ENG 25-04C STREET TREE PURCHASE & PLANTING - REBID #2
Solicitation number
2026-ENGINEERING-038
Issued by
Kalamazoo County, Huntington Woods City, Michigan

About this file

This document is the specifications and bidding requirements for the City of Jackson, Michigan's street tree purchase and planting project (ENG 25-04C). The City seeks bids for furnishing, delivering, planting, maintaining, and guaranteeing approximately 200 street trees across a minimum of 15 tree species for spring 2027 planting season. Bid responses are due by Wednesday, September 30, 2026, by 10:00 AM, with contract award anticipated at the October 20, 2026 City Council meeting. Work must commence no earlier than April 1, 2027, with tree plantings to be completed by no later than June 18, 2027. Substantial completion and roadway approval for traffic is required by July 2, 2027. The contract includes an establishment period of one year following Engineer acceptance of tree planting work, during which the contractor must maintain tree health through watering, staking adjustments, and other necessary maintenance at no additional cost. The contract may be renewed for up to two additional planting seasons (Fall 2027 and Spring 2028) upon mutual agreement, with a cost-of-living adjustment of up to 3% for each renewal term. Final project completion, including punch list items and restored turf grass, must be achieved by October 31, 2029.

The project is funded by a USDA grant, requiring the successful bidder and all subcontractors to comply with Davis-Bacon Act requirements and prevailing wage standards as established by the U.S. Department of Labor Wage Decision. Contractors must follow Disadvantaged Business Enterprise (DBE) requirements and maintain documentation of Good Faith Efforts (GFE). Payment for each tree is a single unit price covering all costs associated with furnishing, transporting, and installing each tree in accordance with Section 815 of the 2020 MDOT Standard Specifications for Construction and the provided planting details. The contractor must provide certificates of insurance within ten days of award notification and must notify Michigan's utility locating service (Miss Dig) at least three full working days prior to any excavation. Failure to achieve the Substantial Completion milestone will result in liquidated damages assessed in accordance with MDOT specifications. Utility coordination and cooperation with other construction activities occurring within or adjacent to tree planting locations are required, with no additional compensation permitted for delays resulting from others' work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF JACKSON

ENG 25-04C STREET TREE

PURCHASE & PLANTING

Bid Responses Due: WEDNESDAY, SEPTEMBER 30, 2026, BY 10:00 AM

CONTENTS

TREE PLANTING MAP

TREE PLANTING DETAIL

FUNDING AGENCY REQUIRMENTS

SPECIAL PROVISIONS

CITY OF JACKSON, MICHIGAN

161 W. Michigan Avenue Jackson, Michigan 49201

Ann Arbor Rd

Fa la he e

Rd

Ann Arbor Rd

S US 127

N US 127

4th St

E High StS W es t A ve

Cooper St

E Michigan Ave

1s t S t

N We st Av e

N Wi sn er

St

E Ganson St

W High St

S B ro wn S t

S E lm

Av e

N Elm

Av e

E I 94

W Morrell St

Page Ave

W Ganson St

S J ac ks on

St

W Franklin St

W Monroe St

E North St

La ns ing Av e

S Cooper St

S W isn er St

N Wa ter loo

Av e

W Michigan Ave

Wildwood Ave

Morrell St

S M art in Lu th er

Ki ng

S t

Kibb y R d

St ew ard Av e

E Washington Ave

Plymouth St

Gr een wo od

Av e

S G or ha m

St W Prospect St E Prospect St

Brooklyn Rd

Lo se y A ve

Hupp Ave

W Washington Ave

W Argyle St

W Trail St

Elmdale Dr

E South St

E Porter St

S M ec ha nic

St N

Me ch an ic

St

E Morrell St

S B lac ks ton e S t

W Louis Glick Hwy

E Franklin St

S East Ave

Randolph St

N Br ow n S t

N Ma rti n L uth er

K ing

S t

Griswold St

N Ho rto n S t

W North St

Daniel Rd

W North St W North St

STREET TREE PLANTINGS

BOUNDARY MAP

November 2025

0 0.25 0.5 Miles

S u m m i tS u m m i t n

Michigan

C ooper

Washington

Possible Tree Planting Locations (For Bidding Purposes Only, Subject to Change)

0 0.25 0.5

Miles

M:\Shared_GIS\Tree Removals 2025.aprx 5/26/2026

Large

Small

Medium

Mature Size

Tree Planting Detail Scale: No scale

Modified from Dr. Bonnie Appleton, Virginia Polytechnic Institute and State University Courtesy of Michigan Department of Natural Resources, Forest Management Division

Do not prune terminal leader or branch tips.

Prune away dead or broken branches only.

Remove nursery applied tree wrap, tape or string from tree trunk and crown. Remove and tags or labels.

Prune suckers off.

Set rootball level to grade or slightly above grade (1/2”) if in clay soil.

Mulch 2” – 3” deep leaving 3” circle of bare soil around trunk of tree.

Fold down or pull back string, burlap or plastic exposing rootball. Remove all non-degradable materials. Do not remove soil from rootball.

Break up (scarify) sides of planting hole.

Center rootball in planting hole. Leave bottom of planting hole firm. Do not amend soil unless planting in poor or severely disturbed soil or building rubble. Use water to settle soil and remove air pockets and firmly set tree. Gently tamp if needed.

Do not stake unless in heavy clay soil, windy conditions, 3” or greater diameter tree trunk or large crown. If staking is needed due to these conditions:

§ Stake with 2 x 2 hardwood stakes or approved equal driven 6”

– 8 “ outside of rootball.

§ Loosely stake tree trunk to allow for trunk flexing.

§ Stake trees just below first branch with 2” – 3” wide belt-like, nylon or plastic straps (2 per tree on opposite sides of tree, connect from tree to stake horizontally. Do not use rope or wire through a hose.)

§ Remove all staking materials after 1 year.

Width = 2-3x rootball

, and City of Jackson.

Jeff Crow Line

Jeff Crow Line

Jeff Crow Line

Jeff Crow Line

FA 1 of 2

FUNDING AGENCY REQUIREMENTS

The Contract awarded under this Invitation to Bid is funded by a grant from USDA. The successful bidder, and all subcontractors, must comply with USDA requirements including the Davis-Bacon Act. Due to the requirements of the USDA funding, the bidding contractor shall follow the Disadvantaged Business Enterprise (DBE) Requirements and maintain documents of the Good Faith Efforts (GFE).

FA 2 of 2

Davis-Bacon and Related Acts/Prevailing Federal Wages P.L. 111-88 requires compliance with the Davis Bacon Act and adherence to the current U.S. Department of Labor Wage Decision. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents (see Wage Decision included herein) must be paid on this project. The Wage Decision, including modifications, must be posted by the Contractor on the job site. The “Contracting Agency” or “Contracting Officer” for Davis-Bacon Wage Decision posters on jobsites is the loan applicant/bond issuer. A copy of the Labor Standards Provisions for Federally Assisted Projects is included and is hereby a part of this contract.

INDEX of SPECIAL PROVISIONS

MDOT Standard Specs and Supp Conditions ........................................ SP 1 of 17

Progress Clause ..................................................................................... SP 2 of 17

Coordination Clause ............................................................................... SP 4 of 17

Utility Coordination ................................................................................. SP 5 of 17

Landscaping ........................................................................................... SP 6 of 17

Errata to the 2020 Standard Specifications ............................................ SP 7 of 17

MDOT STANDARD SPECIFICATIONS AND SUPPLEMENTARY CONDITIONS

HRC:JDC 1 of 1 6/3/26

a. General

The Michigan Department of Transportation 2020 Standard Specifications for

Construction (referenced herein as the “MDOT Standard Specifications for Construction”) are hereby incorporated by reference and shall be deemed to be a part of these contract documents as though herein written in its entirety. The MDOT Standard Specifications for Construction shall be changed and supplemented by the Supplemental Specifications, Special Provisions and errata included in these contract documents. MDOT Standard Specifications for Construction are available for review and download from the MDOT website.

Unless otherwise omitted, changed or supplemented, the Division 1 “General Provisions” of the MDOT Standard Specifications for Construction shall be incorporated into the City’s General Conditions for this contract (pp. G-1 through G-14). In the event of any inconsistency, discrepancy or conflict between the aforementioned MDOT General Provisions and other contract documents including, but not necessarily limited to, pp. G-1 through G-14, said other contract documents shall govern.

Throughout the specifications, the term “Engineer” shall mean the City Engineer of the

City of Jackson or his designee. The MDOT Standard Specifications for Construction, Division 1 “General Provisions” shall be changed and supplemented as follows:

Section 102 Bid Submission, Award and Execution of Contract (This section shall be omitted in its entirety)

Section 104.09 Lines, Grades, and Elevations (This section shall be omitted in its entirety)

Section 104.10 Claim for Extra Compensation or Extension of Time (This section shall be omitted in its entirety)

Section 104.11 Work Zone Safety and Mobility (This section shall be omitted in its entirety)

Section 107.10 Indemnification, Damage Liability and Insurance, paragraphs A through D (This section shall be omitted in its entirety)

Section 109.04 Progress and Partial Payments (This section shall be omitted in its entirety)

PROGRESS CLAUSE

HRC:JDC 1 of 2 7/20/26

It is expected that this contract will be awarded at the October 20, 2026 City Council meeting, after which a Notification of Award will be provided by the City to the approved bidder.

Within ten (10) days of Notification of Award, the approved bidder must provide certificates of insurance evidencing insurance coverage as required by the Contract. A Notice to Proceed will then be provided to the Contractor by the City. The Contractor must begin work on a date agreed upon with the City, which date shall be no earlier than April 1, 2027. In no case shall any work be commenced prior to receipt of formal notice of award by the City.

The approved bidder(s) for the work covered by this proposal will be required to participate in a pre-construction meeting with the Engineer. The Engineer will arrange the time and place for the preconstruction meeting after contract award. The named subcontractor(s) for Designated and/or Specialty Items, as shown in the Proposal, is(are) recommended to be at the preconstruction meeting if such items materially affect the work schedule.

The Contractor shall attend bi-weekly construction progress meetings and shall provide updates to the Engineer that shall include work completed to date, a two-week outlook for upcoming work, and any necessary updates regarding the Milestone dates identified herein.

b. Milestones

The contract term shall include tree plantings until a date agreed upon with the City, which date shall be no later than June 18, 2027.

1. Substantial Completion

Work shall be substantially completed and the roadways be designated as “Approved for Traffic” no later than July 2, 2027. The “Approved for Traffic” condition shall be as defined in section 107.21, Approved for Traffic, of the MDOT 2020 Standard Specifications for Construction.

This shall include tree plantings, restoration, and removal of soil erosion and traffic control items.

2. Establishment Period

The establishment period shall begin upon the Engineer's acceptance of all tree planting work and shall continue for a period of one (1) year.

During the establishment period, the Contractor shall provide all labor, materials, equipment, and incidentals necessary to maintain the health of the trees, including watering, staking adjustments or removal, and other maintenance required to ensure proper establishment.

HRC:JDC 2 of 2 7/20/26

The Contractor shall guarantee that all planted trees are healthy and acceptable through the end of the establishment period. At no additional cost to the City, the Contractor shall remove and replace any trees deemed by the Engineer to be dead, unhealthy, or otherwise unacceptable during this period. Trees damaged or lost due to vehicle impacts, vandalism, ice storms, or other causes beyond the Contractor's control shall not be considered unacceptable under this guarantee.

3. Replacement Trees

Replacement trees shall be installed during the next available planting season on a date agreed upon with the City, and be subject to a one (1) year establishment period beginning on the date of the Engineer's acceptance of the replacement tree work.

4. Contract Completion

The entire project, including punch list items, replacement tree plantings, and restored turf grass, shall be completed on or before October 31, 2029.

c. Liquidated Damages

Failure by the Contractor to achieve the Substantial Completion milestone shall result in the assessment of liquidated damages in accordance with Section 108.10 of the 2020 MDOT Standard Specifications for Construction.

COORDINATION CLAUSE

Other construction activities, utility work, and private development may occur within or adjacent to the tree planting locations during the term of this contract.

The Contractor shall comply with the cooperation requirements of Section 104.08 of the

MDOT Standard Specifications for Construction and shall coordinate its operations, including scheduling, material storage, and equipment staging, to minimize interference with the work of others.

The Contractor shall consider and accommodate the activities of utility companies, public agencies, and private property owners performing work in the vicinity of the tree planting locations.

No additional compensation, time extension, or claim for damages shall be allowed due to delays, conflicts, or impacts resulting from the work of others.

UTILITY COORDINATION

For protection of underground utilities and in conformance with Public Act 53, the

Contractor shall dial 1-800-482-7171 a minimum of three (3) full working days, excluding Saturdays, Sundays, and holidays, prior to beginning each excavation in areas where public utilities have not been previously located. Members will thus be routinely notified. This does not relieve the Contractor of the responsibility of notifying utility owners who may not be a part of the “Miss Dig” alert system.

The following Public Utilities have facilities located within the right-of-way:

Consumers Energy – Gas Division Tyler Lawrence (517) 888-3882

Consumers Energy – Electric Division Eddie Haire (517) 262-1473

AT&T Telephone Karen Trudgen (517) 392-1340

City of Jackson – Water Division Jeremiah Spencer (517) 788-4170

City of Jackson – Traffic Signs & Signals Lee Rose (517) 788-4160

City of Jackson – Sanitary & Storm Sewer Jeff Crow (517) 788-4160

Comcast - Cable Dave Dostie (248) 459-0246

The contractor shall cooperate and coordinate construction activities with the owners of utilities as stated in section 104.08 for the MDOT Standard Specifications for Construction. In addition, for the protection of underground utilities, the contractor shall follow the requirements in section 107.12 of the MDOT Standard Specifications for Construction. Contractor delay claims, resulting from a utility, will be determined based upon section 109.05.E of the MDOT Standard Specifications for Construction.

LANDSCAPING

This work shall consist of furnishing, transporting and installing the trees in accordance with Section 815 of the 2020 Michigan Department of Transportation Standard Specifications for Construction, details in the plans, as directed by the engineer and as specified herein.

a. Materials

The materials shall meet the requirements as specified in Section 815 of the 2020 MDOT Standard Specifications for Construction, except that the materials specified shall be larger or of different species or variety than the standard MDOT pay items, as noted in the pay item.

c. Construction

Construction methods shall meet the requirements as specified in the 2020 MDOT Standard Specifications for Construction.

d. Measurement and Payment

The completed work, as described, will be measured and paid for at the contract unit price using the following pay item:

Pay Item Pay Unit Species ‘Cultivar’, 1 1/2 inch ...................................................................................... Each

Payment for each item shall be payment in full for all costs associated with furnishing, transporting and installing each tree. All materials, labor and equipment required to prepare and install the plant material, per the 2020 MDOT Standard Specifications for Construction and the drawing details, will be considered included in the contract unit price for each item.

20SS-001A-16

MICHIGAN

DEPARTMENT OF TRANSPORTATION

SUPPLEMENTAL SPECIFICATION

FOR

ERRATA TO THE 2020 STANDARD SPECIFICATIONS

1 of 11 04-30-24

Page Subsection Errata

1-06 101.02 Delete the second abbreviation of the list on this page reading:

“IES ............... Illuminating Engineering Society

1-06 101.02 Add the abbreviation to the list on this page reading:

“IESNA Illuminating Engineering Society of North America

1-07 101.02 Change the first abbreviation of the list on this page to read:

MMUTCD ....... Michigan Manual on Uniform Traffic Control Devices

1-83 108.05.A.2 In the first paragraph of this subsection change the language

“MDOT Form 1130” to read “MDOT Form 1130A”.

1-88 108.08.D Move the last paragraph of this subsection to the left one indent to align with the first paragraph of the subsection and not with the subsection 108.08.D.3.

2-29 205.03.P.1 Delete the first sentence of this subsection and replace with the following:

“Do not dispose of material, temporarily or permanently, beyond the normal plan fill slope across wetlands or floodplains.”

2-30 205.03.P.2 Delete the first sentence of this subsection and replace with the following:

“Do not dispose of material, temporarily or permanently, in wetlands or floodplains.”

2-30 205.03.P.3 Delete the second paragraph of this subsection and replace with the following:

“Contact the appropriate regulatory agencies to determine whether an area is a regulated wetland or floodplain before disposing of surplus or unsuitable material in areas outside the right-of-way and not shown on the plans as disposal sites.”

2-30 205.03.P.3 Delete the first sentence of the third paragraph of this subsection and replace with the following:

“Immediately move to an upland site any surplus or unsuitable material that was disposed of in portions of wetlands or floodplains not shown on the plans as disposal sites, at no additional cost to the Department.”

2 of 11 04-30-24

2-30 205.03.P.4 Delete the first sentence of this subsection and replace with the

“The Department will notify the applicable regulatory agencies if the

Department becomes aware that the Contractor disposed of surplus or unsuitable material in portions of a wetland or floodplain not shown on the plans.”

3-31 308.04.D Change the subsection title from “D. General.” to read “A. General.”

4-7 401.03.E Delete the third sentence of the second paragraph of this subsection and replace with the following:

“Use precast or cast-in-place footings for precast end sections as required.”

4-8 401.03.E Delete the first sentence of the fourth paragraph on this page of this subsection and replace with the following:

“When discharging stormwater directly to waters of the state, permanently label all end sections or other piped points of stormwater entry with “MDOT” or the local agency’s name in a conspicuous location that will remain visible after construction.”

4-11 401.04 Change the eighth pay item from the bottom of the list on this page to read as follows:

Culv End Sect __ inch, Grate .................................................. Each

4-12 401.04.C.4 Change this subsection to read:

“The Engineer will measure Culv End Sect __ inch, Grate by each as shown on the plans for the size of grate required.”

4-21 402.03 Add a new subsection to the end of subsection 402.03 on this page reading as follows:

“K. Outfall Labeling. Label all stormwater outfalls directly discharging to waters of the state in accordance with subsection 401.03.E.

4-39 406.02 Change the third line in the list of materials to read:

Coarse Aggregate 6A, 6AA, 17A

4-41 406.03.A.3 Delete the third paragraph of this subsection and replace with the following:

“Design joints between adjacent box culvert sections in accordance with Section 9 of ASTM C1577 and to accommodate the joint sealing material in accordance with section 914 as applicable.”

4-50 406.03.G.3 Change the first sentence of the first paragraph to read:

“Unless otherwise shown on the plans, construct culvert bedding for box culverts by placing a 9-inch-thick layer of 46G aggregate, covered with a 3-inch-thick layer of 34G, 34R aggregate, or approved equal.”

3 of 11 04-30-24

4-51 406.03.G.3 Add the following sentence to the end of the second paragraph of this subsection:

“The cold applied joint sealer must completely cover the external rubber gasket with the placement limits matching the width of the geotextile blanket.”

4-52 406.04.B In the second paragraph of this subsection delete the first sentence

“The Department will pay separately for cast-in-place concrete, other than for culvert segments, headwalls, wingwalls, aprons, and curtain walls.”

5-26 502.02 Delete the first sentence of the subsection and the listed materials in this subsection.

5-26 502.02.A Add the following to the end of the first sentence in this subsection:

“(914.04A)”

5-26 502.02.B Add the following to the end of the first sentence in this subsection:

“(502.02B)”

5-35 503.04 Change the first paragraph to read:

“The unit price for Paver-Placed Surface Seal, of the type required, includes the cost of preparing the surface, and placing a membrane and paver placed surface seal course for full-width coverage, except that the Department will pay separately for removing pavement markings in accordance with subsection 812.04”

5-46 504.04.A Change the first paragraph to read:

“A. General. The unit prices for Micro-Surface, regardless of the type required, include cleaning existing pavement, applying a bond coat, stationing, corrective action, and traffic control to complete corrective action.”

6-20 602.04 Delete the fifteenth pay item of the list on this page reading:

“Shoulder, Reinf Conc ................................................. Square Yard

6-20 602.04 Change the sixteenth thru the eighteenth pay items on this page to read as follows:

Shld, Nonreinf Conc .................................................... Square Yard Shld, Nonreinf Conc, High Performance ..................... Square Yard Shld, Freeway ............................................................. Square Yard

6-21 602.04.B.1 Delete this subsection and replace with the following:

“Shld, Nonreinf Conc; and Shld, Nonreinf Conc, High

Performance. The Engineer will measure, and the Department will pay for, Shld, Nonreinf Conc; and Shld, Nonreinf Conc, High Performance by area, based on plan quantities in accordance with subsection 109.01.”

6-21 602.04.B.2 Delete this subsection and replace with the following:

4 of 11 04-30-24

“Shld, Freeway. The Engineer will measure, and the Department will pay for, Shld, Freeway based on plan quantities in accordance with subsection 109.01. If the Contractor uses concrete for the shoulder, the unit price for Shld, Freeway includes the cost of the transverse joints in the shoulder and the external longitudinal pavement joints.”

6-23 602.04.F Add the following sentence to the end of the first paragraph of this subsection:

Temporary concrete pavement, pavement within 4 feet of an obstruction, pavement areas less than 300 square yards, or pavement less than 3 feet wide will not be cored.

6-23 602.04.F Delete the following language from this subsection on this page:

“The Engineer will not core the following:

1. Temporary concrete pavement;

2. Pavement within 4 feet of an obstruction;

3. Pavement areas less than 300 square yards; or

4. Pavement less than 3 feet wide.”

6-24 602.04 Rename the following subsections as follows:

“1. Initial Core.

6-24 602.04 2. Additional Cores.

6-24 602.04 3. Price Adjustment for Thickness.

6-25 602.04 4. Price Adjustments for Steel Locations within the Pavement.

6-26 602.04 5. Remove and Replace.”

6-29 603.02 Change the first sentence in the last paragraph in this subsection to read:

“Provide coarse aggregate with no greater than 2.5% absorption in accordance with AASHTO T85.”

7-11 705.02 Change the second sentence in the last paragraph in this subsection to read:

“Provide natural aggregate and with no greater than 2.50% absorption as specified in AASHTO T85 for structure concrete.”

7-29 706.02 Change the first sentence in the seventh paragraph in this subsection to read:

“Provide natural aggregate and with no greater than 2.50% absorption as specified in AASHTO T85 for structure concrete.”

7-107 709.04 Change the Pay Unit on the second pay item from the top of the list on this page to read as follows:

Thousand Board Foot

5 of 11 04-30-24

7-115 711.02 Change the first sentence in the last paragraph in this subsection to read:

“Provide natural aggregate with a maximum absorption of 2.50% in accordance with AASHTO T85.”

7-120 712.02 Change the first sentence in the sixth paragraph in this subsection to read:

“Provide concrete containing natural aggregate with a maximum absorption of 2.50% in accordance with AASHTO T85.”

7-185 718.02 Change the first sentence in the last paragraph in this subsection to read:

“Provide concrete with natural aggregate with a maximum absorption of 2.50% in accordance with AASHTO T85.”

8-12 804.03.B.2 Change the first sentence in this subsection to read:

“Cast in place light standard and sign support foundations using fixed forms in accordance with the MDOT Standard Plan R-50 series.”

8-27 Change the last pay item at the bottom of this page to read as follows:

Guardrail Anch, Bridge, Det __, Curved .................................. Each

8-44 810.03.J.9 Add a period to the end of the third sentence in this subsection.

8-53 810.03.V Add a period to the end of the second sentence of the first paragraph of this subsection.

8-53 810.04 Change the fourth pay item from the top of the list on this page to read as follows:

Post, Steel, __ pound ............................................................... Foot

8-53 810.04 Change the last four pay items at the bottom of this page to read as follows:

Fdn, Truss Sign Structure Type __, __ inch dia, Cased ............ Foot Fdn, Truss Sign Structure Type __, __ inch dia, Uncased ........ Foot Fdn, Cantilever Sign Structure Type __, __ inch dia, Cased .... Foot Fdn, Cantilever Sign Structure Type __, __ inch dia, Uncased . Foot

8-55 810.04.B.1 Delete the second paragraph of this subsection and replace with the following:

“The unit prices for Fdn, Truss Sign Structure Type __, __ inch dia, Cased and Fdn, Cantilever Sign Structure Type __, __ inch dia, Cased include the cost of concrete, slurry, steel reinforcement, permanent casings, anchor bolts, excavation, and disposal of excavated material.”

8-55 810.04.B.2 Delete this subsection and replace with the following:

“Foundation, Truss Sign Structure, Uncased and Foundation, Cantilever Sign Structure, Uncased. The unit prices for Fdn, 6 of 11 04-30-24

Truss Sign Structure Type __, __ inch dia, Uncased and Fdn, Cantilever Sign Structure Type __, __ inch dia, Uncased include the cost of concrete, slurry, steel reinforcement, temporary casings, anchor bolts, excavation, and disposal of excavated material.”

8-57 810.04.I Delete the first paragraph of this subsection and replace with the

“The unit price for Sign, Rem of the type required includes the cost of removing signs from supports and stacking by shape and size.”

8-57 810.04.I Delete the second paragraph of this subsection and replace with the following:

“The unit prices for Ground Mtd Sign Supports, Rem; Cantilever, Rem and Truss, Rem include the cost of removing ground mounted sign supports, cantilever or truss supports.”

8-57 810.04.L Change this subsection to read:

“The unit price for Sign, Erect, Salv of the type required includes erecting the salvaged sign on a new sign support or existing sign support, as shown on the plans, and attaching devices, and hardware, including brackets.”

8-110 812.04 Change the fifth and sixth pay item from the top of the list on this page to read as follows:

Sign, Type B, Temp, Prismatic, Spec, Furn ................ Square Foot Sign, Type B, Temp, Prismatic, Spec, Oper ................ Square Foot

8-141 815.04.C.1.b Delete this subsection in its entirety.

8-141 815.04.C.1.c Rename and change this subsection as follows:

“b. Removal and disposal of unacceptable plants including the root ball.

8-141 815.04.C.1.d Delete this subsection in its entirety.

8-142 815.04.C.2.d Change this subsection to read:

"During the first watering of the second growing season, remove and dispose of the guying material, identification tags, and inspection tags."

8-144 816.03.A Change the third sentence in this subsection to read:

“Use topsoil from within the project limits; or from off-site sources meeting the requirements in subsection 917.06.”

8-167 818.04 Add the pay item to the bottom of the list on this page as follows:

Power Company (Estimated Cost to Contractor) ................... Dollar

8-170 818.04.G Delete this subsection in its entirety.

8-170 818.04 Rename the following subsections as follows:

“G. Handholes (Hh).

7 of 11 04-30-24

8-171 818.04 H. Service Disconnect.

8-171 818.04 I. Metered Service.

8-171 818.04 J. Unmetered Service.

8-172 818.04 K. Wood Pole.

8-172 818.04 L. Concrete Pole, Fit Up.

8-172 818.04 M. Steel Pole, Fit Up.

8-172 818.04 N. Bracket Arm.”

8-171 818.04.J Delete the second paragraph of this subsection and replace with the following:

“The pay item, Power Company (Estimated Cost to Contractor), establishes a budgeted amount in the contract to cover the cost of reimbursing the Contractor for payments made to the power company for providing electrical power at the locations shown on the plans. The Department will estimate the reimbursement costs to the Contractor and establish a budgeted amount as shown on the plans. The Department will pay the Contractor for power company invoices paid, as submitted to the Engineer.”

8-176 819.03.B.5.b In the second paragraph of this subsection delete the first sentence

“Tighten bolts connecting the pole to the frangible base to a snug tight condition in accordance with subsection 707.03.E.6.c.”

8-185 820.01.B Add a period to the end of the first sentence of this subsection.

8-187 820.02 Change the first line in the list of materials on this page to read:

Conduit Material

8-196 820.03.O In the fourth paragraph of this subsection delete the last sentence and replace with the following:

“Use smooth wall, Schedule 80, rigid PVC conduit, or coilable, Schedule 80 PE conduit in accordance with section 818.”

8-199 820.04 Add the pay item to the list on this page:

TS, (number) Way (type) Mtd (LED) Optic

8-200 820.04 Change the second pay item from the top of the list on this page to read as follows:

TS Head, Temp ...................................................................... Each

8-200 820.04 Change the eleventh pay item from the top of the list on this page to read as follows:

TS, Lens, Pedestrian Sym (LED) ........................................... Each

8-200 820.04 Delete the following pay items from the list:

Strain Pole, Steel, 6 bolt, __ foot ............................................. Each Mast Arm Pole, Cat__ ............................................................. Each Mast Arm, __Foot, Cat ............................................................ Each

8 of 11 04-30-24

8-200 820.04 Change the eleventh pay item from the bottom of the list on this page to read as follows:

Mast Arm, Rem ....................................................................... Each

8-201 820.04 Delete the following pay item from the list:

Power Co. (Est Cost to Contractor) ....................................... Dollar

8-202 820.04 Add the following pay item to the list:

Bracket, Truss, Salv ................................................................ Each

8-204 820.04.C Delete the last paragraph of this subsection in its entirety.

8-204 820.04.D Delete the first paragraph of this subsection in its entirety.

9-5 902.02 Delete the first line under the Material list and relace with the following:

“Wire Cloth and Sieves ................................................ ASTM E11”

9-9 902.03.C.1.b Delete the first sentence in this subsection and replace with the following:

“The physical requirements for the coarse aggregate are as specified in Table 902-2 and as follows:”

9-14 Table 902-1 In the row that includes the information on the 34G material, under the column titled Item of Work by Section Number (Sequential) delete the reference to the section 404.

9-15 Table 902-2 Add the superscript (n) in the first row in the Dense-graded aggregates section of the table under the column titled Crushed Material, % min. (MTM 117).

9-16 Table 902-2 Add the superscript (n) in the first row in the Open-graded aggregates section of the table under the column titled Crushed Material, % min. (MTM 117).

9-16 Table 902-2 Delete the superscript footnote in the first through fourth rows under the header row that reads “(m)” in the column Loss, % max, LA Abrasion (MTM 102).

9-16 Table 902-2 Add the following row after the third row in the Open-graded aggregates section reading:

46R -- 45 -- -- --

9-16 Table 902-2 Add the superscript footnote in the header row that reads “(m)” in the column Loss, % max, LA Abrasion (MTM 102).

9-15 Table 902-2 Delete the footnote (d) in one location in the table.

9-17 Table 902-2 Delete the footnote (d) in one location in the table.

9 of 11 04-30-24

9-17 Table 902-2 Add the following footnote below the existing footnotes in this table.

“(n) For recycled crushed concrete, if the source concrete uses primarily rounded river gravel aggregates, the minimum crushed particle content can be reduced to 90%.”

9-21 Table 902-6 Delete the footnote (b) in two locations in the table.

9-21 Table 902-6 Change the footnote (c) to read (b) in two locations in the table.

9-21 Table 902-6 Change the footnote (d) to read (c) in two locations in the table.

9-25 903.04 Delete the second sentence of the second paragraph of this subsection.

9-70 909.07.A Delete the second sentence of this subsection.

9-70 909.05.D Change the first sentence in this subsection to read:

“Provide steel pipe for jacking in place meeting the requirements of

ASTM A53/A53M for Type E or Type S, Grade B, or ASTM A139/A139M for Grade B.”

9-71 909.08.A Change the first sentence in this subsection to read:

“Provide bridge deck downspouts of PE pipe meeting the requirements of ASTM F714, PE 4710, DR 26 or Schedule 80 PVC.

9-94 Table 910-01 Change the value in the fifth row under the header row in the

Permittivity (min) (per second) column from 0.5 to read:

“0.05”

9-94 Table 910-01 Change the value in the seveth row under the header row in the

Permittivity (min.) (per second) column from 0.5 to read:

“0.05”

9-95 Table 910-2 Change the second row under the Ultimate strength section to read:

“CMD(c) 1950 lb/ft”

9-119 913.06 Change this subsection to read:

Circular precast concrete units with circular reinforcement for adjusting rings, tops, risers, and sump bases for manholes, catch basins, and inlets must meet the requirements of AASHTO M199 and the following additions and exceptions:

9-133 917.03 Rename the four subsections following the first paragraph on this page as follows:

D. Deciduous Shade Trees.

E. Small Trees, Ornamentals, and Shrubs.

F. Evergreen Trees.

G. Vines, Ground Cover, and Herbaceous Ornamental Plants.

9-149 918.08 In the first paragraph of this subsection delete the second sentence

10 of 11 04-30-24

“Provide light standards designed in accordance with AASHTO’s LRFD Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals.”

9-150 918.10 In the first paragraph of this subsection delete the first sentence and replace with the following:

“Provide tower lighting units designed in accordance with

AASHTO’s LRFD Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals.”

9-164 919.04.B In the first paragraph of this subsection delete the first sentence and replace with the following:

“Provide square tubular steel sign supports meeting the chemical, mechanical, and geometric properties of material used in the crash tests referenced in AASHTO’s LRFD Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals.”

9-170 920.02.C Change the reference to Table 920-2 to read Table 920-3 in two locations.

9-222 922.10.A.3 Delete this subsection and replace with the following:

“Conform to the wind load requirements specified by AASHTO’s

LRFD Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals with all equipment mounted without the need for additional ballast;”

10-23 1003.03.B Delete the last sentence of this subsection and replace with the

“Aggregate sampling for concrete will be performed by an MCAT-certified Aggregate Technician Level II.”

10-42 Table 1006-01 Change footnote (a) to read:

“(a) Ensure that the coarse aggregate’s absorption does not exceed 2.5% in accordance with AASHTO T85.”

10-43 Table 1006-02 Replace Table 1006-02 with the Table 1006-02 below.

1A - 20A Pay Item Index Replace the Pay Item Index in its entirety.

11 of 11 04-30-24

Table 1006-2:

Overlay Mixtures

Mixture Type Aggregate

Slump (inch) Air Content

Admixture Required

Mixture Proportions lb/yd³, dry weight

Cement(a) Dry Densified Silica Fume(b)

Net Mix Water Fine Agg

Coarse Agg

Latex Admixture

SFMC 2NS and 26A(c) 4–6 6.5 ±1.5% (d),(e),(f) 618 40 273(g) 1273 1601 —

LMC 2NS and 26A(c) (h) 4.5 ±1.5% — 658 — (h) 1490(i),(j) 1300(i),(j) 206

(a) Use only Type I Portland cement.

(b) For SFMC mixtures, the Contractor may use a blended silica fume Portland cement. However, if the silica fume content of the blended material is greater than 8% of the total cementitious material, submit to the Engineer modified mix proportions with Type I Portland cement added to the blended material to achieve the equivalent individual cementitious material mixture proportions.

(c) Provide coarse aggregate, 95% minimum crushed materials in accordance with Michigan Test Method (MTM) 117, with an absorption no greater than 2.5%, in accordance with AASHTO T85.

(d) Water-reducing high-range admixture or water-reducing high-range and retarding admixture.

(e) Virgin polypropylene collated fibers at 2 lb/yd³.

(f) Air-entraining admixture.

(g) Provide a net water to cementitious material ratio of 0.41 (cementitious material includes cement and silica fume).

(h) Add water in addition to water in the latex admixture to control slump to within 3 to 5 inches. Measure slump from 4 to 5 minutes after discharge from the mixer. During the waiting period, deposit concrete on the deck and do not disturb. If placing mixtures on sections within superelevated curves, the Contractor may need to use the lower allowable range of the slump requirement, as determined by the Engineer. Do not exceed water-cement ratio, by weight, of 0.30 including water contained in the latex emulsion.

(i) Aggregate proportions are approximate; due to gradation changes, the Contractor may increase proportions by no greater than 5% by weight of total aggregate if reducing coarse aggregate by an equivalent volume.

(j) Aggregate weights specified in the table are based on a dry bulk specific gravity of 2.65 for gravel and stone. Adjust the weights if the specific gravity of the materials used varies by more than 0.02 from the specified values.

01 Front Docs
02 Maps
03 Tree Detail
04 List of SP
05 MDOT Standards
06 Progress Clause
07 Coordination Clause
08 Utility Coordination
09 Landscaping
10-20 Supp MDOT Conditions