25-8421_Bid_Schedule_R1.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
BIG CYPRESS GOLF AND COUNTRY CLUB ESTATES OF NAPLES SECONDARY DRAINAGE IMPROVEMENTS AND WATER MAIN REPLACEMENT
Solicitation number
25-8421
Issued by
Collier County, Florida

About this file

The provided file is a Bid Schedule for Collier County, Florida, specifically for the Big Cypress Golf & Country Club Estates and Country Club of Naples Secondary Drainage System Improvements and Water Main Replacement project. The bid schedule, dated August 2025, outlines a comprehensive infrastructure project involving two primary categories: Common Items and Drainage. The document details 12 line items in Category No. 1, including mobilization, maintenance of traffic, sedimentation barrier, inlet protection, clearing and grubbing, and concrete removal. The project spans 170.50 acres and requires removing and replacing existing infrastructure such as driveways, culverts, roadside swales, cross drains, and outfall piping, along with constructing a new water main. The non-mandatory pre-bid meeting is scheduled for September 11, 2025, at 10:00 a.m., with sealed bids due electronically by October 7, 2025, at 3:00 p.m.

The project budget is set at $8,000,000.00, with the county imposing liquidated damages of $3,813 per calendar day for failing to achieve substantial completion within the specified timeframe. The bid requires a 5% bid bond and comprehensive insurance coverage. Contractors must coordinate with multiple agencies, including the South Florida Water Management District and City of Naples Utilities, and adhere to strict environmental, health, and safety requirements. The existing water main, composed of asbestos cement (AC) pipe, requires special handling and disposal procedures. Work is restricted to 7:00 a.m. to 7:00 p.m., Monday through Friday, and performance and payment bonds for 100% of the contract amount will be mandatory. The project timeline mandates substantial completion within 270 calendar days and final completion within 300 calendar days from the Notice to Proceed.

