25-0450 FC300 PHYSICAL SECURITY- SR.pdf

PDF 62 KB Posted

Attached to
FC300 Security Upgrades and Server Room Modernization
Solicitation number
N4008526R9027
Issued by

About this file

This is a Submittal Register form used to track contractor submissions throughout a federal construction contract. The document serves as a master schedule documenting all required submittals from the contractor, including preconstruction materials, product data, test reports, and certificates required for contract performance.

The register identifies specific submission items organized by CSI division codes (01 20 00 through 01 57 19) and tracks key administrative information including contractor schedule dates, approval requirements, and government reviewer tracking. Required submittals span multiple categories: SD-01 Preconstruction Submittals (Schedule of Prices, List of Contact Personnel, Construction Schedule, Equipment Delivery Schedule, Accident Prevention Plan, Activity Hazard Analysis, Crane plans and operators if applicable, Traffic Control Plan, Environmental Protection Plan, and Permit for Storm Water Discharge); SD-03 Product Data (Backflow Preventers if applicable); SD-06 Test Reports (Reports, Accident Reports, Monthly Exposure Reports, Regulatory Citations and Violations, Crane Reports, and Backflow Preventer Tests if applicable); and SD-07 Certificates (Confined Space Entry Permit, Backflow Tester Certification if applicable, Certificate of Compliance, and Third Party Certification of Barge-Mounted Mobile Cranes if applicable). The form includes submission dates, approval authority tracking, material delivery dates, and columns for government and alternate reviewer date stamps to ensure proper oversight and documentation of all contractor deliverables throughout the project lifecycle.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11

Crane Reports

SD-07 CERTIFICATES

Confined Space Entry Permit

Approving AuthorityContractor Schedule Dates

SD-11 CLOSEOUT SUBMITTALS

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Submittal Register

Complete Submittal Package

TITLE AND LOCATION

(Enter Contract Title and Locaiton Here)

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

(d)

Contractor Action

DESCRIPTION

ITEM SUBMITTED

(Enter Contractor Name Here)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-06 TEST REPORTS

SD-01 PRECONSTRUCTION SUBMITTALS

(Enter Contract No. Here)

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

SUBMITTAL REGISTER

P A R A G R A P H

N O

S P E C

S E C T

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

Monthly Exposure Reports

Regulatory Citations and Violations

1.14.6

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF _

Submittals 1.

Manufactures Maintenance instructions

Third Party Certification of Barge-

Mounted Movile Cranes

Complete Submittal Package

Maufactures Name, Manufactures Warranty

Specifications

SD-11 CLOSEOUT SUBMITTALS

Qaulity Control Plan (QC Plan)

Certificate of Compliance

Backflow Tester Certification (If Applicable)

Backflow Preventer Tests (If Applicable)

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicab

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable) work schedule shop drawings

Product data

Door hardware, door, lock combination door frame, acess door, metal studs.

SD-03 PRODUCT DATA

Backflow Preventers (If Applicable)

Backflow Preventers Certificate (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES