25.099 Brooklyn Senior Center Renovations - Addendum 3 11.04.26.pdf

PDF 1 MB Posted

Attached to
Renovations at Brooklyn Senior Center
Solicitation number
39457
Issued by
Tolland County, Connecticut

About this file

This Addendum #3, issued October 27, 2026, modifies the Brooklyn Senior Center Renovations project (S/P+A Project #25.099) located at 69 South Main Street, Brooklyn, Connecticut. The addendum incorporates changes resulting from ninety-one (91) Requests for Information (RFIs) received through the October 29, 2026 deadline. Key modifications include deletion and replacement of multiple drawings across electrical, architectural, and structural disciplines; addition of new specification Section 230993.11 for HVAC DDC Sequence of Operations; revisions to the Bid Form Appendices B and D; and clarifications regarding allowances for plywood roof deck replacement, existing first-floor ductwork cleaning ($5,000), and concrete spall repair (12 square feet). The bid deadline remains November 12, 2026 at 1:00 p.m., with an earlier bid extension previously issued in Addendum #2 from the original November 5, 2026 date. The mandatory prebid walkthrough occurred October 22, 2026, and was required only for general contractor bidders.

The project is funded through a Small Cities Community Development Block Grant (CDBG) with a 40% invoicing milestone required by June 1, 2027. Construction is anticipated to commence on or before December 10, 2026, with a required substantial completion date of 365 calendar days from commencement. The successful bidder must submit a satisfactory bid bond or certified check equal to 5% of the base bid and furnish 100% Performance and Payment Bonds. The project scope is a general contractor (GC) bid only; subcontractors must provide pricing to participating GCs. All workers require current OSHA 10 cards not more than five years old. No affirmative action plan is required, no builder's risk insurance is required, and no BABA waivers are currently in place, meaning all construction materials must meet Buy American requirements.

View the file

Other files

File Type Posted
25.099 Brooklyn Senior Center Renovations BID Dwgs 10.15.26.pdf PDF
39457_Oct_20_26_solicitation_doc.pdf PDF
39457_Nov_11_26_solicitation_doc.pdf PDF
39457_Oct_29_26_solicitation_doc.pdf PDF
39457_Nov_18_26_solicitation_doc.pdf PDF
25.099 Brooklyn Senior Center Renovations BID V1 10.15.26.pdf PDF
25.099 Brooklyn Senior Center Renovations BID V2 10.15.26.pdf PDF
39457_Nov_6_26_solicitation_doc.pdf PDF
25.099 Brooklyn Senior Center Renovations - Addendum 2 10.27.26.pdf PDF
39457_Nov_12_26_solicitation_doc.pdf PDF
39457_Nov_17_26_solicitation_doc.pdf PDF
39457_Oct_30_26_solicitation_doc.pdf PDF
39457_Oct_28_26_solicitation_doc.pdf PDF
39457_Nov_4_26_solicitation_doc.pdf PDF
39457_Nov_13_26_solicitation_doc.pdf PDF
39457_Nov_19_26_solicitation_doc.pdf PDF
FINAL - Invitation to Bid updated.pdf PDF
39457_Nov_3_26_solicitation_doc.pdf PDF
39457_Nov_5_26_solicitation_doc.pdf PDF
39457_Nov_9_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_39457_v4_Nov_4_26.pdf PDF
39457_Nov_16_26_solicitation_doc.pdf PDF
FINAL - Invitation to Bid.pdf PDF
39457_Oct_26_26_solicitation_doc.pdf PDF
39457_Nov_10_26_solicitation_doc.pdf PDF
Brooklyn Senior Center Renovations - Addendum 1 10.19.26.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #3

Senior Center Renovations – Brooklyn Addendum #3-1

RENOVATIONS

SENIOR CENTER

69 SOUTH MAIN STREET

BROOKLYN, CT 06234

S/P+A PROJECT #25.099

DATE: October 27, 2026

The following changes to the Drawings and Project Specifications shall become a part of the Drawings and Project Specifications; superseding previously issued Drawings and Project Specifications to the extent modified by Addendum #3.

General Information:

• The deadline for RFIs was Thursday, October 29, 2026, 4:00pm.

• See attached RFI log. (8)

Changes to Addenda:

• ADDENDUM #2:

o Changes to the Addenda, ADDENDUM #1, Changes to the Drawings, DRAWING E210, ELEC LOWER LEVEL POWER PLAN, delete in its entirety. A new DRAWING E210 has been added and is attached as part of this addendum.~ (Per RFI #075) o Changes to the Specifications, BID FORM, APPENDIX B, delete in its entirety. A new APPENDIX B has been added and is attached as part of this addendum. (1) (Per RFIs #054 & #073) o Changes to the Drawings:

DRAWING S101, SECTIONS, TYPICAL DETAILS & GENERAL NOTES, delete in its entirety. A new DRAWING S101 has been added and is attached as part of this addendum.~ (Per RFI #073)

DRAWING E500, ELEC SCHEDULES, delete in its entirety. A new DRAWING E500 has been added and is attached as part of this addendum.~ (Per RFIs #075 & #084)

• ADDENDUM #1:

o Changes to the Drawings, the following ELECTRICAL drawings have been deleted in their entirety. New drawings have been added and are attached as part of this addendum~: (2)

E001 ELEC ABBREVIATIONS & LEGENDS (Per RFI #075) E600 ELEC DETAILS PLAN~ (Per RFIs #075, #083 & #084)

New Specifications:

• SECTION 230993.11, SEQUENCE OF OPERATIONS FOR HVAC DDC has been added and is attached as part of this addendum. (10) (Per RFI #090)

Addendum #3-2

Changes to the Specifications:

• BID FORM, APPENDIX D, delete in its entirety. A new APPENDIX D has been added and is attached as part of this addendum. (2) (Per RFIs #019, #072 & #073)

• TECHNICAL SPECIFICATIONS TABLE OF CONTENTS:

o Page 2, Division 09 – Finishes Section 096566, delete in its entirety.

o Page 3, Division 23 – Heating, Ventilating and Air Conditioning, Page 3, add the following:

“Section 230993.11 Sequence of Operations for HVAC DDC 10” (Per RFI #090)

• SECTION 012100, ALLOWANCES, Page 3:

o Article 3.3, add the following:

“C. Allowance #3: Existing 1st Floor Ductwork Cleaning: Include in the Base Bid an allowance of five thousand dollars ($5,000) for the cleaning of the existing ductwork on the first floor. Cleaning to include all supply and return air ducts, grills, and diffusers.

Refer to Note on Drawing M110 for additional information.

D. Allowance #4: Concrete Spall Repair: Include in the Base Bid and allowance to repair 12 square feet of concrete that has deteriorated where indicated on the Drawings. Refer to 3/S101 for additional information.” (Per RFIs #054 & #073)

• SECTION 096516, RESILIENT SHEET FLOORING, Page 2, Article 2.2.G., revise “RSF” to read “RST”. (Per Internal Review)

• SECTION 096566, RESILIENT ATHLETIC FLOORING, delete in its entirety. (Per RFI #065)

• SECTION 262416, PANELBOARDS:

o Page 1, Article 1.5.C., delete in its entirety.

o Page 2:

Article 1.5.D., delete in its entirety.

Article 1.6.A., delete in its entirety.

o Page 9, Article 3.4, delete in its entirety. (Per RFI #082)

• SECTION 262816, ENCLOSED SWITCHES AND CIRCUIT BREAKERS:

o Page 1, Articles 1.5.C. and .E., delete in their entirety.

o Page 2, Article 1.6.A., delete in its entirety.

o Page 8, Article 3.4, delete in its entirety. (Per RFI #082)

Changes to the Drawings:

• DRAWING G001, GENERAL INFORMATION & DRAWING LIST, delete in its entirety. A new DRAWING G001 has been added and is attached as part of this addendum.~ (Per RFI #008)

• The following drawings ARCHITECTURAL drawings have been deleted in their entirety. New drawings have been added and are attached as part of this addendum~: (2)

Addendum #3-3 o A800 DOOR & FINISH SCHEDULES (Per RFI #069) o A810 WINDOW & DOOR DETAILS (Per RFI #064)

• DRAWING E110, ELEC LOWER LEVEL LIGHTING PLAN, delete in its entirety. A new DRAWING E110 has been added and is attached as part of this addendum.~ (Per RFI #081)

The bid date remains Thursday, November 12, 2026 at 1:00pm by this addendum.

The addendum consists of twenty-four (24) pages of 8½” x 11” text and nine (9) 24” x 36” drawings~.

End of Addendum #3

BID RFI LOG

Project: Brooklyn Senior Center Renovations State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

Could you point us in the right direction to where the drawings and bid docs are available for download for free? All I see is advanced reprographics to view them, but to d/l, its $109.

10/16/26

Drawings & bid documents are also available for download on the Town of Brooklyn's website, https://www.brooklynct.gov/bids.aspx & will be posted on CT Source.

002 Is a project schedule required with the bid? 10/19/26 No. 1

003 Would you like us to include a DAS prequalification certificate and bid statement with the bid? 10/19/26 No. 1

004 How many copies of the bid would you like us to submit? 10/19/26 Two (2) total, one (1) original & one (1) copy. 1 005 Does this project require a CHRO plan? 10/19/26 No. 1

Are we required to provide preventative maintenance once the job is done? If so, for how long? This would be separate from our 1 Year Workmanship Warranty.

10/19/26 No. 1

The invitation to bid states there is a "mandatory" Prebid walk through 10/22 at 9am, is this only applicable to gc bidders, or anyone submitting a bid/proposal? There are also no clearly defined "bid packages" in the bid documents. Would our form of proposal just include the spec sections we intend on addressing?

10/21/26

The walkthrough is mandatory for contractors who are interested in submitting a bid for the entire project.

Subcontractors are welcome to attend but it is not mandatory. This project is for a GC bid only therefore subcontractors must provide their pricing to a GC bidding on the project. Separate bid packages are not acceptable.

Missing hazardous-material abatement plan Volume 1 drawing list, PDF p259; Section 020800, 1.3.A, PDF p393 Please provide the governing HM-1, Lower Level & First Floor Hazardous Material Abatement Plan, listed and referenced in Volume 1. We could not locate it in the downloaded drawings or Addendum #1. The survey appendix contains sample-location sheets BP-1, FP-1, FP-2 and RP-1; please identify whether any are intended to replace HM-1.

10/21/26 Refer to Addendum #2 for Drawing HM-1. 2

Structural sheet identifies another building S102, original drawing PDF p7 S102 is titled MEP & Door Replacements, Brooklyn Community Center 31 Tiffany Street, project 25-135, while this bid is the Senior Center at 69 South Main Street, project

25.099. Please confirm which S102 plans/details apply to this project and issue the correctly identified structural roof-repair sheet and details.

10/21/26 Refer to Addendum #2 for revised Drawings S100, S101 & S102. 2

Roof-deck allowance and applicable deck Volume 1 Appendix B, PDF p21; Section 012100, 3.3.A, PDF p271; Appendix C PDF p22; Section 012300, PDF p 276;

A113, original drawing PDF p10 Appendix B places allowances in the base bid, but Section 012100 places the 5% metal-roof-deck replacement allowance in Alternate 1, which is otherwise the front entry stairs. Please confirm the correct pricing location. Identify the roof zones, deck type and area to which the 5% allowance applies, given the existing roof sheathing/wood-truss details on A113, and clarify the pricing basis for any deteriorated wood sheathing replacement.

10/21/26 Allowance is to be included as part of the Base Bid & s for plywood roof decking. Refer to Addendum #2 for revised Appendix B & Section 012100.

CU-1 electrical selection M500 and E500, original drawing PDF pp28 and 39 M500 lists CU-1 as Trane RAUKC30EB, R454B, MCA 159A/MOP200A, with 230/3/60, while E500 shows 208V/3-phase. Please confirm the complete intended selection and rated voltage and issue coordinated requirements. Is the RAUKC30E 200V configuration intended for nominal 208V service, retaining the scheduled MCA/MOP and E500 circuit/disconnect requirement?

10/21/26 Refer to Addendum #2 for revised Drawings M500 & E500. 2

EUH-1 scope and location M501, original drawing PDF p29; M110 and revised E210, Addendum 1 pp3 and 5 M501 schedules recessed EUH-1, 2kW, 208V/1-phase, but we could not identify a new EUH-1 location on M110 or revised E210. Please confirm whether it is required and provide its quantity, location and coordinated circuit/control requirements.

10/21/26 EUH-1 is in Toilet Room 012. Refer to Addendum #2 for revised Drawings M110, E210 & E500. 2

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

AC-1/CU-3 selection and power arrangement M501/E500; revised E210; Volume 2 Condensing Split System section, heading 237436/footer 237435, 1.1 and 2.2.G.3, PDF pp491 and 493 Please confirm the controlling AC-1/CU-3 matched selection:

M501 lists Mitsubishi MSY-D30NA-8/MUY-D30NA-1, while the specification describes MSZ/MUZ and PKA/PUZ families.

Reconcile the separate indoor/outdoor feeds shown on E500 and revised E210 with Section 2.2.G.2, which powers the indoor unit from the outdoor unit, and issue the required electrical arrangement.

10/21/26 Refer to Ductless Split System Schedule Note 1 for AC- 1/CU-3 controls. Refer to Addendum #2 for revised Drawings E210 & E500.

Applicable AHU controls and zoning sequence M300, M110 and M500; Volume 2 Section 230926, PDF

PP403-412

Please identify which M300 diagrams apply to AHU-1 and AHU-2 and provide corrected project-specific diagrams/sequences. The diagram labeled Fan Coil Unit #2 depicts CHWS/CHWR and a chilled-water valve, while M110/M500 pair AHU-2 with refrigerant condensing unit CU-2.

Include the AHU-2 sequence coordinating ZD-1 through ZD-5 and DH-1 with the specified Trane controls.

10/21/26 Fan Coil Unit #2 shall be DX. Refer to Addendum #2 for revised Drawing M300. 2

L-3 existing versus new M110, Addendum 1 p3; M501, original drawing PDF p29 At the EF-1 discharge/L-3 location, M110 calls for a new plenum connected to an existing louver, while M501 schedules a 12-by-12-inch Ruskin ELF-375DX with bird screen and motorized damper. Please confirm whether L-3 is retained or replaced and identify required new louver/damper work if the existing louver is retained.

10/21/26 Louver is existing to remain. Refer to Addendum #2 for revised Drawing M110. 2

Corrective work discovered during duct cleaning M110 boxed first-floor cleaning note, Addendum 1 p3 For the required first-floor duct cleaning, please clarify the base-bid treatment of damaged or corroded existing dustwork found during inspection. Beyond the expressly required cleaning and connection sealing, are repairs/replacements required, and what repair limits or pricing basis should bidders use?

10/21/26 Damaged or corroded existing ductwork is to be replaced. Refer to Addendum #2 for allowance. 2

Contract duration and milestones Volume 1 A101, 3.1 and 3.3, PDF pp152-153; Section 013200, PDF p301 Please provide the anticipated commencement/notice-to-proceed basis, required substantial-completion duration or date, and any phased completion milestones for bidding. The A101 commencement selection and duration/milestone fields are blank. We note that $250/day liquidated damages are stated and that Addendum 1 removes the bid-stage schedule requirement; neither establishes the construction duration.

10/21/26

The date of commencement of the work shall be the date of the contract signing & as set forth in a Notice to Proceed issued by Owner, which is anticipated to occur simultaneously on or before December 10, 2026.

The Contractor shall achieve Substantial Completion of the entire work not later than Three Hundred Sixty-Five

(365) calendar days from the date of commencement of the work.

The Contractor must achieve forty percent (40%) invoicing, less retainage, no later than June 1, 2027.

This milestone is set by the funding source & cannot be extended.

Occupied-site phasing and permitted hours Volume 1 Sections 011000, 011001 and 011600, PDF pp261, 264 and 267-268 To price the specified occupied-site and abatement coordination, please provide the baseline phases/access restrictions, allowance work hours and shutdown windows, and any required separate abatement mobilizations. Section 011600 assigns consultant overtime to the hazardous-materials contractor; please identify normal monitoring hours and the applicable consultant overtime rates or pricing basis.

10/21/26 Area of construction will not be occupied, only the adjacent building.

Work will be permitted on-site from 7a-7p.

Abatement unit-price definitions Volume 1 Appendix D, PDF p23, items 6, 7 and 9 Please correct or define the non-overlapping measurement triggers for small containment (printed >3Lf/160SF) and large containment (printed >260LF/160SF, both including remobilization. For hazardous lead waste item 9, confirm whether both per-ton and per-T-pak rates are required, define the T-pak capacity/measurement, and explain when each rate applies to avoid duplicate payment.

10/21/26

Refer to Addendum #3 for revised Appendix D.

Both units of measure are required. Unit price used will depend on the abatement contractor's proposed method of packaging lead waste for disposal. T-Pak is equivalent to 1 cubic yard of properly packaged lead waste.

State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

020 What is the duration of this project? Beginning and end dates? 10/21/26 Refer to RFI #017.

Due to the 7-day window from the RFI date to the bid date, will there be a possibility of a bid extension to allow time to receive subcontractor and supplier bids?

10/21/26 Refer to Addendum #2 for bid extension. 2

Reference A113 Details 2, 3 & 4; Spec 061600 2.4; Spec 072100 Details 2, 3 and 4 show 4" rigid insulation directly under the air space of the "nailable vented deck system". Spec 061600 2.4 specified a vented, plywood-surfaced polyisocyanurate nailbase with 2" foam. Please confirm the required foam thickness, and confirm the assembly is a single factory vented-nailbase panel (polyiso + air space + plywood) rather than a separate rigid layer plus nailbase.

10/22/26

The required foam thickness is 6 inches.

The nailable vented deck system is to have 2 inches of foam as specified in Section 061600 with a separate 4-inch rigid layer under the nailable vented deck system as specified in Section 072100.

Reference A113 Roof Plan, Details 2 & 3; Spec 073113 2.4 The hip roof has about 17 LF of ridge, and the plan shows ridge vent only at the ridge. Please confirm the ridge is the only exhaust for the vented nailbase air space, or whether hip vents or other exhaust are intended. Please also confirm the "vented metal flashing" at the soffit (Detail 3) is the intended intake, and provide a profile or product if one is required.

10/22/26 Confirmed for exhaust & intake. No profile or product for vented metal flashing, just perforated metal. 2

Reference Spec 012100 3.3.A; Bid Form Appendix B; A113 Details 5, 6 & 7 Allowance #1 covers metal roof deck "under the existing roof membranes" at 5% of the membrane-roof deck area, and states the cost is to be included "in Alternate #1" (Front Entry Stair Replacement). The only membrane roof on A113 is the elevator roof (about 84 SF), and Details 5-7 show the existing deck as a solid deck rather than corrugated metal. Please confirm: (a) the allowance is carried in the Base Bid, not Alternate #1; (b) it applies only to the elevator roof; and (c) the existing elevator roof deck type.

10/22/26 Refer to RFI #010. 2

Reference A113 Detail 6 vs. A113 Roof Legend Detail 6 shows a 2x3 metal downspout below the 12x12 collection box. The roof legend lists D.S. as 3x4 aluminum downspout. Please confirm the required size.

10/22/26 Refer to Addendum #2 for revised Drawing A113. 2

Reference Spec 073113 1.12.A.2.a; Spec 075323 1.11.A.1.a & 2.2.C Both the shingle and EPDM warranties must "include wind speed as indicated in the Drawings," and the EPDM system must resist "uplift requirements as indicated on the Drawings."

The architectural set does not include the referenced general notes (G001) or structural sheets. Please confirm the design wind speed (the structural design criteria in the Project Manual list 125 Vult) and any required uplift pressures.

10/22/26 G001 & Structural drawings were included in the set of bid drawings. Design wind speed & uplift requirements are as indicated on Drawing S102.

Reference A113 Detail 3; Spec 062013 Exterior Finish Carpentry Detail 3 shows 5/8" PVC fascia over 1/2" exterior plywood, a PVC soffit panel, and wood blocking at 16" o.c. for ventilation.

These items are specified in Section 062013. Please confirm whether they are to be included in the roofing subcontract or carried by the GC/carpentry trade.

10/22/26 This is a GC bid. GC is responsible for all trades. 2

Reference A113 Roof Plan (E.C.); A300 Elevations; MEP P110 Note 4; Spec 076200 The new roof assembly raises the roof surface about 6".

Please confirm: (a) the chimney remains above the roof; (b) the step, apron and counterflashing are to be 20 oz copper (per the Section 076200 roof-penetration flashing material);

and (c) whether a cricket is required on the upslope side (chimney is about 5'-0 1/2" wide). P110 Note 4 indicates the plumbing contractor caps and seals the chimney - please confirm the chimney cap is not roofing scope.

10/22/26

(a) Confirmed.

(b) Confirmed.

(c) Cricket is not required.

This is a GC Bid. GC is responsible for all trades.

State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

Reference A113 Detail 4 & Note 10; Spec 077200 With the roof surface raised by the new insulation and nailbase, existing vent stacks may need extending to project through the new 20 oz copper vent sleeves. Please confirm that any vent pipe extension is by the plumbing contractor.

10/22/26 This is a GC bid. GC is responsible for all trades. 2

Reference Spec 070150.19 1.6.A.1 & 1.7.A; Spec 020800 Asbestos Abatement (scope description) Section 070150.19 requires the reroofing installer to be licensed to perform asbestos abatement. The hazardous materials information indicates the asbestos-containing materials (orignial flat roof inside the attic) remain in place and are not impacted. No asbestos-containing material is identified in the roof being removed. Please confirm this licensing requirement does not apply to the roofing subcontractor.

10/22/26 Licensing requirement is not required. Refer to Addendum #2 for revised Section 070150.19. 2

Please clarify the composite nail base insulated roof system in section 061600. The specs say 2" thickness but the plans say 4" thickness. Are we to add a second layer of 2" rigid under the composite panel, make the composite panel 4" thick or is it an error and total thickness is supposed to be 2"?

10/22/26 Refer to RFI #022. 2

Could you provide the mandatory October 22 walkthrough attendance list when available, confirm whether separate attendance is required for a non-filed cleaning subcontractor, and identify the estimating contact for A. Secondino or another eligible GC accepting cleanup quotes?

10/22/26

Refer to Addendum #2 for prebid sign-in sheet.

Refer to RFI #007.

Subcontractors are responsible for contacting GCs on their own.

033 Which first-floor areas require final cleaning in addition to the lower-level renovation areas? 10/22/26 All areas affected by the scope of work will require final cleaning. 2

Is ordinary final cleaning under Section 01 77 00 performed only after the hazardous-materials contractor completes its cleanup and the affected areas are released for other trades?

10/22/26 This is a GC bid. GC is responsible for dictating scheduling of trades. 2

Which final-cleaning tasks are retained by the mechanical/electrical or site contractors, including the duct cleaning added by Addendum 1 and any filter, equipment, roof or site work?

10/22/26 This is a GC bid. GC is responsible for all trades. 2

What wage determinations/classifications and cleaning phases apply to the cleanup subcontract? Please identify any later addenda or instructions affecting this scope.

10/22/26 This is a GC bid. GC is responsible for all wage determinatins/classifications and phases. 2

037 Is the electrical scope of work limited to just the lower level? 10/23/26 Electrical scope is as indicated on the Drawings. 2

038 Is the existing fire alarm control panel in the lower level and will that need to be removed, replaced with a new system? 10/23/26

There is no existing fire alarm system for the Senior Center. A horn strobe is to be interlocked with the duct smokes. Refer to Addendum #2 for revised Drawing E500.

039 Do we need to add fire alarm in the lower level? If so what is the existing current system? 10/23/26 Fire alarm duct smoke detectors as indicated for AHU-1 shut down upon detection of smoke. 2

040 Confirm that there is not an existing AOR system and that we are installing a newly designed system. 10/23/26 Confirmed. 2

Due to the request to hold our bid proposal pricing for a minimum of 60 days how will increases in material costs specifically referring to current and unknown future tariffs be addressed for this project bid, would there be an option to have a specified dollar amount allowance added to the base bid in order to help protect the contractors and the customer from escalating tariff expenses?

10/23/26 Allowance is not allowed. 2

If there is no specified allowance for tariffs in the bid form, will the contractor be required to carry their own dollar amount cost increase markup in their bids to try to absorb future tariffs or will an add/delete change order be issued during the project for increases or decreases from changes in tariffs from bid date?

10/23/26

Cost increase due to tariffs with be dealt with on a case-by-case basis but would only be considered through a PCO if back-up quotes showing bid cost vs. purchase costs are presented. Any change order, for whatever purpose or need, is subject to CT DOH approval.

Please designate the contractor laydown area (40' conex and dumpsters) and contractor parking. Confirm whether restoration of any laydown area not on pavement is included in the Base Bid.

10/23/26 Laydown area is the lawn in front of the building. Parking is in the parking lot at the back of the building.

Restoration of laydown area to be included in Base Bid

044 What is the project duration? 10/23/26 Refer to RFI #017. 2 045 What is the desired project start date? 10/23/26 Refer to RFI #017. 2

046 What funding sources are involved on this project? 10/23/26 Small Cities Community Delelopment Block Grant

(CDBG) 2

047 Will the winning bid general contractor required to submit a job specific affirmative action (AA) plan on the project? 10/23/26 No. 2

State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

Does the Connecticut requirement for workers to have a current OSHA 10 card less than five (5) years old apply to this project for all trade subcontractor workers planning to work on site?

10/23/26 Yes. 2

049 Who is responsible for payment towards all third-party testing? 10/23/26

Unless otherwise indicated in the project manual, Owner is responsible to retain and pay for third-party testing.

Testing not explicitly assigned to the Owner is the Contractor's responsibility. Refer to Section 014000.

Appendix F applies to BABA to all construction materials, including manufactured products. Please confirm whether any BABA waivers (public interest, non-availability, or de minimis) have been issued or are anticipated for items such as HVAC equipment, electrical distribution equipment, elevator components, and light fixtures.

10/23/26 There are no BABA waivers currently in place. 2

051 Will the building remain occupied during construction? 10/23/26 Portions of the building under construction will be unoccupied. Refer to Section 011000, 1.2.B. for additional information.

There were lots of items within the lower level of the building.

Will the contractor be responsible for the removal of any of the current items found around the lower level? If so, are we storing these materials or disposing them?

10/23/26 No, Owner will move to another part of the building outside of the construction area. 2

Existing air handling units are being replaced. Please confirm whether the building's existing heating system will remain operational during construction, who provides and pays for temporary heat (equipment and fuel) if required during winter months.

10/23/26

Existing heating systems will remain operational during construction to the extent practicable, except during planned tie-ins or outages needed to replace the air handling units. Contractor to coordinate with Owner & give advance notice of any interuptions. Contractor to provide & pay for temporary heating equipment, fuel, setup & operation if required.

Drawing M110 addendum 1 at the top has a note to clean ductwork for the 1st floor. Please provide drawing for the 1st floor HVAC system with ductwork on it.

10/23/26 Drawing not required. Refer to RFI #016.

Design drawings for the existing first floor layout do not exist. Refer to Addendum #3 for allowance.

Drawing M010 note 7 says for Mechanical contractor to reinsulate any ductwork or piping that was removed by the Abatement contractor, refer to Abatement Drawings. Please provide the abatement drawings.

10/23/26 Refer to RFI #008. 2

056 Drawing M110 shows a DH-1, this item is not on the schedule page. Please provide. 10/23/26 Model for DH-1 is provided as a note pointing to

Mechanical 021 on Drawing M110. 2

Is the intent for AHU-1 to reconnect to the existing supply & return ductwork within the Mechanical Room with new ductwork for Economizer air intake & exhaust?

10/23/26 That is correct. 2

Section 012100, 3.3.A states the Allowance #1 Metal Roof Deck Replacement is to be included in "Alternate #1," while Appendix B states the allowance is included in the Base Bid.

Please confirm the allowance is carried in the Base Bid. Also confirm the existing elevator roof deck is metal, as the main roof is wood sheathing on wood trusses.

10/23/26 Refer to RFI #010. 2

Is there a HazMat Drawing prepared by the consultant? I can't seem to find it in the documents. In the asbestos section it makes reference to a drawing:

"The work to be performed includes but is not limited to the proper removal, handling, and disposal of specified ACM contained within the areas of renovation at the building located at 69 South Main Street in Brooklyn, Connecticut. Detailed descriptions of materials and locations of ACM scheduled for removal are shown on Table I below and on the Hazardous Building Materials Abatement Plan HM-1."

10/23/26 Refer to RFI #008. 2

For ST1.0, what is the full vertical extent of the required painting, and which stair or landing surface can support temporary access?

10/26/26 The entire height of the stair shaft, from the lower level up to above the attic door. GC to coordinate construction access.

Are the areaway/stair alternates and localized window replacements included, and what roof-edge setup or public-entry restrictions apply?

10/26/26

Alternates are as indicated in Section 012300. Any roof-edge setup is to be determined by the GC. No publc-entry restrictions required. Refer to Section 011000 for GC coordination requirements.

062 I see BABA forms in the project manual. Please confirm if this is a BABA certified project. 10/26/26 Confirmed. 2

State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

The window spec calls out to follow the 088000 GL10 glass spec, but I do not see any such listing in that spec. I plan to carry a LoE2 Cardinal Glass as annealed. The drawings do not call out tempered at any locations, but the plan view appears to require it at 2 locations as a Code compliance issue.

10/27/26 Refer to 088000, 3.10 for GL-10, which calls for tempered glazing & is the only glazing on the project. 3

064 The other problem is that the Type W02 window is too large to provide as an operating unit. 10/27/26 Type W02 to be fixed. Refer to Addendum #3 for revised Drawing A810. 3

065 Who is the current BMS vendor for the building? 10/27/26 There is no BMS currently in the building. 3

066 Is Builder's Risk Insurance Required? 10/27/26 No. 3 existing fire alarm manufacturer and current fire alarm service vendor? We need this information to match the new information with the existing.

10/27/26 Refer to RFI #038. 3

Exercise Room Flooring and Underlayment (Ref: 096566;

096516; 035416; A800 Room Finish Schedule) Section 096566 specifies athletic rubber floor tile (BOD Altro Ollero, "RAF as indicated on Drawings"). No RAF tag appears on the drawings, and A800 schedules RST-1 (Mannington Attune sheet) in Exercise Room 018 and Group Exercise Room 019.

Please confirm:

(a) RST-1 governs in these rooms and Section 096566 does not apply; and

(b) the locations and extent of the self-leveling underlayment in Section 035416 or confirm that it is required only as floor prep at patched slab and trench areas.

10/28/26

(a) Confirmed.

(b) Section 035416 applies at all existing concrete floors where existing floor finishes are being removed and new resilient floor finishes are being applied. Refer to "Preparation" articles within Sections 096516 & 096519.

Area Way 023 Finishes. (Ref: A800 Room Finish Schedule;

A400; P-series Area Drain schedule) A800 schedules Room 023 Area Way with PT-1, RB-1, and VCT-1. A400 shows the areaway as an open exterior stairwell with a concrete slab and stair, and the plumbing drawings call for an areaway drain.

Please confirm that no interior finishes are intended at the areaway, and state any required exterior finish or coating for the walls and slab.

10/28/26 No finishes are to be applied at Areaway 023. Refer to Addendum #3 for revised Drawing A800. 3

Lead Paint Stabilization - Base Bid Extend and Unit Price.

(Ref: 020900, 1.3.C and 1.8; HM-1 Keynotes A, C and D, Addendum #2; Hazardous Materials Report, 4.2 and Appendix C; RFI #049) HM-1, issued in Addendum #2, identifies paint stabilization at Keynotes A (concrete and masonry walls to remain), C (concrete ceilings), and D (metal stair components), but provides no quantities. Section 020900, 1.8 requires all painted surfaces to be assumed lead-based unless tested otherwise. To ensure all bidders carry the same scope, please confirm the following:

(a) The Base Bid paint stabilization scope is limited to the locations identified at HM-1 Keynotes A, C, and D. Please provide square footage at each keynote location.

(b) The assumption in 1.8 governs lead-safe work practices for any work that disturbs painted surfaces. It does not require paint stabilization on painted surfaces beyone those identified on HM-1.

(c) If additional surfaces with loose or flaking paint are found during construction, the Owner's consultant will test them. Any stabilization the Architect directs will be paid at a unit price per SF added to Appendix D.

10/28/26

(a) Scaled drawings are included in the bid package.

Contractors are required to develop their own quantities for the work to be performed.

(b) Correct.

(c) Correct.

State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

Hydraulic Cement Underlayment - Extent and Quantities. (Ref:

035416, 1.3.B, 2.2; 096516; 096519; A800 Room Finish Schedule) Section 035416 requires self-leveling hydraulic cement underlayment, but the documents do not show the locations, square footage, average depth, or a flatness tolerance for the existing slab. Section 035416, 1.3.B also states that depths will be set by a substrate survey after award. Please provide:

(a) The locations, square footage, and average depth of underlayment to carry in the Base Bid.

(b) The flatness tolerance the existing slab must meet before receiving finish flooring.

(c) A unit price for underlayment, per SF per 1/8" of thickness, to be added to Appendix D for quantitites above the Base Bid amount.

10/28/26

(a) Refer to RFI #068(b). Refer to 035416, 2.2.A for depth per coat.

(b) Not applicable.

(c) Not required.

Existing Slab Moisture Testing and Mitigation. (Ref: 035416, 3.2.B.1; 096516; 096519; 096723; RFI #049) Section 035416, 3.2.B.1 requires the existing lower level slab to pass ASTM F1869 calcium chloride testing at a maximum rate of 3 lb/1000 SF/24 hr before underlayment is installed. No moisture mitigation is specified if the slab fails. Please provide the following:

(a) Whether moisture mitigation is to be included in the Base Bid. If so, please issue a specification identifying:

-the mitigation system type and basis-of-design product, compatible with the Ardex K 15 underlayment;

-the required surface preparation (ICRI CSP profile);

-the RH or MVER rating the system must meet;

-the square footage and locations to be treated.

(b) If moisture mitigation is not included in the Base Bid, please add a unit price per SF to Appendix D for the specified mitigation system, including surface preparation.

(c) Per RFI #049, please confirm whether the ASTM F1869 testing required by Section 035416, 3.2.B.1 will be performed and paid for by the Owner's testing agency.

10/28/26

(a) No moisture mitigation is required.

(b) Refer to Addendum #3 for revised Appendix D.

(c) Contractor is responsible for testing.

E300 shows (1) PL fixture for site lighting, however the drawing shows (3) PL fixtures. Please confirm quantity of PL fixtures that are required.

10/28/26 Schedule indicates (1) QTY lamp per fixture, not fixture quantity. Fixture quantity is as indicated on the plan. 3 looking at the drawings, no fire alarm devices are Shown, does this space require any devices other than the duct smokes shown if so, please advise on requirements.

10/28/26 Yes. Refer to Addendum #3 for revised Drawings E001, E210, E500 & E600. 3

Concrete Restoration - Extend, Quantities, and Unit Prices.

(Ref: 037000, 1.1.B, 2.1, 3.3; S100 Plan Notes; S101 Detail 3;

S100 and S101 as reissued by Addendum #2) Section 037000 limits the work to "the extent indicated on the plans."

S100 identifies spall repair at two lower level columns but gives no repair area. Section 037000 also includes pressure-injected epoxy crack repair, siloxane sealer, and a stone pebble aggregate finish for slab fascia repairs, none of which appear on the drawings. The S100 and S101 sheets reissued in Addendum #2 do not change the spall repair callouts or add the items below. Please provide the following:

(a) The locations and square footage of spall repair to carry in the Base Bid, using S101 Detail 3.

(b) S101 Detail 3 refers to "Concrete Repair Notes" and a reinforcement "repair detail on this sheet." Neither is included in the bid set. Please issue them, including criteria for when existing reinforcing must be supplemented or replaced.

(c) The locations and linear footage of crack injection, if any, to carry in the Base Bid.

(d) Whether the siloxane sealer and the stone pebble aggregate finish apply to this project. If they do, please identify the locations.

(e) Unit prices to add to Appendix D for quantities above the Base Bid amounts:

-spall repair per SF, per S101 Detail 3;

-supplemental reinforcing at damaged bars, per LF;

-epoxy crack injection, per LF.

(f) Whether S101 Detail 3 (new concrete with 1/2" maximum aggregate) or the Section 037000 repair mortars govern.

073 10/28/26

(a) Locations are indicated in 1/S100. Refer to Addendum #3 for allowance.

(b) Disregard note. Refer to Addendum #3 for revised S101.

(c) Not applicable. Refer to Addendum #3 for revised Section 037000.

(d) Not applicable. Refer to Addendum #3 for revised Section 037000.

(e) Refer to Addendum #3 for revised Appendix D.

(f) Section 037000 requirements govern. Refer to Addendum #3 for revised Drawing S101.

State Project/Bid #: RFI Deadline: 10/29/26, 4p

S/P+A Project #: 25.099 Bids Due:

11/05/26, 1p 11/12/26, 1p

RFI # QUESTION DATE RESPONSE ADDENDUM #

RECEIVED ISSUED

SILVER PETRUCELLI + ASSOCIATES

3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320

076 May I ask if above bid require bid bond? 10/28/26

A satisfactory Bid Bond or Certified Check, in an amount equal to five percent (5%) of the base bid, is to be submitted with each bid. The successful bidder will be required to furnish & pay for 100% Performance & Payment Bonds.

077 Is 1" fiberglass duct liner required 10 feet down stream supply and return of AHU's? 10/29/26 Yes, as indicated per Fan Coil Unit Detail on Drawing

M600. 3

078 Is duct leakage testing required? 10/29/26 Yes, refer to HVAC Note #17 on Drawing M110. 3 079 Will all work commence during 1st shift. 10/29/26 Refer to RFI #018 for working hours. 3

Would the design team entertain extending the RFI deadline 1 week to match the length of bid date extension? Please advise.

10/29/26 No, the RFI deadline remains 10/29 due to RFI #21. 3

Lighting, E110: Please provide the fixture specification for Type DE at the five stair landings. Also confirm Type AE: its description refers to Type B, but the scheduled model appears to be an emergency version of Type A.

10/29/26 Refer to Addendum #3 for revised Drawing E110. 3

Testing of retained equipment: Under Sections 262416 and 262816, which retained panels, switches and breakers require factory-authorized field service, NETA acceptance testing, and initial/11-month infrared scans? Please identify who retains and pays the testing firm, considering Addendum 2 RFI 049's exception for requirements elsewhere in the project manual.

10/29/26 Testing not required. Refer to Addendum #3 for revised Section 262416 & 262816. 3

Area-of-refuge communications, E600 detail 10: Who provides and activates the dedicated telephone line and supervised off-site 24/7 answering service? Please identify responsibility for startup and recurring charges and the service term to include in the bid.

10/29/26 Refer to Addendum #3 for revised Drawing E600. 3

Alarm/elevator interfaces: Addendum 2 confirms there is no existing fire alarm system, while E600 detail 6 retains elevator/shunt-trip detection requirements. Please identify the required new controls, equipment and interfaces. Also clarify the horn/strobe requirement versus the audible-alarm wording in revised E500 note 5.

10/29/26 Refer to Addendum #3 for revised Drawings E500 & E600. 3

085 Trane Tracer is the BOD for the controls work. Is there any alternate manufacturers allowed? If so, please provide who. 10/29/26 ESC & Honeywell are also acceptable manufacturers. 3

Page M110 of the plans state to clean all the existing 1st floor ductwork. Please provide as-builts of the 1st floor ductwork sizes and lengths so this can be quoted properly. If as-builts are not available please provide the amount and size ductwork to be cleaned.

10/29/26 Refer to RFI #054. 3

087 Does CU-3 required a poured concrete housekeeping pad to sit on? 10/29/26 Yes, refer to Condensor Detail on Drawing M600. 3

Is the existing condenser, concrete pad and underground refrigerant piping that currently serves AHU-1 to remain or be removed? There's nothing shown on the demo plans. Just an FYI, I believe this piping travels underneath asphalt and to what extent is unknown.

10/29/26

The existing concrete pad serving existing CU-1 to remain. The existing refrigerant piping service CU-1 shall be cut back 6 inches below grade & capped. Refer to Addendum #3 for revised Drawing M110.

Is it the responsibility of the abatement contractor or mechanical contractor to remove all the hydronic piping & insulation requried?

10/29/26 This is a GC bid. GC is responsible for all trades. 3

Please confirm whether ZD-1 through ZD-5 are to be EMME zone dampers or the VAV terminals specified in Section 233600, and provide the required zone airflow settings.

Please also provide the complete operating sequence for AHU-2, CU-2, the hot-water coil, zone dampers and DH-1, including minimum airflow as zones close, dehumidification operation, and the EMME/Trane controls interface

10/29/26 Zone dampers 1-5 are EMME. Refer to Addendum #3 for Sequence of Operations Section 230993.11. 3

Please identify the existing first-floor outlets and branches included in final TAB and provide the required airflow values and acceptance criteria. If original design airflows are unavailable, please confirm whether pre-demolition airflow measurements are required and establish the basis for final balancing.

10/29/26 Design drawings for the existing first floor layout do not exist. Provide a pre-balance at each diffuser on the first floor for reference only.

E

E

E

E

S D

S D

CU-1

CU-2

EF-1

DH-1

EF-2

EWC/BF

OP-1

ATS

MSDB TR-1LS

METER

MSD

AC-1

CU-3

STORAGE

STORAGE

019A

STORAGE

018A

CORRIDOR

ELEVATOR

EL1.0

EL.

MACHINE

ROOM

STORAGE

EXERCISE

ROOM

GROUP

EXERCISE

ROOM

CRAFT

ROOM

GAME

ROOM

CORRIDOR

ELECTRICAL

STAIRS

ST1.0

ELECTRICAL

TOILET

TOILET

CORRIDOR

MECHANICAL

MECHANICAL

STORAGE

MECHANICAL

JANITOR

STORAGE

AREA

WAY

CLT

017A

HPHWH-1

UH

GFI/48"

G F

I/4 8"

G F

I/4 8"

GFI/48"

GFI/48"

GFI/48"GFI/48"

G F

I/4 8"

G F

I/4 8"

G F

I/4 8"

48"

60"

AHU-2

AHU-1

E M

E M

G F

I/W P

SUB METERS

GFI/WP

TR-1LS /16

RP-1

M S

D B

TR-1LS /32

TR-1LS /31

TR-1LS /33

TR-1LS /35

TR-1LS /37

TR-1LS /39

TR-1LS /1

TR-1LS /9

T R

-1

LS

TR-1LS /34

TR-1LS /13

TR-1LS /17

TR-1LS /15

TR-1LS /19

TR-1LS /21

CT-1

M S

D B

/8 ,1

0, MSDB

/7,9,11

MSDB /33,35

MSDB /43,45

T R

-1

LS

/6 ,8

M S

D B

/1 4, ,1

TR-1LS /3

MSDB /20

D H

TR-1LS /5

CP

TR-1LS

/26,28

AR

AOR

E U

H -1

T R

-1

LS

/2 ,4

FACP

T R

-1

LS

GENERAL POWER NOTES

POWER KEY NOTES

1. FURNISH AND INSTALL ALL ELECTRICAL EQUIPMENT, DEVICES,

AND WIRE AS INDICATED ON PLAN AND DIAGRAMS, SHOWN AS

DARK AND SOLID, UNLESS OTHERWISE NOTED BY KEY NOTE.

2. ALL NEW ELECTRICAL DEVICES MOUNTED ON EXISTING

CONCRETE WALLS (POURED OR BLOCK), MUST BE FED WITH

SURFACE MOUNTED "WIREMOLD" RACEWAY TYPE 500 OR 700

SERIES. PROVIDE ALL NECESSARY ACCESSORIES, CONNECTIONS

AND FITTINGS FOR A COMPLETE SYSTEM.

3. ALL ELECTRICAL EQUIPMENT, DEVICES, ETC. SHOWN AS LIGHT

(HALF-TONE) AND SOLID ARE EXISTING TO REMAIN, UNLESS

OTHERWISE NOTED BY KEY NOTE.

4. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE

CONTINUITY OF ALL EXISTING BRANCH CIRCUITS AFFECTED BY

THIS RENOVATION AND PROVIDE ADDITIONAL WIRING AS NEEDED.

5. REFER TO DRAWINGS E001 & E002 FOR GENERAL NOTES,

ABBREVIATIONS & ELECTRICAL LEGEND.

6. REFER TO E600 SERIES DRAWINGS FOR DETAILS AND WIRING

DIAGRAMS.

7. REFER TO E500 SERIES DRAWINGS FOR SWITCHBOARD AND

PANELBOARD SCHEDULES.

ELECTRICAL MAIN SERVICE DISCONNECT SWITCH AND UTILITY

METER TO REMAIN.

ELECTRICAL PANEL TO REMAIN. REFER TO E500 SERIES PLANS

FOR PANEL SCHEDULE INFORMATION AND REQUIREMENTS.

AUTOMATIC TRANSFER SWITCH TO REMAIN.

SUB-METERS TO REMAIN.

TELEPHONE BACKBOARD TO REMAIN.

REFER EQUIPMENT SCHEDULE ON E500 PLAN FOR POWER

REQUIREMENTS.

EXISTING ELECTRICAL SERVING EQUIPMENT TO REMAIN.

INSTALL RELOCATED (HP) HEAT PUMP EMERGENCY SHUT-OFF

SWITCH AND EXTEND/MODIFY WIRING AS REQUIRED.

FURNISH AND INSTALL NEW (HWH-1) WATER HEATER

EMERGENCY SHUT-OFF SWITCH AND WIRE AS REQUIRED.

FURNISH AND INSTALL NEW DISCONNECT SWITCHES FOR

WATER HEATER AND RE-CIRCULATION PUMP. EXTEND MODIFY

EXISTING BRANCH CIRCUIT WIRING TO DISCONNECT SWITCHES

AND NEW EQUIPMENT AS REQUIRED.

FURNISH AND INSTALL AREA OF RESCUE ASSISTANCE SURFACE

MOUNTED CALL STATION AT THIS LOCATION WITH FIXED

COMMAND UNIT, SUB-COMMAND UNIT, AND STROBE/SIREN

LOCATED ON THE FIRST FLOOR. PROVIDE COMPLETE AOR

SYSTEM REQUIREMENTS AND WIRE AS INDICATED ON DRAWING

E600 DETAIL 10.

FURNISH AND INSTALL AREA OF RESCUE ASSISTANCE

ILLUMINATED SIGNAGE AND WIRE TO LINE SIDE OF LOCAL LIGHT

CIRCUIT. REFER TO DRAWING E600 DETAIL 10 FOR

REQUIREMENTS.

FURNISH AND INSTALL FIRE ALARM CONTROL PANEL ON FIRST

FLOOR NEAR MAIN ENTRANCE. SHOWN IN APPROX. LOCATION

FOR FIRST FLOOR. REFER TO DRAWING E600 DETAIL 11 AND

WIRING SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:

SCALE:

DRAWN BY:

PROJECT NUMBER:

DRAWING NUMBER:

SILVER PETRUCELLI + ASSOCIATES

203 230 9007

3190 WHITNEY AVENUE HAMDEN CT 06518

silverpetrucelli.com

311 STATE STREET NEW LONDON CT 06320

PROJECT SUBMISSION:

STATE PROJECT NUMBER:

RENOVATIONS TO

BROOKLYN SENIOR CENTER

69 SOUTH MAIN STREET

BROOKLYN, CT

ISSUED FOR BID

25.099

10-16-2026

As indicated

/4

/2

7:

:5

A

ME210

ELEC LOWER LEVEL POWER PLAN

D. Turner

1/8" = 1'-0"1 ELEC LOWER LEVEL POWER PLAN

TBB

11 12

1 ADDENDUM #1 10/19/2026 DT

2 ADDENDUM #2 10/27/2026 DT

3 ADDENDUM #3 11/04/2026 DT

1 ADDENDUM #1 10/19/2026 DT

2 ADDENDUM #2 10/27/2026 DT

3 ADDENDUM #3 11/04/2026 DT

2RFI 013

2RFI 012

RFI 075

APPENDIX “B” – ALLOWANCES

The following is a list of Allowances referenced in the bid submitted by:

(Bidder)

Dated and which is an integral part of the Bid Form.

I certify that the following Allowance amount(s) listed below are included within the Base Bid Price total.

ALLOWANCES

Allowance #1: Plywood Roof Deck Replacement $ ____________________ Allowance #2: Existing 1st Floor Ductwork Replacement $ ____________________ Allowance #3: Existing 1st Floor Ductwork Cleaning $ ____________________ Allowance #4: Concrete Spall Repair $ ____________________

FIRST FLOOR LEVEL

0"

BASEMENT/FOUNDATION

-12' - 0"

SLAB ON GRADE

REINFORCED WITH

6X6-W2.9XW2.9 W.W.F.

#4 CONT. NOSING

BAR TYP.

RAILING REQUIRED BY ARCHITECTURAL

DRAWINGS. REFER TO ARCHITECTURAL

DRAWINGS FOR REQUIREMENTS

#4 AT 18" O.C. TYP.

#4 AT 12" O.C. CONT. HORIZ.

REINFORCING, TYP.

DRILL AND EPOXY REINFORCING

ABUTTING EXISTING CONSTRUCTION

INTO EXISTING FOUNDATION (4"

EMBED)

(3)-#5 CONT. IN FOOTING

FINISH GRADE

REFER TO SITE DRAWINGS

#5 AT 16" O.C. VERTICAL REINF.

CENTERED TYPICAL

ALTERNATE DOWEL LEGS

1'

8" 8" 8"

2' - 0"

BASEMENT/FOUNDATION

-12' - 0"

8" 8" 8"

2' - 0"

1'

SITE CONCRETE

REFER TO ARCHITECTURAL

DRAWINGS

(2)-#5 CONT. IN WALL

FOOTING

#4 AT 12" O.C. CONT.

HORIZ. REINFORCING

#5 AT 16" O.C. VERTICAL

REINFORCING CENTERED

ALTERNATE DOWEL LEGS

#4 AT 18" O.C.

REFER TO ARCHITECTURAL DRAWINGS

FOR STAIR GROOVE

REQUIREMENTS

COORDINATE STEP

GEOMETRY WITH

ARCHITECTURAL DRAWINGS

M

IN

5"

#4 NOSING

BAR (TYP.)

(TYP)

"Ld"

1/2" DEEP SAWCUT TO MAKE EDGES OF

REMOVAL PERPENDICULAR TO EXPOSED

FACE

RUBBED FINISH SMOOTH AND EVEN WITH

ADJACENT CONCRETE.

IF EXISTING REINFORCEMENT IS

DAMAGED BEYOND THE

REQUIREMENTS NOTED IN THE

CONCRETE REPAIR NOTES,

REFER TO REPAIR DETAIL ON

THIS SHEET

.REMOVE CONCRETE TO 3/4" MIN. BEHIND

REINFORCING BARS.

REMOVE ALL DETERIORATED CONCRETE

AND REPLACE AS INDICATED IN

SPECIFICATION SECTION 037000.

APPLY BONDING AGENT TO

EXISTING CONCRETE PRIOR TO

INSTALLING REPAIR MATERIAL

MIN.

1' - 0"

MIN.

1' - 0"

2'

M A

X.

2"

EXISTING FOUNDATION WALL

AND FOOTING. VERIFY IN FIELD

2" DRYPACK

PIPE PENETRATION

NOTE:

DO NOT LOCATE PENETRATIONS THROUGH COLUMN FOOTINGS.

COORDINATE WITH SITE MECHANICAL, PLUMBING, AND ELECTRICAL

DRAWINGS FOR LOCATIONS AND ELEVATIONS.

UNDERPINNING AT PIPE PENETRATIONS.

UNDERPINNING MUST BE PERFORMED

IN SEGMENTS NOT TO EXCEED 4' IN LENGTH.

UNDERPINNING TO MATCH WIDTH

OF EXISTING FOOTING.

PIPE SLEEVE

DIAMETER 2" LARGER

THAN PENETRATING

PIPE

WITH NEW CONCRETE (3000 PSI)

INFILL EXISTING WALL OPENING

3"

#4 AT 12" O.C. EACH WAY,

EACH FACE

DRILL AND SET #4X1'-0"

DOWELS AT 12" O.C.

INTO EXISTING CONCRETE

WALL WITH INJECTION ADHESIVE

3"

BENTONITE WATERSTOP

BOTH SIDES AND BOTTOM WALL

TYP.

6" EMBED

EXISTING CONCRETE

WALL

3"

DRILL AND SET #5X2'-0"

DOWELS INTO EXISTING

WALL WITH HILTI HIT-HY270

3"

BENTONITE WATERSTOP

BOTH SIDES AND BOTTOM WALL

WHERE BELOW GRADE

EXISTING MASONRY

WALL

SOLID GROUT ALL CORES

BELOW GRADE

#5 IN TOP COURSE, BOTTOM COURSE

AND 48" O.C. MAX.

EACH FACE IN SOLID GROUTED COURSE

#5 VERTICAL AT ENDS AND AT 32" O.C.

IN SOLID GROUTED CORE. DOWEL INTO

EX. WALL, SIMILAR TO HORIZONTAL

REINFORCING

TYP.

6" TOOTH IN NEW

MASONRY WHERE

REQUIRED BY ARCH'L

DRAWINGS

WITH NEW MASONRY

INFILL EXISTING WALL OPENING

EXISTING MASONRY LINTEL SCHEDULE

MARK CMU OPENING WIDTH LINTEL

(3)-L7X4X3/8 L.L.V.

(MIN. 8" BEARING)

UP TO 9'-6"EXISTING

12" BLOCK

NOTE:

1. PROVIDE LINTELS WHERE NEEDED. NOT SHOWN ON THE DRAWINGS

2. ALL EXTERIOR STEEL SHALL BE HOT DIPPED GALVANIZED

3. COORDINATE ALL OPENINGS WITH ARCHT & MECH DRAWINGS.

4. GROUT CORES SOLID BELOW LINTEL BEARING FULL HEIGHT TO UNDERSIDE OF LINTEL.

5. LINTELS FOR EXISTING 8" AND 12" CMU WERE DESIGNED BASED ON A BEARING WALL SUPPORTING 15'

OF ROOF, WITH 8' OF CMU ABOVE LINTEL. CONTRACTOR TO CONTACT STRUCTURAL ENGINEER, MICHAEL

HORTON ASSOCIATES, INC. FOR ALL FIELD CONDITIONS WITH BEARING WALLS SUPPORTING MORE THAN

15' OF ROOF ABOVE AND ALL OPENINGS LARGER THAN THOSE IN THE LINTEL SCHEDULE.

L5X3 1/2X5/16 (4" MIN. BEARING)UP TO 6'-0"

EXISTING

INTERIOR

4" MASONRY

L7X4X3/8 (4" MIN. BEARING) 6'-0" TO 10'-0"

UP TO 9'-6" EXISTING

8" BLOCK

(2)-L7X4X3/8 L.L.V.

(MIN. 8" BEARING)

EXISTING

INTERIOR

4" MASONRY

SAWCUT & REMOVE EXISTING

SLAB TO PLACE NEW UTILITIES.

REPLACE WITH NEW CONCRETE

SLAB ON GRADE.

EXISTING

SLAB ON

GRADE

6X6-W2.9XW2.9 WWF.

NEW UTILITY, REFER TO

MECHANICAL, ELECTRICAL &

PLUMBING DRAWINGS

COMPACTED

STONE FILL

OTH

IC

KN

ES

S M

A

TC

H E

X.

S

LA

B

M

IN

4"

4" MIN

6" M

IN

VAPOR RETARDER

FOUNDATIONS

1. BACKFILLING SHALL BE ACCOMPLISHED TO EQUAL HEIGHTS ON BOTH SIDES OF FOUNDATION WALLS TO PREVENT MOVEMENTS DUE TO UNBALANCED EARTH PRESSURE.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .