25-0454 CHILLER REPLACEMENT - SR.pdf

PDF 45 KB Posted

Attached to
Mechanical Repairs to Buildings 1005, 1, PP100, PP200, FC504, FC507, & FC510
Solicitation number
N4008525R9028
Issued by

About this file

This document is a Submittal Form, a standard federal contract document used to track and manage various pre-construction and close-out submittals required for a construction project. The form covers multiple types of required documentation across different specification sections, including preconstruction submittals, test reports, certificates, and closeout documents. Key submittal categories include Accident Prevention Plan (APP), Activity Hazard Analysis, Construction Schedule, Equipment Delivery Schedule, Quality Control Plan, Environmental Protection Plan, Traffic Control Plan, and various crane-related documentation such as Crane Work Plan and Crane Critical Lift Plan. Additional required submittals include reports like accident reports, monthly exposure reports, regulatory citations, and certificates like Confined Space Entry Permit and Third Party Certification of Barge-Mounted Mobile Cranes. The form provides a structured template for contractors to track and submit these required documents, with sections for scheduling, approvals, and administrative tracking of each submittal.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11

1.14.6

Crane Reports

SD-07 CERTIFICATES

Confined Space Entry Permit

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Submittal Register

Complete Submittal Package

Approving AuthorityContractor Schedule Dates

TITLE AND LOCATION

(Enter Contract Title and Locaiton Here)

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

(d)

SD-11 CLOSEOUT SUBMITTALS

Contractor Action

DESCRIPTION

ITEM SUBMITTED

(Enter Contractor Name Here)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-06 TEST REPORTS

Certificate of Compliance

SD-01 PRECONSTRUCTION SUBMITTALS

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

P A R A G R A P H

N O

S P E C

S E C T

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

Monthly Exposure Reports

Regulatory Citations and Violations

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF _

Submittals 1.

SCHEDULE

PRE-CONSTRUCTION SUBMITTALS

Complete Submittal Package

ELECTRICAL FEED

PIPING

HVAC EQUIPMENT SPECS

Third Party Certification of Barge-

Mounted Movile Cranes

Qaulity Control Plan (QC Plan)

Backflow Preventer Tests (If Applicable)

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

SD-11 CLOSEOUT SUBMITTALS

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicab

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable)

CLOSE-OUT SUBMITTALS

SD-03 PRODUCT DATA

Backflow Preventers (If Applicable)

Backflow Preventers Certificate (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES

Backflow Tester Certification (If Applicable)