About this file
This document is a set of engineering drawings and specifications for a boiler replacement project at the City of Sun Prairie's City Hall building located at 300 E Main St, Sun Prairie, WI. The project involves removing the existing single boiler, which is original to the 1993 building, and installing two new high-efficiency condensing boilers. The drawings detail the required piping, venting, combustion air, and electrical connections for the new boiler system. No bid date, award date, or contract term is provided in the document.
The drawings and specifications indicate that the existing boiler and associated piping and venting will be demolished, with new boilers and piping installed in the same mechanical room location. The new boiler system will connect to the existing hot water distribution system serving the City Hall building. Electrical connections, including feeds to the new boilers and a draft inducer fan, are also detailed. No pricing information, set asides, or funding sources are included in the provided documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-BM16_Notice of Intent to Award Letter.pdf | ||
| 24-BM16 QA.pdf.crdownload | CRDOWNLOAD file | |
| DC SRT RFP 2025-2029.docx | DOCX document | |
| Questions Answers.docx | DOCX document | |
| Contract Construction Services_Draft.pdf | ||
| RFB 24-BM16.pdf | ||
| 24-BM16 QA.pdf | ||
| RFP 24-SWU15 Stormwater Native Vegetation Installation.PDF | ||
| RFB 24-BM16_Sign-in Sheets.pdf | ||
| 240050-COSP-CH-Boiler-2024-06-07.pdf.crdownload | CRDOWNLOAD file | |
| 24-BM16 Bid Opening Log.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUN PRAIRIE CITY HALL -
BASEMENT
GENERATOR
ROOM
STAIRS
MECHANICAL
EQUIPMENT
ROOM
UNASSIGNED
STAIRS
CITY HALL
SUPPLY
ROOM
RECORDS
VAULT
09A
POLICE
RECORDS
ELEVATOR
ELEVATOR
ROOM
ALCOVE
MEN'S
TOILET
ROOM
WOMEN'S
TOILET
ROOM
ELECTRICAL
ROOM
TRANSMITTER
ROOM
CONFERENCE
ROOM
018/019
TELEPHONE
EQUIPMENT
MEN'S
LOCKER
ROOM
020A
MEN'S
TOILET
ROOM
WOMEN'S
TOILET
ROOM
WOMEN'S
LOCKER
ROOM
021C
CORRIDOR
020B
CORRIDOR
021B
SQUAD
ROOM
STAIRS
RADIO
EQUIPMENT
ROOM
DISPATCH
EMERGENCY
GOVERNMENT/
MULTI-PURPOSE ROOM
FURNITURE
STORAGE
DARK
ROOM
JANITOR'S
CLOSET
LAB
TOILET
ROOM
UNASSIGNED
021A
WOMEN'S
SHOWER
020C
MEN'S
SHOWER
MECHANICAL
ROOM
AREA OF WORK
OWNER:
CITY OF SUN PRAIRIE
300 E MAIN ST
SUN PRAIRIE, WI 53590
CONTACT:
BENJAMIN JOHN
608-825-0713
HVAC:
JDR ENGINEERING, INC.
5525 NOBEL DR., STE 110
MADISON, WI 53711
CONTACT:
JAMES VANDER ZANDEN, P.E.
608-277-1728
ELECTRICAL:
JDR ENGINEERING, INC.
5525 NOBEL DR., STE 110
MADISON, WI 53711
CONTACT:
MIKE KLUBERTANZ
608-277-1728
SUN PRAIRIE CITY HALL
COSP - City Hall Boiler Replacement
Sun Prairie City Hall
300 E Main St., Sun Prairie, WI 53590
COVER SHEET
T000
PROJECT LOCATION - CITY HALL
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
REVISIONS / ADDENDA
CONSULTANTS
ISSUED
24.0050
JDR
JDR
06/07/24
BD
COSP - CITY HALL
BOILER REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: fax:
JDR Project No. 24.0050
DRAWING INDEX
DRAWING NO. DRAWING TITLE
GENERAL
T000 COVER SHEET
MECHANICAL
M000 SYMBOLS AND ABBREVIATIONS - HVAC
M400
M001
M500
M002 SPECIFICATIONS - HVAC
SECTIONS - HVAC
SPECIFICATIONS - HVAC
HOT WATER FLOW DIAGRAMS - HVAC
M200 BASEMENT PARTIAL PLANS - HVAC
M800 SCHEDULES AND DETAILS - HVAC
ELECTRICAL
E200 BASEMENT PARTIAL PLANS - ELECTRICAL
HVAC SHEET INDEX
SYMBOLS AND ABBREVIATIONS - HVACM000
SPECIFICATIONS - HVACM002
SPECIFICATIONS - HVACM001
BASEMENT PARTIAL PLANS - HVACM200
12'' Ø
M
S
T
T
M
P
T
BFP
V
PS
FS
FM
PITCH OF PIPE
PRESSURE GAUGE AND COCK
FLOW SWITCH
FLOW METER
TEMPERATURE SENSOR
PUMP
THERMOMETER
STRAINER
PRESSURE SWITCH
STRAINER, W/ BLOW DOWN VALVE
CAP
BLIND FLANGE
REDUCER, ECCENTRIC - STRAIGHT CROWN
SOLENOID VALVE
CONNECTION, BOTTOM
CONNECTION, TOP
ELBOW, TURNED UP
ELBOW, TURNED DOWN
REDUCER, ECCENTRIC - STRAIGHT INVERT
REDUCER, CONCENTRIC
S
FLOW DIRECTION IN PIPES
BACKFLOW PREVENTER
THERMOMETER WELL, ONLY
PETES PLUG
UNION
PIPE FLANGE
AIR VENT
FLEXIBLE CONNECTOR
AIR SEPARATOR
PIPING SYSTEMS
CALIBRATED BALANCE/SHUTOFF
VALVE (FLOW MEASURING)
PLUG VALVE (GAS)
BUTTERFLY VALVE
GATE VALVE
GATE, ANGLE VALVE
GLOBE VALVE
GLOBE, ANGLE VALVE
BALL VALVE
3-WAY TEMPERATURE CONTROL VALVE
2-WAY TEMPERATURE CONTROL VALVE
OS & Y GLOBE VALVE
OS & Y GATE VALVE
CHECK VALVE
DRAIN VALVE
NEEDLE VALVE
PRESSURE REDUCING VALVE
RELIEF (R) OR SAFETY (S) VALVE
(PNEUMATIC OR ELECTRIC)
(PNEUMATIC OR ELECTRIC)
(W/ HOSE CONNECTION & BRASS CAP)
END OF DUCT
ABBREVIATIONS
ELEVATION SYMBOL
ON ROOF
ON ROOF ABOVE
DUCT TRANSITION (RECT. TO ROUND)
AD
START/STOP SWITCH$
SPEED CONTROLLER
GENERAL SYMBOLS
HWR
HWS
G
V
MU
CW
BBD
POINT OF NEW CONNECTION
DUCT TRANSITION (SINGLE LINE)
DUCTWORK SYSTEMS
COMBINATION FIRE/SMOKE DAMPER
NEWEXISTING
NEWEXISTING
ROUND DUCT
THERMOSTAT OR TEMPERATURE SENSOR
(DUCTWORK, PIPING, & EQUIPMENT)
EXISTING TO REMAIN
EXISTING TO BE REMOVED
(DUCTWORK, PIPING, & EQUIPMENT)
NEW EQUIPMENT
NEW DUCTWORK/PIPING
EXHAUST, NO SPLITTER
STANDARD BRANCH, SUPPLY, RETURN, OR
MANUAL VOLUME DAMPER
FIRE DAMPER
MOTOR OPERATED DAMPER
BACK DRAFT DAMPER
HIDDEN DUCTWORK
LOUVER AND BIRD SCREEN
ELBOW WITH TURNING VANES
DUCT TRANSITION (DOUBLE LINE)
FLEXIBLE CONNECTION
ACCESS DOOR, VERTICAL OR HORIZONTAL
OF AIR FLOW
CHANGE OF ELEVATION IN DIRECTIONUP/DN
NEGATIVE PRESSURE DUCT (DOWN OR AWAY)
NEGATIVE PRESSURE DUCT SECTION
POSITIVE PRESSURE DUCT (DOWN OR AWAY)
POSITIVE PRESSURE DUCT SECTION
20/12 DUCT SIZE, (FIRST FIGURE IS SIDE SHOWN)
ROOF VENTILATOR OR HOOD
MOTOR STARTER
AIR FLOW
THERMOSTAT OR TEMPERATURE SENSOR
HOT WATER RETURN
HOT WATER SUPPLY
ATMOSPHERIC VENT
MAKEUP WATER
BOILER BLOWDOWN
COLD WATER (DOMESTIC)
GAS
ROOF VENTILATOR OR HOOD
UNIT HEATER
CR
CS
D DRAIN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
B
WITH SECURITY COVER
NEWEXISTING
(PIPE OR DUCT)
EXISTING NEW
NEWEXISTING
DOUBLE LINE PIPE SECTION
DOUBLE LINE PIPE (DOWN OR AWAY)
PUMP IN VERTICAL
EXISTINGNEW
NEW EXISTING
AD ACCESS DOOR
ADJ ADJUSTABLE
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AGA AMERICAN GAS ASSOCIATION
AL ALUMINUM
AMP AMPERE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASC ABOVE SUSPENDED CEILING
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AUTO AUTOMATIC
B BOILER
BDD BACK DRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STRUCTURE
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
CA COMBUSTION AIR
CAB CABINET
CCC COOLING COIL CONDENSATE
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON OR CUBIC INCH
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONARY UNIT
COMB COMBINATION OR COMBUSTION
CONC CONCRETE
COND CONDENSATE
CONTR CONTRACTOR
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CPVC CHLORINATED POLYVINYL CHLORIDE
CRU COMPUTER ROOM UNIT
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CSA CANADIAN STANDARDS ASSOCIATION
CT COOLING TOWER
CU COPPER
CUH CABINET UNIT HEATER
CW COLD WATER
D DRAIN
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DEPT DEPARTMENT
DF DUCT FURNACE
DIF DRAFT INDUCER FAN
DIA DIAMETER
DN DOWN
DSA DUCT SOUND ATTENUATOR
DWG DRAWING
E EXISTING
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EER ENERGY EFFICIENCY RATIO
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER
EQUIP EQUIPMENT
ET EXPANSION TANK
ETR EXISTING TO REMAIN
EVAP EVAPORATOR
EWH ELECTRIC WALL HEATER
