25-0433 AS4108 OIL FILTRATION CART POWER - SUBMITTAL REGISTER.pdf

PDF 63 KB Posted

Attached to
AS4108 Oil Filtration Cart Power
Solicitation number
N4008526R9070
Issued by

About this file

This document is a Submittal Register template for federal construction contracts. It is designed to track all required submittals from the contractor throughout the project lifecycle, organized by construction specification sections and submittal classification categories.

The register documents submittals for the Oil Filtration Cart Power Installation AS4108 project and requires tracking of preconstruction submittals (SD-01), product data (SD-03), test reports (SD-06), and certificates (SD-07), as well as closeout submittals (SD-11). Preconstruction submittals include Schedule of Prices, List of Contact Personnel, Construction Schedule, Equipment Delivery Schedule, Accident Prevention Plan, Activity Hazard Analysis, Crane Work Plans and Critical Lift Plans (if applicable), Traffic Control Plan (if applicable), Environmental Protection Plan, Preconstruction Survey, MSDS documentation, and permit applications. Product data submittals cover electrical components including safety switches, receptacles, circuit breakers, outlet boxes, splice and connector details, and backflow preventers (if applicable). Test reports and certificates document crane operations, accident and exposure reports, regulatory compliance, backflow preventer testing and certification, and third-party certifications for mounted mobile cranes. Closeout submittals include a Quality Control Plan, Complete Submittal Package, Submittal Register, and Interim DD1354 Transfer and Acceptance documentation for military real property (if applicable). The register provides columns for tracking approval requirements, material delivery dates, contractor action dates, approving authority review dates, and other reviewer coordination dates, allowing both the contractor and government to manage submittal workflows throughout the construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11 Confined Space Entry Permit

SD-11 CLOSEOUT SUBMITTALS

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Submittal Register

Complete Submittal Package

SD-06 TEST REPORTS

Crane Reports

SD-07 CERTIFICATES

TITLE AND LOCATION

Oil Filtration Cart Power Installation AS4108

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

(d)

Approving AuthorityContractor Schedule Dates

Contractor Action

DESCRIPTION

ITEM SUBMITTED

(Enter Contractor Name Here)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-01 PRECONSTRUCTION SUBMITTALS

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

(Enter Contract No. Here)

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

SUBMITTAL REGISTER

P A R A G R A P H

N O

S P E C

S E C T

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

Monthly Exposure Reports

Regulatory Citations and Violations

1.14.6

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF 2_

26 05 00

3.2.5

26 05 00

2.2.2.1

26 05 00

2.2.3.1

26 05 00

3.2.8

26 05 00

2.1.3.1Circuit Breakers

Safety Switches

SD-03 PRODUCT DATA

Receptacles

SD-03 PRODUCT DATA

Outlet boxes, pull boxes and junction boxes

SD-03 PRODUCT DATA

Mounted Movile Cranes

Certificate of Compliance

SD-03 PRODUCT DATA

Splices and connectors

SD-03 PRODUCT DATA

SD-11 CLOSEOUT SUBMITTALS

Backflow Preventers (If Applicable)

Third Party Certification of Barge-

Qaulity Control Plan (QC Plan)

Backflow Preventers Certificate (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES

Backflow Tester Certification (If Applicable)

Backflow Preventer Tests (If Applicable)

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

SD-03 PRODUCT DATA

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicab

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable)

File details come from the government source that posted it. Updated .