUPANCY CHAPTER
OF NFPA 101.
B. THE AREAS OF THE FACILITY WHERE NO WORK IS BEING PERFORMED
MUST MEET THE APPLICABLE EXISTING OCCUPANCY CHAPTER OF
NFPA 101, BEFORE BEGINNING THE PROJECT OR BE INCLUDED AS
PART OF THE PROJECT.
NFPA 101, 43.2.2.1.3, MODIFICATION:
THE RECONFIGURATION OF ANY SPACE; THE ADDITION, RELOCATION, OR
ELIMINATION OF ANY DOOR OR WINDOW; THE ADDITION OR ELIMINATION OF
LOAD BEARING ELEMENTS; THE RECONFIGURATION OR EXTENSION OF ANY
SYSTEM; OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT.
NFPA 101, 43.5.1.3, GENERAL REQUIREMENTS:
NEWLY CONSTRUCTED ELEMENTS, COMPONENTS, AND SYSTEMS SHALL
COMPLY WITH THE REQUIREMENTS OF OTHER SECTIONS OF THIS CODE [NFPA
101] APPLICABLE TO NEW CONSTRUCTION.
3.
4.
6. THE CONTRACTOR SHALL UNINSTALL THE FIRE SPRINKLER SUB-SYSTEMS
AS SHOWN ON THE DRAWINGS, AND SEAL THE OLD SPRINKLER
PENETRATION OPENINGS.
17. SUBMIT SHOP DRAWINGS AND CALCULATIONS AND PRODUCT DATA
TO THE GOVERNMENT FOR REVIEW, IN A MANNER AS REQUIRED PER
NFPA 2001 AND UFC 3-600-01. SUBMIT EQUIPMENT DATA SHEETS
FOR THE COMPLETE INSTALLATION OF THE FIRE SUPPRESSION
SYSTEMS. APPROVED SHOP DRAWINGS,
TESTING PLANS, DATA SHEETS, AND CALCULATIONS ARE
REQUIRED PRIOR TO COMMENCEMENT OF WORK.
THE FIRE SUPPRESSION SYSTEMS SUBMITTAL
SHALL BE A COMPLETE PACKAGE. PARTIAL SUBMITTALS WILL NOT BE
ACCEPTABLE.
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE
BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE
CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO
ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE
PERFORMED ON THE SYSTEM.
UNINSTALL THE FIRE SPRINKLER SYSTEM FROM THE BOOTHS, DUCTWORK,
AND DUST COLLECTORS. CAP THE MAIN SPRINKLER WATER SUPPLY TO
EACH BOOTH AT THE CEILING SYSTEM CROSS MAIN. DO NOT USE A VALVE
AS A CAP. REPAIR PENETRATION HOLES TO THE DUCTS AND BOOTHS TO
OPERATIONAL TOLERANCES.
FD101
B3221 FIRE SPRINKLER DEMOLITION PLAN
NTS
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
SP
RI
NK
LE
RS
IN
P
LA
SM
A
BO
OT
H
DU
ST
CO
LL
EC
TO
RS
A
ND
R
EP
LA
CE
T
HE
B
UI
LD
IN
G F/
A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
A M cP H
ER
SO
N
FD101
S S
TA
R
R
B
JI
M O
H
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
\M od el
B3
FI
RE
S
PR
IN
KL
ER
DE
MO
LIT
IO
N
PL
AN
03 09
B3221 KEY PLAN
DOOR BLOCKED
LADDER
LAB
HEAT TREAT
PLASMA SPRAY
HYDROGEN ROOM
GRINDING
SHOP
CMM
PLASMA STORAGE
BREAK
ROOM
M
1 2 3 4 5 6
I
J
K
L
M M M M M
I
J
K
L
M
BL
AS
T
MA
CH
IN
E
OC
E-89040
EMPIRE ABRASIVE
BL
AS
T
CA
BI
NE
T
PD
H6
VA
PO
R
BL
AS
T
TANK
AIR
COMPRESSOR
OC11110
E88007180
M 161 ROBOT
9MP DJ POWER FEEDER
AIR PRESSURE
BOOSTER
DJC CONTROL UNIT
NITROGEN
DJC
AC
9HL
TURNTABLE
CLIMET RC HV
WT 650LB
PLASMA SPREY 22 HV OF
OC19237
SULZER METCO
DJCJDJ0090913/1
Equipment Mezzanine
LA
DD
ER
PLASMA SPRAY AUTOMATED SYST 26
OC20040
SULZER METCO
SM101145
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
BLAST SYSTEM GRIT ROBOTIC
OC20352
PROGRESSIVE TECHNOLOGIES INC
PLASMA SPARY, AUTOMATED SYST 27
OC20039
SULZER METCO
SM101144
NI
TR
OG
EN
NITROGEN
HEAT WATER CHILLEROC15462
PROGRESSIVE TECHNOLOGIES INC
OC???
DAYTON
OVEN
OC16301
PRECISION SCIENTIFICCUT OFF SAW
OC16988
ALLIED HIGH TECH PRODUCTS INC
2049T5
ALLIED HIGH TECH PRODUCTS INC
TE
NS
ILE
O
VE
N
TESTER MATERIAL
OC16204
GALDABINI CESARE
V73B
POLISHER
OC18510
STRUERS
5560422
TEGRADOSER
OC17504
STRUERS
560061
PLASMA SPRAY
OC24332
PLASMA SPRAY
OC24336
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
UNIT 20 UNIT 21
UNIT 26
UNIT 23
UNIT 22
UNIT 20
UNIT 21
UNIT 23
UNIT 27
UNIT 26
UNIT 22
NOT CONNECTED
AT THIS END
UNIT 27
1 2 3 4 5 6
AutoCAD SHX Text H
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE
BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE
CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO
ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE
PERFORMED ON THE SYSTEM.
