240044 Basis of Design.pdf

PDF 658 KB Posted

Attached to
Roof Repairs Building 1445
Solicitation number
N4008525R9005
Issued by

About this file

The document is a Basis of Design (BOD) for roof repairs at Building 1445 on Marine Corps Base Camp Lejeune in North Carolina. The project involves demolishing the existing built-up roofing system and replacing it with a new modified bitumen roofing system approved by MCB Camp Lejeune. The scope includes replacing roof penetrations, equipment curbs, roof drains, emergency overflow scuppers, building expansion joints, and sheet metal copings. The building is classified as Type IIB non-combustible construction with Business (B) and Storage (S-1) occupancy classifications.

The design incorporates R-30 continuous insulation above the roof deck and follows multiple UFC (Unified Facilities Criteria) and building code standards, including IBC2018 and NFPA101. Structural design parameters include a Risk Category II, roof live load of 20PSF, ground snow load of 10psf, ultimate wind speed of 144mph, and seismic design category B. The mechanical and electrical scopes are limited to removing and reinstalling existing rooftop equipment to facilitate the new roofing system installation, with the intent of restoring all systems to full functionality.

View the file

Other files

File Type Posted
01 30 00.pdf PDF
07 52 00.pdf PDF
Amend 0003 259005.pdf PDF
Submittal Register.pdf PDF
Amend 0002 240044.pdf PDF
Amend 0001 24-0044.pdf PDF
N4008524B0044 Dwgs.pdf PDF
RFP pdf.pdf PDF
N4008524B0044 Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 1445 ROOF REPAIRS

aboard

MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA

A/E Contract: N40085-22-D-0002

Task Order No: N40085-25-F-2550

MCBCL Project No: 24-0044

MBFA No: 2428

Basis of Design Final Design Submittal

May 23, 2025

This page is intentionally left blank.

TABLE OF CONTENTS

ARCHITECTURAL BASIS OF DESIGN Page 3

STRUCTURAL BASIS OF DESIGN Page 5

MECHANICAL BASIS OF DESIGN Page 6

ELECTRICAL BASIS OF DESIGN Page 7

ARCHITECTURAL BASIS OF DESIGN

REFERENCE DOCUMENTS

Architectural work will comply with the latest edition of the following codes and standards:

International Building Code (IBC)

NFPA101 Life Safety Code (NFPA)

UFC 1-200-01 General Building Requirements

UFC 1-300-09N Design Procedures

UFC 3-101-01 Architecture

UFC 3-110-03 Roofing

UFC 3-120-10 Interior Design

UFC 3-190-06 Protective Coatings and Paints

UFC 3-450-01 Noise and Vibration Control

UFC 3-600-01 Fire Protection Engineering for Facilities

UFC 4-010-01 DOD Minimum Antiterrorism Standards for Buildings

Architectural Barriers Act Standards (ABA)

SCOPE OF WORK

Demolition of the existing built-up roofing system and insulation at Building 1445. All roof areas are included in the scope of work. The design intent is to replace the existing roofing system with a new

MCB CL approved modified bitumen roofing system. Penetrations, rooftop equipment curbs, roof drains, emergency overflow scuppers and building expansion joints are included in the scope. Existing sheet metal copings will be replaced with new.

TYPE OF CONSTRUCTION

Type IIB non-combustible construction

OCCUPANCY CLASSIFICATIONS

Business (B) and Storage (S-1)

LIFE SAFETY CODE ANALYSIS

Life safety work is limited to fall protection at the roof hatch.

ACCESSIBILITY

Not applicable.

ARCHITECTURAL COMPATIBILITY

Limited. The modified bitumen roofing system will comply with the MCB Camp Lejeune (BEAP) Base

Exterior Architectural Plan, 2010. New sheet metal coping material and color will comply with the MCB

Camp Lejeune (BEAP) Base Exterior Architectural Plan, 2010.

EXTERIOR WALL SYSTEM

Not applicable.

ROOFING

Replacement of existing low built-up roofing system with a MCB CL approved modified bitumen roofing system. Existing structural slope.

Roof drainage is collected via roof drains and conveyed to underground storm water piping. Existing emergency overflow scupper locations will remain and receive new sheet metal sleeves and flashing.

THERMAL INSULATION

The roof assembly provides R-30 continuous insulation above the roof deck.

DOOR AND WINDOW FENESTRATION

Not applicable.

INTERIOR PARTITION SYSTEM

Not applicable.

CEILING SYSTEMS

Not applicable.

FLOOR SYSTEMS

Not applicable.

NOISE AND ACOUSTIC CONTROL

Not applicable.

SECURITY REQUIREMENTS

Not applicable.

SPECIAL DESIGN FEATURES

Not applicable.

HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS

High Performance and Sustainable Building (HPSB) Requirements will be in accordance with UFC 1-200-

02, High Performance and Sustainable Buildings Requirements and limited to roofing system replacement.

ANTITERRORISM (AT) MITIGATION

Not applicable.

STRUCTURAL BASIS OF DESIGN

REFERENCE DOCUMENTS

Note: The active governing codes are as prescribed in UFC 3-301-01 effective on the date of this BOD.

UFC 1-200-01, Change 1, 1 Oct 2020 "General Building Requirements"

UFC 3-301-01, Change 1, 4 February 2022 "Structural Engineering"

UFC 4-010-01, Change 1, 19 August 2020 “Minimum Anti-Terrorism Standards for Buildings”

IBC2018, "International Building Code"

ACI 318-14, “Building Code Requirements for Structural Concrete”

ASCE 7-16, "Minimum Design Loads for Buildings and Other Structures"

AWS D1.1-04, “Structural Welding Code”

ACI360R-10, “Guide to Design of Slabs-on-Ground”

AISC 360-16, “Specification for Structural Steel Buildings”

SDI-07, “Code of Standard Practice for Composite Deck, Form Deck, and Roof Deck Construction”

AWS D1.1-20, “Structural Welding Code”

DESIGN LOAD CRITERIA

Risk Category II

LIVE LOADS

Roof = 20PSF

SNOW LOAD

Importance Factor, Is = 1.0

Ground snow load, Pg = 10psf

Snow Exposure Factor, CE = 1.0

Thermal Factor, Ct = 1.0

WIND DESIGN DATA

Exposure Category = B

Ultimate Wind Speed = 144mph

SEISMIC DESIGN DATA

Seismic Importance Factor, Ie = 1.0

Mapped Spectral Response Accelerations:

Ss = .115g

S1 = .055g

Sds = .123g

Sd1 = .088g

Site Class = D

Seismic Design Category = B

RAIN DESIGN DATA

100-year, 1-hour rainfall = 4.25”

STRUCTURAL MODIFICATIONS

Structural modifications are not in the scope of work.

MECHANICAL BASIS OF DESIGN

PROJECT DESCRIPTION

This roof repairs project requires a very limited mechanical scope and is limited to removal and reinstallation of existing rooftop mechanical equipment to facilitate installation of the new roofing system. The intent is for existing systems to be restored to complete functionality.

ELECTRICAL BASIS OF DESIGN

PROJECT DESCRIPTION

This roof repairs project requires a very limited electrical scope and is primarily disconnection and reconnection of existing rooftop mechanical equipment to be removed and reinstalled.

BASIS OF DESIGN
COVER
TABLE OF CONTENTS
ARCHITECTURAL BASIS OF DESIGN
REFERENCE DOCUMENTS
SCOPE OF WORK
TYPE OF CONSTRUCTION
OCCUPANCY CLASSIFICATIONS
LIFE SAFETY CODE ANALYSIS
EXTERIOR WALL SYSTEM
ROOFING
THERMAL INSULATION
DOOR AND WINDOW FENESTRATION
INTERIOR PARTITION SYSTEM
CEILING SYSTEMS
FLOOR SYSTEMS
NOISE AND ACOUSTIC CONTROL
SECURITY REQUIREMENTS
SPECIAL DESIGN FEATURES
HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS
ANTITERRORISM (AT) MITIGATION
STRUCTURAL BASIS OF DESIGN
REFERENCE DOCUMENTS
DESIGN LOAD CRITERIA
LIVE LOADS
SNOW LOAD
WIND DESIGN DATA
SEISMIC DESIGN DATA
RAIN DESIGN DATA
STRUCTURAL MODIFICATIONS
MECHANICAL BASIS OF DESIGN
PROJECT DESCRIPTION
ELECTRICAL BASIS OF DESIGN
PROJECT DESCRIPTION

File details come from the government source that posted it. Updated .