This is a Submittal Register form for federal construction contract 25-0447, Server Room Modernization FC300. The document serves as a tracking tool for all required contractor submittals throughout the project lifecycle, organized by submittal category codes (SD-01 through SD-11) and specification sections.
The register requires contractors to submit preconstruction submittals including Schedule of Prices, List of Contact Personnel, Construction Schedule, Equipment Delivery Schedule, Accident Prevention Plan, Activity Hazard Analysis, and crane-related documentation (Critical Lift Plans, Work Plans, and Operator certifications) as applicable. Additional preconstruction requirements include Environmental Protection Plan, Preconstruction Survey, Traffic Control Plan (if applicable), and permits for storm water discharge and Notice of Intent (if applicable). Product data and certificates required include Backflow Preventers, Quality Control Plan, and various third-party certifications. Closeout submittals include interim DD1354 (Transfer & Acceptance), Submittal Register, and Complete Submittal Package. Test reports and certificates must be submitted for backflow preventers, cranes, confined space entry, and compliance documentation. The form tracks contractor action dates, approval needs, material delivery requirements, dates forwarded to approving authority, dates received from contractor, and communications with other reviewers. Specification section cross-references are provided for each submittal item to link requirements to contract documents.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO.
CONTRACTOR
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 20 00
1.3
01 30 00
1.4.1
01 31 50
1.2
01 32 16
1.2
1.3
01 33 00
1.4.1
1.6.1
01 35 29
1.9
1.10
1.9.1
1.9.1
1.7.1.4
1.14
1.14.1
1.14.3
1.14.4
1.14.5
SD-11 CLOSEOUT SUBMITTALS
Interim DD1354, Transfer & Acceptance
SD-11 CLOSEOUT SUBMITTALS
Submittal Register
Complete Submittal Package
SD-06 TEST REPORTS
Crane Reports
TITLE AND LOCATION
25-0447 Server Room Modernization FC300
Schedule of Prices
List of Contact Personnel
Construction Schedule of Military Real Property (If Applicable)
A C T I V I T Y
N O
T R A N S M I T T A L
N O
(d)
Approving AuthorityContractor Schedule Dates
Contractor Action
DESCRIPTION
ITEM SUBMITTED
(Enter Contractor Name Here)
Crane Work Plan (If Applicable)
Activity Hazard Analysis (AHA)
SD-01 PRECONSTRUCTION SUBMITTALS
(Enter Contract No. Here)
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP)
SD-01 PRECONSTRUCTION SUBMITTALS
Equipment Delivery Schedule
SD-01 PRECONSTRUCTION SUBMITTALS
SUBMITTAL REGISTER
P A R A G R A P H
N O
S P E C
S E C T
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
Crane Critical Lift Plan (If Applicable)
Crane Operators (If Applicable)
Reports
Accident Reports
Monthly Exposure Reports
Regulatory Citations and Violations
1.11
1.14.6
1.14.7
01 45 10
1.6
01 50 00
1.6.2.1
2.1
3.1
1.3
01 57 19
1.6.1
1.6.4
1.7.2
1.7
1.7
PAGE 1 OF _
Mounted Movile Cranes
Confined Space Entry Permit
Certificate of Compliance
SD-11 CLOSEOUT SUBMITTALS
SD-07 CERTIFICATES
Third Party Certification of Barge-
Qaulity Control Plan (QC Plan)
Backflow Preventers Certificate (If Applicable
SD-06 TEST REPORTS
SD-07 CERTIFICATES
Backflow Tester Certification (If Applicable)
Backflow Preventer Tests (If Applicable)
SD-01 PRECONSTRUCTION SUBMITTALS
Traffic Control Plan (If Applicable)
SD-03 PRODUCT DATA
SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE
MSDS for Class I ODS Waivered Product
SD-01 PRECONSTRUCTION SUBMITTALS
Permit for Storm Water Discharge (If applicab
Environmental Protection Plan
Preconstruction Survey
Backflow Preventers (If Applicable)
Notice of Intent (If applicable)