Project Summary: WWYK250019 - Fire Sprinkler and Fire Alarm System Replacement

This is a Concept Design document for a federal construction project at Tinker Air Force Base, Building 3221, with project number WWYK250019. The work consists of three primary scopes: (1) removal and replacement of wet-pipe fire sprinkler protection systems in plasma spray booths, exhaust ductwork, and dust collectors with clean agent suppression systems approved for combustible metal dusts and flammable gases; (2) installation of a new building fire alarm and mass notification system; and (3) demolition of the existing fire alarm system. The project is located at Tinker AFB in Oklahoma and is managed by the Air Force Materiel Command, 72nd Air Base Wing Civil Engineer Directorate.

Key technical requirements include coordination with fire protection specialists, compliance with NFPA codes (NFPA 2001, NFPA 70, NFPA 72), UFC standards (UFC 3-600-01, UFC 3-601-02), and Tinker AFB fire protection standards. The suppression system contractor must employ a minimum NICET Level III specialist in special hazard systems to verify sizing and design. All materials must be UL-listed or FM-approved. The fire alarm system shall remain operational during construction, and no building areas shall be occupied until fire alarm devices are installed or fire watch is in place. Construction documents include demolition plans for sprinkler and fire alarm systems, work plans for clean agent installation and fire alarm/mass notification systems, and detailed specifications addressing hydrogen hazards in plasma booths, requiring safety testing prior to work shifts. The project emphasizes coordinated commissioning and simultaneous testing of fire suppression and alarm systems to expedite completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

6. THE PURPOSE OF THIS PROJECT IS TO REMOVE THE

WET-PIPE FIRE SPRINKLER PROTECTION FROM THE

WORKSTATION BOOTHS, DUCTWORK, AND DUST

COLLECTORS. THEN TO INSTALL AN APPROPRIATE

SUPPRESSION SYSTEM IN THE BOOTHS, DUCTWORK, AND

DUST COLLECTORS THAT IS APPROVED FOR USE WITH

COMBUSTIBLES METAL DUSTS AND FLAMMABLE GAS.

7. A NEW BUILDING FIRE ALARM AND MASS NOTIFICATION

SYSTEM IS REQUIRED FOR THIS PROJECT. CONTRACTOR

WILL NEED TO UNINSTALL THE EXISTING SYSTEM AFTER

THE NEW SYSTEM IS INSTALLED AND OPERATIONAL.

WWYK250019

REMOVE AND REPLACE

FIRE SPRINKLERS IN PLASMA

BOOTH DUST COLLECTORS, B3221

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

S

PR

IN

KL

ER

S

IN

P

LA

SM

A

BO

OT

H

DU

ST

C

OL

LE

CT

OR

S

AN

D

RE

PL

AC

E

TH

E

BU

ILD

IN

G

F/ A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

X

XX

G-101

S S

TA

R

R

A M cP H

ER

SO

N

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

\M od el

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 09

F-100 GENERAL NOTES

FD101 B3221 FIRE SPRINKLER DEMOLITION PLAN

4 FD102 B3221 FIRE ALARM DEMOLITION PLAN

5 FD103 B3221 FIRE ALARM DEMOLITION PLAN

6 F-101 B3221 NEW CLEAN AGENT WORK PLAN

7 F-102 B3221 NEW FIRE ALARM AND MASS NOTIFICATION WORK PLAN

8 F-103 B3221 NEW FIRE ALARM AND MASS NOTIFICATION WORK PLAN

9 VARIES ELECTRICAL CLASSIFIED AREAS_RECORD DRAWING

So ld ie r C re ek

3220 3707

43609

W ar eh ou se R d.

Entrance Road "A"

Turbine Dr. Turbine Dr.

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

62501W 62501E

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

(FUTURE

HAUL ROUTE)

(F

UT

UR

E

HA

UL

R

OU

TE

FUTURE

TRUCK GATE

FUTURE

HAUL ROUTE

PROJECT LOCATION

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

S

PR

IN

KL

ER

S

IN

P

LA

SM

A

BO

OT

H

DU

ST

C

OL

LE

CT

OR

S

AN

D

RE

PL

AC

E

TH

E

BU

ILD

IN

G

F/ A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

A M cP H

ER

SO

N

F-100

S S

TA

R

R

B

JI

M O

H

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

\M od el

GE

NE

RA

L N

OT

ES

02 09

SPRINKLER SYSTEM DEMOLITION NOTES:

1.

2.

3.

4.

5.

CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.

THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS

THAT MAY ADVERSELY AFFECT THE ARCHITECTURAL, ELECTRICAL,

AND MECHANICAL SYSTEMS DEMOLITION OR INSTALLATION.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO

STARTING ANY WORK.

THE EXISTING BUILDING SPRINKLER SYSTEM LOCATED OUTSIDE OF

THE WORK AREA SHALL REMAIN OPERATIONAL AT ALL TIMES. THE

FIRE ALARM SYSTEM SHALL MONITOR THE SPRINKLER SYSTEM

WATER FLOW AND VALVE TAMPER DEVICES AT ALL TIMES.

SUPERVISE ALL FIRE PROTECTION IMPAIRMENTS IN ACCORDANCE

WITH UFC 3-601-02. COMPLY WITH THE TINKER AIR FORCE BASE

OUTAGE POLICY AND PROCEDURES.

PERFORM DEMOLITION AND INSTALLATION IN A MANNER THAT SHALL

HAVE LEAST ADVERSE EFFECT ON NORMAL BUILDING OPERATION.

CONTRACTOR SHALL COORDINATE DEMOLITION AND INSTALLATION

WITH THE BUILDING USER AND THE GOVERNMENT.

HOT WORK ASSOCIATED WITH DEMOLITION AND CONSTRUCTION

SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 51B.

SAFEGUARDS FOR HOT WORK OPERATIONS INCLUDE, BUT ARE NOT

LIMITED TO THE RELOCATION OF COMBUSTIBLE STORAGE, THE USE

OF FIRE RESISTIVE BARRIERS TO PROTECT COMBUSTIBLES THAT

CANNOT BE RELOCATED, THE ESTABLISHMENT OF FIRE WATCH AND

THE TERMINATION OF HOT WORK OPERATIONS WHEN FIRE

PROTECTION SYSTEMS ARE OUT OF SERVICE. ADDITIONALLY, HOT

WORK SHOULD NOT BE PERFORMED WHEN ALTERNATIVE METHODS

CAN BE EMPLOYED TO DISMANTLE EXISTING OR ASSEMBLE NEW

SYSTEMS.

THE CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS

SUITABLE FOR THE COMBUSTIBLES PRESENT DURING

CONSTRUCTION. WHERE EXISTING BUILDING EXTINGUISHERS ARE

BLOCKED, REMOVED OR GENERALLY MADE INACCESSIBLE TO THE

BUILDING OCCUPANTS, SUPPLEMENTAL EXTINGUISHERS SHALL BE

PROVIDED SUCH THAT A PORTABLE FIRE EXTINGUISHER IS LOCATED

WITHIN 75 FT OF ALL AREAS OF THE BUILDING. THE CONTRACTOR

SHALL REGULARLY INSPECT (AT LEAST WEEKLY) PORTABLE

EXTINGUISHERS LOCATED WITHIN THE WORK AREA TO ENSURE THAT

THEY ARE CHARGED, FREE FROM DAMAGE AND ACCESSIBLE.

SUPPRESSION SYSTEM GENERAL NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

CONTRACTOR IS RESPONSIBLE FOR INSTALLATION DESIGN

AND COORDINATION. SIZING OF FIRE SUPPRESSION COMPONENTS

WILL BE CONFIRMED BY THE CONTRACTOR. THE DESIGNER WILL BE

MINIMUM NICET LEVEL III IN SPECIAL HAZARD SYSTEMS.

THESE DRAWINGS ARE CONCEPTUAL IN NATURE AND DEVICE

PLACEMENTS ARE REPRESENTATIVE. CONTRACTOR TO VERIFY AND

PROVIDE FULL DESIGN IN ACCORDANCE WITH APPLICABLE CODES

(UFC, ICC, NFPA, ETC.).

THE FIRE SPRINKLER CONTRACTOR WILL COORDINATE WITH THE

FIRE ALARM CONTRACTOR AND OTHER TRADES FOR PROVISION OF

CONNECTIONS BETWEEN THEIR RESPECTIVE SYSTEMS.

ALL MATERIALS ARE TO BE UL LISTED OR FM APPROVED FOR USE IN

FIRE PROTECTION SYSTEMS.

COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE

TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS

21 22 00 CLEAN AGENT EXTINGUISHING SYSTEMS.

COORDINATE TESTING WITH OTHER TRADES AND BASE PERSONNEL

PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND FIRE ALARM

TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE

COMMISSIONING.

THE BUILDING FIRE PROTECTION WATER SUPPLY IS SERVED BY

EXISTING FIRE PUMPS.

WHERE PIPE PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE

PARTITION, OR FLOORS, AN APPROVED FIRE PENETRATION WILL BE

REQUIRED. COMPLY WITH THE TINKER AFB FIRE PROTECTION

STANDARD.

SLEEVES PENETRATING CONCRETE, MASONRY WALLS OR CONCRETE

FLOORS WILL BE CUT FLUSH WITH EACH SURFACE. SLEEVE SIZES

AND CLEARANCE BETWEEN PIPE AND SLEEVE WILL BE IN

ACCORDANCE WITH NFPA 13.

OUTLETS WILL BE SPACED IN ACCORDANCE WITH NFPA 2001

REQUIREMENTS.

PROVIDE HEAD GUARDS IN AREAS SUBJECT TO DAMAGE OR HEADS

INSTALLED LOWER THAN SEVEN FEET ABOVE FLOOR.

PROVIDE HEAD GUARDS WITH WATER SHIELDS FOR ALL HEADS

INSTALLED BENEATH OPEN GRATED PLATFORMS.

VALVES LOCATED MORE THAN 8 FOOT ABOVE FINISHED FLOOR AND

NOT READILY ACCESSIBLE FROM MEZZANINE WILL BE PROVIDED

WITH CHAIN OPERATORS.

PROVIDE ACCESS DOORS AND SIGNAGE WHERE ACCESS IS

REQUIRED TO CONCEALED SUPPRESSION EQUIPMENT, VALVES, AND

CONTROLS. LOCATIONS TO BE APPROVED BY CONTRACTING

OFFICER.

PROVIDE PERMANENT LABELS ON RISERS TO INDICATE

WHICH ZONE EACH ONE SERVES.

PROVIDE PERMANENT LABELS INDICATING NORMAL OPERATING

POSITION ON ALL VALVES INCLUDING, BUT NOT LIMITED TO,

SECTIONAL VALVES, INSPECTOR'S TEST VALVES, AND DRAIN VALVES.

CONSTRUCTION (SHOP) DRAWINGS AND

CALCULATIONS MUST BE PREPARED BY AN INDIVIDUAL THAT HAS A

CURRENT CERTIFICATION BY THE NATIONAL INSTITUTE FOR CERTIFICATION

IN ENGINEERING TECHNOLOGIES, SPECIAL HAZARD SYSTEMS, LEVEL III, AT

A MINIMUM. THE QFPE MUST REVIEW ALL SUBMITTALS.

THE SUBMITTALS MUST BEAR THE QFPE REVIEW STAMP INDICATING REVIEW

AND APPROVAL PRIOR TO SUBMITTING TO THE GOVERNMENT.

FIRE ALARM AND MASS

NOTIFICATION DEMOLITION NOTES:

1.

2.

3.

4.

5.

6.

CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.

THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS

THAT MAY ADVERSELY AFFECT DEMOLITION OR INSTALLATION.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO

STARTING ANY WORK.

THE BUILDING FIRE ALARM SYSTEM OUTSIDE THE PROJECT AREA

SHALL REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE FIRE

PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO

FIRE ALARM DEVICES SHALL BE DEMOLISHED UNTIL THE BUILDING

OCCUPANTS HAVE BEEN REMOVED FROM THAT PORTION OF THE

BUILDING OR FIRE WATCH IN PLACE OR THE NEW SYSTEM IS

INSTALLED AND OPERATIONAL.

PROVIDE PROTECTION AS REQUIRED TO PREVENT DAMAGE

TO EXISTING EQUIPMENT.

COORDINATE DEMOLITION WITH NEW WORK. IF UNDOCUMENTED

CONDITIONS EXIST, CONTACT THE CONTRACTING OFFICER BEFORE

PROCEEDING.

PROTECT EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO:

STRUCTURES, CEILING, WALLS, EQUIPMENT, UTILITIES, ETC. DAMAGE

TO EXISTING CONDITIONS SHALL BE REPAIRED BY THE CONTRACTOR AT

NO ADDITIONAL COST TO THE GOVERNMENT.

THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION.

COORDINATE WORK WITH GOVERNMENT PRIOR TO COMMENCING

WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR WORKING

AROUND OCCUPANT SCHEDULE AS DETERMINED BY THE

GOVERNMENT AND MAINTAIN MINIMUM IMPACT DUE TO

CONSTRUCTION.

FIRE ALARM AND MASS

NOTIFICATION GENERAL NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

REPLACE THE EXISTING FIRE ALARM AND MASS NOTIFICATION

SYSTEM AS INDICATED ON THE CONTRACT DOCUMENTS, AS

EVIDENTLY INTENDED AND IN ACCORDANCE WITH NFPA 70,

NFPA 72, UFC 3-600-01 , AND

TINKER AFB FIRE PROTECTION STANDARDS. THE DRAWINGS

ARE DIAGRAMMATIC IN NATURE AND INDICATE GENERAL

ARRANGEMENTS OF SYSTEMS AND WORK, BUT DO NOT INCLUDE ALL

INTERCONNECTIONS BETWEEN OTHER SYSTEMS. PROVIDE CONDUIT,

BACK BOXES, RACEWAY AND WIRING AS REQUIRED TO ACCOMPLISH

THE FUNCTIONS INTENDED AND REQUIRED BY CODE.

COORDINATE WORK WITH THAT OF OTHER TRADES SO AS TO AVOID

CONFLICTS. RESOLVE CONFLICTS THROUGH THE CONTRACTING

OFFICER PRIOR TO ROUGH-IN.

FAILURE TO PROVIDE SUCH COORDINATION PRIOR TO

WORK BEING INSTALLED SHALL NOT BE CAUSE FOR ADDITIONAL

COMPENSATION TO THE CONTRACTOR, AND MAY RESULT IN

REJECTION OF THE WORK.

COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE

TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS

28 31 76 FIRE ALARM AND MASS NOTIFICATION SYSTEM, FIRE

PROTECTION. COORDINATE TESTING WITH OTHER TRADES AND BASE

PERSONNEL PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND

FIRE ALARM TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE

COMMISSIONING.

THE BUILDING FIRE ALARM SYSTEM SHALL

REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE ALL FIRE

PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO

PORTION OF THE BUILDING SHALL BE OCCUPIED UNTIL THE FIRE

ALARM DEVICES HAVE BEEN INSTALLED OR FIRE WATCH IN PLACE,

OR THE NEW SYSTEM IS INSTALLED AND OPERATIONAL.

PROVIDE NEW MATERIALS BEARING LABELS OR MARKING

INDICATING THIRD PARTY TESTING AND APPROVAL SUITABLE FOR

THE APPLICATION INTENDED.

INSTALL FIRE ALARM CABLE IN RED METAL RACEWAY. FREE-RUN CABLE

IS NOT PERMITTED. RACEWAY SHALL BE CONCEALED IN FINISHED

SPACES, AND MAY BE INSTALLED EXPOSED IN UNFINISHED SPACES

SUCH AS MECHANICAL AND ELECTRICAL ROOMS. INSTALL RACEWAY

PERPENDICULAR OR PARALLEL TO THE BUILDING'S STRUCTURAL

COMPONENTS. RACEWAY SHOULD BE 3/4 INCH RED EMT.

PROVIDE PULL AND JUNCTION BOXES AS REQUIRED TO MEET CODE

AND INSTALLATION REQUIREMENTS. PULL AND JUNCTION BOXES

SHALL BE CONCEALED IN FINISHED SPACES. COORDINATE WITH

OTHER TRADES SO AS TO AVOID CONFLICTS. BOXES TO BE RED.

SUPPORT CONDUIT AND BACK BOXES BY MEANS OF ANCHORS,

RODS, HANGERS, ETC., TO MAINTAIN ALIGNMENT AND PREVENT

MOVEMENT. SUPPORT CEILING MOUNTED BACK BOXES WITH "T"

HANGERS OR EQUAL METHOD OF SUPPORT. BACK BOXES SHALL NOT

BE SUPPORTED SOLELY BY CONDUIT.

IDENTIFY CONDUCTORS AT EACH JUNCTION BOX, OUTLET BOX,

CABINET, PULL BOX, ETC., WITH VINYL HEAT SHRINK TAGS

INDICATING PANEL AND CIRCUIT NUMBER, CONTROL WIRE

IDENTIFICATION NUMBER, OR OTHER APPROPRIATE INFORMATION.

WHERE CONDUIT PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE

PARTITION, OR FLOORS, AN APPROVED FIRE PENETRATION WILL BE

REQUIRED. COMPLY WITH THE TINKER AFB FIRE PROTECTION

STANDARD, 2026.

