25-8371_-_Bid_Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- First Street Corridor Phase I
- Solicitation number
- 25-8371
- Issued by
- Collier County, Florida
About this file
This document is a Bid Schedule for Collier County's First Street Corridor Phase I Construction (ITB No. 25-8371), located in Immokalee, Florida. The project involves comprehensive street lighting infrastructure improvements, with specific deliverables including installing 6 new light poles and utilizing 11 total light poles along South 1st Street from School Road/Seminole Crossing Trail to Eustis Avenue. The project requires a licensed Florida Electrical Contractor to complete the work within 210 calendar days from the Notice to Proceed, with a final completion deadline 30 calendar days after punch list delivery. A non-mandatory pre-bid meeting is scheduled for July 16, 2025, at 10:00 a.m., and sealed electronic bids are due by August 21, 2025, at 3:00 p.m. local time.
The project is funded through a Community Development Block Grant (CDBG Grant #CD24-02) with an anticipated budget of $170,000.00, and bidders must comply with federal HUD grant requirements, including Davis-Bacon wage standards and equal employment opportunity provisions. Evaluation will be based on the lowest responsive and responsible bidder, with mandatory submissions including a 5% bid bond and comprehensive insurance coverage. Liquidated damages are set at $904.00 per calendar day for failure to achieve substantial completion on time. Additional requirements include providing five extra luminaire fixtures to Collier County Traffic Operations, utilizing 150W GE Evolve ERL2 luminaires, and limiting work hours to 7:00 a.m. to 7:00 p.m., Monday through Friday.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| First Street Corridor Phase I | |||||
| Construction ITB No. 25-8371 | |||||
| Bid Schedule | |||||
| Item No. | Description | Unit | QTY | Unit Price | Total Cost |
| 102 1 | MAINTENANCE OF TRAFFIC | LS | 1 | $ - 0 | $ - 0 |
| 110 1 | MOBILIZATOIN | LS | 1 | $ - 0 | $ - 0 |
| 630 2 11 | CONDUIT, FURNISH & INSTALL, OPEN TRENCH | LF | 1003 | $ - 0 | $ - 0 |
| 630 2 12 | CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE | LF | 255 | $ - 0 | $ - 0 |
| 635 2 11 | PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE | EA | 9 | $ - 0 | $ - 0 |
| 639 1112 | ELECTRICAL POWER SERVICE, F&I, OVERHEAD METER PURCHASED BY CONTRACTOR FROM POWER COMPANY | AS | 1 | $ - 0 | $ - 0 |
| 639 3 11 | ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNT | EA | 1 | $ - 0 | $ - 0 |
| 641 2 11 | PRESTRESSED CONCRETE POLE, F&I, TYPE P-II PEDESTAL | EA | 1 | $ - 0 | $ - 0 |
| 715 1 12 | LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 | LF | 4566 | $ - 0 | $ - 0 |
| 715 5 31 | *LUMINAIRE & BRACKET ARM- ALUMINUM, FURNISH & INSTALL NEW LUMINAIRE AND ARM ON NEW/EXISTING POLE* | EA | 10 | $ - 0 | $ - 0 |
| 715 7 11 | LOAD CENTER, F&I, SECONDARY VOLTAGE | EA | 1 | $ - 0 | $ - 0 |
| 715 61311 | LIGHT POLE COMPLETE, F&I, STANDARD POLE STANDARD FOUNDATION, 40' MOUNTING HEIGHT, 8' ARM LENGTH | EA | 6 | $ - 0 | $ - 0 |
| 715 500 1 | POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL, CONVENTIONAL | EA | 6 | $ - 0 | $ - 0 |
| TOTAL BID AMOUNT: | $ - 0 |
| Pay Item Notes: | |
| 715 5 31 | *NOTE: 5 additional luminaires are included in the project quantities and cost estimate for storage by |
Collier County Traffic Ops for future maintenance. The Bid must include that the Contractor is to provide CCTO five (5) additional GE Evolve luminaire fixtures at completion of the Phase 1 Project for storage by CCTO for future use.
File details come from the government source that posted it. Updated .