25-0433 AS4108 OIL FILTRATION CART POWER - SOW.pdf
PDF 2 MB Posted
- Attached to
- AS4108 Oil Filtration Cart Power
- Solicitation number
- N4008526R9070
About this file
This document consists of electrical design drawings and general notes for a power installation project at MCB Camp Lejeune, North Carolina, specifically for an Oil Filtration Cart Power Installation (Project 25-0433) in Building AS4108.
The work involves installing two cord reel and disconnect systems to provide temporary power connections for an existing oil filtration cart. At Panel AC1 in the south section, the contractor must install one 600V 60-amp NEMA-1 and NEMA-3R non-fused heavy-duty disconnect with a 600V 55-amp NEMA-4 cord reel containing 50 feet of 6/4 SOOW cord. At Panel M2D in the center section, a second identical system must be installed; this work includes removing existing 200-amp service point conductors and pin-and-sleeve receptacles while retaining junction boxes and feeder conduits for reuse. Both installations require 1-inch conduit runs with four #6 AWG conductors and one #10 AWG conductor from the panels to disconnects and cord reels, cable-mounted receptacles matching the oil filtration cart plug configuration (Mil-Spec MS90557C44156S), and installation of two 3-pole 50-amp circuit breakers per location. All work must comply with NFPA 70, the North Carolina State Building Code, and local codes. Equipment must be listed and labeled by a nationally-recognized testing agency, weatherproof where applicable, and all systems must be tested for proper voltage and operation upon completion with updated panel directories. The cord reel and disconnect assemblies must be mounted with a minimum 36-inch clearance from fire alarm pull stations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP AS4108
AREA MAP AS4108
LOCATION MAP AS4108
MCB CAMP LEJEUNE, NORTH CAROLINA
25-0433 OIL FILTRATION CART POWER INSTALLATION
25-0433 T1
SHEET # SHEET NAME
T1 G1 E1 E2
TITLE SHEET/AREA MAPS BLDG AS4108
GENERAL NOTES
ELECTRICAL PLAN/DETAILS 1ST FLOOR SOUTH
ELECTRICAL PLAN 1ST FLOOR CENTER
DRAWING INDEX
E3 DETAILS/CONDUIT & EQUIPMENT SCHEDULES
BLDG
AS4108
1. ALL ELECTRICAL WORK SHALL BE IN FULL COMPLIANCE WITH NFPA 70, THE NORTH CAROLINA STATE BUILDING CODE, ALL LOCAL CODES AND ORDINANCES AND IN ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL AUTHORITY HAVING
JURISDICTION.
2. ALL EQUIPMENT PROVIDED BY THE CONTRACTOR SHALL BE LISTED AND LABELED BY A NATIONALLY-RECOGNIZED TESTING AGENCY, ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION, FOR THE CONDITIONS OF INSTALLATION. ALL MATERIAL, EQUIPMENT AND DEVICES SHALL BE NEW CURRENT PRODUCTS OF MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SUCH PRODUCTS. EQUIPMENT SHALL BE SUITABLE FOR ITS APPLICATION (E.G. WHEN INSTALLED OUTDOORS, IT
SHALL BE WEATHERPROOF, ETC.)
3. THE CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR WORK REQUIREMENTS, THE AMOUNT OF SPACE AVAILABLE FOR ELECTRICAL EQUIPMENT, AND LAYOUT HIS WORK IN A COMPATIBLE AND COMPLEMENTARY MANNER.
4. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THOROUGHLY FAMILIARIZING HIMSELF WITH ANY CONTRACTUAL REQUIREMENTS AS MAY BE SET FORTH IN THE OTHER DIVISIONS OF THE PROJECT SPECIFICATIONS.
5. UNLESS SPECIFICALLY NOTED OTHERWISE, SYSTEMS PROVIDED OR INSTALLED BY THE CONTRACTOR SHALL BE COMPLETE AND FULLY-FUNCTIONING AFTER INSTALLATION. INCIDENTAL COMPONENTS MAY NOT BE SHOWN, AND ALL WORK WHICH MAY BE REASONABLY IMPLIED AS BEING INCIDENTAL TO THIS WORK, BUT REQUIRED FOR THE PROPER OPERATION OF THE EQUIPMENT OR SYSTEM, SHALL BE PROVIDED BY THE CONTRACTOR AND INCLUDED IN THE BID. ADDITIONAL CIRCUITS SHALL BE INSTALLED
WHEREVER NEEDED TO CONFORM TO THE SPECIFIC REQUIREMENTS OF EQUIPMENT.
6. TEMPORARY POWER CONNECTIONS AS REQUIRED SHALL BE PROVIDED BY THE CONTRACTOR AND INCLUDED IN THE BID. ALL TEMPORARY EQUIPMENT WIRING SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE. THE CONTRACTOR SHALL PROVIDE DETAILS, METHODS, MATERIALS, ETC. FOR REVIEW PRIOR TO MAKING TEMPORARY CONNECTIONS. FURNISH AND INSTALL ALL EQUIPMENT AND MATERIALS INCLUDING CONTROL EQUIPMENT, MOTOR STARTERS, BRANCH AND FEEDER CIRCUIT BREAKERS, PANELBOARDS, TRANSFORMERS, ETC. FOR TEMPORARY POWER. COORDINATE WITH THE ELECTRICAL UTILITY
COMPANY AS REQUIRED.
7. THE WORK SHALL INCLUDE COMPLETE TESTING OF ALL EQUIPMENT AND WIRING AT THE COMPLETION OF WORK AND ANY MINOR CORRECTIONS, CHANGES OR ADJUSTMENTS NECESSARY FOR THE PROPER FUNCTIONING OF THE SYSTEM AND
EQUIPMENT.
8. ALL ELECTRICAL EQUIPMENT SHALL, AT ALL TIMES DURING CONSTRUCTION, BE ADEQUATELY PROTECTED AGAINST MECHANICAL INJURY, OR DAMAGE BY WATER AND/OR THE ELEMENTS. ELECTRICAL EQUIPMENT SHALL NOT BE STORED OUT OF DOORS, BUT SHALL BE STORED IN DRY PERMANENT SHELTERS. IF AN APPARATUS HAS BEEN DAMAGED, OR HAS BEEN SUBJECT TO POSSIBLE INJURY BY WATER OR THE ELEMENTS, SUCH DAMAGE SHALL BE REPLACED AT NO ADDITIONAL COST.
9. DO NOT SCALE ELECTRICAL DRAWINGS. FIELD VERIFY ALL DIMENSIONS.
10. CIRCUIT LAYOUTS ARE NOT INTENDED TO SHOW THE NUMBER OF FITTINGS, OR OTHER INSTALLATION DETAILS. UNLESS NOTED OTHERWISE, THE EXACT ROUTING OF FEEDER AND BRANCH CIRCUIT RACEWAYS AND CABLES IS THE RESPONSIBILITY OF THE CONTRACTOR. RISER AND GENERAL CIRCUIT ARRANGEMENTS ARE SHOWN SCHEMATICALLY/DIAGRAMMATICALLY ONLY.
THE CONTRACTOR SHALL ROUTE CONDUITS AS REQUIRED BY THE CONDITIONS OF THE INSTALLATION.
11. UNLESS DIMENSIONED, DEVICE LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. ADJUST EXACT LOCATIONS AS REQUIRED TO SERVE THE INTENDED PURPOSE. IF NOT DIMENSIONED ON THE ELECTRICAL DRAWINGS, VERIFY EXACT LOCATION
WITH THE CONTRACTING OFFICER PRIOR TO ROUGH-IN.
12. SEAL ALL CONDUIT OPENINGS THROUGH EXTERIOR BUILDING WALLS WATERTIGHT.
13. IN WET LOCATIONS AND EXTERIOR, ALL WIRING DEVICES SHALL BE WEATHER-RESISTANT LISTED WITH WEATHERPROOF WHILE IN USE COVER. LIGHTING FIXTURES SHALL BE APPROPRIATELY RATED AND LISTED FOR THE ENVIRONMENT INCLUDING 0
DEGREE BALLASTS FOR FLUORESCENT.
14. RACEWAYS AND DUCTS PENETRATING FLOORS, CEILINGS OR WALLS SHALL BE PROPERLY SEALED SMOKETIGHT.
15. RACEWAYS AND DUCTS PENETRATING RATED FLOOR, CEILING OR WALL ASSEMBLIES SHALL BE PROPERLY SEALED IN ACCORDANCE WITH THE CORRESPONDING UNDERWRITERS LABORATORIES (OR OTHER APPROVED THIRD PARTY TESTING AGENCY) APPROVED AND LISTED FIRESTOPPING MATERIALS AND MANUFACTURER APPROVED INSTALLATION TECHNIQUES
COMPLYING WITH ALL APPLICABLE CODES.
16. ALL RACEWAYS SHALL BE CONCEALED WHERE POSSIBLE IF APPLICABLE, MATCH EXISTING RACEWAY INSTALLATION METHODS
AND ROUTINGS AT OR NEAR EXISTING FACILITIES.
17. INSTALL EXPOSED RACEWAYS PARALLEL TO OR AT RIGHT ANGLES TO NEARBY SURFACES OR STRUCTURAL MEMBERS, AND FOLLOW THE SURFACE CONTOURS AS MUCH AS POSSIBLE. NO DIAGONAL RUNS WILL BE ALLOWED. ALL CONDUITS SHALL BE RUN STRAIGHT AND TRUE. RUN PARALLEL OR BANKED RACEWAYS TOGETHER ON COMMON SUPPORTS WHERE PRACTICAL.
MAKE BENDS IN PARALLEL OR BANKED RUNS FROM SAME CENTERLINE TO MAKE BENDS PARALLEL.
18. PROVIDE AND PLACE ALL SLEEVES FOR CONDUITS PENETRATING WALLS, FLOORS, PARTITIONS, ETC. LOCATE ALL NECESSARY SLOTS
FOR ELECTRICAL WORK AND FORM BEFORE CONCRETE IS POURED.
19. PATCHING OF WATERPROOFED SURFACES SHALL RENDER THE AREA OF THE PATCHING COMPLETELY WATERPROOF.
20. ALL MOTORS AND OTHER VIBRATING EQUIPMENT SHALL BE CONNECTED TO THE CONDUIT SYSTEM BY MEANS OF A SHORT SECTION (18 INCH MINIMUM) OF FLEXIBLE CONDUIT UNLESS OTHERWISE INDICATED. AN EQUIPMENT GROUNDING CONDUCTOR SHALL BE INSTALLED INSIDE THE FLEXIBLE CONDUIT AND TERMINATE AT THE LOAD END WITH AN APPROVED GROUNDING CLAMP OR LUG.
21. SURFACE MOUNTED PANELBOARDS, JUNCTION AND PULL BOXES, RACEWAYS, ETC., INSTALLED ON EXTERIOR SURFACES OR INSIDE ON EXTERIOR WALLS SHALL BE SUPPORTED BY SPACERS TO PROVIDE A 1/4" MINIMUM CLEARANCE BETWEEN THE WALL AND EQUIPMENT.
22. PRIOR TO TRENCHING IN ANY AREA, THE CONTRACTOR SHALL CONTACT ELECTRICAL, COMMUNICATIONS/DATA/FIBER, CABLE TELEVISION, GAS AND WATER UTILITY PROVIDERS AND HAVE ALL UTILITIES IN THE AREA IDENTIFIED. DAMAGE TO ANY UNDERGROUND UTILITIES OR STRUCTURES SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE PROJECT.
23. FINAL TYPED PANELBOARD DIRECTORIES INSTALLED IN THE PANELBOARD DOOR POCKET SHALL INCLUDE FINAL ACTUAL ROOM NAMES AND NUMBERS IN ADDITION TO THE GENERAL DESCRIPTION SHOWN ON THE PANEL SCHEDULES ON THE DRAWINGS.
24. CONDUCTOR SIZING IS BASED ON 75 DEGREE C. COPPER NEC RATINGS, UNLESS NOTED OTHERWISE. THE CONTRACTOR SHALL VERIFY, PRIOR TO INSTALLATION OF CONDUCTORS OR CONDUIT FEEDING ANY EQUIPMENT, THE ELECTRICAL EQUIPMENT IS RATED FOR USE WITH 75 DEGREE C. WIRING. IF ANY EQUIPMENT IS RATED FOR USE WITH LESS THAN 75 DEGREE C. CONDUCTORS, THE CONTRACTOR
SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY FOR EVALUATION/CORRECTION.
25. BEFORE COMMENCING WORK OR ORDERING MATERIALS, THE CONTRACTOR SHALL COORDINATE THE NAMEPLATE RATINGS OF ALL EQUIPMENT (MOTORS, HEATERS, COMPRESSORS, ETC.) AND ADJUST THE RATINGS OF THE ELECTRICAL EQUIPMENT (SWITCHES, FUSES, CIRCUIT BREAKERS, FEEDERS, ETC.) AS APPROPRIATE TO SERVE THIS EQUIPMENT.
26. THE LAYOUT AND PLACEMENT OF ELECTRICAL DISTRIBUTION EQUIPMENT IN ELECTRICAL AND MECHANICAL EQUIPMENT ROOMS IS BASED ON PUBLISHED EQUIPMENT SIZES AND SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE. DEVIATIONS FROM CONFIGURATIONS SHOWN IS THE RESPONSIBILITY OF THE CONTRACTOR. PROVIDE NATIONAL ELECTRIC CODE REQUIRED CLEARANCES FOR ALL ELECTRICAL EQUIPMENT, PANELBOARDS, TRANSFORMERS, SAFETY SWITCHES, SWITCHBOARDS, ETC. COORDINATE RESOLUTION OF CONFLICTS WITH
OTHER TRADES.
27. INSTALLATION INFORMATION PACKED WITH DEVICES AND EQUIPMENT SHALL BE RETAINED FOR INCLUSION IN THE OPERATIONS AND
MAINTENANCE MANUALS.
28. PROTECT ALL EXISTING POWER, COMMUNICATIONS, DATA, LIFE SAFETY SYSTEMS, FIRE ALARM AND PUBLIC ADDRESS SYSTEMS AND MAINTAIN THEM IN OPERATION THROUGHOUT THE PROGRESS OF THE WORK. NOTIFY THE CONTRACTING OFFICER IF SHUTDOWNS ARE REQUIRED PRIOR TO ANY OUTAGE OF SERVICE. WHERE THE DURATION OF A PROPOSED OUTAGE CANNOT BE TOLERATED BY THE
GOVERNMENT, PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO MAINTAIN SERVICE.
29. EXISTING CIRCUITING WHERE SHOWN IS FOR CONVENIENCE PURPOSES ONLY. VERIFICATION OF EXISTING WIRING DESTINATION, TERMINATION AND ADDITIONS OF NEW LOADS IS THE RESPONSIBILITY OF THE CONTRACTOR.
30. ABANDONED POWER WIRING, RACEWAYS AND CONDUCTORS, SHALL BE REMOVED BACK TO THEIR SOURCE. THE ACCESSIBLE
PORTIONS OF ABANDONED CABLES (VOICE, DATA, VIDEO, ALARM, ETC.) SHALL BE REMOVED.
31. THE EXISTING ELECTRICAL SYSTEMS DEPICTED ON THESE DRAWINGS HAVE BEEN COMPILED BY THE ENGINEER FROM GOVERNMENT RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF THE EXISTING CONDITIONS FOR THE PURPOSE OF INDICATING THE WORK REQUIRED AND ARE BELIEVED TO BE CORRECT. NOTWITHSTANDING, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, POINTS OF
ACCESS AND FIELD CONDITIONS AFFECTING HIS WORK.
32. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE EXISTING ELECTRICAL SYSTEMS AND THE EXISTING BUILDING. THE SUBMISSION OF THE PROPOSAL BY THE CONTRACTOR SHALL BE CONSIDERED EVIDENCE THAT HE OR HIS REPRESENTATIVE HAS VISITED THE SITE AND BUILDINGS AND NOTED THE LOCATION AND CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED AND THAT HE TAKES FULL RESPONSIBILITY OF ALL FACTORS GOVERNING HIS WORK. NO EXTRAS WILL BE CONSIDERED BECAUSE OF ADDITIONAL WORK NECESSITATED BY EXISTING JOB CONDITIONS THAT ARE NOT INDICATED ON THE DRAWINGS.
33. THE EXISTING FACILITIES WILL REMAIN OCCUPIED BY THE STAFF THROUGHOUT THE PROJECT. AS SUCH, WORK WILL REQUIRE SPECIAL EFFORT BY THIS CONTRACTOR TO ALLOW THE WORK TO PROCEED IN A TIMELY MANNER. ALL ELECTRICAL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER SO AS TO MINIMIZE DISRUPTION OF THE GOVERNMENT USE OF THE FACILITIES AND
MAINTAIN THE CONSTRUCTION SEQUENCE.
GENERAL ELECTRICAL NOTES
25-0433 G1
PANEL AC1
CORD REEL & DISCONNECT
LOCATION
STORAGE
CAGE
CORD REEL & DISCONNECT LOCATION
M
AT
CH
LI
N E
SE
E
SH
EE
T E2
M
AT
CH
LI
N E
SE
E
SH
EE
T E2
PARTIAL FIRST FLOOR PLAN - SOUTH SECTION - ELECTRICAL
NO SCALE
E-3
25-0433 E1
E-3
AC1-26, 28, 30 AC1-32, 34, 36
C2
C1
1. Install 600 volt 60 amp NEMA-1 and NEMA-3R non-fused heavy duty disconnects where indicated.
2. Install 600V 55A NEMA-4 cord reels with 50' 6/4 SOOW cord adjacent to the disconnects, basis of design is KH INDUSTRIES MODEL RTMH4L-WW-K6K.
Install cable mounted receptacle to match existing oil filtration cart plug to the end of the cord reel, basis of design is Mil-Spec MS90557C44156S.
3. Install 1" conduit with 4ea #6awg and 1ea #10awg from the indicated panel to the disconnect and cord reel.
4. Install 2ea 3 pole 50 amp circuit breakers where indicated and terminate all conductors.
5. Test for proper voltage and operation. Update panel directories to reflect the changes.
DESCRIPTION OF WORK
C1 C2
KEY PLAN
*CORD REEL AND DISCONNECT SHALL BE MOUNTED WITH
MINIMUM 36" CLEARANCE FROM FIRE ALARM PULL STATION.
M
AT
CH
LI
N E
SE
E
SH
EE
T E1
M
AT
CH
LI
N E
SE
E
SH
EE
T E1
STORAGE
CAGE
ELECTRICAL
PANEL
M2D
CORD REEL & DISCONNECT
LOCATION
PARTIAL FIRST FLOOR PLAN - CENTER SECTION - ELECTRICAL
NO SCALE
CORD REEL & DISCONNECT
LOCATION
25-0433 E2
E-3
M2D-2
M2D-4
C3
1. Install 600 volt 60 amp NEMA-1 non-fused heavy duty disconnects where indicated.
2. Install 600V 55A NEMA-4 cord reels with 50' 6/4 SOOW cord adjacent to the disconnects, basis of design is KH INDUSTRIES MODEL RTMH4L-WW-K6K.
Install cable mounted receptacle to match existing oil filtration cart plug to the end of the cord reel, basis of design is Mil-Spec MS90557C44156S.
3. Remove the existing conductors from Panel M2D to the junction box for the 200A Service Points indicated (M2D-5, M2D-8). Remove the existing 200A disconnects, pin and sleeve receptacles complete. Junction boxes and feeder conduits to remain and be re-used.
4. Install 4ea #6awg and 1ea #10awg from panel M2D to the junction box in the existing 3" conduit. Install 1" conduit with 4ea #6awg and 1ea #10awg from the junction box to the disconnect and cord reel.
5. Remove existing 3 pole 40 amp circuit breaker in panel M2D space 4 and tag wires as “Downdraft 2”. Install 2ea 3 pole 50 amp circuit breakers where indicated and terminate all conductors. Contractor shall provide all necessary trim and hardware for installation of new circuit breakers.
6. Test for proper voltage and operation. Update panel directories to reflect the changes.
DESCRIPTION OF WORK
E-3
E-3
E-3
C4
KEY PLAN
STORAGE CAGE
SECTION (TYP)
FINISHED FLOOR
E-1
CORD REEL & DISCONNECT CAGE MOUNTING (TYP)
NO SCALE
UNISTRUT - SPACING
DETERMINED BY
EQUIPMENT
DEMINSIONS
DOOR
OPENING
(TYP)
FINISHED FLOOR
E-1
CORD REEL & DISCONNECT WALL MOUNTING (TYP)
NO SCALE
25-0433 E3
E-2
EXISTING 200A SERVICE POINT (DEMO)
NO SCALE
FINISHED FLOOR
E-2
CORD REEL & DISCONNECT OLD SERVICE POINT
NO SCALE
FEEEDER CONDUIT AND
CONDUCTORS TO PANEL M2D
DEMO
COMPLETE
FEEEDER CONDUIT AND
CONDUCTORS TO PANEL M2D
CONDUIT AND EQIPMENT SCHEDULE
CONDUIT CONDUIT WIRE
NO.
C1
SIZE NO. SIZE
1" EMT 4
6 AWG
10 AWG
FROM
PANEL AC1
TO
WALL MOUNTED CORD REEL
DISCONNECT
EQUIPMENT
600V 60A 3P NEMA-1 HEAVY DUTY NON FUSED DISCONNECT
600V 55A NEMA4 CORD REEL WITH 50' 6/4 SOOW CORD (BASIS OF
DESIGN KH INDUSTRIES MODEL RTMH4L-WW-K6K)
C2 1" EMT 4
6 AWG
10 AWG
PANEL AC1 CAGE MOUNTED CORD REEL
DISCONNECT
600V 60A 3P NEMA-3R HEAVY DUTY NON FUSED DISCONNECT
600V 55A NEMA4 CORD REEL WITH 50' 6/4 SOOW CORD (BASIS OF
DESIGN KH INDUSTRIES MODEL RTMH4L-WW-K6K)
C3 3" RMC (EX)
1" EMT
6 AWG
10 AWG
PANEL M2D WALL MOUNTED CORD REEL
DISCONNECT
600V 60A 3P NEMA-1 HEAVY DUTY NON FUSED DISCONNECT
600V 55A NEMA4 CORD REEL WITH 50' 6/4 SOOW CORD (BASIS OF
DESIGN KH INDUSTRIES MODEL RTMH4L-WW-K6K)
C4 3" RMC (EX)
1" EMT
6 AWG
10 AWG
PANEL M2D WALL MOUNTED CORD REEL
DISCONNECT
600V 60A 3P NEMA-1 HEAVY DUTY NON FUSED DISCONNECT
600V 55A NEMA4 CORD REEL WITH 50' 6/4 SOOW CORD (BASIS OF
DESIGN KH INDUSTRIES MODEL RTMH4L-WW-K6K)
FINISHED FLOOR
60"
60"
36"
E-2
CORD REEL & DISCONNECT OLD SERVICE POINT
NO SCALE
FEEEDER CONDUIT
AND CONDUCTORS
TO PANEL M2D
FINISHED FLOOR
DOOR
OPENING
(TYP)
60"
P
| Page-1� |
| Page-2� |
| Page-3� |
| Page-4� |
| Page-5� |
File details come from the government source that posted it. Updated .