SEAL PENETRATIONS AT FIRE OR SMOKE RATED CONSTRUCTION

WITH FIRESTOPPING SYSTEMS APPROVED AND LISTED FOR THE

RATING OF THE CONSTRUCTION TO BE PENETRATED. PROVIDE

DOCUMENTATION FOR EACH PENETRATION SEALING SYSTEMS FOR

VERIFICATION OF PROPER INSTALLATION. COMPLY WITH THE TINKER

AIR FORCE BASE FIRE PROTECTION STANDARD.

PERFORM WORK ON DE-ENERGIZED SYSTEMS ONLY TO PREVENT

PERSONNEL INJURY AND POTENTIAL SYSTEM FAILURE. WHERE

WORK ON EXISTING SYSTEMS SHALL REQUIRE INTERRUPTION OF

ELECTRICAL SERVICE, TEMPORARY PROVISIONS ACCEPTABLE TO

THE OWNER SHALL BE REQUIRED. COMPLY WITH THE TINKER AIR

FORCE BASE OUTAGE REQUEST POLICY AND PROCEDURES.

CONSTRUCTION (SHOP) DRAWINGS AND CALCULATIONS

MUST PREPARED BY AN INDIVIDUAL THAT HAS A CURRENT

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING

TECHNOLOGIES, FIRE ALARM SYSTEMS, LEVEL III CERTIFICATION, AT

A MINIMUM. THE QUALIFIED FIRE PROTECTION ENGINEER (QFPE)

MUST REVIEW ALL SUBMITTALS. THE SUBMITTALS MUST BEAR

THE REVIEW STAMP OF THE QFPE INDICATING REVIEW AND

APPROVAL PRIOR TO SUBMITTING TO THE GOVERNMENT.

SUBMIT SHOP DRAWINGS AND CALCULATIONS AND PRODUCT DATA

TO THE GOVERNMENT FOR REVIEW, IN A MANNER AS REQUIRED PER

NFPA 72 AND UFC 3-600-01. SUBMIT EQUIPMENT DATA SHEETS

FOR THE COMPLETE INSTALLATION OF THE FIRE ALARM AND

MASS NOTIFICATION SYSTEM. APPROVED SHOP DRAWINGS,

TESTING PLANS, DATA SHEETS, AND CALCULATIONS ARE

REQUIRED PRIOR TO COMMENCEMENT OF WORK.

THE FIRE ALARM AND MASS NOTIFICATION SYSTEM SUBMITTAL

SHALL BE A COMPLETE PACKAGE. PARTIAL SUBMITTALS WILL NOT BE

ACCEPTABLE.

EXISTING BUILDING SCOPE EXTENTS:

1.

2.

UFC 3-600-01, SECTION 34-1.1, EXISTING FACILITIES, MINIMUM REQUIREMENTS:

FACILITIES AS THEY EXIST, MUST MEET THE REQUIREMENTS OF NFPA 101,

FOR EXISTING OCCUPANCIES. FACILITIES THAT DO NOT MEET THE

REQUIREMENTS OF NFPA 101 FOR EXISTING OCCUPANCIES MUST CONFORM

TO ONE OF THE FOLLOWING:

A. UPGRADE THE DEFICIENCY TO MEET THE EXISTING OCCUPANCY

REQUIREMENTS, OR

B. ESTABLISH MANAGEMENT PROTOCOLS TO PROVIDE A LEVEL OF LIFE

SAFETY EQUIVALENT TO THAT REQUIRED BY NFPA 101 FOR

EXISTING OCCUPANCIES, UNTIL AN UPGRADE PROJECT CAN BE

COMPLETED. MANAGEMENT PROTOCOLS MUST BE IN WRITING

AND APPROVED BY THE COMPONENT FIRE PROTECTION

ENGINEER.

UFC 3-600-01, 34-1.2.1, WORK IN EXISTING FACILITIES:

CONFORM TO THE REQUIREMENTS OF THE BUILDING REHABILITATION

CHAPTER OF NFPA 101 FOR DESIGN AND CONSTRUCTION PROJECTS IN

EXISTING BUILDINGS EXCEPT AS SPECIFIED IN UFC 3-600-01.

A. THE ENTIRE FACILITY, AT A MINIMUM, MUST COMPLY WITH THE

APPLICABLE EXISTING OCCUPANCY CHAPTER OF NFPA 101

BEFORE BEGINNING THE PROJECT FOR WORK IN EXISTING

FACILITIES. THE PROJECT MAY INCLUDE BRINGING THE FACILITY

INTO COMPLIANCE WITH THE APPLICABLE OCCUPANCY CHAPTER

OF NFPA 101.

B. THE AREAS OF THE FACILITY WHERE NO WORK IS BEING PERFORMED

MUST MEET THE APPLICABLE EXISTING OCCUPANCY CHAPTER OF

NFPA 101, BEFORE BEGINNING THE PROJECT OR BE INCLUDED AS

PART OF THE PROJECT.

NFPA 101, 43.2.2.1.3, MODIFICATION:

THE RECONFIGURATION OF ANY SPACE; THE ADDITION, RELOCATION, OR

ELIMINATION OF ANY DOOR OR WINDOW; THE ADDITION OR ELIMINATION OF

LOAD BEARING ELEMENTS; THE RECONFIGURATION OR EXTENSION OF ANY

SYSTEM; OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT.

NFPA 101, 43.5.1.3, GENERAL REQUIREMENTS:

NEWLY CONSTRUCTED ELEMENTS, COMPONENTS, AND SYSTEMS SHALL

COMPLY WITH THE REQUIREMENTS OF OTHER SECTIONS OF THIS CODE [NFPA

101] APPLICABLE TO NEW CONSTRUCTION.

3.

4.

6. THE CONTRACTOR SHALL UNINSTALL THE FIRE SPRINKLER SUB-SYSTEMS

AS SHOWN ON THE DRAWINGS, AND SEAL THE OLD SPRINKLER

PENETRATION OPENINGS.

17. SUBMIT SHOP DRAWINGS AND CALCULATIONS AND PRODUCT DATA

TO THE GOVERNMENT FOR REVIEW, IN A MANNER AS REQUIRED PER

NFPA 2001 AND UFC 3-600-01. SUBMIT EQUIPMENT DATA SHEETS

FOR THE COMPLETE INSTALLATION OF THE FIRE SUPPRESSION

SYSTEMS. APPROVED SHOP DRAWINGS,

TESTING PLANS, DATA SHEETS, AND CALCULATIONS ARE

REQUIRED PRIOR TO COMMENCEMENT OF WORK.

THE FIRE SUPPRESSION SYSTEMS SUBMITTAL

SHALL BE A COMPLETE PACKAGE. PARTIAL SUBMITTALS WILL NOT BE

ACCEPTABLE.

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE

BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE

CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO

ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE

PERFORMED ON THE SYSTEM.

UNINSTALL THE FIRE SPRINKLER SYSTEM FROM THE BOOTHS, DUCTWORK,

AND DUST COLLECTORS. CAP THE MAIN SPRINKLER WATER SUPPLY TO

EACH BOOTH AT THE CEILING SYSTEM CROSS MAIN. DO NOT USE A VALVE

AS A CAP. REPAIR PENETRATION HOLES TO THE DUCTS AND BOOTHS TO

OPERATIONAL TOLERANCES.

FD101

B3221 FIRE SPRINKLER DEMOLITION PLAN

NTS

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

SP

RI

NK

LE

RS

IN

P

LA

SM

A

BO

OT

H

DU

ST

CO

LL

EC

TO

RS

A

ND

R

EP

LA

CE

T

HE

B

UI

LD

IN

G F/

A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

A M cP H

ER

SO

N

FD101

S S

TA

R

R

B

JI

M O

H

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

\M od el

B3

FI

RE

S

PR

IN

KL

ER

DE

MO

LIT

IO

N

PL

AN

03 09

B3221 KEY PLAN

DOOR BLOCKED

LADDER

LAB

HEAT TREAT

PLASMA SPRAY

HYDROGEN ROOM

GRINDING

SHOP

CMM

PLASMA STORAGE

BREAK

ROOM

M

1 2 3 4 5 6

I

J

K

L

M M M M M

I

J

K

L

M

BL

AS

T

MA

CH

IN

E

OC

E-89040

EMPIRE ABRASIVE

BL

AS

T

CA

BI

NE

T

PD

H6

VA

PO

R

BL

AS

T

TANK

AIR

COMPRESSOR

OC11110

E88007180

M 161 ROBOT

9MP DJ POWER FEEDER

AIR PRESSURE

BOOSTER

DJC CONTROL UNIT

NITROGEN

DJC

AC

9HL

TURNTABLE

CLIMET RC HV

WT 650LB

PLASMA SPREY 22 HV OF

OC19237

SULZER METCO

DJCJDJ0090913/1

Equipment Mezzanine

LA

DD

ER

PLASMA SPRAY AUTOMATED SYST 26

OC20040

SULZER METCO

SM101145

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

BLAST SYSTEM GRIT ROBOTIC

OC20352

PROGRESSIVE TECHNOLOGIES INC

PLASMA SPARY, AUTOMATED SYST 27

OC20039

SULZER METCO

SM101144

NI

TR

OG

EN

NITROGEN

HEAT WATER CHILLEROC15462

PROGRESSIVE TECHNOLOGIES INC

OC???

DAYTON

OVEN

OC16301

PRECISION SCIENTIFICCUT OFF SAW

OC16988

ALLIED HIGH TECH PRODUCTS INC

2049T5

ALLIED HIGH TECH PRODUCTS INC

TE

NS

ILE

O

VE

N

TESTER MATERIAL

OC16204

GALDABINI CESARE

V73B

POLISHER

OC18510

STRUERS

5560422

TEGRADOSER

OC17504

STRUERS

560061

PLASMA SPRAY

OC24332

PLASMA SPRAY

OC24336

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

UNIT 20 UNIT 21

UNIT 26

UNIT 23

UNIT 22

UNIT 20

UNIT 21

UNIT 23

UNIT 27

UNIT 26

UNIT 22

NOT CONNECTED

AT THIS END

UNIT 27

1 2 3 4 5 6

AutoCAD SHX Text H

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE

BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE

CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO

ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE

PERFORMED ON THE SYSTEM.

FD102

B3221 FIRE ALARM DEMOLITION PLAN

NTS

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

SP

RI

NK

LE

RS

IN

P

LA

SM

A

BO

OT

H

DU

ST

CO

LL

EC

TO

RS

A

ND

R

EP

LA

CE

T

HE

B

UI

LD

IN

G F/

A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

A M cP H

ER

SO

N

FD102

S S

TA

R

R

B

JI

M O

H

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

B3

FI

RE

A

LA

RM

D

EM

OL

IT

IO

N

PL

AN

04 09

B3221 KEY PLAN

UNINSTALL THE BUILDING FIRE ALARM SYSTEM THROUGHOUT THE ENTIRE

BUILDING.

BREAK

AREA

WOMEN

MEN

COATING

OFFICE

UP

UP

ELEV.

INSPECTION

OFFICE

FIC/PCS

PROCESS ROOM

DOOR BLOCKED

EXHAUST VENT

LADDER

DUST COLLECTOR ROOM

OFFICE

LAB

CONTROL

ROOM

MECH.

ROOM

STORAGE

STORAGE

EXHAUST VENT

HEAT TREAT

PLASMA SPRAY

HYDROGEN ROOM

SURFACE ENHANCEMENT

PAINT

AUTOMATED FPI AREA

EXHAUST VENT

JAN

OFFICE

WELDING

SHOP

GRINDING

SHOP

CMM

PLASMA STORAGE

DF

LADDER

BREAK

ROOM

ELEC ELEC

A/C

A/C

M

1 2 3 4 5 6 7 8 9 10 11 12

H

1 3 5 7 9 11

G

1 3 5 7 9 11

A

1 2 3 4 5 6 7 8 9 10 11 12

A A A A A A A A A A A

H

G

H

G

H

G

H

G

H

G

I

J

K

L

F

E

D

C

B

M M M M M M M M M M

H

I

J

K

L

M

BL

AS

T

MA

CH

IN

E

OC

E-89040

EMPIRE ABRASIVE

BL

AS

T

CA

BI

NE

T

PD

H6

VA

PO

R

BL

AS

T

TANK

AIR

COMPRESSOR

OC11110

E88007180

M 161 ROBOT

9MP DJ POWER FEEDER

AIR PRESSURE

BOOSTER

DJC CONTROL UNIT

NITROGEN

DJC

AC

9HL

TURNTABLE

CLIMET RC HV

WT 650LB

PLASMA SPREY 22 HV OF

OC19237

SULZER METCO

DJCJDJ0090913/1

Equipment Mezzanine

LA

DD

ER

PLASMA SPRAY AUTOMATED SYST 26

OC20040

SULZER METCO

SM101145

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

BLAST SYSTEM GRIT ROBOTIC

OC20352

PROGRESSIVE TECHNOLOGIES INC

PLASMA SPARY, AUTOMATED SYST 27

OC20039

SULZER METCO

SM101144

NI

TR

OG

EN

NITROGEN

HEAT WATER CHILLEROC15462

PROGRESSIVE TECHNOLOGIES INC

OC???

DAYTON

OVEN

OC16301

PRECISION SCIENTIFICCUT OFF SAW

OC16988

ALLIED HIGH TECH PRODUCTS INC

2049T5

ALLIED HIGH TECH PRODUCTS INC

TE

NS

ILE

O

VE

N

TESTER MATERIAL

OC16204

GALDABINI CESARE

V73B

POLISHER

OC18510

STRUERS

5560422

TEGRADOSER

OC17504

STRUERS

560061

PLASMA SPRAY

OC24332

PLASMA SPRAY

OC24336

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

UNIT 20 UNIT 21

UNIT 26

UNIT 23

UNIT 22

UNIT 20

UNIT 21

UNIT 23

UNIT 27

UNIT 26

UNIT 22

NOT CONNECTED

AT THIS END

UNIT 27

M

AT

CH

L

IN

E

M

AT

CH

L

IN

E

MA

TC

H

LIN

E

MA

TC

H

LIN

E

MA

TC

H

LIN

E

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

H

I

J

K

L

M

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE

BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE

CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO

ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE

PERFORMED ON THE SYSTEM.

FD103

B3221 FIRE ALARM DEMOLITION PLAN

NTS

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

SP

RI

NK

LE

RS

IN

P

LA

SM

A

BO

OT

H

DU

ST

CO

LL

EC

TO

RS

A

ND

R

EP

LA

CE

T

HE

B

UI

LD

IN

G F/

A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

A M cP H

ER

SO

N

FD103

S S

TA

R

R

B

JI

M O

H

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

B3

FI

RE

A

LA

RM

D

EM

OL

IT

IO

N

PL

AN

05 09

B3221 KEY PLAN

UNINSTALL THE BUILDING FIRE ALARM SYSTEM THROUGHOUT THE ENTIRE

BUILDING.

INSPECTION

UP

WOMEN

MEN

ST

OR

AG

E

AR

EA

STEAM PIT

IDTS DROP

TIP

MAINTENANCE

SHOP

OFFICE

TEST LAB

OFFICE OFFICE

OFFICE

OFFICE

SECRETARY

WOMEN

OFFICE

DN

UP

UPUP

UP

UP

UP

PIT PIT PIT

DOWN TO

CONCRETE

FLOOR BELOW

FUME SCRUBBER ROOM

OFFICE

STORAGE

MECH.

ROOM

OFFICE OFFICE

STORAGE

CONVEYOR

OPERATIONS

CO

NF

ER

EN

CE

R

OO

M

ST

OR

AG

E

DN

UP UP UP

UP UP UP

STEEL GRATING

@ FLOOR LEVEL

ENTRYCORRIDOR

CO

RR

ID

OR

CO

RR

ID

OR

CO

RR

ID

OR

CO

RR

ID

OR

JAN

ELEC.

ROOM STORAGE

ELEC.

ROOM

JAN

MENMEN

TE

LE

CO

M

AUTOMATED FPI AREA

VIBRATORY CLEAN

CHEMICAL CLEAN

LADDER

EYE WASH

TRAN

ELEC

EL

EC

LADDER

DF

SS

ELECELEC

'-8

2'- 4"

2'-0"

12 13 14 15 16 17 18 19 20 21

13 15 17 19 21

13 15 17 19 21

12 13 14 15 16 17 18 19 20 21

A A A A A A A A A A

H

G

H

G

H

G

H

G

H

G

M M M M M M M M M M

H

G

I

J

K

L

F

E

D

C

B

MA

TC

H

LIN

E

MA

TC

H

LIN

E

MA

TC

H

LIN

E

12 13 14 15 16 17 18 19 20 21

20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 19'-0"

A

B

C

D

E

F

G

H

I

J

K

L

M

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

GENERAL NOTES

KEYED NOTES

PROVIDE NEW CLEAN AGENT SUPPRESSION FOR THE PLASMA BOOTHS ,

EXHAUST DUCTS, AND DUST COLLECTORS. SUPPRESSION AGENT AND

SYSTEM SHALL BE APPROPRIATE FOR THE FUEL LOAD, AREA / VOLUME, AND

TEMPERATURE.

F-101

B3221 NEW CLEAN AGENT WORK PLAN

NTS

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

SP

RI

NK

LE

RS

IN

P

LA

SM

A

BO

OT

H

DU

ST

CO

LL

EC

TO

RS

A

ND

R

EP

LA

CE

T

HE

B

UI

LD

IN

G F/

A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

A M cP H

ER

SO

N

F-101

S S

TA

R

R

B

JI

M O

H

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

\M od el

B3

NE

W C

LE

AN

A

GE

NT

W

OR

K

PL

AN

06 09

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE

BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE

CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO

ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE

PERFORMED ON THE SYSTEM.

B3221 KEY PLAN

UNIT 20 UNIT 21

UNIT 20

UNIT 21

UNIT 23

UNIT 27

UNIT 26

UNIT 22

DOOR BLOCKED

LADDER

LAB

HEAT TREAT

PLASMA SPRAY

HYDROGEN ROOM

GRINDING

SHOP

CMM

PLASMA STORAGE

BREAK

ROOM

M

1 2 3 4 5 6

I

J

K

L

M M M M M

I

J

K

L

M

BL

AS

T

MA

CH

IN

E

OC

E-89040

EMPIRE ABRASIVE

BL

AS

T

CA

BI

NE

T

PD

H6

VA

PO

R

BL

AS

T

TANK

AIR

COMPRESSOR

OC11110

E88007180

M 161 ROBOT

9MP DJ POWER FEEDER

AIR PRESSURE

BOOSTER

DJC CONTROL UNIT

NITROGEN

DJC

AC

9HL

TURNTABLE

CLIMET RC HV

WT 650LB

PLASMA SPREY 22 HV OF

OC19237

SULZER METCO

DJCJDJ0090913/1

Equipment Mezzanine

LA

DD

ER

PLASMA SPRAY AUTOMATED SYST 26

OC20040

SULZER METCO

SM101145

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

BLAST SYSTEM GRIT ROBOTIC

OC20352

PROGRESSIVE TECHNOLOGIES INC

PLASMA SPARY, AUTOMATED SYST 27

OC20039

SULZER METCO

SM101144

NI

TR

OG

EN

NITROGEN

HEAT WATER CHILLEROC15462

PROGRESSIVE TECHNOLOGIES INC

OC???

DAYTON

OVEN

OC16301

PRECISION SCIENTIFICCUT OFF SAW

OC16988

ALLIED HIGH TECH PRODUCTS INC

2049T5

ALLIED HIGH TECH PRODUCTS INC

TE

NS

ILE

O

VE

N

TESTER MATERIAL

OC16204

GALDABINI CESARE

V73B

POLISHER

OC18510

STRUERS

5560422

TEGRADOSER

OC17504

STRUERS

560061

PLASMA SPRAY

OC24332

PLASMA SPRAY

OC24336

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

UNIT 20 UNIT 21

UNIT 26

UNIT 23

UNIT 22

UNIT 20

UNIT 21

UNIT 23

UNIT 27

UNIT 26

UNIT 22

NOT CONNECTED

AT THIS END

UNIT 27

1 2 3 4 5 6

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE

BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE

CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO

ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE

PERFORMED ON THE SYSTEM.

F-102

B3221 NEW WORK PLAN

NTS

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

SP

RI

NK

LE

RS

IN

P

LA

SM

A

BO

OT

H

DU

ST

CO

LL

EC

TO

RS

A

ND

R

EP

LA

CE

T

HE

B

UI

LD

IN

G F/

A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

A M cP H

ER

SO

N

F-102

S S

TA

R

R

B

JI

M O

H

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

B3

NE

W W

OR

K

PL

AN

07 09

B3221 KEY PLAN

INSTALL A NEW BUILDING FIRE ALARM AND MASS NOTIFICATION SYSTEM

THROUGHOUT THE FACILITY.

BREAK

AREA

WOMEN

MEN

COATING

OFFICE

UP

UP

ELEV.

INSPECTION

OFFICE

FIC/PCS

PROCESS ROOM

DOOR BLOCKED

EXHAUST VENT

LADDER

DUST COLLECTOR ROOM

OFFICE

LAB

CONTROL

ROOM

MECH.

ROOM

STORAGE

STORAGE

EXHAUST VENT

HEAT TREAT

PLASMA SPRAY

HYDROGEN ROOM

SURFACE ENHANCEMENT

PAINT

AUTOMATED FPI AREA

EXHAUST VENT

JAN

OFFICE

WELDING

SHOP

GRINDING

SHOP

CMM

PLASMA STORAGE

DF

LADDER

BREAK

ROOM

ELEC ELEC

A/C

A/C

M

1 2 3 4 5 6 7 8 9 10 11 12

H

1 3 5 7 9 11

G

1 3 5 7 9 11

A

1 2 3 4 5 6 7 8 9 10 11 12

A A A A A A A A A A A

H

G

H

G

H

G

H

G

H

G

I

J

K

L

F

E

D

C

B

M M M M M M M M M M

H

I

J

K

L

M

BL

AS

T

MA

CH

IN

E

OC

E-89040

EMPIRE ABRASIVE

BL

AS

T

CA

BI

NE

T

PD

H6

VA

PO

R

BL

AS

T

TANK

AIR

COMPRESSOR

OC11110

E88007180

M 161 ROBOT

9MP DJ POWER FEEDER

AIR PRESSURE

BOOSTER

DJC CONTROL UNIT

NITROGEN

DJC

AC

9HL

TURNTABLE

CLIMET RC HV

WT 650LB

PLASMA SPREY 22 HV OF

OC19237

SULZER METCO

DJCJDJ0090913/1

Equipment Mezzanine

LA

DD

ER

PLASMA SPRAY AUTOMATED SYST 26

OC20040

SULZER METCO

SM101145

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

AR

G

O N

AIRHYDROGEN

EXHAUST

PLENUM

TURNTABLE

EXHAUST HOOD

COLLECTOR DUST PLASMA BOOTH

OC12884

AIR CLEANING TECH

IG555398 002

BLAST SYSTEM GRIT ROBOTIC

OC20352

PROGRESSIVE TECHNOLOGIES INC

PLASMA SPARY, AUTOMATED SYST 27

OC20039

SULZER METCO

SM101144

NI

TR

OG

EN

NITROGEN

HEAT WATER CHILLEROC15462

PROGRESSIVE TECHNOLOGIES INC

OC???

DAYTON

OVEN

OC16301

PRECISION SCIENTIFICCUT OFF SAW

OC16988

ALLIED HIGH TECH PRODUCTS INC

2049T5

ALLIED HIGH TECH PRODUCTS INC

TE

NS

ILE

O

VE

N

TESTER MATERIAL

OC16204

GALDABINI CESARE

V73B

POLISHER

OC18510

STRUERS

5560422

TEGRADOSER

OC17504

STRUERS

560061

PLASMA SPRAY

OC24332

PLASMA SPRAY

OC24336

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

BL

AS

T

MA

CH

IN

E

OC

PDH630

VAPOR BLAST

UNIT 20 UNIT 21

UNIT 26

UNIT 23

UNIT 22

UNIT 20

UNIT 21

UNIT 23

UNIT 27

UNIT 26

UNIT 22

NOT CONNECTED

AT THIS END

UNIT 27

M

AT

CH

L

IN

E

M

AT

CH

L

IN

E

MA

TC

H

LIN

E

MA

TC

H

LIN

E

MA

TC

H

LIN

E

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

H

I

J

K

L

M

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. WARNING! CAUTION! : TRANSIENT HYDROGEN MAY ACCUMULATE WITHIN THE

BOOTHS AS WELL AS ESCAPE FROM THE PLASMA UNITS AND COLLECT AT THE

CEILING LEVEL. CONTRACTOR SHALL TEST FOR THE PRESENCE OF HYDROGEN TO

ENSURE A SAFE INERT ENVIRONMENT BEFORE EACH SHIFT WHEN WORK IS TO BE

PERFORMED ON THE SYSTEM.

F-103

B3221 NEW WORK PLAN

NTS

CONCEPT

DESIGN

W W

YK

R

EM

OV

E

AN

D

RE

PL

AC

E

FI

RE

SP

RI

NK

LE

RS

IN

P

LA

SM

A

BO

OT

H

DU

ST

CO

LL

EC

TO

RS

A

ND

R

EP

LA

CE

T

HE

B

UI

LD

IN

G F/

A

SY

ST

EM

, B

N O

V

T

EP

A

- C

SA

G

A M cP H

ER

SO

N

F-103

S S

TA

R

R

B

JI

M O

H

En gr

\D es ig n\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

B3

NE

W W

OR

K

PL

AN

08 09

B3221 KEY PLAN

INSTALL A NEW BUILDING FIRE ALARM AND MASS NOTIFICATION SYSTEM

THROUGHOUT THE FACILITY.