FD102
B3221 FIRE ALARM DEMOLITION PLAN
NTS
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
SP
RI
NK
LE
RS
IN
P
LA
SM
A
BO
OT
H
DU
ST
CO
LL
EC
TO
RS
A
ND
R
EP
LA
CE
T
HE
B
UI
LD
IN
G F/
A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
A M cP H
ER
SO
N
FD102
S S
TA
R
R
B
JI
M O
H
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
B3
FI
RE
A
LA
RM
D
EM
OL
IT
IO
N
PL
AN
04 09
B3221 KEY PLAN
UNINSTALL THE BUILDING FIRE ALARM SYSTEM THROUGHOUT THE ENTIRE
BUILDING.
BREAK
AREA
WOMEN
MEN
COATING
OFFICE
UP
UP
ELEV.
INSPECTION
OFFICE
FIC/PCS
PROCESS ROOM
DOOR BLOCKED
EXHAUST VENT
LADDER
DUST COLLECTOR ROOM
OFFICE
LAB
CONTROL
ROOM
MECH.
ROOM
STORAGE
STORAGE
EXHAUST VENT
HEAT TREAT
PLASMA SPRAY
HYDROGEN ROOM
SURFACE ENHANCEMENT
PAINT
AUTOMATED FPI AREA
EXHAUST VENT
JAN
OFFICE
WELDING
SHOP
GRINDING
SHOP
CMM
PLASMA STORAGE
DF
LADDER
BREAK
ROOM
ELEC ELEC
A/C
A/C
M
1 2 3 4 5 6 7 8 9 10 11 12
H
1 3 5 7 9 11
G
1 3 5 7 9 11
A
1 2 3 4 5 6 7 8 9 10 11 12
A A A A A A A A A A A
H
G
H
G
H
G
H
G
H
G
I
J
K
L
F
E
D
C
B
M M M M M M M M M M
H
I
J
K
L
M
BL
AS
T
MA
CH
IN
E
OC
E-89040
EMPIRE ABRASIVE
BL
AS
T
CA
BI
NE
T
PD
H6
VA
PO
R
BL
AS
T
TANK
AIR
COMPRESSOR
OC11110
E88007180
M 161 ROBOT
9MP DJ POWER FEEDER
AIR PRESSURE
BOOSTER
DJC CONTROL UNIT
NITROGEN
DJC
AC
9HL
TURNTABLE
CLIMET RC HV
WT 650LB
PLASMA SPREY 22 HV OF
OC19237
SULZER METCO
DJCJDJ0090913/1
Equipment Mezzanine
LA
DD
ER
PLASMA SPRAY AUTOMATED SYST 26
OC20040
SULZER METCO
SM101145
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
BLAST SYSTEM GRIT ROBOTIC
OC20352
PROGRESSIVE TECHNOLOGIES INC
PLASMA SPARY, AUTOMATED SYST 27
OC20039
SULZER METCO
SM101144
NI
TR
OG
EN
NITROGEN
HEAT WATER CHILLEROC15462
PROGRESSIVE TECHNOLOGIES INC
OC???
DAYTON
OVEN
OC16301
PRECISION SCIENTIFICCUT OFF SAW
OC16988
ALLIED HIGH TECH PRODUCTS INC
2049T5
ALLIED HIGH TECH PRODUCTS INC
TE
NS
ILE
O
VE
N
TESTER MATERIAL
OC16204
GALDABINI CESARE
V73B
POLISHER
OC18510
STRUERS
5560422
TEGRADOSER
OC17504
STRUERS
560061
PLASMA SPRAY
OC24332
PLASMA SPRAY
OC24336
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
UNIT 20 UNIT 21
UNIT 26
UNIT 23
UNIT 22
UNIT 20
UNIT 21
UNIT 23
UNIT 27
UNIT 26
UNIT 22
NOT CONNECTED
AT THIS END
UNIT 27
M
AT
CH
L
IN
E
M
AT
CH
L
IN
E
MA
TC
H
LIN
E
MA
TC
H
LIN
E
MA
TC
H
LIN
E
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
I
J
K
L
M
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE
BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE
CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO
ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE
PERFORMED ON THE SYSTEM.
FD103
B3221 FIRE ALARM DEMOLITION PLAN
NTS
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
SP
RI
NK
LE
RS
IN
P
LA
SM
A
BO
OT
H
DU
ST
CO
LL
EC
TO
RS
A
ND
R
EP
LA
CE
T
HE
B
UI
LD
IN
G F/
A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
A M cP H
ER
SO
N
FD103
S S
TA
R
R
B
JI
M O
H
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
B3
FI
RE
A
LA
RM
D
EM
OL
IT
IO
N
PL
AN
05 09
B3221 KEY PLAN
UNINSTALL THE BUILDING FIRE ALARM SYSTEM THROUGHOUT THE ENTIRE
BUILDING.
INSPECTION
UP
WOMEN
MEN
ST
OR
AG
E
AR
EA
STEAM PIT
IDTS DROP
TIP
MAINTENANCE
SHOP
OFFICE
TEST LAB
OFFICE OFFICE
OFFICE
OFFICE
SECRETARY
WOMEN
OFFICE
DN
UP
UPUP
UP
UP
UP
PIT PIT PIT
DOWN TO
CONCRETE
FLOOR BELOW
FUME SCRUBBER ROOM
OFFICE
STORAGE
MECH.
ROOM
OFFICE OFFICE
STORAGE
CONVEYOR
OPERATIONS
CO
NF
ER
EN
CE
R
OO
M
ST
OR
AG
E
DN
UP UP UP
UP UP UP
STEEL GRATING
@ FLOOR LEVEL
ENTRYCORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CO
RR
ID
OR
CO
RR
ID
OR
JAN
ELEC.
ROOM STORAGE
ELEC.
