First Street Corridor Phase I
Solicitation number
25-8371
Issued by
Collier County, Florida

About this file

The file is a Bid Schedule for Collier County's First Street Corridor Phase I Construction (ITB No. 25-8371) in Florida. The project involves infrastructure improvements, specifically electrical and lighting installations. The bid is scheduled for submission by August 21, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting on July 16, 2025, at 10:00 a.m. in Naples. The bid schedule includes multiple line items for electrical infrastructure, such as conduit installation (1,258 linear feet), pull and splice boxes (9 units), electrical service components, lighting conductors (4,566 linear feet), luminaire installations (10 units), and pole systems (6 complete units). The county requires contractors to provide an additional 5 luminaire fixtures for future maintenance.

The bid schedule shows a total bid amount of $0, which suggests this is a placeholder or template document. Bidders must register on the Collier County procurement portal to obtain complete project documents. The project appears to be a comprehensive electrical infrastructure upgrade for the First Street Corridor, with specific technical requirements for electrical conduits, poles, lighting, and associated electrical services. Prospective vendors must carefully review the detailed specifications for each line item and ensure compliance with the county's technical and installation requirements. The project seems to be funded through local government sources, with a focus on infrastructure improvement and future maintenance preparedness.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

First Street Corridor Phase I
Construction ITB No. 25-8371
Bid Schedule
Item No.DescriptionUnitQTYUnit PriceTotal Cost
102 1MAINTENANCE OF TRAFFICLS1$ - 0$ - 0
110 1MOBILIZATOINLS1$ - 0$ - 0
630 2 11CONDUIT, FURNISH & INSTALL, OPEN TRENCHLF1003$ - 0$ - 0
630 2 12CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORELF255$ - 0$ - 0
635 2 11PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZEEA9$ - 0$ - 0
639 1112ELECTRICAL POWER SERVICE, F&I, OVERHEAD METER PURCHASED BY CONTRACTOR FROM POWER COMPANYAS1$ - 0$ - 0
639 3 11ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNTEA1$ - 0$ - 0
641 2 11PRESTRESSED CONCRETE POLE, F&I, TYPE P-II PEDESTALEA1$ - 0$ - 0
715 1 12LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6LF4566$ - 0$ - 0
715 5 31*LUMINAIRE & BRACKET ARM- ALUMINUM, FURNISH & INSTALL NEW LUMINAIRE AND ARM ON NEW/EXISTING POLE*EA10$ - 0$ - 0
715 7 11LOAD CENTER, F&I, SECONDARY VOLTAGEEA1$ - 0$ - 0
715 61311LIGHT POLE COMPLETE, F&I, STANDARD POLE STANDARD FOUNDATION, 40' MOUNTING HEIGHT, 8' ARM LENGTHEA6$ - 0$ - 0
715 500 1POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL, CONVENTIONALEA6$ - 0$ - 0
TOTAL BID AMOUNT:$ - 0
Pay Item Notes:
715 5 31*NOTE: 5 additional luminaires are included in the project quantities and cost estimate for storage by

Collier County Traffic Ops for future maintenance. The Bid must include that the Contractor is to provide CCTO five (5) additional GE Evolve luminaire fixtures at completion of the Phase 1 Project for storage by CCTO for future use.

File details come from the government source that posted it. Updated .