24GR03 - Airport Fencing and Security Upgrades - Addendum No. 3.pdf
PDF 2 MB Posted
- Attached to
- Airport Fencing and Security Upgrades - 24GR03
- Solicitation number
- S-KR1079-00014500
- Issued by
- Douglas County, Oregon
About this file
Addendum No. 3 for the Roseburg Regional Airport Airport Fencing and Security Upgrades project in Roseburg, Oregon details modifications to the original bid documents for a comprehensive airport security infrastructure project. The addendum, dated August 15, 2025, is for a bid due on August 19, 2024, and includes updates to project plans and specifications, specifically adding straw wattles for erosion control and revising the bid form. The project involves removing existing chain-link fencing, installing new 6-foot chain-link fencing with 3-strand barbed wire, performing site clearing on 1.8 acres, and implementing slope protection across approximately 82 square yards.
The bid is structured with a base bid and two additional bid options: Bid Additive 1 and Bid Alternate 1. The base bid includes items such as mobilization, construction survey, fence removal, straw wattles, and various fencing installations totaling 5,100 linear feet of 6-foot chain-link fencing. Bid Additive 1 introduces additional fencing, a swing gate, an automatic vertical pivot gate, and temporary security fencing. Bid Alternate 1 proposes replacing the top rail with tension wire across 5,152 linear feet. The project appears to be funded through municipal infrastructure improvements, with detailed specifications for fence installation, erosion control, and site preparation provided in the addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM No. 3
Date: August 15, 2025
Project: Roseburg Regional Airport
Airport Fencing & Security Upgrades
Bid Date: August 19, 2024
This addendum is hereby made a part of the contract documents identified as Airport Fencing & Security
Upgrades, Roseburg Regional Airport, Roseburg, Oregon, to the same extent as though it were originally included therein. It is essential that prospective bidders note the contents of this addendum and that the Roseburg Regional
Airport be made aware that the addendum has been received. Therefore, acknowledge receipt by inserting the number of this addendum in the space provided on the Contract Proposal.
PLANS
C-601
• Added Straw Wattles
SPECS
Bid Form – Replace the bid form in its entirety with the bid form attached to this addendum.
Summary: Bid form has been revised to add straw wattle in the Base Bid.
P-101: Add Straw Wattles
• ADD Section P-101 4.3:
“101-4.3 Erosion and pollution control work required for the initial and final erosion control along with maintenance of erosion control will be performed as directed by the RPR. Payment will be made at the contract unit price for completed and accepted work:
Measurement for straw wattles shall be made at the contract unit price per linear foot, which price and payment shall be full compensation for furnishing and installing all materials and for all labor, equipment, tools, and incidentals necessary to install, maintain and remove the work as shown or prescribed on the plans or in this item.”
• ADD Section P-101 5.3:
“101-5.3 Accepted quantities of temporary water pollution, soil erosion, and siltation control work ordered by the RPR and measured as provided in paragraph 102-4.2 will be paid for under:
P-101-5.3 Straw Wattles – per linear foot. “
F-162: F-162-2.3 Posts rails and braces.
ADD Sentence “When fence line has a change in direction of 15 degrees or more, a terminal post shall be placed at the angle point. Where angle is less than 15 degrees and existing conditions require a terminal post, they shall be placed as directed by the resident project representative.”
ATTACHMENTS
• Replacement Sheet C-601
• Replacement Bid Form
QUESTIONS
1. Question:
Demolition Notes: Note #2. Clearing as described under item P-151 does not require ground disturbance and therefore the project does not require a 1200-C Construction Stormwater General permit. Under Construction Methods specification 162-3.2 Clearing fence line. The specification states that stumps within the cleared area of the fence shall be grubbed or excavated. In the BASE BID Sheet item No. 5.
P-151. Clearing, it shows the quantity as 1.8 Acres. The DEQ requires a permit for disturbed areas of one or more acres. These two specification sections are in conflict. Please clarify.