ROOM
JAN
MENMEN
TE
LE
CO
M
AUTOMATED FPI AREA
VIBRATORY CLEAN
CHEMICAL CLEAN
LADDER
EYE WASH
TRAN
ELEC
EL
EC
LADDER
DF
SS
ELECELEC
'-8
2'- 4"
2'-0"
12 13 14 15 16 17 18 19 20 21
13 15 17 19 21
13 15 17 19 21
12 13 14 15 16 17 18 19 20 21
A A A A A A A A A A
H
G
H
G
H
G
H
G
H
G
M M M M M M M M M M
H
G
I
J
K
L
F
E
D
C
B
MA
TC
H
LIN
E
MA
TC
H
LIN
E
MA
TC
H
LIN
E
12 13 14 15 16 17 18 19 20 21
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 19'-0"
A
B
C
D
E
F
G
H
I
J
K
L
M
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
GENERAL NOTES
KEYED NOTES
PROVIDE NEW CLEAN AGENT SUPPRESSION FOR THE PLASMA BOOTHS ,
EXHAUST DUCTS, AND DUST COLLECTORS. SUPPRESSION AGENT AND
SYSTEM SHALL BE APPROPRIATE FOR THE FUEL LOAD, AREA / VOLUME, AND
TEMPERATURE.
F-101
B3221 NEW CLEAN AGENT WORK PLAN
NTS
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
SP
RI
NK
LE
RS
IN
P
LA
SM
A
BO
OT
H
DU
ST
CO
LL
EC
TO
RS
A
ND
R
EP
LA
CE
T
HE
B
UI
LD
IN
G F/
A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
A M cP H
ER
SO
N
F-101
S S
TA
R
R
B
JI
M O
H
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
\M od el
B3
NE
W C
LE
AN
A
GE
NT
W
OR
K
PL
AN
06 09
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE
BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE
CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO
ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE
PERFORMED ON THE SYSTEM.
B3221 KEY PLAN
UNIT 20 UNIT 21
UNIT 20
UNIT 21
UNIT 23
UNIT 27
UNIT 26
UNIT 22
DOOR BLOCKED
LADDER
LAB
HEAT TREAT
PLASMA SPRAY
HYDROGEN ROOM
GRINDING
SHOP
CMM
PLASMA STORAGE
BREAK
ROOM
M
1 2 3 4 5 6
I
J
K
L
M M M M M
I
J
K
L
M
BL
AS
T
MA
CH
IN
E
OC
E-89040
EMPIRE ABRASIVE
BL
AS
T
CA
BI
NE
T
PD
H6
VA
PO
R
BL
AS
T
TANK
AIR
COMPRESSOR
OC11110
E88007180
M 161 ROBOT
9MP DJ POWER FEEDER
AIR PRESSURE
BOOSTER
DJC CONTROL UNIT
NITROGEN
DJC
AC
9HL
TURNTABLE
CLIMET RC HV
WT 650LB
PLASMA SPREY 22 HV OF
OC19237
SULZER METCO
DJCJDJ0090913/1
Equipment Mezzanine
LA
DD
ER
PLASMA SPRAY AUTOMATED SYST 26
OC20040
SULZER METCO
SM101145
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
BLAST SYSTEM GRIT ROBOTIC
OC20352
PROGRESSIVE TECHNOLOGIES INC
PLASMA SPARY, AUTOMATED SYST 27
OC20039
SULZER METCO
SM101144
NI
TR
OG
EN
NITROGEN
HEAT WATER CHILLEROC15462
PROGRESSIVE TECHNOLOGIES INC
OC???
DAYTON
OVEN
OC16301
PRECISION SCIENTIFICCUT OFF SAW
OC16988
ALLIED HIGH TECH PRODUCTS INC
2049T5
ALLIED HIGH TECH PRODUCTS INC
TE
NS
ILE
O
VE
N
TESTER MATERIAL
OC16204
GALDABINI CESARE
V73B
POLISHER
OC18510
STRUERS
5560422
TEGRADOSER
OC17504
STRUERS
560061
PLASMA SPRAY
OC24332
PLASMA SPRAY
OC24336
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
UNIT 20 UNIT 21
UNIT 26
UNIT 23
UNIT 22
UNIT 20
UNIT 21
UNIT 23
UNIT 27
UNIT 26
UNIT 22
NOT CONNECTED
AT THIS END
UNIT 27
1 2 3 4 5 6
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE
BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE
CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO
ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE
PERFORMED ON THE SYSTEM.
F-102
B3221 NEW WORK PLAN
NTS
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
SP
RI
NK
LE
RS
IN
P
LA
SM
A
BO
OT
H
DU
ST
CO
LL
EC
TO
RS
A
ND
R
EP
LA
CE
T
HE
B
UI
LD
IN
G F/
A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
A M cP H
ER
SO
N
F-102
S S
TA
R
R
B
JI
M O
H
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
B3
NE
W W
OR
K
PL
AN
07 09
B3221 KEY PLAN
INSTALL A NEW BUILDING FIRE ALARM AND MASS NOTIFICATION SYSTEM
THROUGHOUT THE FACILITY.
BREAK
AREA
WOMEN
MEN
COATING
OFFICE
UP
UP
ELEV.
INSPECTION
OFFICE
FIC/PCS
PROCESS ROOM
DOOR BLOCKED
EXHAUST VENT
LADDER
DUST COLLECTOR ROOM
OFFICE
LAB
CONTROL
ROOM
MECH.