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXT EXTERIOR OR EXTERNAL
F FURNACE
°F DEGREES FAHRENHEIT
F&T FLOAT & THERMOSTAT TRAP
FA FREE AREA
FD FLOOR DRAIN OR FIRE DAMPER
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
FILL FILL LINE
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FM FLOW METER
FPC FIRE PROTECTION CONTRACTOR
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FOOT OR FEET
G GAS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GE GAP GENERAL ELECTRIC GLOBAL ASSET PROTECTION
GRH GAS FIRED RADIANT HEAT
GPM GALLONS PER MINUTE
GUH GAS FIRED UNIT HEATER
GV GAS VENT
H HUMIDIFIER
HB HOSE BIBB
HC HEATING CONTRACTOR
HD HUB DRAIN
HG MERCURY
HGT HEIGHT
HP HORSEPOWER
HPU HEAT PUMP UNIT
HPWR HEAT PUMP WATER RETURN
HPWS HEAT PUMP WATER SUPPLY
HR HOUR
HVAC HEATING VENTILATING AND AIR CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
HYD HYDRANT
HZ HERTZ
IH INTAKE HOOD
IN INCH
INV INVERT
IPLV INTEGRATED PART LOAD VALUE
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
M MOTOR OPERATED DAMPER
MAT MIXED AIR TEMPERATURE
MA MIXED AIR
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS/HOUR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MEZZ MEZZANINE
MFS MAXIMUM FUSE SIZE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MTD MOUNTED
MUA MAKE-UP AIR UNIT
NC NOISE CRITERIA
NC NORMALLY CLOSED
NECA NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION
NEBB NATIONAL ENVIRONMENTAL BALANCING BUREAU
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NPLV NOMINAL PART LOAD VALUE
NRTL NATIONALLY RECOGNIZED TESTING LABORATORY
NTS NOT TO SCALE
O OXYGEN
OA OUTDOOR AIR
OAT OUTDOOR AIR TEMPERATURE
OC ON CENTER
OPD OPPOSED BLADE DAMPER
P PUMP
PC PLUMBING CONTRACTOR
PD PUMP DISCHARGE
PH POTENTIAL OF HYDROGEN
PLBG PLUMBING
POC POINT OF CONNECTION
PPB PARTS PER BILLION
PPM PARTS PER MILLION
PRE POWER ROOF EXHAUST FAN
PRELIM PRELIMINARY
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
R REFRIGERANT
RA RETURN AIR
RD ROOF DRAIN
REQD REQUIRED
RF RETURN FAN
RH RELIEF HOOD
RPM REVOLUTIONS PER MINUTE
S SUPPLY
SA SUPPLY AIR
SCR SILICONE CONTROLLED RECTIFIERS
SEER SEASONAL ENERGY EFFICIENCY RATIO
SF SUPPLY FAN
SM SHEET METAL
SQ FT SQUARE FEET
SRV SAFETY RELIEF VALVE
SS STAINLESS STEEL
SWD SINGLE WALL DUCTWORK
T THERMOSTAT/TEMPERATURE SENSOR
TA THROWAWAY
TCAC TEMPERATURE CONTROL AIR COMPRESSOR
TCC TEMPERATURE CONTROL CONTRACTOR
TCP TEMPERATURE CONTROL PANEL
TCV TEMPERATURE CONTROL VALVE
TEMP TEMPORARY
TF TRANSFER FAN
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
TG TRANSFER GRILLE
TO TEST OPENINGS
TS TIP SPEED
TYP TYPICAL
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VSC VARIABLE SPEED CONTROL
WB WET BULB
WC WATER COLUMN
WOG WATER OIL GAS
WP WEATHER PROOF
WPB WELDABLE PRESSURE GRADE B
WPD WATER PRESSURE DROP
SMOKE DETECTOR
S
DUCT CAP
CONDENSATECOND
TRIPLE DUTY VALVE
SEE SPECIFICATIONS FOR TYPE
GENERAL SHUTOFF VALVE
SECTIONS - HVACM400
HOT WATER FLOW DIAGRAMS - HVACM500
SCHEDULES AND DETAILS - HVACM800
EXISTING PROJECT CONDITIONS:
INFORMATION PERTAINING TO EXISTING PROJECT CONDITIONS, SUCH AS
PRESENT LOCATIONS OF ARCHITECTURAL AND STRUCTURAL BUILDING
COMPONENTS, MECHANICAL AND ELECTRICAL EQUIPMENT, PIPING,
DUCTWORK, ROUGH-INS AND OTHER MISCELLANEOUS CONSTRUCTION,
APPEARS ON THE DRAWINGS. WHILE SUCH INFORMATION HAS BEEN
BASED ON AVAILABLE RECORDS AND COLLECTED WITH REASONABLE
CARE, THE ARCHITECT AND ENGINEER DO NOT ASSUME ANY EXPRESSED
OR IMPLIED GUARANTEE THAT CONDITIONS SO INDICATED ARE SHOWN
ENTIRELY COMPLETE, CORRECT AND REPRESENTATIVE OF THOSE
ACTUALLY EXISTING. ALL CONTRACTORS SHALL SATISFY THEMSELVES AS
TO ALL EXISTING JOB CONDITIONS PRIOR TO BIDDING, AND VERIFY ALL
DIMENSIONS AT THE SITE.
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
JDR
06/07/24
BD
COSP - CITY HALL
BOILER REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: fax:
JDR Project No. 24.0050
KEY PLAN - BASEMENT
SCALE: NONE
NORTH
AREA OF WORK
SYMBOLS AND
ABBREVIATIONS
- HVAC
M000
START OF SPECIFICATIONS:
GENERAL
REGULATION AND CODE
ALL WORK TO BE DONE IN COMPLIANCE WITH ALL STATE
AND LOCAL CODES AND ALL MANUFACTURER'S
INSTRUCTIONS.
WARRANTY
WARRANT THAT WORK SHALL FUNCTION FOR ONE YEAR
IMMEDIATELY FOLLOWING THE ACCEPTANCE OF THE
SYSTEM(S). THE DATE OF ACCEPTANCE SHALL BE AN
AGREED UPON DATE BY ALL PARTIES, INCLUDING
CONTRACTOR, GENERAL CONTRACTOR, OWNER AND A/E.
KEEP THE SYSTEM IN GOOD WORKING ORDER AT NO
EXPENSE, UNLESS DEFECTS ARE CLEARLY THE RESULT
OF IMPROPER USAGE.
WARRANTY CALLS SHALL BE AT NO COST TO THE OWNER.
EXISTING CONDITIONS
CONTRACTOR SHALL BECOME FAMILIAR WITH THE
PROJECT AND EXISTING CONDITIONS. ALL WORK TO BE
COORDINATED WITH EXISTING CONDITIONS PRIOR TO
FABRICATION OR RELEASE OF EQUIPMENT FOR
PRODUCTION.
THE HVAC CONTRACTOR SHALL WORK WITH THE
BUILDING USER TO ESTABLISH ALL SETPOINTS,
SET-BACKS, OPERATIONAL HOURS, UNOCCUPIED HOURS,
ETC.
CONTINUITY OF EXISTING SERVICES
DO NOT INTERRUPT OR CHANGE EXISTING SERVICES
WITHOUT PRIOR WRITTEN APPROVAL FROM THE OWNER,
OR FACILITIES MAINTENANCE. COORDINATE THE
DOWNTIME TO MINIMIZE DISRUPTION TO THEIR
ACTIVITIES.
DEMOLITION
PERFORM ALL DEMOLITION AS INDICATED ON THE
DRAWINGS TO ACCOMPLISH NEW WORK. CONSTRUCT
TEMPORARY DUST PARTITION TO MINIMIZE THE AMOUNT
OF CONTAMINATION OF THE OCCUPIED SPACE. WHERE
PIPE OR DUCT IS REMOVED AND NOT RECONNECTED
WITH NEW WORK, CAP ENDS OF EXISTING SERVICES AS IF
THEY WERE NEW WORK. COORDINATE WORK WITH THE
OWNER TO MINIMIZE DISRUPTION TO THE EXISTING
BUILDING OCCUPANTS.
ALL PIPE, WIRING AND ASSOCIATED CONDUIT,
INSULATION, DUCTWORK, AND SIMILAR ITEMS
DEMOLISHED, ABANDONED, OR DEACTIVATED ARE TO BE
REMOVED FROM THE SITE BY THE CONTRACTOR. ALL
PIPING AND DUCTWORK SPECIALTIES ARE TO BE
REMOVED FROM THE SITE BY THE CONTRACTOR UNLESS
THEY ARE DISMANTLED AND REMOVED OR STORED BY
THE OWNER. ALL DESIGNATED EQUIPMENT IS TO BE
TURNED OVER TO THE OWNER FOR THEIR USE AT A
PLACE AND TIME SO DESIGNATED. MAINTAIN THE
CONDITION OF MATERIAL AND/OR EQUIPMENT THAT IS
INDICATED TO BE REUSED EQUAL TO THAT EXISTING
BEFORE WORK BEGAN.
PROTECTION OF FINISHED SURFACES
PROTECT ALL FINISHES DURING CONSTRUCTION.
SLEEVES, OPENINGS, AND FIRE STOPPING
SEALING AND FIRE STOPPING OF SLEEVES/OPENINGS
BETWEEN DUCTWORK, PIPING, ETC. AND THE SLEEVE,
STRUCTURAL OR PARTITION OPENING SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR WHOSE WORK
PENETRATES THE OPENING.
SUBMITTALS
PROVIDE SUBMITTALS FOR ALL EQUIPMENT AND
MATERIAL.
PERMITS, CERTIFICATES, AND INSPECTIONS
OBTAIN AND PAY FOR ALL REQUIRED LOCAL, STATE AND
FEDERAL CONSTRUCTION PERMITS AND INSTALLATION
INSPECTIONS. DELIVER ORIGINALS OF THESE
CERTIFICATES TO THE PROJECT REPRESENTATIVE.
INCLUDE COPIES OF THE CERTIFICATES IN THE
OPERATING AND MAINTENANCE INSTRUCTIONS.
OPERATION AND MAINTENANCE MANUALS
PROVIDE OPERATION AND MAINTENANCE MANUALS TO
INCLUDE: RECORDS OF TESTS PERFORMED,
CERTIFICATES OF INSPECTION BY REGULATORY
AGENCIES, VALVE SCHEDULES, APPROVED SHOP
DRAWINGS, MANUFACTURER'S INSTALLATION AND
OPERATION MANUALS, TEMPERATURE CONTROL RECORD
DRAWINGS AND CONTROL SEQUENCES PARTS LISTS FOR
MANUFACTURED EQUIPMENT, WARRANTIES.
PROVIDE THREE (3) HARDCOPIES OF THE OPERATION
AND MAINTENANCE MANUAL.
PROVIDE ELECTRONIC COPY (ADOBE PDF) OF THE
OPERATION AND MAINTENANCE MANUAL.
OWNER TRAINING
PROVIDE OWNER TRAINING ON OPERATION AND
MAINTENANCE OF SYSTEMS AND EQUIPMENT.