Sheet C-051. Demolition Notes: Note #2. Clearing as described under item P-151 does not require ground disturbance and therefore the project does not require a 1200-C Construction Stormwater General permit. In the BASE BID Sheet item No. 5. P-151. Clearing, States in the Bid Schedule quantity
1.8 Acres is to be cleared. The DEQ requires a permit for disturbed areas of one or more acres. The disturbed area is over one acre, therefore will the City of Roseburg assume all liabilities and hold the Contractor harmless for not operating under a 1200-C permit.
Clearing shall consist of the removal of all stumps, brush, rocks, trees, or other obstructions that will interfere with proper construction of the fence. Stumps within the clearing area of the fence shall be grubbed or excavated. When shown on the plans or as directed by the RPR, the existing fences which interfere with the new fence location shall be removed by the Contactor as a part of the construction work unless such removal is listed as a separate item in the bid schedule. All holes remaining after post and stump removal shall be refilled with suitable soil, gravel, or other suitable materials and compacted with tampers.
Removal of all stumps, brush, rocks, trees, or other obstructions that interfere with the construction of the fence as described require grubbing and excavation per this section will result in ground disturbing activities.
Holes for the new fence post and electrical bonding bores will require removal greater than 100 cu. yds.
of earth removal. Filling removed fence post, will approximate 50-75cu yds of fill material
The disturbed area is over one acre; therefore, will the City of Roseburg and the DEQ assume all liabilities and hold the Contractor harmless for not operating under a 1200-C permit?
Construction / Preparation for riprap benching will result in ground disturbance. Drilling fence post holes and the removal of existing fence posts and footing require back fill. The scope of work described in the specification and plans will result in ground disturbance activities greater than one acre. Will the City of Roseburg and the DEQ assume all liability and hold the Contractor harmless for not having a 1200-C permit.
An access hole to the ground rod to perform the exothermic welding will result in ground disturbance. Is it the City of Roseburg project approach to construct the project without a 1200-C construction General Permit? Please confirm.
Answer: The area of disturbance for the project will be less than one acre, therefore a 1200-C Construction Stormwater Permit is not expected to be required at this time. Clearing as identified on sheet
C-051 shall consist of cutting and removal of all trees, stumps, brush, logs, hedges, the removal of fences and other loose or projecting material from the designated areas. All stumps to remain, shall be cut flush with the FG. The grubbing of stumps and roots will not be required.
Clearing fence line on sheet C-601 to C-603 shall be incidental to the payment for chain-link fence to installed. Clearing the fence line shall consist of the removal of all stumps, brush, rocks, trees or other obstructions that will interfere with proper construction of the fence. Stumps only within the cleared area of the fence shall be grubbed or excavated. The disturbed area will be less than one acre total.
2. Question: Sheet C-631, Detail 6. Typical fence Post Footing. Fence footing and material notes. Table.
Concrete Footing Depth (A) does not list Line Post Footing Requirements. Please provide line posting details.
Answer: No concrete is required for line post footing. Line post shown in detail 1 on sheet C-631.
3. Question: Sheet C-632. Detail 6. Typical Fence Post Footing. The footing detail shows the concrete post hole fill is to be one-inch higher than the finished grade (FG). To accomplish this requirement a
Sonotube will need to be utilized.
Please provide a typical detail of the fence post perpendicular to the fence line on slopes.
Can the one-inch concrete post fill above the FG be modified to equal the FG?
Answer: Typical fence post detail shown on detail 4 on sheet C-631. Concrete shall be set 1” higher than the finished ground per detail 6 on sheet C-631. Per the FAA General Contract Provisions 80-05, “When the methods and equipment to be used by the Contractor in accomplishing the work are not prescribed in the contract, the Contractor is free to use any methods or equipment that will accomplish the work in conformity with the requirements of the contract, plans, and specifications.”
4. Question Section 162-3.7 requires a 5/8-inch by 8-foot ground rod driven until the top is 6-inches below grade. FAA-STD-019, Lighting surge protection, Grounding. 4.4.4.1 states the ground is to be ¾-inch by
10 feet long and installed 1 foot below frost depth, which at the project location is 18 inches. It appears that the FAA-STD-019 is the more restrictive and therefore the governing document. Please confirm.
Answer: F-162-3.7 states “The Contractor shall comply with FAA-STD-019, Lightning and Surge
Protection, Grounding, Bonding and Shielding Requirements for Facilities and Electronic Equipment, paragraph 4.2.3.8, Lightning Protection for Fences and Gates, where fencing is adjacent to FAA facilities.” Contractor shall comply with FAA-STD-019 paragraph 4.2.3.8 where fencing is adjacent to
FAA facilities, and does not apply. For electrical grounds used on this project, follow the requirements stated in F-162-3.7.
5. Question: Is the installation of ground rods and bonding each strand of security wire and to fence posts required to be performed by a Licensed Electrical Contractor?
Answer: Contractor to follow the requirements of FAA-STD-019.
6. Question: Is an Electrical Permit required?
Answer: We are not aware of any electrical permits required for this work. Unless otherwise explicitly described, it is the contractor’s responsibility to verify and obtain any and all permits required for the work as part of the contract.
7. Question: Is the fabrication welding of gates required to be performed by a certified welder?
Answer: A certified welder is not required.
END OF ADDENDUM
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
x x x x x x x x x x
STA: 75+98.31
OFF: 4.53'
STA: 76+03.26
OFF: 14.13'
STA: 76+16.39
OFF: 13.41'
STA: 75+78.47
OFF: -1.00'
STA: 76+25.71
OFF: 7.90'
STA: 76+59.69
OFF: -1.00'
STA: 75+97.70
OFF: -1.00'
STA: 76+30.10
OFF: -1.00'
STA: 75+77.75
OFF: 1.72'
STA: 76+49.93
OFF: 18.68'
STA: 76+61.17
OFF: -4.00'
STA: 76+31.58
OFF: -4.00'STA: 75+79.53
OFF: -4.02'
STA: 75+97.37
OFF: -4.00'
STA: 75+99.59
OFF: 8.48'
STA: 76+22.96
OFF: 10.42'
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
AP
PR
O X.
B O
X C
U
LV
ER
T
AL
IG
N M
EN
T x x x x x x x x x x x x x x x x x x x x x x
60+00 70+00 80+00
CORNER POST
STA: 58+38.79
OFF: -321.40'
CORNER POST
STA: 74+56.65
OFF: -166.77'
CORNER POST
STA: 78+77.62
OFF: -126.66'
CORNER POST
STA: 78+75.04
OFF: -99.56'
CORNER POST
STA: 74+54.60
OFF: -144.55'
CORNER POST
STA: 75+91.78
OFF: -115.26'
CORNER POST
STA: 77+10.00
OFF: -103.21'
CORNER POST
STA: 76+09.82
OFF: -89.97'
STA: 78+09.99
OFF: -104.22'
STA: 76+86.07
OFF: -74.92'
STA: 76+16.77
OFF: -81.31'
STA: 75+91.84
OFF: -10.57'
STA: 76+52.96
OFF: -7.63'
C-601
FENCING PLAN
(BASE BID)
MLF
SDB
AAS
X:
\1
\2
8.
\T
EC
H \C
AD
\F
EN
C
IN
G
P
LA
N .D
W G
8/
/2
7:
:4
PM 6
3-41-0054-033-2025
1821200-230038.02
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
ofSHEET NO.
Mead and Hunt, Inc.
© Copyright 2025 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
9600 NE Cascades Parkway, Suite 100
Portland, OR 97220 phone: 503-548-1494 meadhunt.com
AIP NO.:
00 100 200
JULY 25, 2025
NOTES:
1. THE STATION / OFFSETS IDENTIFIED ON THIS SHEET DENOTE THE CENTERLINE OF THE
PROPOSED FENCE . STATION / OFFSETS ARE REFERENCED OFF THE RUNWAY 16-34 ROFA
ALIGNMENT. SEE SHEET G-021 FOR ALIGNMENT DATA.
2. CHAIN LINK PERIMETER FENCE SHALL BE INSTALLED ONE FOOT INSIDE THE PROPERTY
LINE.
3. THE CONTRACTOR SHALL NOTIFY THE OWNER UPON COMPLETION OF STAKING THE
PROPOSED FENCE ALIGNMENT. OWNER WILL COORDINATE A WALK THRU WITH THE
CONTRACTOR, ENGINEER, AND OWNER. THE OWNER RESERVES THE RIGHT TO MAKE
ADJUSTMENTS TO THE FINAL ALIGNMENT DURING THE WALK THRU IN EFFORT TO AVOID
EXISTING STRUCTURES, UTILITIES, TERRAIN FEATURES, OR OTHER OBSTACLES
IDENTIFIED BY THE OWNER.
6' CHAIN-LINK PERIMETER FENCE,
SEE DETAIL 1/ C-631
RIPRAP SLOPE PROTECTION
LEGEND:
x
M
AT
C H
LI
N
E
- S
TA
5+
S
EE
S H
EE
T
C -6
RUNWAY 16-34
TW
Y
A3
TW
Y
A2
KEYNOTES:
DITCH CROSSING, SEE DETAIL 2/C-631 AND 3/C-631
RIPRAP SLOPE PROTECTION, SEE DETAIL 5/C-632
6' CHAIN-LINK FENCE WITH 3-STRANDS BARBED WIRE,
SEE DETAIL 1/C-631
6' CHAIN-LINK FENCE WITH 3-STRANDS BARBED WIRE ON SLOPE,
SEE DETAIL 1/C-633
CHAIN-LINK FENCE TRANSITION WITH 3-STRANDS BARBED
WIRE, (5' TO 6') SEE DETAIL 2/C-633
CHAIN-LINK FENCE TRANSITION WITH 3-STRANDS BARBED
WIRE, (2' TO 5') SEE DETAIL 2/C-633
2' CHAIN-LINK FENCE WITH 3-STRANDS BARBED WIRE,
SEE DETAIL 3/C-633
NOT USED
NOT USED
FENCING TO BE ROUTED AROUND DITCH ON THE UPSLOPE SIDE
AND WITHIN THE PROPERTY LINE
SEE FENCE ALONG CULVERT
HEADWALL INSET, THIS SHEET
FENCE ALONG CULVERT HEADWALL1
00 15 30
N E
AI
R
PO
R
T R
O
AD
SOUTHERN PACIFIC
RAILROAD
R O
SE
BU
R G
R
EG
IO
N
AL
A
IR
PO
R T
N W
S
TE
W
AR
T
PA
R
KW
AY
R
O
SE
BU
R
G , O
R
AI
R
PO
R
T
FE
N C
IN
G
A N
D S
EC
U
R
IT
Y U
PG
R
AD
ES
IFB
NOT FOR CONSTRUCTION
WINGWALL
WINGWALL
HEADWALL
CONNECT INTO EXISTING
CORNER POST
1 ADDENDUM 2
10 1
STRAW WATTLE DETAIL2 NO SCALE
FLOW
STAKING
SPACING 4'
O.C.
WOOD STAKE
WHEAT STRAW, RYE
GRASS STRAW,
COCONUT OR
EXCELSIOR
8" -10" DIAMETER
WATTLES
PLACE WATTLES ALONG SLOPE CONTOURS.
NOTES:
1. STAKING SPECIFICATIONS:
a. 1"X2" WOODEN STAKES
b. ADDITIONAL STAKES MAY BE INSTALLED ON DOWNHILL SIDE OF
WATTLES, ON STEEP SLOPE OR HIGHLY EROSIVE SOILS.
2. SPACING IN ACCORDANCE WITH BARRIER SPACING TABLE.
3. REMOVE ALL ROCKS, CLODS, VEGETATION OR OTHER OBSTRUCTIONS
SO THAT THE INSTALLED WATTLES WILL HAVE DIRECT CONTACT WITH
THE SOIL.
4. INSTALL THE WATTLES IN A 2" DEEP TRENCH, INSURING THAT NO GAPS
EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE WATTLE. THE ENDS
OF ADJACENT WATTLES SHALL BE OVERLAPPED 1 FT. MINIMUM TO
PREVENT SEDIMENT PASSING THROUGH THE FIELD JOINT.
5. MATERIALS SHALL MEET COMMERCIAL GRADE STANDARDS AND SHALL
BE APPROVED BY THE RPR BEFORE BEING INCORPORATED INTO THE
PROJECT (P-101).
STAGGER
JOINTS
PROFILE
FLOW
MINIMUM 1'
OVERLAPPING
ON UPHILL
SIDE
SLOPE
BARRIER SPACING
% SLOPE SLOPE H:V MAXIMUM SPACING
10% OR FLATTER 10:1 OR FLATTER 300'
>10% OR <15% >10:1 OR <7.5:1 150'
>15% OR <20% >7.5:1 OR <5:1 100'
>20% OR <30% >5:1 OR <3.5:1 50'
>30% OR <50% >3.5:1 OR <2:1 25'
SEE
BARRIER
SPACING
TABLE, TYP
6' CHAIN-LINK PERIMETER FENCE,
SEE DETAIL 1/ C-631
2 ADDENDUM 3
Page 19 – (Prevailing Wage Projects) Revised 10/2024
Roseburg Regional Airport Bid Information Roseburg, Oregon Airport Fencing and Security Upgrades City No. 24GR03 Page 19 Addendum 3
ROSEBURG REGIONAL AIRPORT
AIRPORT FENCING AND SECURITY UPGRADES
CITY NO. 24GR03
BASE BID
ITEM
NO.
SECTION/
ITEM
ITEM DESCRIPTION QTY UNITS
UNIT PRICE
(IN FIGURES)
TOTAL PRICE
(IN FIGURES)
1 C-105 Mobilization (10% Maximum) 1 LS
2 GP 50-07 Construction Survey 1 LS
3 P-101 Chain-Link Fence Removal 4,771 LF
4 P-101 Riprap Slope Protection, 30” Depth 82 SY
5 P-101 Straw Wattles 150 LF
6 P-151 Clearing 1.8 AC
7 F-162 6-foot Chain-Link Fence, with 3-strand barbed wire 5,100 LF
8 F-162 5-foot to 6-foot Chain Link Fence Transition, with 3-strand barbed wire
16 LF
9 F-162 2-foot to 5-foot Chain Link Fence Transition, with 3-strand barbed wire
22 LF
10 F-162 2-foot Chain-Link Fence, with 3-strand barbed wire 14 LF
TOTAL Base Bid in Figures
Total Base Bid in Writing:
Page 20 – (Prevailing Wage Projects) Revised 10/2024
Roseburg Regional Airport Bid Information Roseburg, Oregon Airport Fencing and Security Upgrades City No. 24GR03 Page 20 Addendum 3
ROSEBURG REGIONAL AIRPORT
AIRPORT FENCING AND SECURITY UPGRADES
CITY NO. 24GR03
BID ADDITIVE 1
ITEM
NO.
SECTION/
ITEM
ITEM DESCRIPTION QTY UNITS
UNIT PRICE
(IN FIGURES)
TOTAL PRICE
(IN FIGURES)
1 C-105 Mobilization (10% Maximum) 1 LS
2 GP 50-07 Construction Survey 1 LS
3 P-101 Chain-Link Fence Removal 560 LF
4 F-162 6-foot Chain-Link Fence, with 3-strand barbed wire 560 LF
5 F-162 Single Panel Swing Gate, 6’-5” 1 EA
6 F-162 3-strand barbed wire installed on 19-foot automatic vertical pivot gate
1 LS
7 F-162 Temporary Security Fencing 1 LS
TOTAL Bid Additive 1 in Figures
Total Bid Additive 1 in Writing:
ROSEBURG REGIONAL AIRPORT
AIRPORT FENCING AND SECURITY UPGRADES
CITY NO. 24GR03
BID ALTERNATE 1
ITEM
NO.
SECTION/
ITEM
ITEM DESCRIPTION QTY UNITS
UNIT PRICE
(IN FIGURES)
TOTAL PRICE
(IN FIGURES)
1 F-162 Tension Wire to Replace Top Rail on Chain-Link Fence in Work Area 1
5,152 LF
TOTAL Bid Alternate 1 in Figures
Total Bid Alternate 1 in Writing:
File details come from the government source that posted it. Updated .