BIG CYPRESS GOLF AND COUNTRY CLUB ESTATES OF NAPLES SECONDARY DRAINAGE IMPROVEMENTS AND WATER MAIN REPLACEMENT
Solicitation number
25-8421
Issued by
Collier County, Florida

About this file

This is an Authorization to Advertise document for Collier County, Florida, for Bid No. 25-8421 involving secondary drainage improvements and water main replacement within the Big Cypress Golf & Country Club residential areas and the adjacent Country Club of Naples golf course. The 170.50-acre project encompasses removing and replacing existing driveways, culverts, roadside swales, cross drains, outfall piping, and roadway asphalt overlay, along with constructing a new water main with associated infrastructure including valves, fire hydrants, water services, and meter boxes. A non-mandatory pre-bid meeting is scheduled for September 11, 2025, at 10:00 a.m. at the Collier County Procurement Services Conference Room. Sealed bids are due electronically by October 7, 2025, at 3:00 p.m. EST. The project timeline mandates substantial completion within 270 calendar days and final completion within 300 calendar days from the Notice to Proceed. The contract term is fixed-price based on the completion schedule with no renewal options identified.

The project budget is set at $8,000,000.00. Bidders must submit a 5% bid bond and provide performance and payment bonds for 100% of the contract amount. Liquidated damages are assessed at $3,813 per calendar day for failure to achieve substantial completion within the specified timeframe. The procurement does not include specific set-aside designations for disadvantaged enterprises, and no incumbent vendors are identified. Prospective bidders must register on the county's online procurement portal, comply with E-Verify requirements and immigration laws, and possess appropriate professional licensing for construction work in Florida. The existing water main consists of asbestos cement pipe requiring special handling and disposal procedures. Work hours are limited to 7:00 a.m. to 7:00 p.m., Monday through Friday. Contractors must coordinate with multiple agencies, including the South Florida Water Management District and City of Naples Utilities, and adhere to strict environmental, health, and safety requirements. The solicitation does not identify specific grant funding sources in this authorization document.

View the file

Other files

File Type Posted
Construction_Bid_Instructions_Version_1.pdf PDF
25-8421_Bid_Schedule_R2.xlsx XLSX spreadsheet
25-8421_Solicitation_R1.pdf PDF
Water_Meter_Application.pdf PDF
25-8421_Interlocal_Agreement.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
25-8421_Bid_Schedule_R1.xlsx XLSX spreadsheet
25-8421_Solicitation_R1.pdf PDF
25-8421_Exhibit_M_-1_-_EOR_R.E._Brylanski_S&S.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8421_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8421_Exhibit_J_-_Technical_Specifications_S&S_10.7.pdf PDF
25-8421_Exhibit_M_-1_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_M_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8421_Exhibit_M_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Solicitation_R1.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
Construction_Services_Agreement_2025_ver._3.pdf PDF
25-8421_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8421_Exhibit_M_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_M_-1_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_J.pdf PDF
25-8421_Bid_Schedule.xlsx XLSX spreadsheet
25-8421_Authorization_to_Advertise_Final.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Authorization to Advertise Date: ______________

Solicitation No.: Title:

Due Date and Time:

Utilizing Local Vendor Preference: Yes No Grant Funded: Yes No

By signing, I am acknowledging that I have reviewed the above referenced solicitation prior to being released to advertisement, and that the approach, scope and specifications are acceptable.

I also acknowledge that a cost estimate or opinion of cost was obtained, and that budgetary resources have been identified to fund any resulting award within the budgeted or reasonable Threshold.

The approach being taken with this solicitation and intended end use of the contract is intended to support the management and operational needs of the Division and takes other potential using Divisions’ needs into consideration (when applicable).

Required Signatures

Design Professional:

Project Manager:

Division Director:

Procurement Strategist:

Grants Office: Required grantor conditions have been provided in the solicitation, grantor approvals have been obtained, and the package appears compliant with federal/state funding requirements.

Sandra Srnka, Procurement Director

Procurement Services Division

Isabel Soto

Jay Ahmad

Olivia Puga

R.E. Brylanski

N/A

August 13, 2025

25-8421 Big Cypress Gof and Country Club Estates of Naples Drainage Improvements

October 7, 2025 at 3:00pm (EST)

Docusign Envelope ID: DF4AA552-2A6B-4550-8879-DF8A2C0FA386

8/13/2025

8/13/2025

8/13/2025

8/13/2025

8/13/2025

2025-08-13T09:47:23-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .