This is a Submittal Register template used for military construction contracts to track and manage contractor submissions throughout the project lifecycle. The form serves as a control document for preconstruction submittals, product data, test reports, certificates, and closeout submittals, with designated sections for contract information, contractor details, submission dates, approval authority reviews, and administrative tracking.
The register organizes submittals by category and specification section, including preconstruction requirements (accident prevention plan, construction schedule, equipment delivery schedule, crane plans and operators), product data (backflow preventers, manufacturers specifications and warranty information), environmental and compliance documentation (environmental protection plan, traffic control plan, quality control plan, permits for storm water discharge, confined space entry permits), test reports (backflow preventer tests, accident reports, exposure reports), and certificates of compliance. The template provides columns for tracking submission dates, approval needed dates, material needed dates, forwarding to approval authority, receipt from contractors, dates sent to other reviewers, receipt from other reviewers, mailing to contractor, receipt from approval authority, and remarks. The form is designed for multiple submittal items across different contract sections and allows for monitoring of regulatory compliance items such as OSHA crane certifications, third-party certifications for barge-mounted cranes, and various safety-related documentation throughout the project duration.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO.
CONTRACTOR
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 20 00
1.3
01 30 00
1.4.1
01 31 50
1.2
01 32 16
1.2
1.3
01 33 00
1.4.1
1.6.1
01 35 29
1.9
1.10
1.9.1
1.9.1
1.7.1.4
1.14
1.14.1
1.14.3
1.14.4
1.14.5
Regulatory Citations and Violations
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
Crane Critical Lift Plan (If Applicable)
Crane Operators (If Applicable)
Reports
Accident Reports
Monthly Exposure Reports
(Enter Contract No. Here)
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP)
SD-01 PRECONSTRUCTION SUBMITTALS
Equipment Delivery Schedule
SD-01 PRECONSTRUCTION SUBMITTALS
SUBMITTAL REGISTER
P A R A G R A P H
N O
S P E C
S E C T
(d)
Contractor Action
DESCRIPTION
ITEM SUBMITTED
(Enter Contractor Name Here)
Crane Work Plan (If Applicable)
Activity Hazard Analysis (AHA)
SD-06 TEST REPORTS
SD-01 PRECONSTRUCTION SUBMITTALS
Submittal Register
Complete Submittal Package
TITLE AND LOCATION
(Enter Contract Title and Locaiton Here)
Schedule of Prices
List of Contact Personnel
Construction Schedule of Military Real Property (If Applicable)
A C T I V I T Y
N O
T R A N S M I T T A L
N O
Approving Authority Contractor
Schedule Dates
SD-11 CLOSEOUT SUBMITTALS
Interim DD1354, Transfer & Acceptance
SD-11 CLOSEOUT SUBMITTALS
Crane Reports
SD-07 CERTIFICATES
1.11
1.14.6
1.14.7
01 45 10
1.6
01 50 00
1.6.2.1
2.1
3.1
1.3
01 57 19
1.6.1
1.6.4
1.7.2
1.7
1.7
PAGE 1 OF _
Submittals 1.
Work schedule
Product data
SD-03 PRODUCT DATA
Backflow Preventers (If Applicable)
Backflow Preventers Certificate (If Applicable)
SD-06 TEST REPORTS
SD-07 CERTIFICATES
SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE
MSDS for Class I ODS Waivered Product
SD-01 PRECONSTRUCTION SUBMITTALS
Permit for Storm Water Discharge (If applicable)
Environmental Protection Plan
Preconstruction Survey
Notice of Intent (If applicable)
Backflow Tester Certification (If Applicable)
Backflow Preventer Tests (If Applicable)
SD-01 PRECONSTRUCTION SUBMITTALS
Traffic Control Plan (If Applicable)
Qaulity Control Plan (QC Plan)
Certificate of Compliance
Complete Submittal Package
Maufactures Name
Manufactures Warranty
Specifications
SD-11 CLOSEOUT SUBMITTALS
Concrete Ticket
Third Party Certification of Barge-
Mounted Movile Cranes
Confined Space Entry Permit