RECORD DRAWINGS
MAINTAIN ACCURATE RECORD DRAWINGS THROUGHOUT
THE DURATION OF THE PROJECT. RECORD DRAWINGS
SHALL BE AVAILABLE ON SITE AT ALL TIMES FOR REVIEW
BY THE A/E OR OWNER. TURN OVER ACCURATE RECORD
DRAWINGS AT THE END OF THE PROJECT.
CLEANING
KEEP THE PREMISES BROOM CLEAN AND FREE OF
SURPLUS MATERIALS, RUBBISH, AND DEBRIS.
CLEAN ALL EQUIPMENT, PIPING, DUCT, STRAINERS,
FILTERS, ETC. PRIOR TO BUILDING TURNOVER TO OWNER.
ALL SYSTEMS SHALL BE TURNED OVER TO OWNER IN
CONDITION READY FOR OPERATION.
IDENTIFICATION
IDENTIFY EQUIPMENT IN MECHANICAL EQUIPMENT
ROOMS BY STENCILING (OR ENGRAVED NAMEPLATE)
EQUIPMENT NUMBER. DO NOT LABEL EQUIPMENT SUCH
AS CABINET HEATERS AND CEILING FANS IN OCCUPIED
SPACES.
IDENTIFY PIPING NOT LESS THAN ONCE EVERY 30 FEET,
NOT LESS THAN ONCE IN EACH ROOM, ADJACENT TO
EACH ACCESS DOOR OR PANEL, AND ON BOTH SIDE OF
THE PARTITION WHERE EXPOSED PIPING PASSES
THROUGH WALLS, FLOORS, OR ROOFS.
LABEL (STENCIL) FIRE, SMOKE AND COMBINATION FIRE
SMOKE DAMPERS ON THE EXTERIOR SURFACE OF
DUCTWORK DIRECTLY ADJACENT TO ACCESS DOORS
READING, “SMOKE DAMPER” OR “FIRE DAMPER”.
CONCRETE EQUIPMENT PADS
PROVIDE ALL REQUIRED CONCRETE EQUIPMENT PADS.
INSTALLATION
ARRANGE FOR THE NECESSARY OPENINGS IN THE
BUILDING TO ALLOW FOR ADMITTANCE OF ALL
EQUIPMENT/MATERIAL. WHEN THE BUILDING ACCESS
WAS NOT PREVIOUSLY ARRANGED AND MUST BE
PROVIDED BY THIS CONTRACTOR, RESTORE ANY
OPENING TO ITS ORIGINAL CONDITION AFTER THE
EQUIPMENT/MATERIAL HAS BEEN BROUGHT INTO THE
BUILDING.
INSTALL ALL PIPING, CONDUIT, DUCTWORK, AND
ACCESSORIES TO PERMIT ACCESS TO EQUIPMENT FOR
MAINTENANCE AND SERVICE. COORDINATE THE EXACT
LOCATION OF WALL AND CEILING ACCESS PANELS AND
DOORS WITH THE GENERAL CONTRACTOR, MAKING SURE
THAT ACCESS IS AVAILABLE FOR ALL EQUIPMENT AND
SPECIALTIES. EQUIPMENT INSTALLED WITHOUT
PROVIDING MANUFACTURER'S REQUIRED MAINTENANCE
AND SERVICE CLEARANCE SHALL BE CONSIDERED
DEFECTIVE. CONTRACTOR SHALL REMOVE AND
RELOCATE CONDUIT, PIPING, CONTROLS, DUCTWORK,
AND EQUIPMENT TO PROVIDE REQUIRED SERVICE
CLEARANCES AT CONTRACTOR'S EXPENSE.
SUBSTITUTION
WHERE EQUIPMENT OR ACCESSORIES ARE USED WHICH
DIFFER IN ARRANGEMENT, CONFIGURATION, DIMENSIONS,
RATINGS, OR ENGINEERING PARAMETERS FROM THOSE
INDICATED ON THE CONTRACT DOCUMENTS, THE
CONTRACTOR IS RESPONSIBLE FOR ALL COSTS
INVOLVED IN INTEGRATING THE EQUIPMENT OR
ACCESSORIES INTO THE SYSTEM AND FOR OBTAINING
THE PERFORMANCE FROM THE SYSTEM INTO WHICH
THESE ITEMS ARE PLACED. THIS MAY INCLUDE CHANGES
FOUND NECESSARY DURING THE TESTING, ADJUSTING,
AND BALANCING PHASE OF THE PROJECT.
PIPING SPECIALTIES
PRODUCTS
THERMOMETERS
CAST ALUMINIM CASE, 9” WINDOW, CLEAR ACRYLIC
WINDOW
EXECUTION
THERMOMETERS
INSTALL IN PIPING SYSTEMS AS INDICATED ON THE
DRAWINGS AND/OR DETAILS USING A SEPARABLE
SOCKET IN EACH LOCATION.
GENERAL DUTY VALVES (HYDRONIC)
PRODUCTS
BALL VALVES
2" AND SMALLER: TWO PIECE BRONZE BODY; THREADED
OR SOLDERED ENDS, AS APPROPRIATE TO THE PIPE
MATERIAL; STAINLESS STEEL OR CHROME PLATED
BRASS/BRONZE BALL; CONVENTIONAL PORT; GLASS
FILLED TEFLON SEAT; THREADED PACKING GLAND
FOLLOWER; BLOWOUT-PROOF STEM; 600 PSIG WOG.
VALVE STEMS SHALL ALLOW OPERATORS TO CLEAR
INSULATION WITHOUT INTERFERENCE. PROVIDE STEM
EXTENSIONS WHEN VALVE OPERATORS INTERFERE WITH
PIPE INSULATION.
2-1/2" AND OVER: BALL VALVES WILL NOT BE ACCEPTED
IN SIZES OVER 2 INCH.
APOLLO 70-100/200 SERIES, HAMMOND 8301/8311,
MILWAUKEE BA100/150, NIBCO T/S 585-70, STOCKHAM
S206/216.
BUTTERFLY VALVES
2" AND SMALLER: USE BALL VALVES; BUTTERFLY VALVES
WILL NOT BE ACCEPTED IN SIZES 2 INCH AND SMALLER.
2-1/2" AND LARGER: CAST IRON BODY; STAINLESS STEEL
SHAFT; TEFLON, NYLATRON, OR ACETAL BEARINGS; EPDM
RESILIENT SEAT. DISK TO BE BRONZE,
ALUMINUM-BRONZE, NICKEL PLATED DUCTILE IRON, CAST
IRON WITH WELDED NICKEL EDGE, OR 316 - STAINLESS
STEEL. PRESSURE RATED TO 150 PSIG. VALVE
ASSEMBLY TO BE BI-DIRECTIONALLY BUBBLE TIGHT TO
150 PSIG WITH NO DOWNSTREAM FLANGE/PIPE
ATTACHED. NYLON COATED DUCTILE IRON DISCS ARE
NOT ACCEPTABLE. POLYMID OR POLYAMIDE COATED
VALVES ARE NOT ACCEPTABLE.
VALVE STEMS SHALL ALLOW OPERATORS TO CLEAR
INSULATION WITHOUT INTERFERENCE. PROVIDE STEM
EXTENSIONS WHEN VALVE OPERATORS INTERFERE WITH
PIPE INSULATION.
USE THREADED LUG TYPE VALVES FOR INSTALLATION
WITH CLASS 125/150 FLANGES.
CENTERLINE SERIES 200, DEZURIK BOS-CL, KEYSTONE
FIG. 222, NIBCO LD2000 (2-1/2”-12”)/LD1000 (14” AND
ABOVE), BRAY SERIES 31H, VICTAULIC 300 SERIES
(2-1/2”-12”)/709 SERIES (14”-24”).
PROVIDE TEN-POSITION LEVER ACTUATORS FOR VALVES
6" AND SMALLER. PROVIDE WORM GEAR OPERATORS
FOR VALVES 8" AND LARGER.
WHERE BUTTERFLY VALVES ARE INDICATED OR
SPECIFIED TO BE INSTALLED AT THE LOCATION OF A
FLOW SENSING DEVICE, PROVIDE THE BUTTERFLY
VALVES WITH A MEMORY STOP.
BALANCE VALVES
2" AND SMALLER: BRONZE OR COPPER ALLOY BODY WITH
CALIBRATED BALL, GLOBE OR VENTURI/VALVE
ARRANGEMENT, INTEGRAL POINTER AND CALIBRATED
SCALE TO REGISTER DEGREE OF VALVE OPENING,
MEMORY STOP, DRAIN TAPPING, THREADED OR
SOLDERED ENDS, WITH OR WITHOUT INTEGRAL UNIONS,
P/T OR SHRAEDER PRESSURE TAPS WITH INTEGRAL
CHECK VALVES AND SEALS, ADJUSTABLE MEMORY STOP,
SUITABLE FOR 200 PSIG WATER WORKING PRESSURE AT
250°F.
ARMSTRONG CBV, BELL & GOSSETT CIRCUIT SETTER
PLUS, GRISWOLD QUICKSET, NEXUS ORTURI, NIBCO 1710
SERIES, TACO ACCU-FLO, TOUR & ANDERSON STAS/STAD,
VICTAULIC SERIES 786/787.
2-1/2" AND LARGER: USE BUTTERFLY VALVES AS
SPECIFIED IN THIS SECTION ALONG WITH A FLOW
SENSING DEVICE.
DRAIN VALVE
USE 3/4 INCH BALL VALVE WITH THREADED HOSE
ADAPTER EXCEPT STRAINER BLOWDOWN VALVES TO BE
THE SAME SIZE AS THE BLOWDOWN CONNECTION.
PROVIDE HOSE CONNECTION CAPS PRESSURE RATED
FOR 150 PSIG AT 180 °F.
COMBINATION SHUT-OFF, CHECK AND BALANCE VALVE
2 INCH AND LARGER: CAST OR DUCTILE IRON BODY,
THREADED OR FLANGED OR GROOVED END
CONNECTIONS, STAINLESS STEEL SPRING, BRONZE DISC
WITH EPDM SEAT, CALIBRATED MEMORY STOP,
BACKSEATING VALVE STEM, INLET AND OUTLET
PRESSURE TAPPINGS, CAPABLE OF BEING REPACKED
UNDER FULL LINE PRESSURE, AND SUITABLE FOR A
MINIMUM WORKING PRESSURE OF 175 PSIG AT 240°F
WHEN USED IN HOT WATER HEATING SYSTEMS.
ARMSTRONG FLO-TREX, BELL & GOSSETT TRIPLE DUTY,
TACO MULTI-PURPOSE VALVE, THRUSH-AMTROL
TRI-FLOW.
EXECUTION
SHUTOFF VALVES
INSTALL SHUT-OFF VALVES AT ALL EQUIPMENT, AT EACH
BRANCH TAKE-OFF FROM MAINS, AND AT EACH
AUTOMATIC VALVE FOR ISOLATION FOR REPAIR.
BUTTERFLY VALVES INSTALLED AT THE LOCATION OF A
FLOW SENSING DEVICE ARE TO HAVE A MEMORY STOP.
BALANCING VALVES
PROVIDE BALANCING VALVES FOR ALL MAJOR
EQUIPMENT AND AT EACH MAJOR BRANCH TAKEOFF AND
AT THE DISCHARGE OF EACH PUMP AS INDICATED ON
DRAWINGS AND DETAILS.
INSTALL WHERE INDICATED ON THE DRAWINGS AND
DETAILS FOR BALANCING OF HYDRONIC SYSTEMS.
DRAIN VALVES
PROVIDE DRAIN VALVES FOR COMPLETE DRAINAGE OF
ALL SYSTEMS. LOCATIONS OF DRAIN VALVES INCLUDE
LOW POINTS OF PIPING SYSTEMS, EQUIPMENT
LOCATIONS SPECIFIED OR DETAILED INCLUDING REHEAT
COILS, OTHER LOCATIONS REQUIRED FOR DRAINAGE OF
SYSTEMS.
COMBINATION SHUT-OFF, CHECK, AND BALANCING
VALVES
CONTRACTOR MAY USE COMBINATION SHUT-OFF, CHECK
AND BALANCING VALVES WHERE SEPARATE SHUT-OFF
VALVE, CHECK VALVE, AND BALANCING VALVE ARE
SPECIFIED OR DETAILED IN PUMP DISCHARGE PIPING.
TESTING ADJUSTING AND BALANCING
GENERAL
HVAC CONTRACTOR OR BALANCING AGENT SHALL TEST,
ADJUST, CALIBRATE AND BALANCE THE SYSTEMS AS
REQUIRED BY APPLICABLE CODES AND IN ACCORDANCE
WITH NEBB. THE BALANCE REPORT SHALL BE SUBMITTED
TO THE ENGINEER, AND TWO COPIES GIVEN TO
FACILITIES ENGINEERING.
HVAC INSULATION
GENERAL
ALL DUCTWORK THAT REQUIRES INSULATION SHALL
CONFORM WITH ALL APPLICABLE CODES. DIMENSIONS
LISTED ARE INSIDE FREE AREAS.
PRODUCTS
RIGID FIBERGLASS PIPE INSULATION
MINIMUM NOMINAL DENSITY OF 3 LB PER CF, AND
THERMAL CONDUCTIVITY OF NOT MORE THAN 0.23 AT 75
°F, 0.25 AT 125°F, 0.27 AT 150°F, 0.29 AT 200°F, 0.32 AT 250
°F, MINIMUM COMPRESSIVE STRENGTH OF 25 PSF AT 10%
DEFORMATION, RATED FOR SERVICE TO 450°F.
FIRE RATED BLANKET
HIGH-TEMPERATURE, FLEXIBLE, BLANKET INSULATION
WITH FSJ JACKET SUITABLE FOR OPERATING
TEMPERATURES UP TO 1700°F. TESTED AND CERTIFIED
TO PROVIDE A 2-HOUR ASTM E814 "F" AND "T" FIRE
RATINGS, UL OR EQUIVALENT NRTL ACCEPTABLE TO
AUTHORITIES HAVING JURISDICTION, LABELED AND
SPECIFICALLY EVALUATED FOR SUCH PURPOSE IN
ACCORDANCE WITH ASTM E2336.
FSJ JACKET
ALUMINUM-FOIL-FACE, FIBERGLASS-REINFORCED SCRIM
WITH KRAFT-PAPER BACKING.
EXECUTION
HOT WATER PIPING INSULATION
3/4" THRU 1-1/4” PIPE: 1-1/2” RIGID FIBERGLASS WITH ALL
SERVICE JACKET
1-1/2” AND LARGER PIPE: 2” RIGID FIBERGLASS WITH ALL
SERVICE JACKET
FIRE RATED INSULATION SYSTEM INSTALLATION
STRICTLY ADHERE TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND RATING REQUIREMENTS FOR
APPLICATION OF FIRE-STOP INSULATION. WHERE
FIRE-RATED INSULATION SYSTEM IS INDICATED, SECURE
SYSTEM TO DUCTS AND DUCT HANGERS AND SUPPORTS
TO MAINTAIN A CONTINUOUS FIRE RATING. INSULATE
DUCT ACCESS PANELS AND DOORS TO ACHIEVE SAME
FIRE RATING AS DUCT.
FACILITY FUEL PIPING (NATURAL GAS)
GENERAL
CONSTRUCT ALL PIPING FOR THE HIGHEST PRESSURES
AND TEMPERATURES IN THE RESPECTIVE SYSTEM IN
ACCORDANCE WITH ANSI B31, BUT NOT LESS THAN 125
PSIG.
ALL CHARGES FOR THE GAS SERVICE AS SHOWN ON THE
PLANS, INCLUDING THE CONNECTION FROM THE MAIN IN
THE STREET OR OTHER LOCATION TO THE GAS METER,
SHALL BE PAID BY THIS CONTRACTOR, INCLUDING
SETTING OF GAS METER(S) AND ALL WORK PERFORMED
BY THE GAS COMPANY.
PRODUCTS
2" AND SMALLER PIPE
ASTM A53, TYPE E OR S, STANDARD WEIGHT (SCHEDULE
40) BLACK STEEL PIPE WITH ASTM A197/ANSI B16.3 CLASS
150 BLACK MALLEABLE IRON THREADED FITTINGS OR
ASTM A234 GRADE WPB/ANSI B16.9 STANDARD WEIGHT,
SEAMLESS, CARBON STEEL WELD FITTINGS.
2-1/2" AND LARGER PIPE
ASTM A53, TYPE E OR S, STANDARD WEIGHT BLACK
STEEL PIPE WITH ASTM A234 GRADE WPB/ANSI B16.9
STANDARD WEIGHT, SEAMLESS, CARBON STEEL WELD
FITTINGS.
SHUT OFF VALVES
2" AND SMALLER: BALL VALVE, BRONZE BODY, THREADED
ENDS, CHROME-PLATED BRONZE OR STAINLESS STEEL
BALL, FULL OR CONVENTIONAL PORT, TEFLON SEAT,
BLOWOUT-PROOF STEM, TWO-PIECE CONSTRUCTION,
SUITABLE FOR 150 PSIG WORKING PRESSURE, UL LISTED
FOR USE AS NATURAL GAS SHUT-OFF.
2-1/2" THROUGH 4": CAST IRON BODY, FLANGED ENDS,
BRONZE BEARINGS, ELECTROLESS NICKEL PLATED CAST
IRON PLUG WITH HYCAR RESILIENT PLUG SEAL, BUNA-N
STEM SEAL PACKING, LEVER ACTUATOR, 175 PSI WOG, UL
LISTED FOR USE AS NATURAL GAS SHUT-OFF.
VENTS AND RELIEF VALVES
USE PIPE AND PIPE FITTINGS AS SPECIFIED FOR THE
SYSTEM TO WHICH THE RELIEF VALVE OR VENT IS
CONNECTED.
EXECUTION
INSTALL ALL PIPING PARALLEL TO BUILDING WALLS AND
CEILINGS AND AT HEIGHTS WHICH DO NOT OBSTRUCT
ANY PORTION OF A WINDOW, DOORWAY, STAIRWAY, OR
PASSAGEWAY. WHERE INTERFERENCES DEVELOP IN THE
FIELD, OFFSET OR REROUTE PIPING AS REQUIRED TO
CLEAR SUCH INTERFERENCES. IN ALL CASES, CONSULT
DRAWINGS FOR EXACT LOCATION OF PIPE SPACES,
CEILING HEIGHTS, DOOR AND WINDOW OPENINGS, OR
OTHER ARCHITECTURAL DETAILS BEFORE INSTALLING
PIPING.
DO NOT ROUTE PIPING THROUGH TRANSFORMER VAULTS
OR ABOVE TRANSFORMERS, PANELBOARDS, OR
SWITCHBOARDS, INCLUDING THE REQUIRED SERVICE
SPACE FOR THIS EQUIPMENT, UNLESS THE PIPING IS
SERVING THIS EQUIPMENT.
INSTALL ALL VALVES, AND PIPING SPECIALTIES,
INCLUDING ITEMS FURNISHED BY OTHERS, AS SPECIFIED
AND/OR DETAILED. MAKE CONNECTIONS TO ALL
EQUIPMENT INSTALLED BY OTHERS WHERE THAT
EQUIPMENT REQUIRES THE PIPING SERVICES INDICATED
IN THIS SECTION.
ALL INTERIOR AND EXTERIOR PIPING SHALL BE CLEANED
AND FREE OF RUST, PRIMED AND PAINTED WITH
SUITABLE EXTERIOR PRIMER AND EXTERIOR PAINT. GAS
PIPING SHALL BE PAINTED YELLOW WITH BLACK
IDENTIFICATION.
SPECIFICATIONS CONTINUED ON SHEET M002
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
JDR
06/07/24
BD
COSP - CITY HALL
BOILER REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: fax:
JDR Project No. 24.0050
SPECIFICATIONS
M001
SPECIFICATION CONTINUED FROM M001:
HYDRONIC PIPING
GENERAL
ALL PIPING SHALL RUN STRAIGHT AND TRUE AND SHALL
BE INSTALLED IN A WORKMANLIKE MANNER.
PRODUCTS
HEATING HOT WATER
2" AND SMALLER: ASTM A53, TYPE F, STANDARD WEIGHT
(SCHEDULE 40) BLACK STEEL PIPE WITH ASTM A126/ANSI
B16.4, CLASS 125, STANDARD WEIGHT CAST IRON
THREADED FITTINGS.
2-1/2" AND LARGER: ASTM A53, STANDARD WEIGHT
(SCHEDULE 40) BLACK STEEL PIPE WITH ASTM A234
GRADE WPB/ANSI B16.9 STANDARD WEIGHT, SEAMLESS,
CARBON STEEL WELD FITTINGS.
CONTRACTOR MAY USE ASTM B88 SEAMLESS, TYPE L,
HARD TEMPER COPPER TUBE WITH ANSI B16.22
WROUGHT COPPER SOLDER-JOINT FITTINGS IN LIEU OF
STEEL PIPE FOR ALL SIZES. MECHANICALLY FORMED TEE
FITTINGS MAY BE USED IN LIEU OF WROUGHT COPPER
SOLDER-JOINT TEE FITTINGS FOR BRANCH TAKEOFF UP
TO ONE-HALF (1/2) THE DIAMETER OF THE MAIN.
NOTE: WHERE ASTM A53 TYPE F PIPE IS SPECIFIED, ASTM
A53 GRADE A TYPE E OR S, OR ASTM A53 GRADE B TYPE E
OR S MAY BE SUBSTITUTED AT CONTRACTOR'S OPTION.