View the file

Other files

File Type Posted
Construction_Bid_Instructions_Version_1.pdf PDF
25-8421_Bid_Schedule_R2.xlsx XLSX spreadsheet
25-8421_Solicitation_R1.pdf PDF
Water_Meter_Application.pdf PDF
25-8421_Interlocal_Agreement.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
25-8421_Solicitation_R1.pdf PDF
25-8421_Exhibit_M_-1_-_EOR_R.E._Brylanski_S&S.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8421_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8421_Exhibit_J_-_Technical_Specifications_S&S_10.7.pdf PDF
25-8421_Exhibit_M_-1_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_M_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8421_Exhibit_M_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Solicitation_R1.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
Construction_Services_Agreement_2025_ver._3.pdf PDF
25-8421_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8421_Exhibit_M_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_M_-1_-_EOR_R.E._Brylanski_S&S.pdf PDF
25-8421_Exhibit_J.pdf PDF
25-8421_Bid_Schedule.xlsx XLSX spreadsheet
25-8421_Authorization_to_Advertise_Final.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Big Cypress Golf & Country Club Estates and Country Club of NaplesCollier County Proportional ShareCity of Naples Proporational Share
Secondary Drainage System Improvements and Water Main Replacement
BID SCHEDULE - AUGUST 2025
Item No.DescriptionUnitQTYUnit PriceTotal Price%Cost%Cost
CATEGORY NO. 1 - COMMON ITEMS
101-1Mobilization/DemobilizationLS1$ - 0$ - 075%$ - 025%$ - 0
102-1Maintenance of TrafficLS1$ - 0$ - 075%$ - 025%$ - 0
102-99Portable Changeable Message SignEA2$ - 0$ - 075%$ - 025%$ - 0
104-10-3Sedimentation BarrierLF1,200$ - 0$ - 088%$ - 012%$ - 0
104-18Inlet Protection SystemEA26$ - 0$ - 095%$ - 05%$ - 0
110-1-1Clearing & GrubbingAC7.73$ - 0$ - 075%$ - 025%$ - 0
110-4-10Removal of Existing ConcreteSY3,169$ - 0$ - 075%$ - 025%$ - 0
SP-1Pre and Post Construction VideoLS1$ - 0$ - 075%$ - 025%$ - 0
SP-2Project SignEA2$ - 0$ - 075%$ - 025%$ - 0
SP-3Record SurveyLS1$ - 0$ - 075%$ - 025%$ - 0
Category No. 1 - Common Items Subtotal:$ - 0$ - 0$ - 0
CATEGORY NO. 2 - DRAINAGE
425-1-521FDOT Type C Inlet, <10'EA4$ - 0$ - 0100%$ - 00%$ - 0
425-1-551FDOT Type E Inlet, <10'EA12$ - 0$ - 0100%$ - 00%$ - 0
425-3-61Junction Box, J-7, <10'EA5$ - 0$ - 0100%$ - 00%$ - 0
430-175-124Pipe Culvert, Optional Material, Round (24" RCP)LF98$ - 0$ - 0100%$ - 00%$ - 0
430-175-136Pipe Culvert, Optional Material, Round (36" RCP)LF38$ - 0$ - 0100%$ - 00%$ - 0
430-175-136APipe Culvert, Optional Material, Round (36" HDPE)LF330$ - 0$ - 0100%$ - 00%$ - 0
430-175-215Pipe Culvert, Optional Material, Ellip. (15" ERCP) 12x18LF2,710$ - 0$ - 0100%$ - 00%$ - 0
430-175-218Pipe Culvert, Optional Material, Ellip. (18" ERCP) 14x23LF854$ - 0$ - 0100%$ - 00%$ - 0
430-175-224Pipe Culvert,Optional Material, Ellip. (24" ERCP) 19x30LF1,182$ - 0$ - 0100%$ - 00%$ - 0
430-175-236Pipe Culvert, Optional Material, Ellip. (36" ECP) 29x45LF64$ - 0$ - 0100%$ - 00%$ - 0
430-536-100Straight Concrete Endwall, 36" Single, 0 Deg. RoundEA1$ - 0$ - 0100%$ - 00%$ - 0
430-536-202Straight Concrete Endwall, 36" Double, 0 Deg. Ellip.EA2$ - 0$ - 0100%$ - 00%$ - 0
430-601-123U-Type Concrete Endwall (12"x18")EA179$ - 0$ - 0100%$ - 00%$ - 0
430-601-125U-Type Concrete Endwall (14"x23")EA50$ - 0$ - 0100%$ - 00%$ - 0
430-601-129U-Type Concrete Endwall (19"x30")EA66$ - 0$ - 0100%$ - 00%$ - 0
SP-4Swale Regrading (Inclduing Cut & Fill)SY23,600$ - 0$ - 075%$ - 025%$ - 0
SP-5Golf Course Interconnect, Site Work (Sheet 13)LS1$ - 0$ - 0100%$ - 00%$ - 0
SP-6Golf Course Interconnect, Site Work (Sheet 13A)LS1$ - 0$ - 0100%$ - 00%$ - 0
Category No. 2 - Drainage Subtotal:$ - 0$ - 0$ - 0
CATEGORY NO. 3 - RESTORATION
110-7-1Mailbox, F&I SingleEA127$ - 0$ - 0100%$ - 00%$ - 0
121-70Flowable FillCY56$ - 0$ - 075%$ - 025%$ - 0
210-2Limerock, New Material for Reworking Base (18")SY360$ - 0$ - 075%$ - 025%$ - 0
334-1-12Superpave Asphaltic Concrete (SP-9.5)TN1,030$ - 0$ - 090%$ - 010%$ - 0
334-1-13Superpave Asphaltic Concrete (SP-12.5)TN40$ - 0$ - 075%$ - 025%$ - 0
522-2Concrete Sidewalk & Driveway, 6" ThickSY3,169$ - 0$ - 075%$ - 025%$ - 0
530-3-4Riprap, Rubble, F&I, Ditch LiningTN54$ - 0$ - 0100%$ - 00%$ - 0
570-1-2Performance Turf, SodSY23,426$ - 0$ - 075%$ - 025%$ - 0
SP-7Remove and Reset Paver DrivewaySY3,379$ - 0$ - 075%$ - 025%$ - 0
Category No. 3 - Restoration Subtotal:$ - 0$ - 0$ - 0
CATEGORY NO. 4 - SIGNAGE AND PAVEMENT MARKINGS
700-1-500Single Column Ground Sign Assembly, RelocateEA9$ - 0$ - 0100%$ - 00%$ - 0
711-11-125Thermoplactic, STD, White, Solid, 24"LF208$ - 0$ - 0100%$ - 00%$ - 0
711-11-123Thermoplactic, STD, White, Solid, 12"LF148$ - 0$ - 0100%$ - 00%$ - 0
711-15-201Thermoplactic, STD, Yellow, Solid 6"LF0.0947$ - 0$ - 0100%$ - 00%$ - 0
Category No. 4 - Signage and Pavement Markings Subtotal:$ - 0$ - 0$ - 0
CATEGORY NO. 5 - WATER MAIN REPLACEMENT
16" PVC, DR-18, C900LF58$ - 0$ - 00%$ - 0100%$ - 0
28" PVC, DR-14, C900LF146$ - 0$ - 00%$ - 0100%$ - 0
38" PVC, DR-18, C900LF2,848$ - 0$ - 00%$ - 0100%$ - 0
410" PVC, DR-14, C900LF84$ - 0$ - 00%$ - 0100%$ - 0
510" PVC, DR-18, C900LF5,132$ - 0$ - 00%$ - 0100%$ - 0
66" Gate Valve w/BoxEA2$ - 0$ - 00%$ - 0100%$ - 0
78" Gate Valve w/BoxEA12$ - 0$ - 00%$ - 0100%$ - 0
810" Gate Valve w/BoxEA9$ - 0$ - 00%$ - 0100%$ - 0
98x8x8 Cut In Tee w/ReducersEA2$ - 0$ - 00%$ - 0100%$ - 0
10Fire Hydrant Assembly w/6" Gate ValveEA15$ - 0$ - 00%$ - 0100%$ - 0
11Water Main ARVEA7$ - 0$ - 00%$ - 0100%$ - 0
126" & 8" Pipe RemovalLF765$ - 0$ - 00%$ - 0100%$ - 0
136" & 8" Pipe Grout and AbandonmentLF7,503$ - 0$ - 00%$ - 0100%$ - 0
14Miscellaneous Water Main AbandonmentLS1$ - 0$ - 00%$ - 0100%$ - 0
15Temporary Water Main Jumper/Final Connection
a. Burning Tree/Solana (Ph. 1)EA1$ - 0$ - 00%$ - 0100%$ - 0
b. Burning Tree/Cypress Point (Ph. 2)EA1$ - 0$ - 00%$ - 0100%$ - 0
c. Burning Tree/Cypress Point (Ph. 3)EA1$ - 0$ - 00%$ - 0100%$ - 0
d. North Gate/Mel Jen (Ph. 4)EA1$ - 0$ - 00%$ - 0100%$ - 0
16Flushing Port/TBSV/Final Connection
a. Burning Tree/Cypress Point (Ph. 1)EA1$ - 0$ - 00%$ - 0100%$ - 0
b. Burning Tree/Cypress Point (Ph. 2)EA1$ - 0$ - 00%$ - 0100%$ - 0
c. North Gate/Burning Tree (Ph. 3)EA1$ - 0$ - 00%$ - 0100%$ - 0
d. Burning Tree/Mel Jen (Ph. 4)EA1$ - 0$ - 00%$ - 0100%$ - 0
17Single Water Service (Short)EA55$ - 0$ - 00%$ - 0100%$ - 0
18Single Water Service (Long)EA52$ - 0$ - 00%$ - 0100%$ - 0
19Double Water Service (Short)EA14$ - 0$ - 00%$ - 0100%$ - 0
20Double Water Service (Long)EA16$ - 0$ - 00%$ - 0100%$ - 0
21Meter BoxesEA137$ - 0$ - 00%$ - 0100%$ - 0
22Additional 8" Water Main DeflectionEA4$ - 0$ - 00%$ - 0100%$ - 0
23Additional 10" Water Main DeflectionEA4$ - 0$ - 00%$ - 0100%$ - 0
24Relocate Existing Sewer LateralLS1$ - 0$ - 00%$ - 0100%$ - 0
25Exist. Sewer Service AdjustmentsEA6$ - 0$ - 00%$ - 0100%$ - 0
26Additional Sewer Clean Out AssemblyEA3$ - 0$ - 00%$ - 0100%$ - 0
27Additional Sewer Lateral PipingLF100$ - 0$ - 00%$ - 0100%$ - 0
Category No. 5 - Water Main Replacement Subtotal:$ - 0$ - 0$ - 0
BID SUMMARY
Category No. 1 - Common Items Subtotal$ - 0$ - 0$ - 0
Category No. 2 - Drainage Subtotal$ - 0$ - 0$ - 0
Category No. 3 - Restoration Subtotal$ - 0$ - 0$ - 0
Category No. 4 - Signage and Pavement Markings Subtotal$ - 0$ - 0$ - 0
Category No. 5 - Water Main Replacement Subtotal$ - 0$ - 0$ - 0
Total Bid Amount:$ - 0$ - 0$ - 0
* County Staff has allocated a total of 10% in Owner's Allowance from the County’s total bid amount for Owner's Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owner's Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

**City Staff has allocated a total of 10% in Owner's Allowance for Owner's Use as Directed. This Allowance will be used only at the City’s direction to accomplish work due to unforeseen conditions and/or as directed by the City. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owner's Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

File details come from the government source that posted it. Updated .