24072 ROA As-Bid Project Manual (IFB 26-007) Vol. 2 2026.05.15.pdf

PDF 17 MB Posted

Attached to
IFB # 26-007 Rehabilitate Runway 6-24
Solicitation number
IFB-120795
Issued by
Roanoke County, Roanoke City, Virginia

About this file

This is Volume 2 of the As-Bid Project Manual for IFB 26-007, issued by the Roanoke Regional Airport Commission to rehabilitate Runway 6-24 at Roanoke-Blacksburg Airport in Roanoke, Virginia. The project encompasses runway pavement rehabilitation work including removal of existing pavements, excavation and subgrade preparation, installation of crushed aggregate base course, asphalt mix pavement placement, joint sealants, tack coats, runway and taxiway markings, seeding, mulching, and installation of airport lighting systems. The manual includes federally funded project contract conditions based on FAA Advisory Circular 150/5370-10H, Davis-Bacon wage rates, technical specifications for various construction items, and general contract provisions. A pre-bid conference will be held to discuss material requirements, Quality Control/Quality Assurance requirements, the Construction Safety and Phasing Plan including airport access and staging areas, and unique airfield paving construction requirements. The work is subject to AIP Project Number 3-51-0045-074-2025 for design and a pending AIP Project Number for construction. The contract requires the contractor to maintain traffic in accordance with the approved Construction Safety and Phasing Plan, ensure aircraft safety, and comply with all FAA and airport operational requirements throughout execution.

The project is federally funded through the FAA's Airport Improvement Program (AIP), with the United States Government reimbursing the Owner for a portion of contract costs. The contractor must possess competency and financial responsibility, with evidence of past experience on similar work and an adequate equipment list. Bidders must submit proposals on Owner-provided forms with unit prices for all pay items and include required bid certifications and a bid bond. The contractor shall perform at least 51 percent of the total contract cost with their own organization, with all subcontracts requiring 14 days' advance notice to the Engineer and copies of insurance certificates. Davis-Bacon prevailing wage rates apply to this federally funded project. The contractor must establish a Contractor Quality Control Program (CQCP) and coordinate all operations with the Engineer and Resident Project Representative, including compliance with Virginia Department of Transportation Road and Bridge Specifications where referenced. The contract documents include provisions for change orders, supplemental agreements, and force account work if costs exceed 25 percent of contract value or major contract item costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AS-BID

MAY 2026

PROJECT MANUAL

VOLUME 2 OF 2

REHABILITATE RUNWAY 6-24

ROANOKE-BLACKSBURG AIRPORT

ROANOKE, VIRGINIA

AIP PROJECT NO. 3-51-0045-074-2025 (DESIGN)

AIP PROJECT NO. PENDING (CONSTRUCTION)

RRAC BID NO. 26-007

PREPARED FOR THE

ROANOKE REGIONAL AIRPORT COMMISSION

2700 POLO PARKWAY

DELTA PROJECT NO. 24072 MIDLOTHIAN, VIRGINIA 23113

Legal Approval 021012

REHABILITATE RUNWAY 6-24 PROJECT

BID NO: 26-007

PROJECT MANUAL

TABLE OF CONTENTS

VOLUME 1

SECTION TITLE PAGE NUMBER

A. Bid Information

Invitation to Bid Instructions to Bidders

B. General Conditions, Including Special Conditions

C. Bid Forms

Bid Form Bid Schedule Bid Certifications Bid Bond

D. Contract Forms

Contract Contractor’s Performance Bond Contractor’s Labor and Material Payment Bond

VOLUME 2

E. Contract Conditions for Federally Funded Projects

Part 1 - General Contract Provisions (FAA AC 150/5370-10H) Federal Contract Provisions for FAA Funded Projects Davis-Bacon Wage Rates

F. Other Contract Forms

G. Technical Specifications

H. Appendices

Page Intentionally Blank

1 VOLUME 2 - List of Contents Rehabilitate Runway 6-24 | 24072 - ROA

VOLUME 2

List of Contents

SECTION E - Contract Conditions for Federally Funded Projects Part 1 – General Contract Provisions

Section 10 Definition of Terms Section 20 Proposal Requirements and Conditions Section 30 Award and Execution of Contract Section 40 Scope of Work Section 50 Control of Work Section 60 Control of Materials Section 70 Legal Regulations and Responsibility to Public Section 80 Execution and Progress Section 90 Measurement and Payment

Federal Contract Provisions for FAA Funded Projects (v. 03/17/26) Davis-Bacon Wage Rates

SECTION F - Other Contract Forms Warranty of Construction Lien and Claims Release Certificate of Substantial Completion Certificate of Final Acceptance

SECTION G - Special Provisions and Technical Specifications Special Provisions FAA Specifications

Part 2 – General Construction Items Item C-100 Contractor Quality Control Program (CQCP) Item C-105 Mobilization Item C-110 Method of Estimating Percentage of Material Within Specification Limits (PWL)

Part 3 – Sitework Item P-101 Preparation/Removal of Existing Pavements Item P-152 Excavation, Subgrade, and Embankment Item P-153 Controlled Low-Strength Material (CLSM)

Part 4 – Base Courses Item P-209 Crushed Aggregate Base Course

Part 6 – Flexible Pavements Item P-401 Asphalt Mix Pavement

2 VOLUME 2 - List of Contents

Part 9 – Miscellaneous Item P-603 Emulsified Asphalt Tack Coat Item P-605 Joint Sealants for Pavements Item P-606 Adhesive Compounds, Two-Component for Sealing Wire and Lights in Pavement Item P-610 Concrete for Miscellaneous Structures Item P-620 Runway and Taxiway Marking Item P-621 Saw-Cut Grooves

Part 12 – Turfing Item T-901 Seeding Item T-905 Topsoil Item T-908 Mulching

Part 13 – Lighting Installation Item L-108 Underground Power Cable for Airports Item L-109 Airport Transformer Vault and Vault Equipment Item L-110 Airport Underground Electrical Duct Banks and Conduits Item L-115 Electrical Manholes and Junction Structures Item L-125 Installation of Airport Lighting Systems

Other Specifications Item M-103 Closed Runway or Taxiway Markers Item M-107 Aviation Barricades Item M-199 Major Sinkhole Treatment Item M-406 Crack Reduction Membrane

SECTION H - Appendices Appendix A - Other Forms Appendix B - Construction Safety and Phasing Plan (CSPP) Appendix C - Geotechnical Report

SECTION E - Contract Conditions for Federally Funded Projects for

Rehabilitate Runway 6-24 at

Roanoke-Blacksburg Airport

12/21/2018 AC 150/5370-10H

Section 10 Definition of Terms 1

Part 1 – General Contract Provisions

Section 10 Definition of Terms

When the following terms are used in these specifications, in the contract, or in any documents or other instruments pertaining to construction where these specifications govern, the intent and meaning shall be defined as follows:

Paragraph

Number Term Definition

10-01 AASHTO The American Association of State Highway and

Transportation Officials.

10-02 Access Road The right-of-way, the roadway and all improvements constructed thereon connecting the airport to a public roadway.

10-03 Advertisement A public announcement, as required by local law, inviting bids for work to be performed and materials to be furnished.

10-04 Airport

Airport means an area of land or water which is used or intended to be used for the landing and takeoff of aircraft; an appurtenant area used or intended to be used for airport buildings or other airport facilities or rights of way; airport buildings and facilities located in any of these areas, and a heliport.

10-05 Airport Improvement

Program (AIP)

A grant-in-aid program, administered by the Federal

Aviation Administration (FAA).

10-06 Air Operations Area

(AOA)

The term air operations area (AOA) shall mean any area of the airport used or intended to be used for the landing, takeoff, or surface maneuvering of aircraft. An air operation area shall include such paved or unpaved areas that are used or intended to be used for the unobstructed movement of aircraft in addition to its associated runway, taxiway, or apron.

10-07 Apron Area where aircraft are parked, unloaded or loaded, fueled and/or serviced.

10-08 ASTM International

(ASTM)

Formerly known as the American Society for Testing and

Materials (ASTM).

10-09 Award The Owner’s notice to the successful bidder of the acceptance of the submitted bid.

10-10 Bidder Any individual, partnership, firm, or corporation, acting directly or through a duly authorized representative, who submits a proposal for the work contemplated.

10-11 Building Area An area on the airport to be used, considered, or intended to be used for airport buildings or other airport facilities or rights-of-way together with all airport buildings and facilities located thereon.

10-12 Calendar Day Every day shown on the calendar.

Section 10 Definition of Terms 2

Paragraph

Number Term Definition

10-13 Certificate of Analysis

(COA)

The COA is the manufacturer’s Certificate of Compliance

(COC) including all applicable test results required by the specifications.

10-14 Certificate of Compliance

(COC)

The manufacturer’s certification stating that materials or assemblies furnished fully comply with the requirements of the contract. The certificate shall be signed by the manufacturer’s authorized representative.

10-15 Change Order A written order to the Contractor covering changes in the plans, specifications, or proposal quantities and establishing the basis of payment and contract time adjustment, if any, for work within the scope of the contract and necessary to complete the project.

10-16 Contract A written agreement between the Owner and the Contractor that establishes the obligations of the parties including but not limited to performance of work, furnishing of labor, equipment and materials and the basis of payment.

The awarded contract includes but may not be limited to:

Advertisement, Construction Agreement, Proposal, Performance bond, Payment Bond, general provisions, certifications and representations, Specifications, Plans, Special Provisions, supplemental provisions, standards incorporated by reference and issued Addenda.

10-17 Contract Item (Pay Item) A specific unit of work for which a price is provided in the contract.

10-18 Contract Time The number of calendar days, or working days, stated in the proposal allowed for completion of the contract, including authorized time extensions. If a calendar date of completion is stated in the proposal, in lieu of a number of calendar or working days, the contract shall be completed by that date.

10-19 Contractor The individual, partnership, firm, or corporation primarily liable for the acceptable performance of the work contracted and for the payment of all legal debts pertaining to the work who acts directly or through lawful agents or employees to complete the contract work.

10-20 Contractors Quality

Control (QC) Facilities

The Contractor’s QC facilities in accordance with the

Contractor Quality Control Program (CQCP).