WHERE ASTM A53 GRADE A PIPE IS SPECIFIED, ASTM A53
GRADE B PIPE MAY BE SUBSTITUTED AT CONTRACTOR'S
OPTION. WHERE THE GRADE OR TYPE IS NOT SPECIFIED,
CONTRACTOR MAY CHOOSE FROM THOSE
COMMERCIALLY AVAILABLE.
NOTE: WHERE ASTM B88, TYPE L HARD TEMPER COPPER
TUBING IS SPECIFIED, ASTM B88, TYPE K HARD TEMPER
COPPER TUBING MAY BE SUBSTITUTED AT
CONTRACTOR'S OPTION.
EXECUTION
GENERAL
FURNISH AND INSTALL ALL FLANGES, CAPS, BYPASSES,
DRAINS, VALVES, ETC. REQUIRED TO FACILITATE
FLUSHING AND DRAINING ALL HEATING AND COOLING
SYSTEM PIPING.
INSTALL ALL PIPING PARALLEL TO BUILDING WALLS AND
CEILINGS AND AT HEIGHTS WHICH DO NOT OBSTRUCT
ANY PORTION OF A WINDOW, DOORWAY, STAIRWAY, OR
PASSAGEWAY. WHERE INTERFERENCES DEVELOP IN THE
FIELD, OFFSET OR REROUTE PIPING AS REQUIRED TO
CLEAR SUCH INTERFERENCES. REVIEW DRAWINGS AND
EXISTING SITE CONDITIONS FOR LOCATION OF PIPE
SPACES, CEILING HEIGHTS, DOOR AND WINDOW
OPENINGS, OR OTHER EXISTING CONDITIONS BEFORE
FABRICATING AND INSTALLING PIPING.
PROVIDE ANCHORS, EXPANSION JOINTS, SWING JOINTS
AND/OR EXPANSION LOOPS SO THAT PIPING MAY EXPAND
AND CONTRACT WITHOUT DAMAGE TO ITSELF,
EQUIPMENT, OR BUILDING.
INSTALL DRAINS THROUGHOUT THE SYSTEMS TO PERMIT
COMPLETE DRAINAGE.
DO NOT ROUTE PIPING ABOVE TRANSFORMERS,
PANELBOARDS, OR SWITCHBOARDS, INCLUDING THE
REQUIRED SERVICE SPACE FOR THIS EQUIPMENT,
UNLESS THE PIPING IS SERVING THIS EQUIPMENT.
INSTALL ALL VALVES, CONTROL VALVES, AND PIPING
SPECIALTIES, INCLUDING ITEMS FURNISHED BY OTHERS,
AS SPECIFIED AND/OR DETAILED. MAKE CONNECTIONS
TO ALL EQUIPMENT INSTALLED BY OTHERS.
PRESSURE TESTING
PRESSURE TEST ALL PIPING USING CLEAN WATER. TEST
FOR A MINIMUM OF 8 HOURS AT 100 PSIG.
SYSTEM FLUSHING
FLUSH ALL PIPING PRIOR TO CHEMICALLY TREATING THE
SYSTEM.
HYDRONIC PUMPS
PRODUCTS
WET-ROTOR PUMPS
MANUFACTURERS: GRUNDFOS, TACO, BELL & GOSSETT
DESCRIPTION: FACTORY-ASSEMBLED AND -TESTED,
WET-ROTOR PUMP. PUMP AND MOTOR TO FORM AN
INTEGRAL UNIT WITH BEARINGS LUBRICATED BY THE
PUMPED LIQUID.
PUMP CONSTRUCTION: DUCTILE IRON OR STAINLESS
STEEL BODY, COMPOSITE OR STAINLESS STEEL
IMPELLER, CERAMIC OR STAINLESS STEEL PUMP SHAFT,
DOUBLE-SINTERED CARBON BEARINGS.
SINGLE SPEED MOTOR. ELECTRICAL COMPONENTS,
DEVICES, AND ACCESSORIES: LISTED AND LABELED AS
DEFINED IN NFPA 70, BY AN NRTL, AND MARKED FOR
INTENDED LOCATION AND USE.
EXECUTION
INSTALL PUMPS IN STRICT ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
ALL VALVES AND PIPING SPECIALTIES MUST BE FULL LINE
SIZE AS INDICATED ON THE DRAWINGS.
LUBRICATE PUMPS BEFORE STARTUP.
INSTALL A FULL LINE SIZE SPRING LOADED CHECK VALVE
AND BALANCING VALVE IN THE PUMP DISCHARGE PIPING.
AT CONTRACTOR'S OPTION, COMBINATION SHUT-OFF,
CHECK, BALANCING VALVE MAY BE SUBSTITUTED
INSTEAD OF SEPARATE VALVES.
PROVIDE PRESSURE GAUGES ACROSS PUMPS.
PRESSURE GAGES SHALL BE INSTALLED UTILIZING PUMP
GAGE TAPINGS.
SET BASE MOUNTED PUMPS ON CONCRETE BASES, OR
CONCRETE INERTIA BASE, LEVEL AND BOLT DOWN PRIOR
TO GROUTING. FILL THE ENTIRE BASE WITH
NON-SHRINKING GROUT WHEN REQUIRED BY THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
ALIGN ALL FLEXIBLE COUPLED BASE-MOUNTED PUMPS IN
ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS
HVAC WATER TREATMENT
GENERAL
THE OWNER'S EXISTING CHEMICAL TREATMENT
SUPPLIER SHALL BE UTILIZED.
ALL PIPING SHALL BE CLEANED PRIOR TO USE. PROVIDE
CHEMICAL TREATMENT SYSTEM AND INITIAL CHEMICAL
TREATMENT.
PRODUCTS
PROVIDE SYSTEM CLEANER AND INHIBITOR.
COORDINATE WITH CHEMICAL TREATMENT SUPPLIER.
FILL WATER
TO HAVE PH RANGE OF 8.5-10.5, LESS THAN 250 PPB
OXYGEN, LESS THAN 5 PPM TOTAL IRON/COPPER, LESS
THAN 200 PPM CHLORIDE AND HARDNESS OF LESS THAN
60 PPM
EXECUTION
ADD CLEANER TO SYSTEM CIRCULATE AND DRAIN.
CHANGE WATER FILTER.
TREAT WITH SCALE AND CORROSION INHIBITORS BEFORE
USING THE SYSTEM FOR HEATING.
RECORD ALL DATA ON PIPE CLEANING AND TREATMENT
REPORT
COMBUSTION AIR AND VENTING
GENERAL
BOILER COMBUSTION AIR:
BOILER COMBUSTION AIR MATERIALS, CONSTRUCTION,
SIZE, TERMINATION, AND ROUTE SHALL BE ACCORDING
TO MANUFACTURER'S INSTRUCTIONS. ALL BOILER
COMBUSTION AIR MATERIALS SHALL BE COMPLIANT WITH
UL 1738 STANDARDS FOR CATEGORY IV OPERATION IN
ADDITION TO ANY MATERIAL SPECIFIC LISTINGS. ALL
BOILER COMBUSTION AIR MATERIALS SHALL BE
COMPLIANT WITH BOTH THE BOILER MANUFACTURER'S
INSTRUCTIONS AND THE COMBUSTION AIR MATERIAL'S
MANUFACTURER'S INSTRUCTIONS. ALL BOILER
COMBUSTION AIR MATERIALS SHALL BE COMPLIANT WITH
ALL RELEVANT LOCAL, STATE, AND NATIONAL CODES.
BOILER COMBUSTION AIR SHALL BE ONE OF THE
FOLLOWING:
PVC - SCHEDULE 40 OR SCHEDULE 80, ANSI/ASTM D1785
PVC - DWV, ANSI/ASTM D2665
CPVC - SCHEDULE 40 OR SCHEDULE 80, ANSI/ASTM F441.
SINGLE WALL GALVANIZED STEEL - GAUGE THICKNESS TO
BE COMPLIANT WITH LOCAL, STATE, AND NATIONAL
CODES.
DOUBLE WALL TYPE "B" VENT - UL 441
AL29-4C STAINLESS STEEL - LISTINGS COMPLIANT WITH
BOILER AND VENT MANUFACTURER'S INSTRUCTIONS AND
LOCAL, STATE, AND NATIONAL CODES.
EXISTING COMBUSTION AIR FOR EXISTING TO REMAIN
CATEGORY I GAS APPLIANCES IN THE BOILER ROOM
SHALL REMAIN.
BOILER VENTING:
VENT MATERIALS, CONSTRUCTION, SIZE, TERMINATION,
AND ROUTE SHALL BE ACCORDING TO MANUFACTURER'S
INSTRUCTIONS. ALL BOILER VENT MATERIALS SHALL BE
COMPLIANT WITH UL 1738 STANDARDS FOR CATEGORY IV
OPERATION IN ADDITION TO ANY MATERIAL SPECIFIC
LISTINGS. ALL BOILER VENT MATERIALS SHALL BE
COMPLIANT WITH BOTH THE BOILER MANUFACTURER'S
INSTRUCTIONS AND THE VENT MATERIAL'S
MANUFACTURER'S INSTRUCTIONS. ALL VENT MATERIALS
SHALL BE COMPLIANT WITH ALL RELEVANT LOCAL, STATE,
AND NATIONAL CODES.
BOILER VENT MATERIAL SHALL BE ONE OF THE
FOLLOWING:
DOUBLE WALL SPECIAL GAS VENT STAINLESS STEEL -
UL1738. MANUFACTURER AND MODEL SHALL BE
JEREMIAS INC. DWGV OR APPROVED EQUAL.
CPVC - SCHEDULE 40 OR SCHEDULE 80, ANSI/ASTM F441.
VERIFY BOILER OPERATION DOES NOT EXCEED MAXIMUM
RETURN WATER TEMPERATURE OF CPVC
MANUFACTURER AND BOILER MANUFACTURER.
EXISTING CATEGORY I GAS APPLIANCE VENTING:
PROVIDE NEW COMMERCIAL CHIMNEY LINING SYSTEM -
JEREMIAS INC OR APPROVED EQUAL
MODEL SWKL SINGLE WALL STAINLESS STEEL VENT
VENT SHALL BE LOWERED FROM THE ROOF WITH
CUSTOM ANCHOR PLATE. EACH SECTION SHALL HAVE
INTEGRAL CLAMP AND CENTERING BANDS.
PROVIDE ROUTE, SIZE, TERMINATION, AND INSTALLATION
ACCORDING TO SITE SPECIFIC MANUFACTURER'S
INSTRUCTIONS BASED ON EXISTING EQUIPMENT
NAMEPLATES. FURNISH AND INSTALL FIRE RATED
INSULATION ON CATEGORY I VENTING EXPOSED IN
MECHANICAL ROOMS.
CONDENSING FIRE TUBE BOILERS
GENERAL
REGISTRATION
COMPLETE BOILER AND UNFIRED PRESSURE VESSEL
(UPV) INSTALLATION REGISTRATION AND FORWARD TO
THE DEPARTMENT OF SAFETY AND PROFESSIONAL
SERVICES IN ACCORDANCE WITH THE WISCONSIN
ADMINISTRATIVE CODE CHAPTER SPS 341.24.
WARRANTY
HEAT EXCHANGER/COMBUSTION CHAMBER, PRESSURE
VESSEL AND CONDENSATE BASIN SHALL BE WARRANTED
FOR A MINIMUM PERIOD OF 10 YEARS AGAINST DEFECTS
IN MATERIALS OR WORKMANSHIP AND TO WITHSTAND
THERMAL SHOCK.
ALL OTHER COMPONENTS SHALL CARRY A ONE YEAR
WARRANTY FROM THE DATE OF SUBSTANTIAL
COMPLETION.
PRODUCTS
ACCEPTABLE MANUFACTURES
AERCO, CLEAVER BROOKS, LOCHINVAR, OR APPROVED
EQUAL
SINGLE PASS FIRE TUBE BOILER WITH STAINLESS TUBES
& TUBESHEET. NO MINIMUM RETURN WATER
TEMPERATURE, AND OR MINIMUM WATER FLOW
REQUIRED FOR PROPER OPERATION. BOILER ASME H
STAMPED AND CONSTRUCTED FOR 125 PSIG AND
DESIGNED PER ASME SECTION IV. FURNISH A RELIEF
VALVE IN COMPLIANCE WITH ASME SECTION IV AND SET
AT 50 PSIG. ALL INTERNAL COMBUSTION CHAMBER, AND
INTERNAL BURNER COMPONENTS, SHALL BE
MANUFACTURED WITH STAINLESS STEEL MATERIALS
SUITABLE TO WITHSTAND CONSTANT OPERATION UNDER
CONDENSING CONDITIONS. COMBUSTION CHAMBER
SHALL HAVE A CONDENSATE DRAIN TO DISCHARGE ANY
CONDENSATE BUILDUP. CSA CERTIFIED AS AN INDIRECT
OR DIRECT VENT BOILER AND COMPLY WITH ASME CSD-1.
BOILER MINIMUM EFFICIENCY OF 94%+ PER BTS 2000, AND
OPERATION IN THE CONDENSING MODE WITH INLET
TEMPERATURES AS LOW AS 90 F.
PROVIDE WITH INLET AND OUTLET TEMPERATURE
GAUGES.
FURNISH COMPLETE WATER TRIM INCLUDING LOW
WATER CUTOUT, AND HIGH LIMIT CONTROL.
NATURAL GAS-FIRED BURNERS, FORCED DRAFT POWER
TYPE WITH A POSITIVE PRESSURE AT THE BOILER
DISCHARGE. STAINLESS STEEL BURNER MIXER OR ALLOY
FIBER. MINIMUM OF 20:1 TURNDOWN.
FURNISH UNITS WITH FUEL TRAINS AND OPERATING
CONTROLS CONFORMING TO THE LATEST UL OR
EQUIVALENT AGENCY APPROVAL, ASME CSD-1
REQUIREMENTS, BOILER/BURNER PACKAGE SHALL BE
FACTORY ASSEMBLED, WIRED, MOUNTED, AND FACTORY
FIRE TESTED.
PROVIDE CONDENSATE NEUTRLIZATION KIT FOR EACH
BOILER.
PROVIDE BOILER KILL SWITCH (KELE WPS-MP-BS-CLM
WITH AUXILIARY CONTACTS KELE PILNCCB OR EQUAL) TO
BE INTEGRATED WITH BOILER EMERGENCY SHUTDOWN.
CONTROLS
BOILER OPERATING CONTROLS SHALL INCLUDE THE
FOLLOWING DEVICES AND FEATURES:
CONTROL TRANSFORMER
ALL SET POINTS SHALL BE ADJUSTABLE
ELECTRIC, FACTORY FABRICATED AND FACTORY
INSTALLED PANEL
OUTSIDE AIR TEMPERATURE SENSOR
PIPE MOUNTED HOT WATER TEMPERATURE SENSOR
BOILER CONTROLS SHALL SEQUENCE BOILERS, CONTROL
BURNER-FIRING RATE, RESET SUPPLY-WATER
TEMPERATURE SET POINT TO MATCH EXISTING CONTROL
SEQUENCE.
BOILER CONTROLS SHALL INTERLOCK BOILER
OPERATIONS WITH BOILER PUMP OPERATION AND
OPERATE BOILER PUMPS. BOILERS SHALL NOT BE
ALLOWED TO FIRE UNTIL THE BOILER FLOW SWITCH
PROVES PUMP OPERATION.
BURNER OPERATING CONTROLS: TO MAINTAIN SAFE
OPERATING CONDITIONS, BURNER SAFETY CONTROLS
LIMIT BURNER OPERATION.
HIGH CUTOFF: AUTOMATIC RESET STOPS BURNER IF
OPERATING CONDITIONS RISE ABOVE MAXIMUM BOILER
DESIGN TEMPERATURE.
LOW-WATER CUTOFF SWITCH: ELECTRONIC PROBE
SHALL PREVENT BURNER OPERATION ON LOW WATER.
CUTOFF SWITCH SHALL BE AUTOMATIC-RESET TYPE.
BLOCKED INLET SAFETY SWITCH: MANUAL-RESET
PRESSURE SWITCH FACTORY MOUNTED ON BOILER
COMBUSTION-AIR INLET.
AUDIBLE ALARM: FACTORY MOUNTED ON CONTROL
PANEL WITH SILENCE SWITCH; SHALL SOUND ALARM FOR
ABOVE CONDITIONS.
BUILDING AUTOMATION SYSTEM INTERFACE: FACTORY
INSTALL HARDWARE AND SOFTWARE TO ENABLE
BUILDING AUTOMATION SYSTEM TO MONITOR AND
ENABLE BOILER OPERATION. PROVIDE ALL AVAILABLE
POINTS AND ALARMS TO THE BUILDING AUTOMATION
SYSTEM.
EXECUTION
INSTALLATION
INSTALL UNITS AS SHOWN ON PLANS, AS DETAILED, AND
ACCORDING TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
SET UNITS ON EXISTING CONCRETE HOUSEKEEPING
PADS. EXTEND EXISTING PAS AS REQUIRED TO
ACCOMMODATE DIMENSIONS OF NEW BOILER. PAD SHALL
EXTEND A MINIMUM OF 2" BEYOND THE BOILERS IN ANY
DIRECTION.
INSTALL ALL ITEMS SHIPPED LOOSE BY EQUIPMENT
MANUFACTURER UNDER SUPERVISION OF EQUIPMENT
MANUFACTURER'S FIELD SERVICE PERSONNEL.
START UP BOILERS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
PIPE VENTS FROM GAS TRAIN TO ATMOSPHERE. SIZE OF
EACH VENT SHALL NOT BE LESS THAN CONNECTION SIZE
TO DEVICE.
PIPE BOILER DRAINS TO NEAREST FLOOR DRAINS.
INSTALL CONDENSATE NEUTRALIZATION DEVICES ON
BOILER CONDENSATE PIPING.
INSTALL GAS PRESSURE GAUGES AT DOWNSTREAM OF
GAS PRESSURE REGULATORS.
BOILER KILL SWITCH
INSTALL KILL SWITCH DIRECTLY INSIDE MAIN BOILER
ROOM DOOR ENTRANCE OR WHERE INDICATED ON THE
DOCUMENTS. WIRE SWITCH TO BOILER CONTROL PANEL
SAFETY CIRCUIT. WHEN ACTIVATED, SWITCH WILL ENACT
EMERGENCY BOILER SHUTDOWN.
OWNER TRAINING
PROVIDE FACTORY AUTHORIZED TRAINING FOR OWNER.
DRAFT INDUCER FANS
GENERAL
ALL DRAFT INDUCER FANS SHALL BE LISTED AS UL 378 OR
EQUIVALENT LISTING BY EQUIVALENT NRTL ACCEPTABLE
TO AUTHORITIES HAVING JURISDICTION. ALL DRAFT
INDUCER FAN PRODUCTS SHALL BE IN COMPLIANCE WITH
LOCAL, STATE, AND NATIONAL CODES.
PRODUCTS
EXTERIOR MOUNT VARIABLE SPEED MECHANICAL DRAFT
INDUCER ETL LISTED FOR VERTICAL AND SIDEWALL
VENTING. PROVIDES NEGATIVE PRESSURE THROUGHOUT
THE ENTIRE VENT SYSTEM. FURNISHED WITH INTEGRAL
STAINLESS STEEL HANDLES, HINGED HOUSING WITH
REMOVAL HINGE PIN, INTEGRAL TILT SWITCH, MOTOR
WINDING AND COMPARTMENT LIMIT SWITCH.
HOUSING CONSTRUCTED OF TYPE 5052 ALUMINUM AND
COATED WITH BRONZE TONED, HIGH-TEMPERATURE,
CORROSION RESISTANT MATERIAL. IMPELLER
CONSTRUCTED OF TYPE 304 STAINLESS STEEL. VARIABLE
SPEED, PERMANENTLY LUBRICATED, SEALED BALL
BEARING MOTOR. RATED FOR TEMPERATURES UP TO
500°F.
MANUFACTURER AND MODEL SHALL BE BASIS OF DESIGN
PRODUCT TJERNLUND VSAD8-230 OR APPROVED EQUAL
CONTAINING ALL ACCESSORIES AND CONTROLS DEVICES
LISTED IN THIS SPECIFICATION. FAN SHALL BE FURNISHED
WITH 4 IN. BY 4 IN. WEATHERPROOF JUNCTION BOX WITH
4 FOOT CONDUIT, PSA-1 FAN PROVING SWITCH, RMK
ADJUSTABLE HEIGHT 5052 ALUMNIUM ROOF MOUNTING
KIT, 304 STAINLESS STEEL ABD SERIES BAFFLES, AND FAN
REDUCER.
FAN SHALL BE FURNISHED WITH COMPATIBLE VFD, MAC4E
MULTIPLE APPLIANCE CONTROL DEVICE, UCRT-UC1
INTERLOCK WITH SPEED CONTROL FOR RT-SERIES
DEVICES FOR EACH APPLIANCE TO BE VENTED THROUGH
THE DRAFT INDUCER FAN, NON-FUSED DISCONNECT,
VSAD JUNCTION BOX, MPCI FAN CONTROLLER, AND ANY
AND ALL COMPONENTS REQUIRED TO CONNECT ALL
CONTROLS DEVICES TOGETHER TO FURNISH A FULLY
CONTROLLABLE SYSTEM.
EXECUTION
INSTALL UNITS AS SHOWN ON PLANS, AS DETAILED, AS
PER LOCAL, STATE, AND NATIONAL CODE, AND
ACCORDING TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
INSTALL DRAFT INDUCER FAN LEVEL AND PLUMB. INSTALL
ALL MANUFACTURER FURNISHED ACCESSORIES. SECURE
ROOF-MOUNTED FAN TO ROOF MOUNTING KIT. INSTALL
FAN WITH CLEARANCES FOR SERVICE AND
MAINTENANCE. FURNISH AND INSTALL NAMEPLATE FOR
FAN. DIVISION 26 CONTRACTOR SHALL CONNECT WIRING,
GROUND EQUIPMENT, PERFORM ELECTRICAL
CONNECTIONS, AND INSTALL ELECTRICAL DEVICES AS
REQUIRED PER NFPA 70 AND NECA 1. DIVISION 23
CONTRACTOR SHALL INSTALL CONTROL AND ELECTRICAL
POWER WIRING TO FIELD-MOUNTED CONTROL DEVICES.
PERFORM STARTUP SERVICE FOR FAN. PERFORM ALL
NECESSARY TESTING, ADJUSTING, AND BALANCING FOR
PROPER OPERATION OF FAN. PERFORM FINAL CLEANING
OF FAN TO REMOVE FOREIGN MATERIAL AND
CONSTRUCTION DEBRIS AFTER SYSTEM INSTALLATION
AND ANY TESTING, ADJUSTING, AND BALANCING IS
COMPLETE. PROVIDE FACTORY AUTHORIZED TRAINING
FOR OWNER.
END OF SPECIFICATION
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
JDR
06/07/24
BD
COSP - CITY HALL
BOILER REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: fax:
JDR Project No. 24.0050
SPECIFICATIONS
M002
DN
MECHANICAL
EQUIPMENT
ROOM
ELECTRICAL
ROOM
TRANSMITTER
ROOM
M
M
24''Ø (E)
24''Ø (E) UP
30/10 (E)
30/20 (E)
30/20 (E) UP
144/56 (E) UP
SUMP
PUMP
(E)
SUMP
PUMP
(E)
P-3 (E)
P-5 (E)
4" AIR SEPARATOR (E)
60 GAL EXPANSION TANK (E)
60 GAL EXPANSION
TANK (E)
EVAP-1 (E)
4" G (E) UP
4" G (E)
1" G (E)
3" CS/R (E)
2" HWS/R (E)
P-2 (E)
P-1 (E)
5" AIR SEPARATOR (E)
5" CS (E)
20''Ø (E)
1-1/4" HWR (E)
1-1/4" HWS (E)
2" HWR (E)
2-1/2" HWR (E) UP
4" HWR (E)
4" HWR (E)
4" HWS (E)
4" HWS (E)
4" HWS (E)
2-1/2" HWS (E)
5" CS (E)
5" CR (E)
2-1/2" HWS (E)
1-1/4" G (E)
3" CR (E) UP
30/16 (E) UP
3" CS (E) UP
8''Ø (E)
6''Ø (E)
6''Ø (E)
WATER HEATER (E)
WATER HEATER (E)
2-1/2" HWS (E)
4" HWS (E)
M
M
3-1/2'' G (E)
3'' G (E)
MUA-1
(E)
/2
E
/1
E
TCP (E)
MM
1" G (E)
1-1/4''
G (E)
168/84 (E)
6/24 (E) DOWN
42/24 (E) DOWN
M
4" HWR (E)
4" HWS (E)
H-1 (E)
UH-6 (E)
4" HWS (E)
2-1/2" HWS (E)
3 4
HPU-L-7
(E)
2-1/2" HWS (E) UP
6''Ø (E)
B-1 (E)
4''Ø (E)
6''Ø (E)
P-4 (E)
30/16 (E)
4''Ø (E)
8''Ø (E) 2
DF-1
(E) 4" G (E)
4'' G (E)
48/48 (E)
EVAP-1 PUMP (E)
DN
MECHANICAL
EQUIPMENT
ROOM
ELECTRICAL
ROOM
TRANSMITTER
ROOM
M
M
24''Ø (E) UP
30/10 (E)
30/20 (E)
30/20 (E) UP
144/56 (E) UP
SUMP
PUMP
(E)
SUMP
PUMP
(E)
P-3 (E)
P-5 (E)
4" AIR SEPARATOR (E)
60 GAL EXPANSION TANK (E)
60 GAL EXPANSION
TANK (E)
EVAP-1 (E)
4" G (E) UP
4" G (E)
1" G (E)
3" CS/R (E)
2" HWS/R (E)
P-2 (E)
P-1 (E)
5" AIR SEPARATOR (E)
5" CS (E)
1-1/4" HWR (E)
1-1/4" HWS (E)
2" HWR (E)
2-1/2" HWR (E) UP
4" HWR (E)
4" HWR (E)
4" HWS (E)
4" HWS (E)
4" HWS (E)
2-1/2" HWS (E)
5" CS (E)
5" CR (E)
2-1/2" HWS (E)
1-1/4" G (E)
3" CR (E) UP
30/16 (E) UP
3" CS (E) UP
8''Ø (E)
6''Ø (E)
6''Ø (E)
WATER HEATER (E)
WATER HEATER (E)
2-1/2" HWS (E)
4" HWS (E)
M
M
3-1/2'' G (E)
3'' G (E)
MUA-1
(E)
/2
E
/1
E
TCP (E)
MM
1" G (E)
1-1/4''
G (E)
168/84 (E)
6/24 (E) DOWN
42/24 (E) DOWN
3" G
4" HWR (E)
3" G
4" HWS (E)
H-1 (E)
UH-6 (E)
4" HWS (E)
2-1/2" HWS (E)
BP-2
HPU-L-7
(E)
2-1/2" HWS (E) UP
4''Ø (E)
B-2
B-1 1
6''Ø (E)
BP-1
P-4 (E)
''Ø
''Ø
''Ø
8''Ø
8''Ø
8''Ø
''Ø
6''Ø
4''Ø
8''Ø
30/16 (E)
10''Ø UP
DF-1
(E) 4" G (E)
4'' G (E)
48/48 (E)
6''Ø
6''Ø
VFD-DIF112
EVAP-1 PUMP (E)
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
JDR
06/07/24
BD
COSP - CITY HALL
BOILER REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: fax:
JDR Project No. 24.0050
KEY PLAN - BASEMENT
SCALE: NONE
NORTH
AREA OF WORK
BASEMENT PARTIAL
PLANS - HVAC
M200
SCALE:
M200
PARTIAL BASEMENT DEMOLITION PLAN - HVAC
1/4"=1'-0"
NORTH
GENERAL NOTES:
1. PRIOR TO THE BEGINNING OF CONSTRUCTION, TEST THE EXISTING PUMPS P-3, P-4, AND P-5. REPORT THE EXISTING GPM, HEAD, AND HORSEPOWER FOR REBALANCING FOLLOWING CONSTRUCTION.
2. EXISTING HOT WATER SUPPLY TEMPERATURE AND HOT WATER RETURN TEMPERATURE SENSORS SHALL REMAIN.
KEYED NOTES:
DEMOLISH EXISTING BOILER B-1 COMPLETE. DISCONNECT EXISTING BOILER COMBUSTION AIR INTERLOCK FROM EXISTING 42"X24" COMBUSTION AIR DAMPER. ALL OTHER INTERLOCKS ASSOCIATED WITH CONTROL DAMPER SHALL BE EXISTING TO REMAIN. DEMOLISH EXISTING PIPING, INSULATION AND SPECIALTY DEVICES TO POINT SHOWN. ALL VALVES AND CONTROL INSTRUMENTATION SHALL BE EXISTING TO REMAIN. EXISTING BOILER ISOLATION VALVES TO REMAIN FOR REUSE BY NEW BOILERS. REFER TO DETAIL 1/M500 FOR FURTHER INFORMATION REGARDING DEMOLITION.
DEMOLISH EXISTING FLUE VENT AS SHOWN. SEAL REMAINING VENT AIRTIGHT IN PREPARATION FOR NEW CONNECTION.
REMOVE EXISTING 3" GAS PIPING AND GAS PRESSURE REGULATOR AS SHOWN. CAP IN PREPARATION FOR NEW CONNECTION.
EXISTING TO REMAIN HOUSEKEEPING PAD TO BE MODIFIED AS INDICATED IN NEW WORK PLAN.
EXISTING CONTROL PANEL TO REMAIN.
REMOVE EXISTING CAP AND PREPARE PIPING FOR NEW CONNECTIONS AS SHOWN IN NEW WORK PLAN. REFER TO DETAIL 1/M500 FOR MORE INFORMATION REGARDING THE DEMOLITION HOT WATER
PIPING.
GENERAL NOTES:
1. ALL WORK TO BE DONE IN COMPLIANCE WITH SPECIFICATIONS, ALL STATE AND LOCAL CODES, AND ALL MANUFACTURER'S INSTRUCTIONS.
2. ALL PIPING SHALL RUN STRAIGHT AND TRUE AND SHALL BE INSTALLED IN A WORKMANLIKE MANNER.
3. HC OR BALANCING AGENT SHALL TEST, ADJUST, CALIBRATE AND BALANCE THE SYSTEMS AS REQUIRED BY APPLICABLE CODES AND IN ACCORDANCE WITH NEBB. THE BALANCE REPORT SHALL BE
SUBMITTED TO THE ENGINEER, AND ONE COPY RETAINED AT THE JOBSITE.
4. ALL EQUIPMENT IS TO BE PROVIDED COMPLETE WITH OPERATION & MAINTENANCE MANUALS AND SYSTEM SCHEMATICS.
5. ALL HVAC EQUIPMENT TO MEET GE GAP, AGA, AND UL REQUIREMENTS.
6. ALL LOW-VOLTAGE WIRING BY HC PER NATIONAL ELECTRIC CODE.
7. HC TO FIELD VERIFY EXACT LOCATION OF PIPE ROUTING AND EQUIPMENT LOCATIONS AND CLEARANCES ON JOB SITE.
8. GAS PIPE SIZING IS BASED UPON SCHEDULE 40 BLACK STEEL.
KEYED NOTES:
FURNISH AND INSTALL NEW BOILER IN LOCATION SHOWN ON EXISTING PAD. BOILERS SHALL BE INSTALLED SIDE BY SIDE AS SHOWN. EXTEND EXISTING PAD AS REQUIRED TO ACCOMMODATE DIMENSIONS OF NEW BOILER. PAD SHALL EXTEND A MINIMUM OF 2" BEYOND THE BOILERS IN ANY DIRECTION. FURNISH AND INSTALL PIPING AND SPECIALITY DEVICES AS SHOWN ON DETAIL 1/M800.
ROUTE NEW FLUE INTAKE AND VENT AS SHOWN. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE LOCATION OF EXISTING PIPING PRIOR TO SUBMITTALS. MODIFICATION TO EXISTING SERVICES SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR. VERIFY FINAL SIZES OF ALL PIPING AND DUCTWORK WITH MANUFACTURER'S INSTRUCTIONS. REFER TO DETAIL 2/M500 FOR ALL
NEW WORK HOT WATER PIPING SIZES.
EXISTING OPEN ENDED COMBUSTION AIR DUCT PROVIDING COMBUSTION AIR TO EXISTING APPLIANCE DF-1 AND EXISTING WATER HEATERS.
EXISTING OPEN ENDED COMBUSTION AIR DUCT PROVIDING COMBUSTION AIR TO EXISTING APPLIANCE MUA-1.
RISE NEW 8''Ø CATEGORY IV VENT PIPING AS CLOSE TO STRUCTURE AS POSSIBLE. PERFORM INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
CORE NEW 8''Ø CATEGORY IV VENT PIPING THROUGH CONCRETE SECTION ABOVE EXISTING INTAKE LOUVER. PERFORM INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. REFER
TO ELEVATION 1/M400 FOR MORE INFORMATION.
RISE NEW 8''Ø CATEGORY IV VENT PIPING IN EXISTING AREA WELL. PENETRATE EXISTING GRATE AND TERMINATE VENT PIPING 10'-0" ABOVE TOP OF EXISTING INTAKE LOUVER WITH 90° ELBOW AND 45° ELBOW JOINED TOGETHER FACING AWAY FROM BUILDING FACADE. FURNISH AND INSTALL SUPPORTS AS REQUIRED. FURNISH AND INSTALL BIRD SCREEN ON ELBOW INLET. FURNISH MATERIAL AND PERFORM INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. REFER TO ELEVATION 1/M400 FOR MORE INFORMATION.
CONNECT EXISTING CATEGORY I VENT FROM EXISTING APPLIANCE TO NEW CATEGORY I VENT. NEW VENT SHALL BE SINGLE WALL STAINLESS STEEL VENT. MANUFACTURER SHALL BE JEREMIAS AND MODEL SHALL BE SWKL OR APPROVED EQUAL. VERIFY EXISTING CATEGORY I VENT MATERIAL PRIOR TO CONNECTION. DO NOT CONNECT DISSIMILAR MATERIALS. VENT SHALL BE SUPPORTED BY JEREMIAS KL CLAMPS OR APPROVED EQUAL. FURNISH AND INSTALL FIRE RATED INSULATION ON CATEGORY I VENTING EXPOSED IN MECHANICAL ROOM. VERIFY ALL INSTALLATION REQUIREMENTS WITH THE MANUFACTURERS OF THE EXISTING APPLIANCES PRIOR TO PERFORMING CONNECTIONS. PERFORM INSTALLATION IN ACCORDANCE WITH ALL EXISTING APPLIANCES' MANUFACTURERS'
INSTRUCTIONS AND BOTH EXISTING AND NEW VENT MANUFACTURERS' INSTRUCTIONS.
RISE NEW 10''Ø CATEGORY I VENT STACK THROUGH EXISTING 24''Ø STACK. SEAL PENETRATION LOCATION AIRTIGHT. RISE DUCT TO ROOF LEVEL AND CONNECT TO FAN DIF-1 ON ROOF. SUPPORT NEW STACK FROM EXISTING WALLS OF EXISTING STACK. FURNISH AND INSTALL ALL REQUIRED SUPPORTS. NEW VENT SHALL BE SINGLE WALL STAINLESS STEEL VENT. MANUFACTURER SHALL BE JEREMIAS AND MODEL SHALL BE SWKL OR APPROVED EQUAL. VENT SHALL BE SUPPORTED BY JEREMIAS KL CLAMPS OR APPROVED EQUAL.
CORE NEW 6"Ø COMBUSTION AIR PIPING THROUGH CONCRETE SECTION ABOVE EXISTING INTAKE LOUVER. PERFORM INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. REFER
TO ELEVATION 1/M400 FOR MORE INFORMATION.
DROP NEW 6''Ø COMBUSTION AIR PIPING IN EXISTING AREA WELL. TERMINATE INTAKE PIPING 10'-0" BELOW BOTTOM OF ANY EXHAUST OR VENT TERMINATIONS WITH 45° ELBOW FACING AWAY FROM BUILDING FACADE. FURNISH AND INSTALL ALL REQUIRED SUPPORTS. PROVIDE BIRD SCREEN ON ELBOW INLET. FURNISH MATERIAL AND PERFORM INSTALLATION IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS. REFER TO ELEVATION 1/M400 FOR MORE INFORMATION.
FURNISH AND INSTALL BAROMETRIC DAMPER AT POINT OF CONNECTION TO EXISTING APPLIANCE. COORDINATE BAROMETRIC DAMPER PRODUCT SELECTION AND INSTALLATION WITH VENT
MANUFACTURER.
FURNISH AND INSTALL VFD AND ALL REQUIRED SPEED CONTROL DEVICES FOR DIF-1 ON EXISTING TCP BACKBOARD. EC SHALL ROUTE CONDUIT TO DIF-1 LOCATED ON ROOF THROUGH EXISTING SHAFT BETWEEN EXISTING 24"'Ø STACK AND EXISTING 2-1/2" HOT WATER RISER PIPING. REFER TO 2/E200 FOR ALL ELECTRICAL REQUIREMENTS.
FURNISH AND INSTALL FIRE RATED INSULATION ON CATEGORY I VENTING EXPOSED IN MECHANICAL ROOM.
SCALE:
M200
PARTIAL BASEMENT NEW WORK PLAN - HVAC
1/4"=1'-0"
NORTH
M400
EXISTING 14'-0"x7'-0"
INTAKE LOUVER
EXISTING
4'-0"x4'-0"
INTAKE
LOUVER
EXISTING
WOODEN
FENCING
EXISTING
WOODEN
FENCING
EXISTING
DOOR
EXISTING
OPERABLE
WINDOW
EXISTING
OPERABLE
WINDOW
EXISTING
OPERABLE
WINDOW
EXISTING GRATE
ABOVE
AREA WELL
EXISTING
AREA WELL
EXISTING 14'-0"x4'-0"
BLANK OFF
MECHANICAL ROOM FLOOR -15'-0"
FIRST FLOOR 0'-0"
SECOND FLOOR/LOW ROOF 13'-4"
ROOF 26'-8"
EXISTING 12'-0"x4'-8"
EXHAUST LOUVER
''Ø
''Ø
24''Ø (E)
10''Ø
DIF-1
EXISTING
TRASH AREA
WALL
EXISTING
CONDENSING
UNIT
EXISTING
INTAKE HOOD
ON LOW ROOF
4" G (E) @ 7" W.C.
OPERATING
PRESSURE
EXISTING GAS
METER ASSEMBLY
2" G (E) HIGH PRESSURE
LINE FROM UTILITY
FEEDING INTO GAS
METER ASSEMBLY GPRS.
36/36 (E)
6''Ø
SECOND FLOOR SET BACK
10'-0" FROM ROOF EDGE
ROOF EDGE
M
IN
DRAWN :
CHECKED :
DATE :
PHASE :
PROJECT
PROJECT # :
JDR
06/07/24
BD
COSP - CITY HALL
BOILER REPLACEMENT
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: fax:
JDR Project No. 24.0050
KEY PLAN - BASEMENT
SCALE: NONE
NORTH
AREA OF WORK
SECTIONS
- HVAC
M400
GENERAL NOTES:
1. ALL WORK TO BE DONE IN COMPLIANCE WITH SPECIFICATIONS, ALL STATE AND LOCAL CODES, AND ALL MANUFACTURER'S INSTRUCTIONS.
2. ALL PIPING SHALL RUN STRAIGHT AND TRUE AND SHALL BE INSTALLED IN A WORKMANLIKE MANNER.
3. HC OR BALANCING AGENT SHALL TEST, ADJUST, CALIBRATE AND BALANCE THE SYSTEMS AS REQUIRED BY APPLICABLE CODES AND IN ACCORDANCE WITH NEBB. THE BALANCE REPORT SHALL BE SUBMITTED TO THE ENGINEER, AND ONE COPY RETAINED AT THE JOBSITE.
4. ALL EQUIPMENT IS TO BE PROVIDED COMPLETE WITH OPERATION & MAINTENANCE MANUALS AND SYSTEM SCHEMATICS.
5. ALL HVAC EQUIPMENT TO MEET IRI, AGA, AND UL REQUIREMENTS.
6. ALL LOW-VOLTAGE WIRING BY HC PER NATIONAL ELECTRIC CODE.
7. HC TO FIELD VERIFY EXACT LOCATION OF PIPE ROUTING AND EQUIPMENT LOCATIONS AND CLEARANCES ON JOB SITE.
8. GAS PIPE SIZING IS BASED UPON SCHEDULE 40 BLACK STEEL.
KEYED NOTES:
CORE NEW 8''Ø CATEGORY IV VENT PIPING THROUGH CONCRETE SECTION ABOVE EXISTING INTAKE LOUVER. PERFORM INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
RISE NEW 8''Ø CATEGORY IV VENT PIPING IN EXISTING AREA WELL. PENETRATE EXISTING GRATE AND TERMINATE VENT PIPING 10'-0" ABOVE TOP OF EXISTING INTAKE LOUVER WITH 90° ELBOW AND 45° ELBOW JOINED TOGETHER FACING AWAY FROM BUILDING FACADE. FURNISH AND INSTALL SUPPORTS AS REQUIRED. FURNISH AND INSTALL BIRD SCREEN ON ELBOW INLET. FURNISH MATERIAL AND PERFORM INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. REFER TO ELEVATION 1/M400 FOR MORE INFORMATION.
RISE NEW 10''Ø CATEGORY I VENT STACK THROUGH EXISTING 24''Ø STACK. SEAL PENETRATION LOCATION AIRTIGHT. RISE DUCT TO ROOF LEVEL AND CONNECT TO FAN DIF-1 ON ROOF. SUPPORT NEW STACK FROM EXISTING WALLS OF EXISTING STACK. FURNISH AND INSTALL ALL REQUIRED SUPPORTS. NEW VENT SHALL BE SINGLE WALL STAINLESS STEEL VENT. MANUFACTURER SHALL BE JEREMIAS AND MODEL SHALL BE SWKL OR APPROVED EQUAL. VENT SHALL BE SUPPORTED BY JEREMIAS KL CLAMPS OR APPROVED EQUAL.
EXISTING GAS METER RATED FOR 3,000 CFH. NEW TOTAL GAS LOAD THROUGH GAS METER IS 2,986 MBH.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .