This is an as-bid design document for IFB #26-007, issued by the Roanoke Regional Airport Commission for the Roanoke-Blacksburg Regional Airport in Roanoke, Virginia. The project involves the rehabilitation of Runway 6-24 under AIP Project No. 3-51-0045-074-2025 (Design) with construction to follow under a pending AIP Project number. Contractors are required to submit bids for three independent alternates: Alternate 1 encompasses all work shown in the plans; Alternate 2 covers work from baseline station 9+00.00 to station 33+18.00; and Alternate 3 covers work from baseline station 9+00.00 to station 27+25.00. Only one alternate will be awarded. The document includes comprehensive construction specifications and details covering pavement rehabilitation, milling and overlay operations, drainage and grading work, electrical installations, marking and grooving, and sinkhole treatment. Work scope includes mill and overlay pavement sections with 3-inch nominal overlays, crack repair, joint and pavement adjustments, and utility coordination.
Alternate 1 is structured as a two-year project with work split between fiscal years 2026 and 2027, with the FAA anticipated to provide approximately 55 percent of project funding in FY 2026 and the remaining 45 percent in FY 2027. The contract for Alternate 1 is conditioned upon the owner receiving multiple FAA grants awarded on separate timelines and fiscal years, and the owner retains the right to cancel and terminate the Year 2 portion without prejudice if FY 2027 grant funding is not awarded, with notification due by September 30, 2027. In the event of Year 2 cancellation, the contractor receives no further payment and the owner incurs no liability for damages, lost profits, or other claims. The low bidder for each alternate shall be considered the lowest responsive and responsible bidder, and the owner reserves the right to award any alternate or reject all bids and readvertise based on the best interests of the owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROANOKE-BLACKSBURG REGIONAL AIRPORT
ROANOKE, VIRGINIA
ROANOKE REGIONAL AIRPORT COMMISSION
FOR THE
DELTA PROJECT NO. 24072
MAY 2026
REHABILITATE RUNWAY 6-24
RRAC BID NO.
AIP PROJECT NO. 3-51-0045-074-2025 (DESIGN)
AIP PROJECT NO. PENDING (CONSTRUCTION)
VICINITY MAP
LEXINGTON
o460 o220 o220 p
BLUE
64p
BEDFORD
o460REGIONAL
ROANOKE
AIRPORT
o29
PA
RK
W
AY
RIDGE
BUENA VISTA
o11
LYNCHBURG
ROCKY MOUNT
MARTINSVILLE
DANVILLE
58o
29o
220o p81
ROANOKE
SMITH
MOUNTAIN
LAKE
N
APPROX SCALE:
1"= 13 MILE
BIDDING NOTES:
1. ALTERNATE 1 SCOPE INCLUDES ALL WORK SHOWN IN THE PLANS.
2. ALTERNATE 2 SCOPE INCLUDES ALL WORK SHOWN IN THE PLANS
FROM BASELINE "RW 6-24" STA 9+00.00 TO STA 33+18.00 UNLESS
OTHERWISE NOTED.
3. ALTERNATE 3 SCOPE INCLUDES ALL WORK SHOWN IN THE PLANS
FROM BASELINE "RW 6-24" STA 9+00.00 TO STA 27+25.00 UNLESS
OTHERWISE NOTED.
4. THE CONTRACTOR IS REQUIRED TO BID ALTERNATE 1,
ALTERNATE 2 AND ALTERNATE 3.
5. THE QUANTITIES SHOWN FOR EACH ALTERNATE ARE
INDEPENDENT; I.E. EACH ALTERNATE SHALL STAND ALONE AS AN
INDIVIDUAL PROJECT. ONLY ONE (1) ALTERNATE WILL BE
AWARDED.
6. THE OWNER RESERVES THE RIGHT TO AWARD ALTERNATE 1,
ALTERNATE 2, ALTERNATE 3, OR TO REJECT ALL BIDS AND
READVERTISE.
