25-8371_-_Exhibit_M_-_LightingPlans_SS_R1.pdf
PDF 1 MB Posted
- Attached to
- First Street Corridor Phase I
- Solicitation number
- 25-8371
- Issued by
- Collier County, Florida
About this file
These lighting plans are for the First Street Corridor Phase I Project in Collier County, Florida, prepared by Kisinger Campo and Associates Corp. The document contains detailed lighting design specifications for South 1st Street from School Road/Seminole Crossing Trail to Eustis Avenue, spanning sheets L-1 through L-7. The plans include a comprehensive lighting design with 11 total light poles (6 new and 5 existing), utilizing 150W luminaires with varying mounting heights of 34' and 40'. The lighting circuit (A-1) will be powered by a 100A, 120/240V single-phase load center with provisions for future circuit expansion.
The technical specifications outline specific installation requirements including conduit routing (both open trench and directional bore), electrical service disconnects, pull and splice boxes, and detailed conductor specifications. The design incorporates standard Florida Department of Transportation (FDOT) specifications for FY 2024-25, with a design wind speed of 160 MPH and specific illumination criteria including a maximum veiling luminance ratio of 0.3:1 and an average initial intensity of 1.0-1.5 foot candles. The project includes coordination requirements with Lee County Electric Cooperative (LCEC) for existing infrastructure and mandates careful utility location and protection during installation.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
c:\pww\kca_prod\dms62126\KEYSLT01.dgnnrussin 7/9/2025 2:47:08 PM Default
LIGHTING PLANS
NO.
SHEET
YEAR
FISCAL
CONTRACT NO.
CONSTRUCTION
EXPRESSWAY
T U
R N P
IK
E
PENSACOLA FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
SARASOTA -
BRADENTON
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
CITY
LAKE
F
LO
R
ID
A 'S
BEACH LINE
ENGINEER OF RECORD:
LIGHTING PLANS
CONTRACT PLANS
PROJECT MANAGER:
COLLIER COUNTY
NO.
SHEET
YEAR
FISCAL
CONTRACT NO.
CONSTRUCTION
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
https://maps.app.goo.gl/kwwGE4iosS3mH7dP8
COLLIER COUNTY
PROJECT NO.: 33831-01
SOUTH 1ST STREET (IMMOKALEE ROAD - C.R. 846 E)
STATE OF
No 88738
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
S L
EUMAS .R TT
O
C S http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:
Florida Department of Transportation, FY 2024-25 Standard Specifications
GOVERNING STANDARD SPECIFICATIONS:
following website: http://www.fdot.gov/design/standardplans
Standard Plans for Road Construction and associated IRs are available at the
Bridge Construction and applicable Interim Revisions (IRs).
Florida Department of Transportation, FY 2024-25 Standard Plans for Road and
GOVERNING STANDARD PLANS:
SHEET NO. SHEET DESCRIPTION
L-1N/A
LOCATION OF PROJECT
N
COLLIER COUNTY
INDEX OF LIGHTING PLANS
VENDOR NO.: F59-1677145
CONTRACT NO.: 18-7432-CE
PHONE: (813) 871-5331
TAMPA, FLORIDA 33602
201 N. FRANKLIN STREET, SUITE 900
KISINGER CAMPO AND ASSOCIATES CORP.
P.E. No. 88738
SCOTT R. SAMUELS, P.E.
YVONNE BLAIR
FROM SCHOOL RD. / SEMINOLE CROSSING TRAIL TO EUSTIS AVE.
L-5 - L-7
L-4
L-3
L-2
L-1
LIGHTING PLANS
LIGHTING DATA & LEGEND
GENERAL NOTES
TABULATION OF QUANTITIES
KEY SHEET
T H
E
O F
F I
C I
A L
R
C O
D
T
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
A L
U
D
L E
G
A c:\pww\kca_prod\dms62126\TABQLT01.dgnnrussin 1/3/2025 12:44:08 PM Default
COLLIER CR-846
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEET
KISINGER CAMPO
& ASSOCIATES
Tampa, Florida 33602
201 N. Franklin Street, Suite 900
P.E. No.:88738
Engineer of Record:Scott R. Samuels, P.E.
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
33831-01 L-2
TABULATION OF QUANTITIES
TABULATION OF QUANTITIES
NO.
ITEM
PAY
DESCRIPTION UNIT
SHEET NUMBERS
SHEET
THIS
TOTAL
TOTAL
GRAND
L-5 L-6 L-7
PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL
630-2-11 CONDUIT, FURNISH & INSTALL, OPEN TRENCH LF 64 532 407 1003 1003
630-2-12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 173 82 255 255
635-2-11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 6 3 9 9
639-1-112 ELECTRICAL POWER SERVICE, F&I, OVERHEAD METER PURCHASED BY CONTRACTOR FROM POWER COMPANY AS 1 1 1
639-3-11 ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNT EA 1 1 1
641-2-11 PRESTRESSED CONCRETE POLE, F&I, TYPE P-II PEDESTAL EA 1 1 1
715-1-12 LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 LF 240 2571 1755 4566 4566
715-5-31 LUMINAIRE & BRACKET ARM- ALUMINUM, FURNISH & INSTALL NEW LUMINAIRE AND ARM ON NEW/EXISTING POLE EA 1 3 1 5 5
715-7-11 LOAD CENTER, F&I, SECONDARY VOLTAGE EA 1 1 1
715-61-311 LIGHT POLE COMPLETE, F&I, STANDARD POLE STANDARD FOUNDATION, 40' MOUNTING HEIGHT, 8' ARM LENGTH EA 1 3 2 6 6
715-500-1 POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL, CONVENTIONAL EA 1 3 2 6 6 c:\pww\kca_prod\dms62126\GNNTLT01.dgnnrussin 7/9/2025 2:23:39 PM Default
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
Tampa, Florida 33602
201 N. Franklin Street, Suite 900
P.E. No.:88738
Engineer of Record:Scott R. Samuels, P.E.
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
33831-01
GENERAL NOTES
L-3
160 MPHDESIGN WIND SPEED
0.3:1 OR LESSVEILING LUMINANCE RATIO (Lv(max.)/Lavg.)
10:1 OR LESS MAX./MIN.
4:1 OR LESSUNIFORMITY RATIO AVG./MIN.
1.0-1.5 FOOT CANDLESAVERAGE INITIAL INTENSITY (HORIZONTAL FOOT CANDLES)
CONVENTIONAL LIGHTING ILLUMINATION CRITERIA
EXOTHERMIC WELD
GROUND ROD ACORN OR
GROUND ROD
5/8" COPPER CLAD
TEN (10) FOOT LENGTH
MINIMUM OF TWO (2),
STREETLIGHT POLE WIRING DETAIL
STREETLIGHT T-BASE WIRING CONNECTIONS
BLACK, RED, GREEN
#10 AWG THHN/THWN-2
CONNECTOR
SPLICE CRIMP
PROPER SIZED BUTT
235240NF030AWLN0)
(ASCO MODEL 235 -
240VAC SURGE ARRESTOR
HEB-AW-RYC)
CONNECTOR. (BUSSMANN -
HAVING CU CRIMP
LOADSIDE TERMINAL
SETSCREW AND THE
HAVING A CU DUAL
WITH LINESIDE TERMINAL
BREAKAWAY FUSE HOLDER
KTK-5 FUSE
RED, GREEN
THHN/THWN-2 BLACK,
MINIMUM #10 AWG
PVC CONDUIT
TWO (2) INCH 3/4 INCH PVC CONDUIT
TERMINAL LUG
THHN/THWN-2
GREEN #6 AWG
OR COPPER C TAP
COPPER SPLIT BOLT
PROPERLY SIZED
KTK-5 FUSE
(BUSSMAN - HEB-AW-RYC)
CRIMP CONNECTOR.
LOADSIDE TERMINAL HAVING CU
CU DUAL SETSCREW AND THE
LINESIDE TERMINAL HAVING A
BREAKAWAY FUSE HOLDER WITH
WITH LCEC TO MODIFY THEIR ASSETS.
THE FIVE EXISTING STREETLIGHT POLES ON THE WEST SIDE OF FIRST STREET ARE LCEC OWNED AND MAINTAINED. CONTACT/COORDINATE 10.
INCLUDES BUT IS NOT LIMITED TO BURIED OR EMBEDDED CONDUIT, GROUNDING CONDUCTORS, GROUND RODS, AND GROUNDING ARRAYS.
RESPONSIBILITY TO EXPOSE THE QUESTIONED ITEM(S) FOR THE INSPECTORS' APPROVAL, AT NO ADDITIONAL COST TO THE COUNTY. THIS
LIGHTING/SIGNAL INSPECTOR GIVES APPROVAL. IN THE EVENT THE FOLLOWING ITEMS ARE CONCEALED, IT WILL BE THE CONTRACTOR'S
CONCEALED WORK: ALL WORK WHICH WILL NOT BE READILY VISIBLE UPON COMPLETION MUST NOT BE CONCEALED UNTIL A COUNTY ROADWAY 9.
AT ALL TIMES IN PERFORMING WORK AROUND THE PRIMARY HIGH VOLTAGE COMPONENTS.
CONDUCTORS AT INSTALLATION SITE, OR TAKE OTHER SAFETY PRECAUTIONS AS NECESSARY. EXTREME CAUTION SHALL BE EXERCISED
ENERGIZED ELECTRICAL CONDUCTORS. LCEC, AT ITS OPTION, SHALL ASSIST THE CONTRACTOR, PROVIDE PROTECTION FOR ENERGIZED
NOTIFY LEE COUNTY ELECTRIC COOPERATIVE (LCEC) AT LEAST 2 BUSINESS DAYS PRIOR TO ANY INSTALLATION THAT IS WITHIN TEN (10) FEET OF8.
TO COLLIER COUNTY TRAFFIC OPERATIONS.
ALL STREET LIGHT EQUIPMENT/MATERIALS/INFRASTRUCTURE THAT WILL BE REMOVED AND THAT CAN BE SALVAGED SHALL BE RETURNED7.
WHENEVER THE WORK ZONE BECOMES INACTIVE. DO NOT OPEN ANY AREA THAT CANNOT BE BACK FILLED IN THE SAME WORK PERIOD.
ALL CONDUIT TRENCHES SHALL BE BACK FILLED COMPLETELY TO PROVIDE SAFE CROSSING BY THE END OF EACH WORKING DAY OR 6.
DETERMINED BY THE ENGINEER, HAND DIG THE FIRST FOUR FEET OF THE HOLE FOR THE POLE FOUNDATION AND CONDUIT RUN.
AT LOCATIONS WHERE UNDERGROUND UTILITIES ARE WITHIN TWO FEET OF THE LIGHT POLE FOUNDATIONS OR CONDUIT RUNS, AS 5.
ACTUAL POLE LENGTHS MAY VARY.
MOUNTING HEIGHT IS HEIGHT OF THE FIXTURE RELATIVE TO THE CROWN OF THE ROADWAY THAT IS INTENDED TO LIGHT. 4.
SSOCOF.
FLORIDA, INC. (SSOCOF) A MINIMUM OF TWO (2) FULL BUSINESS DAYS AT 1 800-432-4770. NOT ALL UTILITY COMPANIES ARE MEMBERS OF
STATE OF FLORIDA STATUTE 556 (2008) REQUIRES THAT BEFORE EXCAVATION, NOTICE BE GIVEN TO THE SUNSHINE STATE ONE CALL OF 3.
NOTIFY THE UTILITY COMPANY OWNER(S) FOR LOCATION AND STAKING OF UNDERGROUND FACILITIES BEFORE EXCAVATING.
TO THE ENGINEER BY THE UTILITY OWNER(S) AND ARE SHOWN AS NOTICE TO THE CONTRACTOR THAT UNDERGROUND UTILITIES EXIST.
THE LOCATIONS OF EXISTING UTILITIES, AS SHOWN ON THESE PLANS, ARE APPROXIMATE AND BASED ON THE INFORMATION FURNISHED 2.
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, NATIONAL ELECTRICAL CODE (NEC) AND COLLIER COUNTY ROADWAY LIGHTING DESIGN STANDARDS.
ALL WORK ON COLLIER COUNTY ARTERIALS SHALL CONFORM TO CURRENT FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) STANDARD1.
LIGHTING GENERAL NOTES:
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEET
ROAD NO. FINANCIAL PROJECT IDCOUNTY
COLLIER COUNTY
COUNTY
COLLIER
LIGHTING DATA & LEGEND
SYMBOL DESCRIPTION
LIGHTING LEGEND
EXISTING PULL BOX
COPPER BOND CONDUCTOR (TW GREEN INSULATION) INSIDE CONDUIT WITH OTHER CONDUCTORS.
PROPOSED 2" OPEN TRENCH CONDUIT (CONDUCTOR SIZE AS SHOWN ON PLAN SHEETS). RUN ONE
REMOVE EXISTING LIGHT POLE
BOND CONDUCTOR (TW GREEN INSULATION) INSIDE CONDUIT WITH OTHER CONDUCTORS.
PROPOSED 2" DIRECTIONAL BORE (CONDUCTOR SIZE AS SHOWN ON PLAN SHEETS). RUN ONE COPPER
PROPOSED PULL BOX
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
L-4
INSTALLED IN THE COMPLETE LIGHT POLE ASSEMBLY.
DISTRIBUTION SYSTEM. PCDS TO BE PAID FOR SEPERATELY. A FIELD ADJUSTABLE OUTPUT SHALL BE
SYMBOL INCLUDES LUMINAIRE, POLE, FOUNDATION, MOUNTING HARDWARE, AND POLE CABLE
ANALYZED USING GE ERL2, FILE NAME: ERL2_19C330_____.ies
PROPOSED CONVENTIONAL LIGHT POLE WITH 40' MOUNTING HEIGHT, 8' ARM, 150 W LUMINAIRE.
EXIST. CONDUIT AND CONDUCTORS TO REMAIN
INSTALLED IN THE RETROFIT LUMINAIRE ASSEMBLY.
SYMBOL INCLUDES LUMINAIRE, MOUNTING HARDWARE. A FIELD ADJUSTABLE OUTPUT SHALL BE
ANALYZED USING GE ERL2, FILE NAME: ERL2_19C330_____.ies
RETROFIT EXISTING LIGHT POLE WITH 150W LED LUMINAIRE ON 12' ARM, 34' MH.
PROPOSED LOAD CENTER
POLE DATA
NO.
POLE
CIRCUIT STATION OFFSET
OR ARM
DIST.
WATTAGE
LUMINAIRE
HEIGHT
MOUNTING
PAY ITEM
1 EXIST. 23+38.35 48.39' LT 12' 150 W 34' 715 5 21
2 A-1 24+33.79 31.00' RT 8' 150 W 40' 715 61 311
3 EXIST. 25+04.57 48.55' LT 12' 150 W 34' 715 5 21
4 A-1 26+49.85 31.00' RT 8' 150 W 40' 715 61 311
5 EXIST. 27+63.84 47.52' LT 12' 150 W 34' 715 5 21
6 A-1 28+97.08 47.15' RT 8' 150 W 40' 715 61 311
7 EXIST. 30+21.12 47.19' LT 12' 150 W 34' 715 5 21
8 A-1 31+75.53 48.11' RT 8' 150 W 40' 715 61 311
9 A-1 32+80.12 40.94' RT 8' 150 W 40' 715 61 311
10 EXIST. 33+08.10 48.50' LT 12' 150 W 34' 715 5 21
11 A-1 34+55.22 38.32' RT 8' 150 W 40' 715 61 311
MAIN 100
(LOAD CENTER SCHEDULE)
SERVICE POINT "A" POLES: 4
VOLTAGE 120/240
PHASE 1-WIRE: 3 AIC RATING: 35K
CKT. NO. KVA AMPS/PHASE
CIRCUIT BREAKER
LUMINAIRES LOAD
AMPS POLES
A-1 0.90 3.75 40 2 6 (Conventional Light Poles)
Roadway Lighting
A-2 (SPARE)
A-3 (SPARE)
A-4 (SPARE)
MCB 100A - 2P
CONNECTED LOAD 0.90 KVA
TOTAL DEMAND LOAD 3.75 AMPS
CR-846 33831-01
KISINGER CAMPO
& ASSOCIATES
Tampa, Florida 33602
201 N. Franklin Street, Suite 900
P.E. No.:88738
Engineer of Record:Scott R. Samuels, P.E.
c:\pww\kca_prod\dms62126\PLANLT01.dgnnrussin 1/3/2025 12:44:16 PM Default
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
Tampa, Florida 33602
201 N. Franklin Street, Suite 900
P.E. No.:88738
Engineer of Record:Scott R. Samuels, P.E.
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
33831-01
C B
C B
18 19 20 21 22 23 24 25
N
S C
H O
SOUTH 1ST STREET
S E
M I
N O
O S
S I
G
A I
L
EXIST. R/W LINE
EXIST. R/W LINE
£ SURVEY 1ST ST
STA. 23+35.19
BEGIN LIGHTING
630-2-1164 LF
Feet
0 10
48.39' LT
STA. 23+38.35
POLE NO. 1
1 - #6 GND.
2 - #6
LIGHTING CONDUCTORS:
ON THIS SHEET SHALL HOUSE THE FOLLOWING
UNLESS OTHERWISE NOTED, ALL PROPOSED CONDUIT
CKT. A-1
31.00' RT
STA. 24+33.79
POLE NO. 2
L-5
LIGHTING PLAN (1)
M A
T C
H
L I N
E
S
T A
.5 nrussin 1/3/2025 12:44:16 PM Default
KISINGER CAMPO
& ASSOCIATES
Tampa, Florida 33602
P.E. No.:88738
19+00 20+00 21+00 c:\pww\kca_prod\dms62126\PLANLT02.dgnnrussin 1/3/2025 12:44:20 PM Default
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
Tampa, Florida 33602
201 N. Franklin Street, Suite 900
P.E. No.:88738
Engineer of Record:Scott R. Samuels, P.E.
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
33831-01
C B
C B
C B
C B
D
D
C B
25 26 27 28 29 30 31 32
SOUTH 1ST STREET
C A
R V
EXIST. R/W LINE
EXIST. R/W LINE
630-2-11 630-2-11
630-2-11 630-2-11
630-2-11
630-2-12
630-2-12
630-2-12
SPARE CONDUIT
SPARE CONDUIT155 LF
152 LF
2 RUNS @ 44 LF
82 LF
2 RUNS @ 44 LF
116 LF
2 RUNS @ 85 LF
27 LF
Feet
0 10
N
CKT. A-1
47.15' RT
STA. 28+97.08
POLE NO. 6
CKT. A-1
48.11' RT
STA. 31+75.53
POLE NO. 8
47.52' LT
STA. 27+63.84
POLE NO. 5
48.55' LT
STA. 25+04.57
POLE NO. 3
47.19' LT
STA. 30+21.12
POLE NO. 7
1 - #6 GND.
2 - #6
LIGHTING CONDUCTORS:
ON THIS SHEET SHALL HOUSE THE FOLLOWING
UNLESS OTHERWISE NOTED, ALL PROPOSED CONDUIT
CKT. A-1
31.00' RT
STA. 26+49.85
POLE NO. 4
M A
T C
H
L I N
E
S
T A
.5
LIGHTING PLAN (2)
L-6
M A
T C
H
L I N
E
S
T A
.5 c:\pww\kca_prod\dms62126\PLANLT03.dgnnrussin 1/3/2025 12:44:23 PM Default
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
Tampa, Florida 33602
201 N. Franklin Street, Suite 900
P.E. No.:88738
Engineer of Record:Scott R. Samuels, P.E.
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
33831-01
M B
B
BB
B
C B
C B
D
C B
32 33 34 35 36 P
A
.3
37 38 39
SOUTH 1ST STREET
E U
S T
V
E
E U
S T
V
E
EXIST. R/W LINE
EXIST. R/W LINE
EXIST. R/W LINE
EXIST. R/W LINE
CKT. A-1
38.32' RT
STA. 34+55.22
POLE NO. 11
630-2-11
630-2-11
82 LF
176 LF
Feet
0 10
N
CKT. A-1
40.94' RT
STA. 32+80.12
POLE NO. 9
149 LF630-2-11
630-2-12
2 RUNS @ 82 LF
SPARE CONDUIT
£ SURVEY 1ST ST
STA. 34+55.22
END LIGHTING
1 - #6 GND.
2 - #6
LIGHTING CONDUCTORS:
ON THIS SHEET SHALL HOUSE THE FOLLOWING
UNLESS OTHERWISE NOTED, ALL PROPOSED CONDUIT
42.96 LT.
STA. 33+03.45
SPARE: 40A, TWO POLE BREAKER
SPARE: 40A, TWO POLE BREAKER
SPARE: 40A, TWO POLE BREAKER
CKT A-1: 40A, TWO POLE BREAKER
(100A, 240V, 2-POLE)
WITH PHOTOCELL AND CONTACTOR
100 AMP MAIN BREAKER (TWO-POLE)
3 #2 UNDERGROUND SERVICE WIRE
120V/240V SINGLE PHASE SERVICE
LOAD CENTER "A"
48.50' LT
STA. 33+08.10
POLE NO. 10
DURING INSTALLATION
CTL PED #65409
EXIST. BT, BFO, &
LOCATE AND ADJUST
DURING INSTALLATION.
EXIST. BT & CTL PED #18655
LOCATE AND ADJUST
M A
T C
H
L I N
E
S
T A
.5
LIGHTING PLAN (3)
L-7
M A
T C
H
L I N
E
S
T A
.5
| 2025-07-10T13:53:31-0400 | |
| Scott Samuels | |
| I am approving this document |
File details come from the government source that posted it. Updated .