10-21 Contractor Quality

Control Program

(CQCP)

Details the methods and procedures that will be taken to assure that all materials and completed construction required by the contract conform to contract plans, technical specifications, and other requirements, whether manufactured by the Contractor, or procured from subcontractors or vendors.

10-22 Control Strip A demonstration by the Contractor that the materials, equipment, and construction processes results in a product meeting the requirements of the specification.

Section 10 Definition of Terms 3

Term Definition

10-23 Construction Safety and

Phasing Plan (CSPP)

The overall plan for safety and phasing of a construction project developed by the airport operator or developed by the airport operator’s consultant and approved by the airport operator. It is included in the invitation for bids and becomes part of the project specifications.

10-24 Drainage System The system of pipes, ditches, and structures by which surface or subsurface waters are collected and conducted from the airport area.

10-25 Engineer The individual, partnership, firm, or corporation duly authorized by the Owner to be responsible for engineering, inspection, and/or observation of the contract work and acting directly or through an authorized representative.

10-26 Equipment All machinery, together with the necessary supplies for upkeep and maintenance; and all tools and apparatus necessary for the proper construction and acceptable completion of the work.

10-27 Extra Work An item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, but which is found by the Owner’s Engineer or

Resident Project Representative (RPR) to be necessary to complete the work within the intended scope of the contract as previously modified.

10-28 FAA The Federal Aviation Administration. When used to designate a person, FAA shall mean the Administrator or their duly authorized representative.

10-29 Federal Specifications The federal specifications and standards, commercial item descriptions, and supplements, amendments, and indices prepared and issued by the General Services Administration.

10-30 Force Account a. Contract Force Account - A method of payment that addresses extra work performed by the Contractor on a time and material basis.

b. Owner Force Account - Work performed for the project by the Owner's employees.

Section 10 Definition of Terms 4

Term Definition

10-31 Intention of Terms Whenever, in these specifications or on the plans, the words

“directed,” “required,” “permitted,” “ordered,” “designated,”

“prescribed,” or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation, or prescription of the Engineer and/or

Resident Project Representative (RPR) is intended; and similarly, the words “approved,” “acceptable,”

“satisfactory,” or words of like import, shall mean approved by, or acceptable to, or satisfactory to the Engineer and/or

RPR, subject in each case to the final determination of the

Owner.

Any reference to a specific requirement of a numbered paragraph of the contract specifications or a cited standard shall be interpreted to include all general requirements of the entire section, specification item, or cited standard that may be pertinent to such specific reference.

10-32 Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

10-33 Major and Minor

Contract Items

A major contract item shall be any item that is listed in the proposal, the total cost of which is equal to or greater than

20% of the total amount of the award contract. All other items shall be considered minor contract items.

10-34 Materials Any substance specified for use in the construction of the contract work.

10-35 Modification of Standards

(MOS)

Any deviation from standard specifications applicable to material and construction methods in accordance with FAA

Order 5300.1.

10-36 Notice to Proceed (NTP) A written notice to the Contractor to begin the actual contract work on a previously agreed to date. If applicable, the Notice to Proceed shall state the date on which the contract time begins.

10-37 Owner The term “Owner” shall mean the party of the first part or the contracting agency signatory to the contract. Where the term “Owner” is capitalized in this document, it shall mean airport Sponsor only. The Owner for this project is the

Roanoke Regional Airport Commission.

10-38 Passenger Facility Charge

(PFC)

Per 14 Code of Federal Regulations (CFR) Part 158 and 49

United States Code (USC) § 40117, a PFC is a charge imposed by a public agency on passengers enplaned at a commercial service airport it controls.

10-39 Pavement Structure The combined surface course, base course(s), and subbase course(s), if any, considered as a single unit.

Section 10 Definition of Terms 5

Term Definition

10-40 Payment bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will pay in full all bills and accounts for materials and labor used in the construction of the work.

10-41 Performance bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will complete the work in accordance with the terms of the contract.

10-42 Plans The official drawings or exact reproductions which show the location, character, dimensions and details of the airport and the work to be done and which are to be considered as a part of the contract, supplementary to the specifications. Plans may also be referred to as "contract drawings," "drawings,"

"plan sheets," or "exhibits."

10-43 Project The agreed scope of work for accomplishing specific airport development with respect to a particular airport.

10-44 Proposal The written offer of the bidder (when submitted on the approved proposal form) to perform the contemplated work and furnish the necessary materials in accordance with the provisions of the plans and specifications.

10-45 Proposal guaranty The security furnished with a proposal to guarantee that the bidder will enter into a contract if their own proposal is accepted by the Owner.

10-46 Quality Assurance (QA) Owner’s responsibility to assure that construction work completed complies with specifications for payment.

10-47 Quality Control (QC) Contractor’s responsibility to control material(s) and construction processes to complete construction in accordance with project specifications.

10-48 Quality Assurance (QA)

Inspector

An authorized representative of the Engineer and/or

Resident Project Representative (RPR) assigned to make all necessary inspections, observations, tests, and/or observation of tests of the work performed or being performed, or of the materials furnished or being furnished by the Contractor.

10-49 Quality Assurance (QA)

Laboratory

The official quality assurance testing laboratories of the

Owner or such other laboratories as may be designated by the Engineer or RPR. May also be referred to as Engineer’s, Owner’s, or QA Laboratory.

10-50 Resident Project

Representative (RPR)

The individual, partnership, firm, or corporation duly authorized by the Owner to be responsible for all necessary inspections, observations, tests, and/or observations of tests of the contract work performed or being performed, or of the materials furnished or being furnished by the Contractor, and acting directly or through an authorized representative.

10-51 Runway The area on the airport prepared for the landing and takeoff of aircraft.

Section 10 Definition of Terms 6

Term Definition

10-52 Runway Safety Area

(RSA)

A defined surface surrounding the runway prepared or suitable for reducing the risk of damage to aircraft. See the construction safety and phasing plan (CSPP) for limits of the

RSA.

10-53 Safety Plan Compliance

Document (SPCD)

Details how the Contractor will comply with the CSPP.

10-54 Specifications A part of the contract containing the written directions and requirements for completing the contract work. Standards for specifying materials or testing which are cited in the contract specifications by reference shall have the same force and effect as if included in the contract physically.

10-55 Sponsor A Sponsor is defined in 49 USC § 47102(24) as a public agency that submits to the FAA for an AIP grant; or a private Owner of a public-use airport that submits to the

FAA an application for an AIP grant for the airport.

10-56 Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers;

navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein.

10-57 Subgrade The soil that forms the pavement foundation.

10-58 Superintendent The Contractor’s executive representative who is present on the work during progress, authorized to receive and fulfill instructions from the Engineer, and who shall supervise and direct the construction.

10-59 Supplemental Agreement A written agreement between the Contractor and the Owner that establishes the basis of payment and contract time adjustment, if any, for the work affected by the supplemental agreement. A supplemental agreement is required if: (1) in scope work would increase or decrease the total amount of the awarded contract by more than 25%: (2) in scope work would increase or decrease the total of any major contract item by more than 25%; (3) work that is not within the scope of the originally awarded contract; or (4) adding or deleting of a major contract item.

10-60 Surety The corporation, partnership, or individual, other than the

Contractor, executing payment or performance bonds that are furnished to the Owner by the Contractor.

10-61 Taxilane A taxiway designed for low-speed movement of aircraft between aircraft parking areas and terminal areas.

10-62 Taxiway The portion of the air operations area of an airport that has been designated by competent airport authority for movement of aircraft to and from the airport’s runways, aircraft parking areas, and terminal areas.

Section 10 Definition of Terms 7

Term Definition

10-63 Taxiway/Taxilane Safety

Area (TSA)

A defined surface alongside the taxiway prepared or suitable for reducing the risk of damage to an aircraft. See the construction safety and phasing plan (CSPP) for limits of the

TSA.

10-64 Work The furnishing of all labor, materials, tools, equipment, and incidentals necessary or convenient to the Contractor’s performance of all duties and obligations imposed by the contract, plans, and specifications.

10-65 Working day A working day shall be any day other than a legal holiday, Saturday, or Sunday on which the normal working forces of the Contractor may proceed with regular work for at least six

(6) hours toward completion of the contract. When work is suspended for causes beyond the Contractor’s control, it will not be counted as a working day. Saturdays, Sundays, and holidays on which the Contractor’s forces engage in regular work will be considered as working days.

Owner Defined Terms:

10-66 Addenda Written or graphic instruments issued prior to the opening of bids which clarify, correct, or change the bidding documents or the contract documents and become a part thereof.

10-67 Bid The Bidder’s formal offer, written and submitted on the prescribed forms, to perform the work for the project at a specified cost based on the terms and conditions outlined in the Bidding Documents.

10-68 Bidding Documents The Bidding Documents include the invitation for bids/advertisement; instructions to bidders; bid forms and supplements (including but not limited to the bid form; bid schedule(s); and all bid certifications and disclosures); bid bond or other accepted forms of bid security; proposed

Contract Documents; and issued Addenda.

10-69 Contract Documents The Contract Documents include the Bid submitted by the awarded Contractor; the Project Manual, other than the supplemental resource material included in the appendices which provide geotechnical and existing conditions information; the Plans; and issued Addenda.

10-70 FAA Advisory

Circular (AC)

A document prepared by the Federal Aviation

Administration to provide guidance and information in a designated aviation related subject area, including standards, materials, and/or methods. The most current edition of ACs, approved by the FAA, can be found on the FAA web site at https://www.faa.gov/regulations_policies/advisory_circulars/

10-71 Install Unless described otherwise in the plans or specifications, "install" shall mean to furnish the item(s) referenced and to provide all materials, labor, equipment, and tools necessary to establish the referenced items(s) in place and in the correct working order.

Section 10 Definition of Terms 8

Term Definition

10-72 Notice of Award The written notice by the Owner to the apparent low bidder that they are the successful bidder and, that upon compliance with the contract conditions, the Owner intends to execute the contract with the apparent low bidder.

10-73 Project Manual A comprehensive written manual consisting of the documents that define the technical, contractual, and administrative requirements for procuring and constructing the project. Contents may be bound in one or more volumes.

10-74 Shop Drawings All drawings, diagrams, illustrations, schedules, and other data which are prepared by the Contractor, a subcontractor, manufacturer, supplier, or distributor and which illustrate the equipment, material or some portion of the work. All shop drawings shall be approved by the Contractor and submitted to the Engineer for review and acceptance for reasonable conformance to the contract documents.

10-75 Subcontractor An individual, firm or corporation having a direct contract with the Contractor or with any other subcontractor for the performance of a part of the work at the site.

10-76 Substantial Completion The work has progressed to the point where, in the opinion of the Owner as evidenced by the Engineer’s definitive

Certificate of Substantial Completion, it is sufficiently complete in accordance with the contract documents, so that the work can be utilized for the purposes for which it is intended.

10-77 Virginia Department of

Transportation (VDOT)

Road and Bridge

Specifications

The Virginia Department of Transportation Road and Bridge

Specifications, current edition, utilized for highway construction. These specifications may be incorporated by reference in some of the technical specifications for this project and shall have the same force and effect as if included in the contract physically.

10-78 Virginia Department of

Transportation (VDOT)

Standard Drawings

The Virginia Department of Transportation Standard

Drawings, current edition, utilized for highway construction.

These standards may be incorporated by reference in some of the plans and technical specifications for this project and shall have the same force and effect as if included in the contract physically.

END OF SECTION 10

Section 20 Proposal Requirements and Conditions 1

Section 20 Proposal Requirements and Conditions

20-01 Advertisement (Notice to Bidders).

A copy of the advertisement for the project has been incorporated in the front of this Project Manual.

20-02 Qualification of bidders. Each bidder shall submit evidence of competency and evidence of financial responsibility to perform the work to the Owner at the time of bid opening.

Evidence of competency, unless otherwise specified, shall consist of statements covering the bidder’s past experience on similar work, and a list of equipment and a list of key personnel that would be available for the work.

Each bidder shall furnish the Owner satisfactory evidence of their financial responsibility. Evidence of financial responsibility, unless otherwise specified, shall consist of a confidential statement or report of the bidder’s financial resources and liabilities as of the last calendar year or the bidder’s last fiscal year.

Such statements or reports shall be certified by a public accountant. At the time of submitting such financial statements or reports, the bidder shall further certify whether their financial responsibility is approximately the same as stated or reported by the public accountant. If the bidder’s financial responsibility has changed, the bidder shall qualify the public accountant’s statement or report to reflect the bidder’s true financial condition at the time such qualified statement or report is submitted to the

Owner.

Unless otherwise specified, a bidder may submit evidence that they are prequalified with the State

Highway Division and are on the current “bidder’s list” of the state in which the proposed work is located. Evidence of State Highway Division prequalification may be submitted as evidence of financial responsibility in lieu of the certified statements or reports specified above.

20-03 Contents of proposal forms. The Owner's proposal forms state the location and description of the proposed construction; the place, date, and time of opening of the proposals; and the estimated quantities of the various items of work to be performed and materials to be furnished for which unit bid prices are asked. The proposal form states the time in which the work must be completed, and the amount of the proposal guaranty that must accompany the proposal. The Owner will accept only those Proposals properly executed on physical forms or electronic forms provided by the Owner. Bidder actions that may cause the Owner to deem a proposal irregular are given in paragraph 20-09, Irregular proposals.

Mobilization is limited to the percentage specified in Item C-105, paragraph 105-2, Mobilization Limit.

A prebid conference will be held for this project to discuss as a minimum, the following items: material requirements; submittals; Quality Control/Quality Assurance requirements; the construction safety and phasing plan including airport access and staging areas; and unique airfield paving construction requirements.

20-04 Issuance of proposal forms. The Owner reserves the right to refuse to issue a proposal form to a prospective bidder if the bidder is in default for any of the following reasons:

a. Failure to comply with any prequalification regulations of the Owner, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding.

b. Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force with the Owner at the time the Owner issues the proposal to a prospective bidder.

c. Documented record of Contractor default under previous contracts with the Owner.

Section 20 Proposal Requirements and Conditions 2

d. Documented record of unsatisfactory work on previous contracts with the Owner.

20-05 Interpretation of estimated proposal quantities. An estimate of quantities of work to be done and materials to be furnished under these specifications is given in the proposal. It is the result of careful calculations and is believed to be correct. It is given only as a basis for comparison of proposals and the award of the contract.

The Owner does not expressly, or by implication, agree that the actual quantities involved will correspond exactly therewith; nor shall the bidder plead misunderstanding or deception because of such estimates of quantities, or of the character, location, or other conditions pertaining to the work. Payment to the

Contractor will be made only for the actual quantities of work performed or materials furnished in accordance with the plans and specifications. It is understood that the quantities may be increased or decreased as provided in Section 40, paragraph 40-02, Alteration of Work and Quantities, without in any way invalidating the unit bid prices.

20-06 Examination of plans, specifications, and site. The bidder is expected to carefully examine the site of the proposed work, the proposal, plans, specifications, and contract forms. Bidders shall satisfy themselves with regard to the character, quality, and quantities of work to be performed, materials to be furnished, and to the requirements of the proposed contract. The submission of a proposal shall be prima facie evidence that the bidder has made such examination and is satisfied to the conditions to be encountered in performing the work and the requirements of the proposed contract, plans, and specifications.

Boring logs and other records of subsurface investigations and tests are available for inspection of bidders. It is understood and agreed that such subsurface information, whether included in the plans, specifications, or otherwise made available to the bidder, was obtained and is intended for the Owner’s design and estimating purposes only. Such information has been made available for the convenience of all bidders. It is further understood and agreed that each bidder is solely responsible for all assumptions, deductions, or conclusions which the bidder may make or obtain from their own examination of the boring logs and other records of subsurface investigations and tests that are furnished by the Owner.

20-07 Preparation of proposal. See Instructions to Bidders.

20-08 Responsive and responsible bidder. A responsive bid conforms to all significant terms and conditions contained in the Owner’s invitation for bid. It is the Owner’s responsibility to decide if the exceptions taken by a bidder to the solicitation are material or not and the extent of deviation it is willing to accept.

A responsible bidder has the ability to perform successfully under the terms and conditions of a proposed procurement, as defined in 2 CFR § 200.318(h). This includes such matters as Contractor integrity, compliance with public policy, record of past performance, and financial and technical resources.

20-09 Irregular proposals. Proposals shall be considered irregular for the following reasons:

a. If the proposal is on a form other than that furnished by the Owner, or if the Owner’s form is altered, or if any part of the proposal form is detached.

b. If there are unauthorized additions, conditional or alternate pay items, or irregularities of any kind that make the proposal incomplete, indefinite, or otherwise ambiguous.

c. If the proposal does not contain a unit price for each pay item listed in the proposal, except in the case of authorized alternate pay items, for which the bidder is not required to furnish a unit price.

d. If the proposal contains unit prices that are obviously unbalanced.

e. If the proposal is not accompanied by the proposal guaranty specified by the Owner.

Section 20 Proposal Requirements and Conditions 3

f. If the applicable Disadvantaged Business Enterprise information is incomplete.

The Owner reserves the right to reject any irregular proposal and the right to waive technicalities if such waiver is in the best interest of the Owner and conforms to local laws and ordinances pertaining to the letting of construction contracts.

20-10 Bid guarantee. See Instructions to Bidders.

20-11 Delivery of proposal. See Instructions to Bidders.

20-12 Withdrawal or revision of proposals. See Instructions to Bidders.

20-13 Public opening of proposals. See Invitation For Bids

20-14 Disqualification of bidders. A bidder shall be considered disqualified for any of the following reasons:

a. Submitting more than one proposal from the same partnership, firm, or corporation under the same or different name.

b. Evidence of collusion among bidders. Bidders participating in such collusion shall be disqualified as bidders for any future work of the Owner until any such participating bidder has been reinstated by the

Owner as a qualified bidder.

c. If the bidder is considered to be in “default” for any reason specified in paragraph 20-04, Issuance of

Proposal Forms, of this section.

20-15 Discrepancies and Omissions. See Instructions to Bidders.

END OF SECTION 20

Section 30 Award and Execution of Contract 1

Section 30 Award and Execution of Contract

30-01 Consideration of proposals. After the proposals are publicly opened and read, they will be compared on the basis of the summation of the products obtained by multiplying the estimated quantities shown in the proposal by the unit bid prices. If a bidder’s proposal contains a discrepancy between unit bid prices written in words and unit bid prices written in numbers, the unit bid price written in words shall govern.

Until the award of a contract is made, the Owner reserves the right to reject a bidder’s proposal for any of the following reasons:

a. If the proposal is irregular as specified in Section 20, paragraph 20-09, Irregular Proposals.

b. If the bidder is disqualified for any of the reasons specified Section 20, paragraph 20-14, Disqualification of Bidders.

In addition, until the award of a contract is made, the Owner reserves the right to reject any or all proposals, waive technicalities, if such waiver is in the best interest of the Owner and is in conformance with applicable state and local laws or regulations pertaining to the letting of construction contracts;

advertise for new proposals; or proceed with the work otherwise. All such actions shall promote the

Owner’s best interests.

30-02 Award of contract. See Instruction to Bidders.

30-03 Cancellation of award. The Owner reserves the right to cancel the award without liability to the bidder, except return of proposal guaranty, at any time before a contract has been fully executed by all parties and is approved by the Owner in accordance with paragraph 30-07, Approval of Contract.

30-04 Return of proposal guaranty. All proposal guaranties, except those of the two lowest bidders, will be returned immediately after the Owner has made a comparison of bids as specified in the paragraph

30-01, Consideration of Proposals. Proposal guaranties of the two lowest bidders will be retained by the

Owner until such time as an award is made, at which time, the unsuccessful bidder’s proposal guaranty will be returned. The successful bidder’s proposal guaranty will be returned as soon as the Owner receives the contract bonds as specified in paragraph 30-05, Requirements of Contract Bonds.

30-05 Requirements of contract bonds. At the time of the execution of the contract, the successful bidder shall furnish the Owner a surety bond or bonds that have been fully executed by the bidder and the surety guaranteeing the performance of the work and the payment of all legal debts that may be incurred by reason of the Contractor’s performance of the work. The surety and the form of the bond or bonds shall be acceptable to the Owner. Unless otherwise specified in this subsection, the surety bond or bonds shall be in a sum equal to the full amount of the contract.

30-06 Execution of contract. See Instructions to Bidders.

30-07 Approval of contract. See Instructions to Bidders.

30-08 Failure to execute contract. See Instructions to Bidders.

END OF SECTION 30

Section 40 Scope of Work 1

Section 40 Scope of Work

40-01 Intent of contract. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract.

40-02 Alteration of work and quantities. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner’s Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work.

For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%.

Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities.

Should the value of altered work or quantity variance meet the criteria for significant change in character of work, such altered work and quantity variance shall be covered by a supplemental agreement.

Supplemental agreements shall also require consent of the Contractor’s surety and separate performance and payment bonds. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion.

40-03 Omitted items. The Owner, the Owner’s Engineer or the RPR may provide written notice to the

Contractor to omit from the work any contract item that does not meet the definition of major contract item. Major contract items may be omitted by a supplemental agreement. Such omission of contract items shall not invalidate any other contract provision or requirement.

Should a contract item be omitted or otherwise ordered to be non-performed, the Contractor shall be paid for all work performed toward completion of such item prior to the date of the order to omit such item.

Payment for work performed shall be in accordance with Section 90, paragraph 90-04, Payment for

Omitted Items.

40-04 Extra work. Should acceptable completion of the contract require the Contractor to perform an item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, Owner may issue a Change Order to cover the necessary extra work. Change orders for extra work shall contain agreed unit prices for performing the change order work in accordance with the requirements specified in the order and shall contain any adjustment to the contract time that, in the Engineer’s opinion, is necessary for completion of the extra work.

When determined by the Engineer to be in the Owner’s best interest, the Engineer may order the

Contractor to proceed with extra work as provided in Section 90, paragraph 90-05, Payment for Extra

Work. Extra work that is necessary for acceptable completion of the project but is not within the general scope of the work covered by the original contract shall be covered by a supplemental agreement as defined in Section 10, paragraph 10-59, Supplemental Agreement.

Section 40 Scope of Work 2

If extra work is essential to maintaining the project critical path, Engineer may order the Contractor to commence the extra work under a Time and Material contract method. Once sufficient detail is available to establish the level of effort necessary for the extra work, the Owner shall initiate a change order or supplemental agreement to cover the extra work.

Any claim for payment of extra work that is not covered by written agreement (change order or supplemental agreement) shall be rejected by the Owner.

40-05 Maintenance of traffic. It is the explicit intention of the contract that the safety of aircraft, as well as the Contractor’s equipment and personnel, is the most important consideration. The Contractor shall maintain traffic in the manner detailed in the Construction Safety and Phasing Plan (CSPP).

a. It is understood and agreed that the Contractor shall provide for the free and unobstructed movement of aircraft in the air operations areas (AOAs) of the airport with respect to their own operations and the operations of all subcontractors as specified in Section 80, paragraph 80-04, Limitation of Operations. It is further understood and agreed that the Contractor shall provide for the uninterrupted operation of visual and electronic signals (including power supplies thereto) used in the guidance of aircraft while operating to, from, and upon the airport as specified in Section 70, paragraph 70-15, Contractor’s Responsibility for

Utility Service and Facilities of Others.

b. With respect to their own operations and the operations of all subcontractors, the Contractor shall provide marking, lighting, and other acceptable means of identifying personnel, equipment, vehicles, storage areas, and any work area or condition that may be hazardous to the operation of aircraft, fire-rescue equipment, or maintenance vehicles at the airport in accordance with the construction safety and phasing plan (CSPP) and the safety plan compliance document (SPCD).

c. When the contract requires the maintenance of an existing road, street, or highway during the

Contractor’s performance of work that is otherwise provided for in the contract, plans, and specifications, the Contractor shall keep the road, street, or highway open to all traffic and shall provide maintenance as may be required to accommodate traffic. The Contractor, at their expense, shall be responsible for the repair to equal or better than preconstruction conditions of any damage caused by the Contractor’s equipment and personnel. The Contractor shall furnish, erect, and maintain barricades, warning signs, flag person, and other traffic control devices in reasonable conformity with the Manual on Uniform Traffic

Control Devices (MUTCD) (http://mutcd.fhwa.dot.gov/), unless otherwise specified. The Contractor shall also construct and maintain in a safe condition any temporary connections necessary for ingress to and egress from abutting property or intersecting roads, streets or highways. Unless otherwise specified herein, the Contractor will not be required to furnish snow removal for such existing road, street, or highway.

40-06 Removal of existing structures. All existing structures encountered within the established lines, grades, or grading sections shall be removed by the Contractor, unless such existing structures are otherwise specified to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work or to remain in place. The cost of removing such existing structures shall not be measured or paid for directly but shall be included in the various contract items.

Should the Contractor encounter an existing structure (above or below ground) in the work for which the disposition is not indicated on the plans, the Engineer shall be notified prior to disturbing such structure.

The disposition of existing structures so encountered shall be immediately determined by the Engineer in accordance with the provisions of the contract.

Except as provided in Section 40, paragraph 40-07, Rights in and Use of Materials Found in the Work, it is intended that all existing materials or structures that may be encountered (within the lines, grades, or grading sections established for completion of the work) shall be used in the work as otherwise provided for in the contract and shall remain the property of the Owner when so used in the work.

Section 40 Scope of Work 3

40-07 Rights in and use of materials found in the work. Should the Contractor encounter any material such as (but not restricted to) sand, stone, gravel, slag, or concrete slabs within the established lines, grades, or grading sections, the use of which is intended by the terms of the contract to be embankment, the Contractor may at their own option either:

a. Use such material in another contract item, providing such use is approved by the Engineer and is in conformance with the contract specifications applicable to such use; or,

b. Remove such material from the site, upon written approval of the Engineer; or

c. Use such material for the Contractor’s own temporary construction on site; or,

d. Use such material as intended by the terms of the contract.

Should the Contractor wish to exercise option a., b., or c., the Contractor shall request the Engineer’s approval in advance of such use.

Should the Engineer approve the Contractor’s request to exercise option a., b., or c., the Contractor shall be paid for the excavation or removal of such material at the applicable contract price. The Contractor shall replace, at their expense, such removed or excavated material with an agreed equal volume of material that is acceptable for use in constructing embankment, backfills, or otherwise to the extent that such replacement material is needed to complete the contract work. The Contractor shall not be charged for use of such material used in the work or removed from the site.

Should the Engineer approve the Contractor’s exercise of option a., the Contractor shall be paid, at the applicable contract price, for furnishing and installing such material in accordance with requirements of the contract item in which the material is used.

It is understood and agreed that the Contractor shall make no claim for delays by reason of their own exercise of option a., b., or c.

The Contractor shall not excavate, remove, or otherwise disturb any material, structure, or part of a structure which is located outside the lines, grades, or grading sections established for the work, except where such excavation or removal is provided for in the contract, plans, or specifications.

40-08 Final cleanup. Upon completion of the work and before acceptance and final payment will be made, the Contractor shall remove from the site all machinery, equipment, surplus and discarded materials, rubbish, temporary structures, and stumps or portions of trees. The Contractor shall cut all brush and woods within the limits indicated and shall leave the site in a neat and presentable condition.

Material cleared from the site and deposited on adjacent property will not be considered as having been disposed of satisfactorily, unless the Contractor has obtained the written permission of the property

Owner.

END OF SECTION 40

Section 50 Control of Work 1

Section 50 Control of Work

50-01 Authority of the Engineer. The Engineer has final authority regarding the interpretation of project specification requirements. The Engineer shall determine acceptability of the quality of materials furnished, method of performance of work performed, and the manner and rate of performance of the work. The

Engineer does not have the authority to accept work that does not conform to specification requirements.

50-02 Conformity with plans and specifications. See General Conditions

50-03 Coordination of contract, plans, and specifications. The contract, plans, specifications, and all referenced standards cited are essential parts of the contract requirements. If electronic files are provided and used on the project and there is a conflict between the electronic files and hard copy plans, the hard copy plans shall govern. A requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for a complete work. In case of discrepancy, calculated dimensions will govern over scaled dimensions; contract technical specifications shall govern over contract general provisions, plans, cited standards for materials or testing, and cited advisory circulars (ACs); contract general provisions shall govern over plans, cited standards for materials or testing, and cited ACs; plans shall govern over cited standards for materials or testing and cited ACs. If any paragraphs contained in the Special Provisions conflict with General Provisions or Technical

Specifications, the Special Provisions shall govern.

From time to time, discrepancies within cited testing standards occur due to the timing of the change, edits, and/or replacement of the standards. If the Contractor discovers any apparent discrepancy within standard test methods, the Contractor shall immediately ask the Engineer for an interpretation and decision, and such decision shall be final.

The Contractor shall not take advantage of any apparent error or omission on the plans or specifications. In the event the Contractor discovers any apparent error or discrepancy, Contractor shall immediately notify the Owner or the designated representative in writing requesting their written interpretation and decision.

50-04 List of Special Provisions. See the Special Provisions section of the specification.

50-05 Cooperation of Contractor. The Contractor shall be supplied with five hard copies or an electronic PDF of the plans and specifications. The Contractor shall have available on the construction site at all times one hardcopy each of the plans and specifications. Additional hard copies of plans and specifications may be obtained by the Contractor for the cost of reproduction.

The Contractor shall give constant attention to the work to facilitate the progress thereof and shall cooperate with the Engineer and their inspectors and with other Contractors in every way possible. The Contractor shall have a competent superintendent on the work at all times who is fully authorized as their agent on the work. The superintendent shall be capable of reading and thoroughly understanding the plans and specifications and shall receive and fulfill instructions from the Engineer or their authorized representative.

50-06 Cooperation between Contractors. See General Conditions.

50-07 Construction layout and stakes. The Engineer shall establish necessary horizontal and vertical control. The establishment of Survey Control and/or reestablishment of survey control shall be by a State

Licensed Land Surveyor. Contractor is responsible for preserving integrity…