INSPECTION

UP

WOMEN

MEN

ST

OR

AG

E

AR

EA

STEAM PIT

IDTS DROP

TIP

MAINTENANCE

SHOP

OFFICE

TEST LAB

OFFICE OFFICE

OFFICE

OFFICE

SECRETARY

WOMEN

OFFICE

DN

UP

UPUP

UP

UP

UP

PIT PIT PIT

DOWN TO

CONCRETE

FLOOR BELOW

FUME SCRUBBER ROOM

OFFICE

STORAGE

MECH.

ROOM

OFFICE OFFICE

STORAGE

CONVEYOR

OPERATIONS

CO

NF

ER

EN

CE

R

OO

M

ST

OR

AG

E

DN

UP UP UP

UP UP UP

STEEL GRATING

@ FLOOR LEVEL

ENTRYCORRIDOR

CO

RR

ID

OR

CO

RR

ID

OR

CO

RR

ID

OR

CO

RR

ID

OR

JAN

ELEC.

ROOM STORAGE

ELEC.

ROOM

JAN

MENMEN

TE

LE

CO

M

AUTOMATED FPI AREA

VIBRATORY CLEAN

CHEMICAL CLEAN

LADDER

EYE WASH

TRAN

ELEC

EL

EC

LADDER

DF

SS

ELECELEC

'-8

2'- 4"

2'-0"

12 13 14 15 16 17 18 19 20 21

13 15 17 19 21

13 15 17 19 21

12 13 14 15 16 17 18 19 20 21

A A A A A A A A A A

H

G

H

G

H

G

H

G

H

G

M M M M M M M M M M

H

G

I

J

K

L

F

E

D

C

B

MA

TC

H

LIN

E

MA

TC

H

LIN

E

MA

TC

H

LIN

E

12 13 14 15 16 17 18 19 20 21

20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 19'-0"

A

B

C

D

E

F

G

H

I

J

K

L

M

WWYK 250019 FOR REFERENCE ONLY

1124001842E Sticky Note Accepted set by 1124001842E

All rights reserved.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.

DATE

DATE

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

DESCRIPTION

R

GCA, SERIES FIRED, HRD & SRD

YELLOW

GREEN

YELLOW

GREEN

BLUE

RED

BLUE

RED

SHIELD

BLACK

WHITE

BLACK

WHITE

SHIELD

GCA WIRING DETAIL

SHUNT AND INSULATE RED AND BLUE LEADS WITH ELECTRICAL TAPE

INSULATE SHIELD WITHIN JUNCTION BOX

OPTIONAL JUNCTION BOX CONNECTION

NOTES:

1. ALL CONDUIT AND FITTINGS ARE TO BE SEALED TO PREVENT THE ENTRANCE

OF MOISTURE AND OTHER CONTAMINANTS PER NFPA 69.

2. REFERENCE FIKE MANUALS E06-051 CONTROL PANEL AND E06-018-1 SUPPRESSION

CONTAINER FOR INSTALLATION AND OPERATING INSTRUCTIONS.

3. REFERENCE FIKE FIELD WIRING DIAGRAM (E09-XXX) FOR FURTHER DETAILS.

4. 12" MINIMUM FLEXIBLE CONDUIT FOR MAINTENANCE OF CONTAINER ON BOTH SIDES

OF ELECTRICAL BOX.

5. ALL FIELD WIRING SHALL BE UL LISTED, MINIMUM 18 AWG, STRANDED, SHIELDED

WITH DRAIN WIRE AND MINIMUM DIELECTRIC STRENGTH AT SERVICE TEMPERATURES

SUITABLE TO THE APPLICATION. STRIP AND TIN OR INSTALL WIRE CRIMP PIN

CONNECTOR AT ALL FIELD TERMINATIONS.

6. UNUSED CONDUCTORS OF CABLES SHALL BE CLIPPED OFF AND ISOLATED.

7. SHIELDING SHALL BE ISOLATED AND WIRED THROUGH TO THE NEXT JUNCTION BOX.

8. APPLY ANTI-SEIZE COMPOUND TO THREADS ON GCA AND GCA BOSS FITTING BEFORE

ASSEMBLY.

9. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA) UNTIL SYSTEM HAS BEEN FULLY

TESTED BY A FIKE FACTORY TRAINED TECHNICIAN OR OTHER FIKE FACTORY TRAINED

PERSONNEL. GCA'S MUST BE HANDLED IN ACCORDANCE WITH FIKE MANUAL E06-018-1

AND THE MANUFACTURER'S RECOMMENDATIONS.

10. HRD CONTAINERS: GCA WIRING AND JUNCTION BOX ASSEMBLY CAN EXIT FROM THE

BACK OR SIDE OF GCA BOSS FITTING. A 3/4 NPT PLUG (SUPPLIED) WILL BE REQUIRED

ON THE UNUSED PORT.

11. JUNCTION BOX(ES) SHALL BE MOUNTED AS CLOSE TO THE HRD/SRD CONTAINER AS

POSSIBLE, 24" MAXIMUM.

SUPPLIED BY CUSTOMER:

ALL CONDUIT, FLEXIBLE CONDUIT AND MINIMUM 18 AWG STRANDED, TWISTED, SHIELDED

CABLE WITH DRAIN.

PER HRD FOR FIRST/MIDDLE LOCATION:

(1) - JUNCTION BOX

(1) - DOUBLE ROW TERMINAL BLOCK

(2) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)

(1) - 3/4" CONDUIT TEE

(1) - 3/4" BREATHER DRAIN

(3) - 3/4" CLOSE CONDUIT NIPPLE

(1) - 3/4" UNION

(2) - 3/4" CLOSE NIPPLE

PER LAST HRD LOCATION:

(1) - JUNCTION BOX

(1) - DOUBLE ROW TERMINAL BLOCK

(1) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)

(1) - 3/4" CONDUIT TEE

(1) - 3/4" BREATHER DRAIN

(2) - 3/4" CLOSE CONDUIT NIPPLE

(1) - 3/4" UNION

(2) - 3/4" CLOSE NIPPLE

SUPPLIED BY FIKE PER HRD:

(1) - GAS CARTRIDGE ACTUATOR (GCA)

(1) - GCA BOSS FITTING

(1) - 3/4" PLUG

4 4

PER SRD FOR FIRST/MIDDLE LOCATION:

(1) - JUNCTION BOX

(1) - DOUBLE ROW TERMINAL BLOCK

(2) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)

(1) - 3/4" CONDUIT TEE

(1) - 3/4" BREATHER DRAIN

(3) - 3/4" CLOSE CONDUIT NIPPLE

(1) - 1/2" UNION

(1) - 1/2" CLOSE NIPPLE

PER LAST SRD LOCATION:

(1) - JUNCTION BOX

(1) - DOUBLE ROW TERMINAL BLOCK

(1) - 3/4" CONDUIT SEAL (IF REQ. PER NEC)

(1) - 3/4" CONDUIT TEE

(1) - 3/4" BREATHER DRAIN

(2) - 3/4" CLOSE CONDUIT NIPPLE

(1) - 1/2" UNION

(1) - 1/2" CLOSE NIPPLE

SUPPLIED BY FIKE PER SRD:

(1) - GAS CARTRIDGE ACTUATOR (GCA)

(2) - 1" x 1/2" REDUCER

(1) - 1" CONDUIT NIPPLE, 3" LONG

(1) - 1/2" CLOSE NIPPLE

50 LITER

(VERSION 2)

E70-059

50 LITER

(VERSION 1)

E70-033

30 LITER

E70-032

20 LITER

E70-030

10 LITER

E70-029

5 LITER

E70-028

2.5 LITER

E70-027

9 LITER

E70-035

All rights reserved.

Copyright by Fike Corp.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.

DATE

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

DESCRIPTION

R

E11-502.idw

E11-502

D

04/29/13D

MK 06/21/00

TO 01/21/00

SR 06/23/00

C

ARS DTN KC

HRD & SRD CONTAINER SPECIFICATIONS

1:8

MOUNTING DETAIL

06370

SEE ECO

UNITS OF MEASUREMENTS

XXX = INCHES

[XXX] = MILLIMETERS

20.56 [522.3]

16.53 [419.8]

16.53 [419.8]

16.53 [419.8] 16.53 [419.8]

16.28 [413.5]

49.15 [1248.3]

5.38 [136.5] 15.13 [384.2]

5.38 [136.5] 12.69 [322.2]

5.38 [136.5] 12.69 [322.2]

10.62 [269.8]3.31 [84.1]

3.31 [84.1] 10.62 [269.8]

2.94 [74.6] 7.62 [193.6]

12.06 [306.4]

16.07 [408.3]

25.82 [655.9]

30.58 [776.7]

38.83 [986.3]

7.50 [190.5]

21.76 [552.7]

42.00 [1066.9]

24.53 [623.0]

5.38 [136.5] 18.88 [479.4]

9 LITER

E70-035

2.5 LITER

E70-027

5 LITER

E70-028

10 LITER

E70-029

20 LITER

E70-030

30 LITER

E70-032

50 LITER, VER 1

E70-033

50 LITER, VER 2

E70-059

MOUNTING FLANGE

4" ANSI 300 4" ANSI 300 4" ANSI 300 4" ANSI 300 4" ANSI 300 6" ANSI 300 6" ANSI 300

EMPTY WEIGHT (LB [KG]) 30 [13.6] 67 [30.4] 95 [43.1] 118 [53.5] 206 [93.4] 220 [99.8] 251 [113.9] 310 [140.6]

DESIGN CODE DOT ASME ASME ASME ASME ASME ASME ASME

NOTE: DIMENSIONS AND WEIGHTS ARE FOR REFERENCE ONLY

ASSEMBLED DETAIL

(LOCKOUT NOT SHOWN)

ALTERNATE

MOUNTING METHOD

All rights reserved.

Copyright by Fike Corp.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

DESCRIPTION

R

E11-503.idw

E11-503

J

07/23/13J

TO 01/17/00

M. KOGAN 06/21/00

4 HRD, SPREADER NOZZLE ASSEMBLY

1:4

MOUNTING DETAIL

06370

SEE ECO

UNITS OF MEASUREMENTS

XXX = INCHES

[XXX] = MILLIMETERS

CONTAINER ORIENTATION DETAIL

SCALE: NONE

NOTES:

1. BACKING PLATE REQUIRED FOR VESSEL WALLS LESS THAN .25 [6.4] THICK.

BACKING PLATE TO BE A MINIMUM OF .25 [6.4] THICK X 2.00 [50.8] WIDE.

2. OPTIONAL: GASKET CAN BE REPLACED BY THERMAL SHIELD E70-0087.

3. SEE LOW PRESSURE SWITCH MOUNTING DETAIL E11-566, AS NECESSARY.

4. SEE HRD LOCKOUT MOUNTING DETAIL E11-567, AS NECESSARY.

CHART D: NOZZLE ASSEMBLY E80-025-X

PART NUMBER -1 QTY -2 QTY DESCRIPTION

E02-0147 8 7 NUT .75-10UNC HH

E02-0146 8 7

STUD .75-10UNC X 6.00 [152.4]

02-8950 1 1 GASKET

E80-006 1 1 SPREADER NOZZLE

CHART B: NOZZLE COVER E02-0172-X

PART NUMBER MATERIAL MAX TEMP

E02-0172-4 VITON A

400ÁF [204ÁC]

E02-0172-5 WHITE NEOPRENE FOOD GRADE

250ÁF [121ÁC]

CHART C: BOLTING PAD E70-0064-X

PART NUMBER MATERIAL

E70-0064-1 CS SA105/SA350 LF2

E70-0064-2 304 SST A182

E70-0064-3 316 SST A182

CHART A: HRD CONTAINER

PART NUMBER CONTAINER

E70-027 2.5 LITER

E70-028 5 LITER

E70-029 10 LITER

E70-030 20 LITER

E70-032 30 LITER

(4.50 [114.3])

(2.27 [57.7])

ASSEMBLED

LENGTH

PRESSURE GAUGE

FILL VALVE

LOW PRESSURE SWITCH

E70-048

(OPTIONAL)

HRD CONTAINER

(SEE CHART A)

(.50 [12.7])

4 HRD LOCKOUT

E70-063

(OPTIONAL)

BOLTING PAD

E70-0064-X

(SEE CHART C)

NOZZLE COVER

E02-0172-X

(SEE CHART B)

SPREADER NOZZLE ASSY

E80-025-X

(SEE CHART D)

GCA BOSS

FITTING

E70-0154

INITIATOR BOSS

45Á MAX45Á MAX

45Á MAX

90Á MAX

7.00

6.50

177.8

165.1

Ï

1.50 [38.1]

TYP

.25 [6.4] MIN

TYP

5.00 [127.0]

VESSEL WALL

10.00 [254.0]

1 1

VESSEL WALL

BOLT HOLES MUST

STRADDLE CENTERLINE

(TWO-HOLE)

MOUNTING BRACKET DETAIL

(70-1372-W)

BALL VALVE INSTALLATION DETAIL

PREFERRED ORIENTATION

BALL VALVE ORIENTATION DETAIL

ALTERNATE ORIENTATION

NOZZLE ASSEMBLY DETAIL

(E80-055-X)

SCALE 1 : 3

All rights reserved.

Copyright by Fike Corp.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

DESCRIPTION

R

E11-562.idw

E11-562

F

09/19/13F

JLF 06/21/11

ARS 06/14/11

KDC 06/21/11

SRD, 9 LITER, 1.50 TRI-CLAMP TO 1.25 NPT,

FLEXIBLE HOSE

1:7

MOUNTING DETAIL

06370

SEE ECO

UNITS OF MEASUREMENTS

XXX = INCHES

[XXX] = MILLIMETERS

CONTAINER ORIENTATION DETAIL

SCALE NONE

NOZZLE ORIENTATION DETAIL

PREFERRED LOCATIONS FOR

HORIZONTAL DUCTS

SCALE NONE

1. DISASSEMBLE AND REMOVE NOZZLE COVER PRIOR TO WELDING.

2. ALL WELDS MUST WITHSTAND 1500 LB FORCE. CAUTION: EXCESSIVE HEAT DURING WELDING

MAY CAUSE DAMAGE TO THE WELD FERRULE.

3. REINFORCEMENT REQUIRED FOR VESSEL WALLS OR DUCTS LESS THAN .25 [6.4] THICK.

4. CAUTION: DO NOT TURN INITIATOR MOUNTING BOSS OR PRESSURE LOSS WILL RESULT.

5. OPTIONAL: LOW PRESSURE SWITCH E70-049, SEE MOUNTING DETAIL E11-566, AS NECESSARY.

6. MOUNTING BRACKET ATTACHED TO STRUCTURAL SUPPORT, BY CUSTOMER.

7. PROVIDE CLEARANCE FOR SWITCH COVER REMOVAL AND BALL VALVE HANDLE (OPEN AND

CLOSED), AS NECESSARY.

SUPPLIED BY FIKE:

(1) - 9 LITER SRD CONTAINER (E70-035-X-W)

(1) - MOUNTING BRACKET, WITH HARDWARE (70-1372-W)

(1) - NOZZLE ASSEMBLY (E80-055-X)

(1) - 1.25 NPT SWIVEL END FLEXIBLE HOSE ASSEMBLY (SEE TABLE A)

(1) - 1.25 BALL VALVE ASSEMBLY (SEE TABLE B) (OPTIONAL)

(1) - LOW PRESSURE SWITCH (E70-049) (OPTIONAL)

SUPPLIED BY CUSTOMER:

ADDITIONAL ITEMS REQUIRED PER BALL VALVE:

(2) - 1.25 NPT SCH 40 CLOSE NIPPLE (AS NECESSARY)

(1) - 1.25 NPT 300 LB UNION (AS NECESSARY)

(1) - 1.25 NPT SCH 40 PIPE, 10 [254] LONG MAX (AS NECESSARY)

TABLE B: BALL VALVE ASSEMBLY (OPTIONAL)

PART NUMBER BALL VALVE BODY MATERIAL

E80-0152 CARBON STEEL

E80-0153 STAINLESS STEEL

45Á MAX 45Á MAX

TABLE A: FLEXIBLE HOSE ASSEMBLY

PART NUMBER DESCRIPTION MIN BEND RADIUS

80-1081-36

STANDARD, 36.00 [914.4] LG 5.50 [139.7]

80-1158-36

HYGIENIC, 36.00 [914.4] LG 9.00 [228.6]

SWIVEL END

FLEXIBLE HOSE ASSEMBLY

(SEE TABLE A)

INITIATOR BOSS

FILL PORT

9 LITER SRD CONTAINER

(E70-035-X-W)

PRESSURE GAUGE

TO SRD

TO SRD

(4.52 [114.8])

(7.00 [177.8])

(8.06 [204.7])

UNION

CLOSE NIPPLE

PIPE

(9.69 [246.1])

(3.59 [91.3])

(16.25 [412.8])

(8.23 [209.0])

(5.00 [127.0])

.38 [9.5](4X )

BALL VALVE ASSEMBLY

NOTE: FLOW ARROW ON VALVE

(SEE TABLE B)

DUCT/VESSEL WALL

NOZZLE ASSEMBLY

(E80-055-X)

(1.67 [42.4])

(1.13 [28.7])

WELD FERRULE

COVER

CLAMP

ADAPTER

"CONTAINER SIDE"

MARKING

ADD

MODE

21 3 4

EXPLOSION PROTECTION

CONTROLLER

P6P5

NCNO CNCNO C

24VDC

P2

A BBA

P1 P3 P4

NON-HAZARDOUS

LOCATION

HAZARDOUS

LOCATION

820 Ω

EOL

R E

D

B L

A C

K

B L

A C

K

JUNCTION BOX

A A

B B

C C

D D

All rights reserved.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.

DATE

DATE

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

HRD & SRD LOW PRESSURE SWITCH ASSY

1. REFER TO E06-018-1 EXPLOSION PROTECTION CONTAINER

INSTALLATION AND OPERATION MANUAL FOR FURTHER DETAILS.

LOW PRESSURE SWITCH LISTINGS:

CLASS I, DIVISION 1 AND 2, GROUPS A, B, C & D

CLASS II, DIVISION 1 AND 2, GROUPS E, F & G

CLASS III

CLASS I, ZONE 1, GROUP IIC

ENCLOSURE TYPE 4X

UL cUL CSA ATEX

* WITH NO PRESSURE APPLIED

E

E

RIGID MOUNT ASSY & MOUNTING FERRULE

(SEE CHART B)

UP

DOWN

All rights reserved.

Copyright by Fike Corp.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

DESCRIPTION

R

E11-607-02.idw

E11-607-02

B

12/12/12B

BPS 09/15/10

ARS 09/13/10

KDC 09/15/10

ARS BRE KC

IR OPTICAL DETECTOR, TRI-CLAMP

1:2

MOUNTING DETAIL

06370

SEE ECO

UNITS OF MEASUREMENTS

XXX = INCHES

[XXX] = MILLIMETERS

TO EPC

IR OPTICAL DETECTOR ORIENTATION DETAIL

ON A HORIZONTAL MOUNT SURFACE

1. ALL CONDUIT IS TO BE SEALED TO PREVENT THE ENTRANCE OF MOISTURE AND OTHER

CONTAMINANTS, PER NFPA 69. FLEXIBLE CONDUIT IS REQUIRED TO ALLOW FOR

REMOVAL AND CALIBRATION OF THE IR OPTICAL DETECTOR.

2. THE TEMPERATURE RANGE FOR THE DETECTOR PROCESS CONNECTION IS

-4ÁF TO 176ÁF [-20ÁC TO 80ÁC]. FOR AMBIENT TEMPERATURE AROUND THE PROCESS

CONNECTION BELOW 32ÁF [0ÁC], THE MOUNTING FERRULE AND THE WHOLE DETECTOR

ASSEMBLY SHOULD BE INSULATED TO PREVENT INTERNAL CONDENSATION AND ICE

BUILD UP.

3. THE IR OPTICAL DETECTOR AMBIENT TEMPERATURE MUST BE MAINTAINED BETWEEN

-4ÁF AND 149ÁF [-20ÁC AND 65ÁC].

4. REFERENCE FIKE FIELD WIRING DIAGRAM E09-XXX.

5. ALL FIELD WIRING SHALL BE UL LISTED, MINIMUM 20 AWG, STRANDED, TWISTED,

SHIELDED WITH DRAIN WIRE AND MINIMUM DIELECTRIC STRENGTH AT SERVICE

TEMPERATURES SUITABLE TO THE APPLICATION. STRIP AND TIN ALL FIELD WIRE

TERMINATIONS.

6. THE OPTICAL DETECTOR CABLE HAS A MINIMUM BEND RADIUS OF 1.50 [38.1].

7. MOUNTING FERRULE MAY BE WELDED TO THE VESSEL/DUCT OR WELDED TO A

BACKING PLATE AND THEN ATTACHED TO THE VESSEL/DUCT. CAUTION: EXCESSIVE

HEAT DURING WELDING MAY DAMAGE THE MOUNTING FERRULE.

8. INSTALL RIGID MOUNT ASSEMBLY AND RUN CONDUIT WITH WIRING AS REQUIRED.

INSTALLATION OF IR OPTICAL DETECTOR SHALL BE PERFORMED BY A FIKE SYSTEM

TECHNICIAN OR OTHER FIKE QUALIFIED PERSONNEL.

9. IF APPLICABLE, AIR PURGE SHALL BE CONNECTED AND CONTINUOUSLY FLOWING.

RATE OF AIR FLOW TO BE ADJUSTED BASED ON THE PROCESS AND OPERATING

CONDITIONS. 50 TO 100 STANDARD CUBIC FEET PER HOUR IS THE RECOMMENDED

STARTING POINT.

PROVIDED BY CUSTOMER (PER DETECTOR):

ALL CONDUIT, FLEXIBLE CONDUIT AND MINIMUM 20 AWG STRANDED,

TWISTED, SHIELDED CABLE WITH DRAIN.

ALL PARTS LISTED ABOVE MUST MEET CURRENT N.E.C. REQUIREMENTS.

PROVIDED BY FIKE (PER DETECTOR):

(1) IR OPTICAL DETECTOR ASSEMBLY (SEE CHART A)

(1) RIGID MOUNT W/ TRI-CLAMP ASSEMBLY (SEE CHART B)

(1) MOUNTING FERRULE (02-8598)

CHART A: DETECTOR

PART NUMBER DESCRIPTION

29998431-S STANDARD

29998441-S TITANIUM NITRIDE COATED

FLEXIBLE CONDUIT

RIGID MOUNT ASSEMBLY

(SEE CHART B)

90Á MAX 90Á MAX

MOUNTING FERRULE

CHART B: RIGID MOUNT ASSEMBLY

PART NUMBER DESCRIPTION

E61-063-1

PTFE GASKET, SST FLANGE

E61-063-2

VITON GASKET, SST FLANGE

E61-063-3

PTFE GASKET, SST FLANGE W/ AIR PURGE

E61-063-4

VITON GASKET, SST FLANGE W/ AIR PURGE

IR OPTICAL DETECTOR

(SEE CHART A)

(6.02 [152.9])

ASSEMBLED

LENGTH

1.75 [44.5] MAX

VESSEL/DUCT WALL

(2.19 [55.7])

(1.75 [44.5])

MOUNTING FERRULE

RIGID MOUNT ASSY

(SEE CHART B)

AIR PURGE

(OPTIONAL)

1 41 322

A B

P5

EXPLOSION PROTECTION

CONTROLLER

24VDC

NO NC C NO NC C

P5

A B 4-20 mA

4-20 mA

P1 P2 P4P3

PER E06-061 EXHIBITS 6-3 & 6-4 CERAMIC HAZARDOUS LOCATION REQUIREMENTS

(D U

AL

C

H

AN

N

EL

W

IR

IN

G

(S

IN

G

LE

C H

AN

N

EL

W

IR

IN

G

(DUAL CHANNEL WIRING)

(SINGLE CHANNEL WIRING)

INTRINSICALLY SAFE & NON-HAZARDOUS CONNECTION

(WITHOUT CONDUIT)

DUST-IGNITION PROOF & NON-HAZARDOUS CONNECTION

(WITH CONDUIT)

A A

B B

C C

D D

All rights reserved.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or modifications to this drawing must be done and/or approved by Fike.

DATE

DATE

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

CERAMIC PRESSURE DETECTOR

ELECTRICAL CONNECTION

J

J

J

J

J

J

All rights reserved.

Copyright by Fike Corp.

ENGR

CHKD

DRN

c

DATE BY/APP/APPREV

This drawing contains system design information of Fike Corporation, Blue Springs, Missouri, and all rights are expressly reserved. This drawing may be copied in whole but not in part. Any changes or

DATE

SIZE FSCM No.

SCALE FILE NAME

DWG NO.

SHEET OF

REV

TITLE

Blue Springs, Missouri - U.S.A www.FIKE.com

DESCRIPTION

R

E11-713.idw

E11-713

C

05/01/13C

BPS 01/07/05

BRE 01/03/05

SR 01/07/05

CERAMIC PRESSURE DETECTOR

2 SANITARY FLEX MOUNT

1:6

MOUNTING DETAIL

06370

SEE ECO

UNITS OF MEASUREMENTS

XXX = INCHES

[XXX] = MILLIMETERS

PROCESS PRESSURE TAKE-OFF

(02-9073)

PROCESS PRESSURE TAKE-OFF

(02-8598)

VERTICAL SURFACE MOUNT

H…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .