25-8371_-_Bid_Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- First Street Corridor Phase I
- Solicitation number
- 25-8371
- Issued by
- Collier County, Florida
About this file
The file is a Bid Schedule for Collier County's First Street Corridor Phase I Construction (ITB No. 25-8371) in Florida. The project involves infrastructure improvements, specifically electrical and lighting installations. The bid is scheduled for submission by August 21, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting on July 16, 2025, at 10:00 a.m. in Naples. The bid schedule includes multiple line items for electrical infrastructure, such as conduit installation (1,258 linear feet), pull and splice boxes (9 units), electrical service components, lighting conductors (4,566 linear feet), luminaire installations (10 units), and pole systems (6 complete units). The county requires contractors to provide an additional 5 luminaire fixtures for future maintenance.
The bid schedule shows a total bid amount of $0, which suggests this is a placeholder or template document. Bidders must register on the Collier County procurement portal to obtain complete project documents. The project appears to be a comprehensive electrical infrastructure upgrade for the First Street Corridor, with specific technical requirements for electrical conduits, poles, lighting, and associated electrical services. Prospective vendors must carefully review the detailed specifications for each line item and ensure compliance with the county's technical and installation requirements. The project seems to be funded through local government sources, with a focus on infrastructure improvement and future maintenance preparedness.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| First Street Corridor Phase I | |||||
| Construction ITB No. 25-8371 | |||||
| Bid Schedule | |||||
| Item No. | Description | Unit | QTY | Unit Price | Total Cost |
| 102 1 | MAINTENANCE OF TRAFFIC | LS | 1 | $ - 0 | $ - 0 |
| 110 1 | MOBILIZATOIN | LS | 1 | $ - 0 | $ - 0 |
| 630 2 11 | CONDUIT, FURNISH & INSTALL, OPEN TRENCH | LF | 1003 | $ - 0 | $ - 0 |
| 630 2 12 | CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE | LF | 255 | $ - 0 | $ - 0 |
| 635 2 11 | PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE | EA | 9 | $ - 0 | $ - 0 |
| 639 1112 | ELECTRICAL POWER SERVICE, F&I, OVERHEAD METER PURCHASED BY CONTRACTOR FROM POWER COMPANY | AS | 1 | $ - 0 | $ - 0 |
| 639 3 11 | ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNT | EA | 1 | $ - 0 | $ - 0 |
| 641 2 11 | PRESTRESSED CONCRETE POLE, F&I, TYPE P-II PEDESTAL | EA | 1 | $ - 0 | $ - 0 |
| 715 1 12 | LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 | LF | 4566 | $ - 0 | $ - 0 |
| 715 5 31 | *LUMINAIRE & BRACKET ARM- ALUMINUM, FURNISH & INSTALL NEW LUMINAIRE AND ARM ON NEW/EXISTING POLE* | EA | 10 | $ - 0 | $ - 0 |
| 715 7 11 | LOAD CENTER, F&I, SECONDARY VOLTAGE | EA | 1 | $ - 0 | $ - 0 |
| 715 61311 | LIGHT POLE COMPLETE, F&I, STANDARD POLE STANDARD FOUNDATION, 40' MOUNTING HEIGHT, 8' ARM LENGTH | EA | 6 | $ - 0 | $ - 0 |
| 715 500 1 | POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL, CONVENTIONAL | EA | 6 | $ - 0 | $ - 0 |
| TOTAL BID AMOUNT: | $ - 0 |
| Pay Item Notes: | |
| 715 5 31 | *NOTE: 5 additional luminaires are included in the project quantities and cost estimate for storage by |
Collier County Traffic Ops for future maintenance. The Bid must include that the Contractor is to provide CCTO five (5) additional GE Evolve luminaire fixtures at completion of the Phase 1 Project for storage by CCTO for future use.
File details come from the government source that posted it. Updated .