7. THE LOW BIDDER FOR EACH ALTERNATE SHALL BE CONSIDERED
THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER ON EACH
ALTERNATE.
8. THE OWNER RESERVES THE RIGHT TO AWARD THE PROJECT
WHICH IS IN THE BEST INTEREST OF THE OWNER.
9. IF ALTERNATE 1 IS AWARDED, IT WILL BE COMPLETED OVER TWO
YEARS. THE SPLIT BETWEEN THE YEARS WILL BE BASED ON THE
FUNDING AVAILABLE AND SEPARATE NOTICE TO PROCEEDS WILL
BE ISSUED EACH YEAR. NO WORK WILL BE PERMITTED TO BEGIN
ON ANY YEAR 2 WORK UNTIL FUNDING HAS BEEN SECURED.
WORK WILL BE ROUGHLY SPLIT EVENLY BETWEEN THE TWO
YEARS. FAA ANTICIPATES PROVIDE ABOUT 55% OF PROJECT
FUNDING IN FY 2026 AND THE REMAINING 45% IN FY 2027.
ALTERNATE 1 - FUNDING AVAILABILITY
BY SUBMITTING A BID, BIDDER ACKNOWLEDGES AND AGREES THAT:
1. THE CONTRACT FOR ALTERNATE 1 IS SUBJECT TO AND
CONDITIONED UPON AWARD OF MULTIPLE GRANTS TO THE
OWNER BY THE FEDERAL AVIATION ADMINISTRATION (FAA) TO BE
AWARDED ON SEPARATE TIMELINES AND FISCAL YEARS.
2. THE OWNER SPECIFICALLY RETAINS THE RIGHT TO CANCEL AND
TERMINATE WITHOUT PREJUDICE THE YEAR 2 PORTION OF THE
ALTERNATE 1 CONTRACT IN THE EVENT THE OWNER IS NOT
AWARDED FY 2027 GRANT FUNDS SUFFICIENT TO FUND YEAR 2
COSTS, AS DETERMINED IN THE SOLE AND EXCLUSIVE
DISCRETION OF THE OWNER. THE OWNER SHALL NOTIFY THE
CONTRACTOR OF SUCH CANCELLATION BY SEPTEMBER 30, 2027.
3. IF YEAR 2 OF THE ALTERNATE 1 CONTRACT IS CANCELLED, THE
CONTRACTOR SHALL BE DUE NO FURTHER PAYMENT, AND THE OWNER
SHALL NOT BE LIABLE TO CONTRACTOR FOR ANY PAYMENT, DAMAGES,
LOST PROFITS, CLAIMS, OR COSTS OF ANY KIND BASED ON SUCH
CANCELLATION OR STOP WORK ORDER.
NO. REVISIONS BY APP. DATE
CONSULTANTS, INC.
XR
EF
S:
IM
AG
ES
D R
AW
IN
G : 2
C O
V.
dw g L
AY
O
U T:
L
DELTA AIRPORT
JOB NO.
SHEET
DATE:SCALE:
DESIGNED BY:
DRAWN BY:
OF
w w w . d e l t a a i r p o r t . c o m
2700 Polo Parkway Midlothian, Virginia 23113 phone: (804) 275-8301
REHABILITATE RUNWAY 6-24
COVER SHEET
ROANOKE-BLACKSBURG REGIONAL AIRPORT
3-51-0045-074-2025 24072
RAS
WME/SRS
MAY 2026
NONE
AIP NO.
SHEET INDEX
SHEET # TITLE
1 COVER SHEET
2 GENERAL LAYOUT
3 PROJECT NOTES
4 PHASING LAYOUT
5 SCHEMATIC PHASING SCHEDULES
6 PHASING DETAILS
7 CONSTRUCTION NOTES
8 DEMOLITION LAYOUT
9 DEMOLITION LAYOUT
10 DEMOLITION LAYOUT
11 DEMOLITION LAYOUT
12 DEMOLITION LAYOUT
13 DEMOLITION LAYOUT
14 PAVING LAYOUT
15 PAVING LAYOUT
16 PAVING LAYOUT
17 PAVING LAYOUT
18 PAVING LAYOUT
19 PAVING LAYOUT
20 GRADING & DRAINAGE ALTERNATE 1
21 GRADING & DRAINAGE ALTERNATE 1
22 GRADING & DRAINAGE ALTERNATE 1
23 GRADING & DRAINAGE ALTERNATE 1
24 GRADING & DRAINAGE ALTERNATE 1
25 GRADING & DRAINAGE ALTERNATE 1
26 GRADING & DRAINAGE ALTERNATE 2
27 GRADING & DRAINAGE ALTERNATE 2
28 GRADING & DRAINAGE ALTERNATE 3
29 GRADING & DRAINAGE ALTERNATE 3
SHEET INDEX
SHEET # TITLE
30 PAVEMENT DETAILS
31 PAVEMENT TIE-IN & TRANSITION DETAILS
32 MARKING & GROOVING LAYOUT
33 MARKING & GROOVING LAYOUT
34 MARKING & GROOVING LAYOUT
35 MARKING & GROOVING LAYOUT
36 MARKING & GROOVING LAYOUT
37 MARKING & GROOVING LAYOUT
38 MARKING NOTES
39 MARKING DETAILS
40 ELECTRICAL LAYOUTS
41 ELECTRICAL LAYOUTS
42 ELECTRICAL LAYOUTS
43 ELECTRICAL LAYOUTS
44 ELECTRICAL LAYOUTS
45 ELECTRICAL LAYOUTS
46 ELECTRICAL NOTES
47 ELECTRICAL DETAILS
48 ELECTRICAL DETAILS
49 ELECTRICAL VAULT PLAN
50 ELECTRICAL SECTION VIEWS
51 ELECTRICAL RISER DIAGRAM
52 ELECTRICAL DETAILS & SCHEDULE
53 ELECTRICALSPECIFICATIONS
54 CENTERLINE PROFILES ALTERNATE 1 ONLY
55 CENTERLINE PROFILES ALTERNATE 1 ONLY
56 CENTERLINE PROFILES ALTERNATE 1 ONLY
57 CENTERLINE PROFILES ALTERNATE 2 ONLY
58 CENTERLINE PROFILES ALTERNATE 3 ONLY
P REE
R
AN
SS
EF
O
OI L E
NIGN
RG
O M M
C
IWN
Lic. No. 034088
DOUGLAS E. SANDER
O
T
E LA FOH
V
IA
I N
P REE
R
AN
SS
EF
O
OI L E
NIGN
RG
O M M
C
IWN
Lic. No. 045144
ESCHENFELDER
O
T
E LA FOH
V
IA
I NWILLIAM M.
AS-BID
FOR BIDDING PURPOSES
DO NOT USE FOR CONSTRUCTION
CONFORMED DOCUMENTS WILL BE
ISSUED SEPARATELY FOR CONSTRUCTION
MAY 2026
C:
\U se rs
\r at ha \D
C\
AC
CD
oc s\
DA
C\
2\
Pr oj ec t F ile s\
CO
V.
dw g, L
1, /1 9/
:3
0:
A M
, r at ha
EXISTING SUBGRADE
EXISTING VARIABLE DEPTH
PAVEMENT SECTION
EXISTING SUBGRADE
3"
OVERLAY MINIMUM 3"
MILL AND OVERLAY PAVEMENT SECTION
(3" NOMINAL)
NTSNOTES:
1. IF SCABBING IS ENCOUNTERED, AN ADDITIONAL 1" OF MILLING MAY BE
NECESSARY. ADDITIONAL MILLING SHALL BE INCIDENTAL TO THE MILLING
PAY ITEM. ADDITIONAL ASPHALT SHALL BE PAID IN ACCORDANCE WITH
THE P-401 SPECIFICATION.
P-603 TACK COAT
EXISTING SUBGRADE
EXISTING VARIABLE DEPTH
PAVEMENT SECTION
EXISTING SUBGRADE
3"
OVERLAY MINIMUM 3"
MILL AND OVERLAY PAVEMENT SECTION
(VARIABLE DEPTH)
NTSNOTES:
1. A MINIMUM OF A 0.5" OF MILLING IS REQUIRED TO ROUGHEN THE SURFACE
AND IMPROVE THE BOND BETWEEN THE OVERLAY AND THE EXISTING
PAVEMENT.
2. IF SCABBING IS ENCOUNTERED, AN ADDITIONAL 1" OF MILLING MAY BE
NECESSARY. ADDITIONAL MILLING SHALL BE INCIDENTAL TO THE MILLING
PAY ITEM. ADDITIONAL ASPHALT SHALL BE PAID IN ACCORDANCE WITH
THE P-401 SPECIFICATION.
3. THE CONTRACTOR SHALL SUBMIT A MILLING PLAN TO BE APPROVED BY
THE ENGINEER PRIOR TO THE START OF MILLING OPERATIONS.
PROPOSED SURFACE
0" - 3"
EXISTING SURFACE
3"
P-603 TACK COAT
TACK COAT APPLICATION RATES
SURFACE TYPE RESIDUAL RATE, GAL/SY EMULSION APPLICATION
BAR RATE, GAL/SY
NEW ASPHALT 0.02 - 0.05 0.03 - 0.07
EXISTING ASPHALT 0.04 - 0.07 0.06 - 0.11
MILLED SURFACE 0.04 - 0.08 0.06 - 0.12
NOTE:
1. REFERENCE IS DIRECTED TO ITEM P-603 OF THE SPECIFICATIONS
FOR ADDITIONAL DETAILS.
NOTES:
1. CRACKS SHALL BE ROUTED FULL DEPTH, 2" MINIMUM. MINIMUM ROUTED
WIDTH 3/4".
2. CRACK PREPARATION, ROUTING (IF REQUIRED), CRACK SEALANT/FILLER,
ETC. INCLUDED WITH CRACK REPAIR (P-101).
3. REMOVE ANY VEGETATION, DIRT, DAMPNESS, AND LOOSE MATERIAL FROM
CRACKS. APPLY HERBICIDE BEFORE FILLING.
CRACK REPAIR DETAIL (TYPE A)
(> 1/4" WIDTH, ≤ 1-1/2" WIDTH)
NTS
AFTER ROUTING AND CLEANING FILL
CRACK WITH AN APPROVED CRACK
SEALANT/FILLER MATERIAL (NOTE 4)
NOTE 1
EXISTING
BASE COURSE
EXISTING
SURFACE COURSE
PROPOSED P-401 ASPHALT
SURFACE COURSE OVERLAY
4. A FAST SETTING FLOWABLE NON-SHRINK, NON-METALLIC, RAPID SET GROUT SHALL BE
USED. GROUT SHALL PROVIDE A MINIMUM OF 90 PERCENT FILLED VOIDS.
CRACK REPAIR DETAIL (TYPE B)
(> 1-1/2" WIDTH)
NTS
TACK COAT (TYP)
EXISTING BASE COURSE
EXISTING
SURFACE COURSE
NOTES:
1. COMPACT ASPHALT CONCRETE PATCH WITH MECHANICAL
COMPACTOR (LOWER LIFTS) OR ROLLER (TOP LIFT).
2. PAVEMENT REMOVAL (MILLING) AND BITUMINOUS PATCH
INCLUDED IN UNIT PRICE PER LINEAR FOOT FOR "JOINT AND
CRACK REPAIR (TYPE B)".
3. DEPTH SHALL BE 6" OR THE FULL DEPTH OF THE COURSE,
WHICHEVER IS LESS.
4. IF CRACK EXTENDS INTO BASE COURSE, NON-SHRINK GROUT
SHALL BE USED TO FILL THE VOID.
REMOVE (BY MILLING OR SAWING)
EXISTING PAVEMENT TO A MINIMUM
WIDTH OF 24" AND PATCH WITH P-401
SAWCUT NEAT
VERTICAL FACE. (TYP)
PROPOSED P-401 ASPHALT
SURFACE COURSE OVERLAY
D
(NOTE 3)
SHOULDER PAVEMENT SECTION
NTS
COMPACTED SUBGRADE. SEE
ITEM P-152 FOR REQUIREMENTS.
PR
O
PO
SE
D
PA
VE
M
EN
T
ED
G
E
NOTES:
1. PLACE TACK COAT BETWEEN LIFTS OF P-401 ASPHALT SURFACE COURSE.
SEE "TACK COAT APPLICATION RATES" TABLE AND ITEM P-603 OF THE
SPECIFICATIONS.
2. IF ORDERED BY THE ENGINEER, THE CONTRACTOR SHALL UNDERCUT THE
SUBGRADE TO REMOVE SOFT OR YIELDING MATERIAL.
NOTE 2
10"
4"
5% MAX.
P-209 CRUSHED
AGGREGATE BASE COURSE
PR
O
PO
SE
D
PA
VE
M
EN
T
ED
G
E
12" (PAY LIMIT)
1.5"
STEP OUT LOWER LIFTS
BY 3 INCHES FOR EACH
SUBSEQUENT LIFTVARIES
P-401 ASPHALT
SURFACE COURSE
NOTE 1
SINKHOLE TREATMENT
NTS
EXISTING
GROUND
LARGE DIAMETER ANGULAR
ROCK (MAX DIA. = 12")
LARGE ROCK AS REQUIRED
TO CHOKE THE SOLUTION
CHANNEL
NONWOVEN GEOTEXTILE FILTER
FABRIC (8 OZ. MINIMUM) TO
ENCAPSULATE ROCK FILL.
BEDROCK
NOTES:
1. EXCAVATE SOIL FROM SINKHOLE TO EXPOSE ROCK THROAT
2. AREAS OF SINKHOLE REPAIR SHALL BE DETERMINED IN THE FIELD BY THE
ENGINEER.
3. UNDERCUT LIMITS SHOULD BE DETERMINED BY THE ENGINEER DURING
SINKHOLE REPAIR.
4. TYPE AGGREGATE TO BE USED SHALL BE DETERMINED BY FIELD
CONDITIONS AND RECOMMENDATIONS OF THE ON-SITE GEOTECHNICAL
ENGINEER. REFER TO ITEM M-199.
SHOULDER PAVEMENT
SECTION
COMPACTED EMBANKMENT MATERIAL.
SHAPE AS ORDERED BY THE ENGINEER.
CAP SINKHOLE AREA
WITH 1" OF ASPHALT
AS ORDERED BY THE
ENGINEER
EXISTING
MANHOLE WALL
MATCH EXISTING
SLAB WIDTH
PROPOSED P.C.C.
1/2"
1/2"
1/4" MAX. BELOW
PAVEMENT SURFACE
1-1/4" MIN
PROPOSED BITUMINOUS
CONCRETE PAVEMENT
5/8" ROD BACK-UP
MATERIAL (CLOSED CELL)
P-605 JOINT SEALANT
REINSTALL EXISTING LID
INTERFACE JOINT SEE
DETAIL THIS SHEET
ADJUST MANHOLE TO GRADE DETAIL
NTS
INTERFACE JOINT DETAIL
NTS
EXISTING MANHOLE FRAME INSTALL NEENAH R-1979
ADJUSTING RING OR
APPROVED EQUIVALENT
NOTE 1
NOTES:
1. P-610 CONCRETE.
2. 4" LENGTH #3 REBAR. DRILL AND EPOXY 2" INTO EXISTING AND PROPOSED
PADS, MINIMUM 12 BARS PER SLAB, SPACED EVENLY AROUND FRAME.
PROVIDE MINIMUM 1.5" CONCRETE COVER OVER REBAR.
3. EXITING CONCRETE SHALL BE GRINDED 0"-1" DOWN SO THAT A MINIMUM OF
3" OF CONCRETE CAN BE PLACED OVER THE EXISTING CONCRETE PAD.
DEPTH OF CONCRETE GRINDING SHALL BE VERIFIED IN THE FIELD. IF
GREATER THAN 1" OF GRINDING IS REQUIRE TO REACH THE MINIMUM 3"
PROPOSED DEPTH, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
PRIOR TO BEGINNING WORK ON THE ADJUSTMENT OF STRUCTURE.
4. THOROUGHLY CLEAN AND DRY EXISTING SLAB AFTER GRINDING AND
APPLY EPOXY BONDING AGENT ACCORDING TO MANUFACTURER'S
INSTRUCTION PRIOR TO PLACING NEW CONCRETE.
5. ALL WORK SHOWN IS INCIDENTAL TO THE PAVEMENT MANHOLE
ADJUSTMENT PAY ITEM.
EXISTING CONCRETE SLAB
NOTE 2
MINIMUM 3" (NOTE 3)
2"±EXISTING GRADE
PROPOSED ELEVATION
NOTE 4
NO. REVISIONS BY APP. DATE
CONSULTANTS, INC.
XR
ES
D R
AW
IN
G : 2
PV
D
.d w g L
AY
O
U T:
L
DELTA AIRPORT
JOB NO.
SHEET
DATE:SCALE:
DESIGNED BY:
DRAWN BY:
OF
w w w . d e l t a a i r p o r t . c o m
2700 Polo Parkway Midlothian, Virginia 23113 phone: (804) 275-8301
REHABILITATE RUNWAY 6-24
PAVEMENT DETAILS
ROANOKE-BLACKSBURG REGIONAL AIRPORT
3-51-0045-074-2025 24072
RAS
WME/SRS
MAY 2026
P REE
R
AN
SS
EF
O
OI L E
NIGN
RG
O M M
C
IWN
Lic. No. 045144
ESCHENFELDER
O
T
E LA FOH
V
IA
I NWILLIAM M.
VARIES
NIGHTLY VARIABLE MILLING TIE-IN DETAIL
NTS
TIE-IN
(20' PER INCH OF OVERLAY)
SAW CUT NEAT VERTICAL
FACE. MATCH EXISTING
GRADE.
PROPOSED OVERLAY
TACK MILLED SURFACE
AND CUT EDGE
EXISTING ASPHALT PAVEMENT
PROPOSED P-401 ASPHALT
SURFACE COURSE OVERLAY
PROPOSED P-101 COLD MILLING
NOTES:
1. REMOVE ALL WEDGE MATERIAL PRIOR TO NEXT PAVING TO NEXT PAVING DAY, AND
PROVIDE SAW CUT WITH NEAT VERTICAL FACE FOR TIE-IN (NO SEPARATE PAY ITEM).
2. ASPHALT MATERIAL REQUIRED TO CONSTRUCT THE TRANSVERSE TIE-IN JOINT IN
ORDER TO REOPEN THE RUNWAY AT THE END OF EACH WORK PERIOD IS ELIGIBLE
FOR PAYMENT, TO THE LIMITS IDENTIFIED IN THIS DETAIL.
12"
PROPOSED OR EXISTING
BASE COURSE
EXISTING BASE COURSE
EXISTING SURFACE COURSE
PAVEMENT TIE-IN DETAIL
NTS
EDGE OF PAVEMENT
AS SHOWN ON PLANS
REMOVE AND REPLACE
EXISTING SURFACE
NEAT SAW CUT
(NO SEPARATE PAY ITEM)
P-603 TACK COAT
PROPOSED ASPHALT
SURFACE COURSE
EXISTING SURFACE
MAX 2% GRADE
(MIN 10' PER 1")
TEMPORARY WEDGE
APPLY HEAVY
TACK. FEATHER
AND ROLL EDGE
SMOOTH.
EMERGENCY LONGITUDINAL JOINT TIE-IN DETAIL
NTS
NOTES:
1. TIE-IN MATERIAL SHALL BE CONSIDERED INCIDENTAL TO THE PROECT
WITH NO MEASUREMENT.
2. REMOVE ALL WEDGE MATERIAL PRIOR TO NEXT PAVING DAY OR
RESUMING PAVING. PROVIDE NEAT VERTICAL FACE FOR THE TIE-IN.
3. FOR USE IN EVENT OF EQUIPMENT BREAKDOWN, CHANGED WEATHER
CONDITIONS, ETC., WHICH PRECLUDES COMPLETION OF FULL WIDTH.
P-401 ASPHALT SURFACE
COURSE OVERLAY ℄
TEMPORARY RUNWAY SHOULDER OVERLAY TIE IN
NTS
NOTES:
1. EXTEND OVERLAY AS NECESSARY TO MAINTAIN THICKNESS AND
COMPACTION REQUIREMENTS ON RUNWAY PAVEMENT. REMOVE ANY
WEDGE MATERIAL PRIOR TO NEXT PAVING DAY OR RESUMING PAVING.
PROVIDE NEAT VERTICAL FACE FOR THE TIE-IN.
2. DROP-OFF BETWEEN RUNWAY AND SHOULDER SHALL NOT EXCEED
THREE INCHES.
P-401 ASPHALT SURFACE
COURSE OVERLAY ℄
NOTE 1
3" MAXIMUM (NOTE 2)
150' RUNWAY WIDTH 25' WIDE RUNWAY
SHOULDER
EXISTING PAVEMENT
NO. REVISIONS BY APP. DATE
CONSULTANTS, INC.
XR
ES
D R
AW
IN
G : 2
PV
D
.d w g L
AY
O
U T:
L
DELTA AIRPORT
JOB NO.
SHEET
DATE:SCALE:
DESIGNED BY:
DRAWN BY:
OF
w w w . d e l t a a i r p o r t . c o m
2700 Polo Parkway Midlothian, Virginia 23113 phone: (804) 275-8301
REHABILITATE RUNWAY 6-24
PAVEMENT TIE-IN &
TRANSITION DETAILS
ROANOKE-BLACKSBURG REGIONAL AIRPORT
3-51-0045-074-2025 24072
RAS
WME/SRS
MAY 2026
P REE
R
AN
SS
EF
O
OI L E
NIGN
RG
O M M
C
IWN
Lic. No. 045144
ESCHENFELDER
O
T
E LA FOH
V
IA
I NWILLIAM M.
| 2026-05-19T19:36:10-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:46-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:46-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:50-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:50-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:54-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:54-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:55-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:55-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:56-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:57-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:57-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:58-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:58-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:36:59-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:00-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:00-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:01-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:01-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:02-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:03-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:03-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:04-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:04-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:05-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:06-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:06-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:07-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:07-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:08-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:09-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:09-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:10-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:10-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:11-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:11-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:12-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:13-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:13-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:14-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:14-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:15-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:16-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:16-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:17-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:17-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:18-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:19-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:19-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:20-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:20-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:21-0400 | |
| William M Eschenfelder |
| 2026-05-19T19:37:21-0400 | |
| William M Eschenfelder |
| 2026-05-20T13:43:56-0400 | |
| Douglas E Sander |
File details come from the government source that posted it. Updated .