This document is an Addendum to a Statement of Work (SOW) for coating roof decks at the Clinton Health Center. The addendum specifies testing requirements for the roofing project, which include plugging roof drains from roof to basement, running water to 1" above the roof surface, and checking roof drains for leaks for a minimum of 30 minutes. The testing is intended to identify potential leak locations that require repair.
The related federal contract opportunity (Solicitation Number 246-25-Q-0067) is a 100% Indian-owned business set-aside for coating existing roof terraces at the Clinton Indian Health Center in Clinton, OK. The project has a 90-calendar day performance period, with a site visit scheduled for June 6th, 2025. Quotes are due by June 23, 2025, with an estimated award amount under $27,000. Offerors must submit technical specifications, past performance references, and complete the required Indian Economic Enterprise Representation Form. Award will be made to the lowest-priced, technically acceptable quote.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction Clauses-DEVIATION FEB 2025.docx | DOCX document | |
| ok57.txt | TXT text file | |
| 7-OF612.pdf | ||
| CIHC Coating decks SOW 052225.pdf | ||
| 5-Tier 1 CNACI Child Care Checklist.pdf | ||
| Bid sheet 052225.xlsx | XLSX spreadsheet | |
| CIHC Coating decks A1 050925.pdf | ||
| SF18-95a Request for Quote.docx | DOCX document | |
| IHS IEE Representation Form_Jan 2022_508 Compliant.pdf | ||
| 6-86c Questionnaire Form.pdf | ||
| OF 306 2-Addendum-CCIC 09170028.pdf | ||
| OF 306-Declaration for Federal Employment OF306 (08.2023).pdf | ||
| 4-HHS 745 (Revised 03.24).pdf | ||
| 3-ISO Provisional Authorization Memo.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Coating Roof Decks SOW OK5AS01C6 Clinton Health Center dated 5/22/2025 Contract Addendum to Statement of Work #1 – Testing
This is reference to current statement of work
Contractor to perform testing to include plugging the roofs drains from roof to basement as necessary, run water to 1" above roof surface and check roof drains for leaks for at least 30 minutes. Intent is to pinpoint, as much as possible, leaks to be addressed.