ROOM
STORAGE
STORAGE
EXHAUST VENT
HEAT TREAT
PLASMA SPRAY
HYDROGEN ROOM
SURFACE ENHANCEMENT
PAINT
AUTOMATED FPI AREA
EXHAUST VENT
JAN
OFFICE
WELDING
SHOP
GRINDING
SHOP
CMM
PLASMA STORAGE
DF
LADDER
BREAK
ROOM
ELEC ELEC
A/C
A/C
M
1 2 3 4 5 6 7 8 9 10 11 12
H
1 3 5 7 9 11
G
1 3 5 7 9 11
A
1 2 3 4 5 6 7 8 9 10 11 12
A A A A A A A A A A A
H
G
H
G
H
G
H
G
H
G
I
J
K
L
F
E
D
C
B
M M M M M M M M M M
H
I
J
K
L
M
BL
AS
T
MA
CH
IN
E
OC
E-89040
EMPIRE ABRASIVE
BL
AS
T
CA
BI
NE
T
PD
H6
VA
PO
R
BL
AS
T
TANK
AIR
COMPRESSOR
OC11110
E88007180
M 161 ROBOT
9MP DJ POWER FEEDER
AIR PRESSURE
BOOSTER
DJC CONTROL UNIT
NITROGEN
DJC
AC
9HL
TURNTABLE
CLIMET RC HV
WT 650LB
PLASMA SPREY 22 HV OF
OC19237
SULZER METCO
DJCJDJ0090913/1
Equipment Mezzanine
LA
DD
ER
PLASMA SPRAY AUTOMATED SYST 26
OC20040
SULZER METCO
SM101145
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
AR
G
O N
AIRHYDROGEN
EXHAUST
PLENUM
TURNTABLE
EXHAUST HOOD
COLLECTOR DUST PLASMA BOOTH
OC12884
AIR CLEANING TECH
IG555398 002
BLAST SYSTEM GRIT ROBOTIC
OC20352
PROGRESSIVE TECHNOLOGIES INC
PLASMA SPARY, AUTOMATED SYST 27
OC20039
SULZER METCO
SM101144
NI
TR
OG
EN
NITROGEN
HEAT WATER CHILLEROC15462
PROGRESSIVE TECHNOLOGIES INC
OC???
DAYTON
OVEN
OC16301
PRECISION SCIENTIFICCUT OFF SAW
OC16988
ALLIED HIGH TECH PRODUCTS INC
2049T5
ALLIED HIGH TECH PRODUCTS INC
TE
NS
ILE
O
VE
N
TESTER MATERIAL
OC16204
GALDABINI CESARE
V73B
POLISHER
OC18510
STRUERS
5560422
TEGRADOSER
OC17504
STRUERS
560061
PLASMA SPRAY
OC24332
PLASMA SPRAY
OC24336
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
BL
AS
T
MA
CH
IN
E
OC
PDH630
VAPOR BLAST
UNIT 20 UNIT 21
UNIT 26
UNIT 23
UNIT 22
UNIT 20
UNIT 21
UNIT 23
UNIT 27
UNIT 26
UNIT 22
NOT CONNECTED
AT THIS END
UNIT 27
M
AT
CH
L
IN
E
M
AT
CH
L
IN
E
MA
TC
H
LIN
E
MA
TC
H
LIN
E
MA
TC
H
LIN
E
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
I
J
K
L
M
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE
BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE
CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO
ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE
PERFORMED ON THE SYSTEM.
F-103
B3221 NEW WORK PLAN
NTS
CONCEPT
DESIGN
W W
YK
R
EM
OV
E
AN
D
RE
PL
AC
E
FI
RE
SP
RI
NK
LE
RS
IN
P
LA
SM
A
BO
OT
H
DU
ST
CO
LL
EC
TO
RS
A
ND
R
EP
LA
CE
T
HE
B
UI
LD
IN
G F/
A
SY
ST
EM
, B
N O
V
T
EP
A
- C
SA
G
A M cP H
ER
SO
N
F-103
S S
TA
R
R
B
JI
M O
H
En gr
\D es ig n\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
B3
NE
W W
OR
K
PL
AN
08 09
B3221 KEY PLAN
INSTALL A NEW BUILDING FIRE ALARM AND MASS NOTIFICATION SYSTEM
THROUGHOUT THE FACILITY.
INSPECTION
UP
WOMEN
MEN
ST
OR
AG
E
AR
EA
STEAM PIT
IDTS DROP
TIP
MAINTENANCE
SHOP
OFFICE
TEST LAB
OFFICE OFFICE
OFFICE
OFFICE
SECRETARY
WOMEN
OFFICE
DN
UP
UPUP
UP
UP
UP
PIT PIT PIT
DOWN TO
CONCRETE
FLOOR BELOW
FUME SCRUBBER ROOM
OFFICE
STORAGE
MECH.
ROOM
OFFICE OFFICE
STORAGE
CONVEYOR
OPERATIONS
CO
NF
ER
EN
CE
R
OO
M
ST
OR
AG
E
DN
UP UP UP
UP UP UP
STEEL GRATING
@ FLOOR LEVEL
ENTRYCORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CO
RR
ID
OR
CO
RR
ID
OR
JAN
ELEC.
ROOM STORAGE
ELEC.
ROOM
JAN
MENMEN
TE
LE
CO
M
AUTOMATED FPI AREA
VIBRATORY CLEAN
CHEMICAL CLEAN
LADDER
EYE WASH
TRAN
ELEC
EL
EC
LADDER
DF
SS
ELECELEC
'-8
2'- 4"
2'-0"
12 13 14 15 16 17 18 19 20 21
13 15 17 19 21
13 15 17 19 21
12 13 14 15 16 17 18 19 20 21
A A A A A A A A A A
H
G
H
G
H
G
H
G
H
G
M M M M M M M M M M
H
G
I
J
K
L
F
E
D
C
B
MA
TC
H
LIN
E
MA
TC
H
LIN
E
MA
TC
H
LIN
E
12 13 14 15 16 17 18 19 20 21
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 19'-0"
A
B
C
D
E
F
G
H
I
J
K
L
M
WWYK 250019 FOR REFERENCE ONLY
1124001842E Sticky Note Accepted set by 1124001842E
All rights reserved.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.
DATE
DATE
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
DESCRIPTION
R
GCA, SERIES FIRED, HRD & SRD
YELLOW
GREEN
YELLOW
GREEN
BLUE
RED
BLUE
RED
SHIELD
BLACK
WHITE
BLACK
WHITE
SHIELD
GCA WIRING DETAIL
SHUNT AND INSULATE RED AND BLUE LEADS WITH ELECTRICAL TAPE
INSULATE SHIELD WITHIN JUNCTION BOX
OPTIONAL JUNCTION BOX CONNECTION
NOTES:
1. ALL CONDUIT AND FITTINGS ARE TO BE SEALED TO PREVENT THE ENTRANCE
OF MOISTURE AND OTHER CONTAMINANTS PER NFPA 69.
2. REFERENCE FIKE MANUALS E06-051 CONTROL PANEL AND E06-018-1 SUPPRESSION
CONTAINER FOR INSTALLATION AND OPERATING INSTRUCTIONS.
3. REFERENCE FIKE FIELD WIRING DIAGRAM (E09-XXX) FOR FURTHER DETAILS.
4. 12" MINIMUM FLEXIBLE CONDUIT FOR MAINTENANCE OF CONTAINER ON BOTH SIDES
OF ELECTRICAL BOX.
5. ALL FIELD WIRING SHALL BE UL LISTED, MINIMUM 18 AWG, STRANDED, SHIELDED
WITH DRAIN WIRE AND MINIMUM DIELECTRIC STRENGTH AT SERVICE TEMPERATURES
SUITABLE TO THE APPLICATION. STRIP AND TIN OR INSTALL WIRE CRIMP PIN
CONNECTOR AT ALL FIELD TERMINATIONS.
6. UNUSED CONDUCTORS OF CABLES SHALL BE CLIPPED OFF AND ISOLATED.
7. SHIELDING SHALL BE ISOLATED AND WIRED THROUGH TO THE NEXT JUNCTION BOX.
8. APPLY ANTI-SEIZE COMPOUND TO THREADS ON GCA AND GCA BOSS FITTING BEFORE
ASSEMBLY.
9. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA) UNTIL SYSTEM HAS BEEN FULLY
TESTED BY A FIKE FACTORY TRAINED TECHNICIAN OR OTHER FIKE FACTORY TRAINED
PERSONNEL. GCA'S MUST BE HANDLED IN ACCORDANCE WITH FIKE MANUAL E06-018-1
AND THE MANUFACTURER'S RECOMMENDATIONS.
10. HRD CONTAINERS: GCA WIRING AND JUNCTION BOX ASSEMBLY CAN EXIT FROM THE
BACK OR SIDE OF GCA BOSS FITTING. A 3/4 NPT PLUG (SUPPLIED) WILL BE REQUIRED
ON THE UNUSED PORT.
11. JUNCTION BOX(ES) SHALL BE MOUNTED AS CLOSE TO THE HRD/SRD CONTAINER AS
POSSIBLE, 24" MAXIMUM.
SUPPLIED BY CUSTOMER:
ALL CONDUIT, FLEXIBLE CONDUIT AND MINIMUM 18 AWG STRANDED, TWISTED, SHIELDED
CABLE WITH DRAIN.
PER HRD FOR FIRST/MIDDLE LOCATION:
(1) - JUNCTION BOX
(1) - DOUBLE ROW TERMINAL BLOCK
(2) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)
(1) - 3/4" CONDUIT TEE
(1) - 3/4" BREATHER DRAIN
(3) - 3/4" CLOSE CONDUIT NIPPLE
(1) - 3/4" UNION
(2) - 3/4" CLOSE NIPPLE
PER LAST HRD LOCATION:
(1) - JUNCTION BOX
(1) - DOUBLE ROW TERMINAL BLOCK
(1) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)
(1) - 3/4" CONDUIT TEE
(1) - 3/4" BREATHER DRAIN
(2) - 3/4" CLOSE CONDUIT NIPPLE
(1) - 3/4" UNION
(2) - 3/4" CLOSE NIPPLE
SUPPLIED BY FIKE PER HRD:
(1) - GAS CARTRIDGE ACTUATOR (GCA)
(1) - GCA BOSS FITTING
(1) - 3/4" PLUG
4 4
PER SRD FOR FIRST/MIDDLE LOCATION:
(1) - JUNCTION BOX
(1) - DOUBLE ROW TERMINAL BLOCK
(2) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)
(1) - 3/4" CONDUIT TEE
(1) - 3/4" BREATHER DRAIN
(3) - 3/4" CLOSE CONDUIT NIPPLE
(1) - 1/2" UNION
(1) - 1/2" CLOSE NIPPLE
PER LAST SRD LOCATION:
(1) - JUNCTION BOX
(1) - DOUBLE ROW TERMINAL BLOCK
(1) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)
(1) - 3/4" CONDUIT TEE
(1) - 3/4" BREATHER DRAIN
(2) - 3/4" CLOSE CONDUIT NIPPLE
(1) - 1/2" UNION
(1) - 1/2" CLOSE NIPPLE
SUPPLIED BY FIKE PER SRD:
(1) - GAS CARTRIDGE ACTUATOR (GCA)
(2) - 1" x 1/2" REDUCER
(1) - 1" CONDUIT NIPPLE, 3" LONG
(1) - 1/2" CLOSE NIPPLE
50 LITER
(VERSION 2)
E70-059
50 LITER
(VERSION 1)
E70-033
30 LITER
E70-032
20 LITER
E70-030
10 LITER
E70-029
5 LITER
E70-028
2.5 LITER
E70-027
9 LITER
E70-035
All rights reserved.
Copyright by Fike Corp.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.
DATE
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
DESCRIPTION
R
E11-502.idw
E11-502
D
04/29/13D
MK 06/21/00
TO 01/21/00
SR 06/23/00
C
ARS DTN KC
HRD & SRD CONTAINER SPECIFICATIONS
1:8
MOUNTING DETAIL
06370
SEE ECO
UNITS OF MEASUREMENTS
XXX = INCHES
[XXX] = MILLIMETERS
20.56 [522.3]
16.53 [419.8]
16.53 [419.8]
16.53 [419.8] 16.53 [419.8]
16.28 [413.5]
49.15 [1248.3]
5.38 [136.5] 15.13 [384.2]
5.38 [136.5] 12.69 [322.2]
5.38 [136.5] 12.69 [322.2]
10.62 [269.8]3.31 [84.1]
3.31 [84.1] 10.62 [269.8]
2.94 [74.6] 7.62 [193.6]
12.06 [306.4]
16.07 [408.3]
25.82 [655.9]
30.58 [776.7]
38.83 [986.3]
7.50 [190.5]
21.76 [552.7]
42.00 [1066.9]
24.53 [623.0]
5.38 [136.5] 18.88 [479.4]
9 LITER
E70-035
2.5 LITER
E70-027
5 LITER
E70-028
10 LITER
E70-029
20 LITER
E70-030
30 LITER
E70-032
50 LITER, VER 1
E70-033
50 LITER, VER 2
E70-059
MOUNTING FLANGE
4" ANSI 300 4" ANSI 300 4" ANSI 300 4" ANSI 300 4" ANSI 300 6" ANSI 300 6" ANSI 300
EMPTY WEIGHT (LB [KG]) 30 [13.6] 67 [30.4] 95 [43.1] 118 [53.5] 206 [93.4] 220 [99.8] 251 [113.9] 310 [140.6]
DESIGN CODE DOT ASME ASME ASME ASME ASME ASME ASME
NOTE: DIMENSIONS AND WEIGHTS ARE FOR REFERENCE ONLY
ASSEMBLED DETAIL
(LOCKOUT NOT SHOWN)
ALTERNATE
MOUNTING METHOD
All rights reserved.
Copyright by Fike Corp.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
DESCRIPTION
R
E11-503.idw
E11-503
J
07/23/13J
TO 01/17/00
M. KOGAN 06/21/00
4 HRD, SPREADER NOZZLE ASSEMBLY
1:4
MOUNTING DETAIL
06370
SEE ECO
UNITS OF MEASUREMENTS
XXX = INCHES
[XXX] = MILLIMETERS
CONTAINER ORIENTATION DETAIL
SCALE: NONE
NOTES:
1. BACKING PLATE REQUIRED FOR VESSEL WALLS LESS THAN .25 [6.4] THICK.
BACKING PLATE TO BE A MINIMUM OF .25 [6.4] THICK X 2.00 [50.8] WIDE.
2. OPTIONAL: GASKET CAN BE REPLACED BY THERMAL SHIELD E70-0087.
3. SEE LOW PRESSURE SWITCH MOUNTING DETAIL E11-566, AS NECESSARY.
4. SEE HRD LOCKOUT MOUNTING DETAIL E11-567, AS NECESSARY.
CHART D: NOZZLE ASSEMBLY E80-025-X
PART NUMBER -1 QTY -2 QTY DESCRIPTION
E02-0147 8 7 NUT .75-10UNC HH
E02-0146 8 7
STUD .75-10UNC X 6.00 [152.4]
02-8950 1 1 GASKET
E80-006 1 1 SPREADER NOZZLE
CHART B: NOZZLE COVER E02-0172-X
PART NUMBER MATERIAL MAX TEMP
E02-0172-4 VITON A
400ÁF [204ÁC]
E02-0172-5 WHITE NEOPRENE FOOD GRADE
250ÁF [121ÁC]
CHART C: BOLTING PAD E70-0064-X
PART NUMBER MATERIAL
E70-0064-1 CS SA105/SA350 LF2
E70-0064-2 304 SST A182
E70-0064-3 316 SST A182
CHART A: HRD CONTAINER
PART NUMBER CONTAINER
E70-027 2.5 LITER
E70-028 5 LITER
E70-029 10 LITER
E70-030 20 LITER
E70-032 30 LITER
(4.50 [114.3])
(2.27 [57.7])
ASSEMBLED
LENGTH
PRESSURE GAUGE
FILL VALVE
LOW PRESSURE SWITCH
E70-048
(OPTIONAL)
HRD CONTAINER
(SEE CHART A)
(.50 [12.7])
4 HRD LOCKOUT
E70-063
(OPTIONAL)
BOLTING PAD
E70-0064-X
(SEE CHART C)
NOZZLE COVER
E02-0172-X
(SEE CHART B)
SPREADER NOZZLE ASSY
E80-025-X
(SEE CHART D)
GCA BOSS
FITTING
E70-0154
INITIATOR BOSS
45Á MAX45Á MAX
45Á MAX
90Á MAX
7.00
6.50
177.8
165.1
Ï
1.50 [38.1]
TYP
.25 [6.4] MIN
TYP
5.00 [127.0]
VESSEL WALL
10.00 [254.0]
1 1
VESSEL WALL
BOLT HOLES MUST
STRADDLE CENTERLINE
(TWO-HOLE)
MOUNTING BRACKET DETAIL
(70-1372-W)
BALL VALVE INSTALLATION DETAIL
PREFERRED ORIENTATION
BALL VALVE ORIENTATION DETAIL
ALTERNATE ORIENTATION
NOZZLE ASSEMBLY DETAIL
(E80-055-X)
SCALE 1 : 3
All rights reserved.
Copyright by Fike Corp.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
DESCRIPTION
R
E11-562.idw
E11-562
F
09/19/13F
JLF 06/21/11
ARS 06/14/11
KDC 06/21/11
SRD, 9 LITER, 1.50 TRI-CLAMP TO 1.25 NPT,
FLEXIBLE HOSE
1:7
MOUNTING DETAIL
06370
SEE ECO
UNITS OF MEASUREMENTS
XXX = INCHES
[XXX] = MILLIMETERS
CONTAINER ORIENTATION DETAIL
SCALE NONE
NOZZLE ORIENTATION DETAIL
PREFERRED LOCATIONS FOR
HORIZONTAL DUCTS
SCALE NONE
1. DISASSEMBLE AND REMOVE NOZZLE COVER PRIOR TO WELDING.
2. ALL WELDS MUST WITHSTAND 1500 LB FORCE. CAUTION: EXCESSIVE HEAT DURING WELDING
MAY CAUSE DAMAGE TO THE WELD FERRULE.
3. REINFORCEMENT REQUIRED FOR VESSEL WALLS OR DUCTS LESS THAN .25 [6.4] THICK.
4. CAUTION: DO NOT TURN INITIATOR MOUNTING BOSS OR PRESSURE LOSS WILL RESULT.
5. OPTIONAL: LOW PRESSURE SWITCH E70-049, SEE MOUNTING DETAIL E11-566, AS NECESSARY.
6. MOUNTING BRACKET ATTACHED TO STRUCTURAL SUPPORT, BY CUSTOMER.
7. PROVIDE CLEARANCE FOR SWITCH COVER REMOVAL AND BALL VALVE HANDLE (OPEN AND
CLOSED), AS NECESSARY.
SUPPLIED BY FIKE:
(1) - 9 LITER SRD CONTAINER (E70-035-X-W)
(1) - MOUNTING BRACKET, WITH HARDWARE (70-1372-W)
(1) - NOZZLE ASSEMBLY (E80-055-X)
(1) - 1.25 NPT SWIVEL END FLEXIBLE HOSE ASSEMBLY (SEE TABLE A)
(1) - 1.25 BALL VALVE ASSEMBLY (SEE TABLE B) (OPTIONAL)
(1) - LOW PRESSURE SWITCH (E70-049) (OPTIONAL)
SUPPLIED BY CUSTOMER:
ADDITIONAL ITEMS REQUIRED PER BALL VALVE:
(2) - 1.25 NPT SCH 40 CLOSE NIPPLE (AS NECESSARY)
(1) - 1.25 NPT 300 LB UNION (AS NECESSARY)
(1) - 1.25 NPT SCH 40 PIPE, 10 [254] LONG MAX (AS NECESSARY)
TABLE B: BALL VALVE ASSEMBLY (OPTIONAL)
PART NUMBER BALL VALVE BODY MATERIAL
E80-0152 CARBON STEEL
E80-0153 STAINLESS STEEL
45Á MAX 45Á MAX
TABLE A: FLEXIBLE HOSE ASSEMBLY
PART NUMBER DESCRIPTION MIN BEND RADIUS
80-1081-36
STANDARD, 36.00 [914.4] LG 5.50 [139.7]
80-1158-36
HYGIENIC, 36.00 [914.4] LG 9.00 [228.6]
SWIVEL END
FLEXIBLE HOSE ASSEMBLY
(SEE TABLE A)
INITIATOR BOSS
FILL PORT
9 LITER SRD CONTAINER
(E70-035-X-W)
PRESSURE GAUGE
TO SRD
TO SRD
(4.52 [114.8])
(7.00 [177.8])
(8.06 [204.7])
UNION
CLOSE NIPPLE
PIPE
(9.69 [246.1])
(3.59 [91.3])
(16.25 [412.8])
(8.23 [209.0])
(5.00 [127.0])
.38 [9.5](4X )
BALL VALVE ASSEMBLY
NOTE: FLOW ARROW ON VALVE
(SEE TABLE B)
DUCT/VESSEL WALL
NOZZLE ASSEMBLY
(E80-055-X)
(1.67 [42.4])
(1.13 [28.7])
WELD FERRULE
COVER
CLAMP
ADAPTER
"CONTAINER SIDE"
MARKING
ADD
MODE
21 3 4
EXPLOSION PROTECTION
CONTROLLER
P6P5
NCNO CNCNO C
24VDC
P2
A BBA
P1 P3 P4
NON-HAZARDOUS
LOCATION
HAZARDOUS
LOCATION
820 Ω
EOL
R E
D
B L
A C
K
B L
A C
K
JUNCTION BOX
A A
B B
C C
D D
All rights reserved.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.
DATE
DATE
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
HRD & SRD LOW PRESSURE SWITCH ASSY
1. REFER TO E06-018-1 EXPLOSION PROTECTION CONTAINER
INSTALLATION AND OPERATION MANUAL FOR FURTHER DETAILS.
LOW PRESSURE SWITCH LISTINGS:
CLASS I, DIVISION 1 AND 2, GROUPS A, B, C & D
CLASS II, DIVISION 1 AND 2, GROUPS E, F & G
CLASS III
CLASS I, ZONE 1, GROUP IIC
ENCLOSURE TYPE 4X
UL cUL CSA ATEX
* WITH NO PRESSURE APPLIED
E
E
RIGID MOUNT ASSY & MOUNTING FERRULE
(SEE CHART B)
UP
DOWN
All rights reserved.
Copyright by Fike Corp.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
DESCRIPTION
R
E11-607-02.idw
E11-607-02
B
12/12/12B
BPS 09/15/10
ARS 09/13/10
KDC 09/15/10
ARS BRE KC
IR OPTICAL DETECTOR, TRI-CLAMP
1:2
MOUNTING DETAIL
06370
SEE ECO
UNITS OF MEASUREMENTS
XXX = INCHES
[XXX] = MILLIMETERS
TO EPC
IR OPTICAL DETECTOR ORIENTATION DETAIL
ON A HORIZONTAL MOUNT SURFACE
1. ALL CONDUIT IS TO BE SEALED TO PREVENT THE ENTRANCE OF MOISTURE AND OTHER
CONTAMINANTS, PER NFPA 69. FLEXIBLE CONDUIT IS REQUIRED TO ALLOW FOR
REMOVAL AND CALIBRATION OF THE IR OPTICAL DETECTOR.
2. THE TEMPERATURE RANGE FOR THE DETECTOR PROCESS CONNECTION IS
-4ÁF TO 176ÁF [-20ÁC TO 80ÁC]. FOR AMBIENT TEMPERATURE AROUND THE PROCESS
CONNECTION BELOW 32ÁF [0ÁC], THE MOUNTING FERRULE AND THE WHOLE DETECTOR
ASSEMBLY SHOULD BE INSULATED TO PREVENT INTERNAL CONDENSATION AND ICE
BUILD UP.
3. THE IR OPTICAL DETECTOR AMBIENT TEMPERATURE MUST BE MAINTAINED BETWEEN
-4ÁF AND 149ÁF [-20ÁC AND 65ÁC].
4. REFERENCE FIKE FIELD WIRING DIAGRAM E09-XXX.
5. ALL FIELD WIRING SHALL BE UL LISTED, MINIMUM 20 AWG, STRANDED, TWISTED,
SHIELDED WITH DRAIN WIRE AND MINIMUM DIELECTRIC STRENGTH AT SERVICE
TEMPERATURES SUITABLE TO THE APPLICATION. STRIP AND TIN ALL FIELD WIRE
TERMINATIONS.
6. THE OPTICAL DETECTOR CABLE HAS A MINIMUM BEND RADIUS OF 1.50 [38.1].
7. MOUNTING FERRULE MAY BE WELDED TO THE VESSEL/DUCT OR WELDED TO A
BACKING PLATE AND THEN ATTACHED TO THE VESSEL/DUCT. CAUTION: EXCESSIVE
HEAT DURING WELDING MAY DAMAGE THE MOUNTING FERRULE.
8. INSTALL RIGID MOUNT ASSEMBLY AND RUN CONDUIT WITH WIRING AS REQUIRED.
INSTALLATION OF IR OPTICAL DETECTOR SHALL BE PERFORMED BY A FIKE SYSTEM
TECHNICIAN OR OTHER FIKE QUALIFIED PERSONNEL.
9. IF APPLICABLE, AIR PURGE SHALL BE CONNECTED AND CONTINUOUSLY FLOWING.
RATE OF AIR FLOW TO BE ADJUSTED BASED ON THE PROCESS AND OPERATING
CONDITIONS. 50 TO 100 STANDARD CUBIC FEET PER HOUR IS THE RECOMMENDED
STARTING POINT.
PROVIDED BY CUSTOMER (PER DETECTOR):
ALL CONDUIT, FLEXIBLE CONDUIT AND MINIMUM 20 AWG STRANDED,
TWISTED, SHIELDED CABLE WITH DRAIN.
ALL PARTS LISTED ABOVE MUST MEET CURRENT N.E.C. REQUIREMENTS.
PROVIDED BY FIKE (PER DETECTOR):
(1) IR OPTICAL DETECTOR ASSEMBLY (SEE CHART A)
(1) RIGID MOUNT W/ TRI-CLAMP ASSEMBLY (SEE CHART B)
(1) MOUNTING FERRULE (02-8598)
CHART A: DETECTOR
PART NUMBER DESCRIPTION
29998431-S STANDARD
29998441-S TITANIUM NITRIDE COATED
FLEXIBLE CONDUIT
RIGID MOUNT ASSEMBLY
(SEE CHART B)
90Á MAX 90Á MAX
MOUNTING FERRULE
CHART B: RIGID MOUNT ASSEMBLY
PART NUMBER DESCRIPTION
E61-063-1
PTFE GASKET, SST FLANGE
E61-063-2
VITON GASKET, SST FLANGE
E61-063-3
PTFE GASKET, SST FLANGE W/ AIR PURGE
E61-063-4
VITON GASKET, SST FLANGE W/ AIR PURGE
IR OPTICAL DETECTOR
(SEE CHART A)
(6.02 [152.9])
ASSEMBLED
LENGTH
1.75 [44.5] MAX
VESSEL/DUCT WALL
(2.19 [55.7])
(1.75 [44.5])
MOUNTING FERRULE
RIGID MOUNT ASSY
(SEE CHART B)
AIR PURGE
(OPTIONAL)
1 41 322
A B
P5
EXPLOSION PROTECTION
CONTROLLER
24VDC
NO NC C NO NC C
P5
A B 4-20 mA
4-20 mA
P1 P2 P4P3
PER E06-061 EXHIBITS 6-3 & 6-4 CERAMIC HAZARDOUS LOCATION REQUIREMENTS
(D U
AL
C
H
AN
N
EL
W
IR
IN
G
(S
IN
G
LE
C H
AN
N
EL
W
IR
IN
G
(DUAL CHANNEL WIRING)
(SINGLE CHANNEL WIRING)
INTRINSICALLY SAFE & NON-HAZARDOUS CONNECTION
(WITHOUT CONDUIT)
DUST-IGNITION PROOF & NON-HAZARDOUS CONNECTION
(WITH CONDUIT)
A A
B B
C C
D D
All rights reserved.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.
DATE
DATE
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
CERAMIC PRESSURE DETECTOR
ELECTRICAL CONNECTION
J
J
J
J
J
J
All rights reserved.
Copyright by Fike Corp.
ENGR
CHKD
DRN
c
DATE BY/APP/APPREV
This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or
DATE
SIZE FSCM No.
SCALE FILE NAME
DWG NO.
SHEET OF
REV
TITLE
Blue Springs, Missouri - U.S.A www.FIKE.com
DESCRIPTION
R
E11-713.idw
E11-713
C
05/01/13C
BPS 01/07/05
BRE 01/03/05
SR 01/07/05
CERAMIC PRESSURE DETECTOR
2 SANITARY FLEX MOUNT
1:6
MOUNTING DETAIL
06370
SEE ECO
UNITS OF MEASUREMENTS
XXX = INCHES
[XXX] = MILLIMETERS
PROCESS PRESSURE TAKE-OFF
(02-9073)
PROCESS PRESSURE TAKE-OFF
(02-8598)
VERTICAL SURFACE MOUNT
H…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .