The document is a Basis of Design (BOD) for roof repairs at Building 1445 on Marine Corps Base Camp Lejeune in North Carolina. The project involves demolishing the existing built-up roofing system and replacing it with a new modified bitumen roofing system approved by MCB Camp Lejeune. The scope includes replacing roof penetrations, equipment curbs, roof drains, emergency overflow scuppers, building expansion joints, and sheet metal copings. The building is classified as Type IIB non-combustible construction with Business (B) and Storage (S-1) occupancy classifications.
The design incorporates R-30 continuous insulation above the roof deck and follows multiple UFC (Unified Facilities Criteria) and building code standards, including IBC2018 and NFPA101. Structural design parameters include a Risk Category II, roof live load of 20PSF, ground snow load of 10psf, ultimate wind speed of 144mph, and seismic design category B. The mechanical and electrical scopes are limited to removing and reinstalling existing rooftop equipment to facilitate the new roofing system installation, with the intent of restoring all systems to full functionality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01 30 00.pdf | ||
| 07 52 00.pdf | ||
| Amend 0003 259005.pdf | ||
| Submittal Register.pdf | ||
| Amend 0002 240044.pdf | ||
| Amend 0001 24-0044.pdf | ||
| N4008524B0044 Dwgs.pdf | ||
| RFP pdf.pdf | ||
| N4008524B0044 Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1445 ROOF REPAIRS
aboard
MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA
A/E Contract: N40085-22-D-0002
Task Order No: N40085-25-F-2550
MCBCL Project No: 24-0044
MBFA No: 2428
Basis of Design Final Design Submittal
May 23, 2025
This page is intentionally left blank.
TABLE OF CONTENTS
ARCHITECTURAL BASIS OF DESIGN Page 3
STRUCTURAL BASIS OF DESIGN Page 5
MECHANICAL BASIS OF DESIGN Page 6
ELECTRICAL BASIS OF DESIGN Page 7
ARCHITECTURAL BASIS OF DESIGN
REFERENCE DOCUMENTS
Architectural work will comply with the latest edition of the following codes and standards:
International Building Code (IBC)
NFPA101 Life Safety Code (NFPA)
UFC 1-200-01 General Building Requirements
UFC 1-300-09N Design Procedures
UFC 3-101-01 Architecture
UFC 3-110-03 Roofing
UFC 3-120-10 Interior Design
UFC 3-190-06 Protective Coatings and Paints
UFC 3-450-01 Noise and Vibration Control
UFC 3-600-01 Fire Protection Engineering for Facilities
UFC 4-010-01 DOD Minimum Antiterrorism Standards for Buildings
Architectural Barriers Act Standards (ABA)
SCOPE OF WORK
Demolition of the existing built-up roofing system and insulation at Building 1445. All roof areas are included in the scope of work. The design intent is to replace the existing roofing system with a new
MCB CL approved modified bitumen roofing system. Penetrations, rooftop equipment curbs, roof drains, emergency overflow scuppers and building expansion joints are included in the scope. Existing sheet metal copings will be replaced with new.
TYPE OF CONSTRUCTION
Type IIB non-combustible construction
OCCUPANCY CLASSIFICATIONS
Business (B) and Storage (S-1)
LIFE SAFETY CODE ANALYSIS
Life safety work is limited to fall protection at the roof hatch.
ACCESSIBILITY
Not applicable.
ARCHITECTURAL COMPATIBILITY
Limited. The modified bitumen roofing system will comply with the MCB Camp Lejeune (BEAP) Base
Exterior Architectural Plan, 2010. New sheet metal coping material and color will comply with the MCB
Camp Lejeune (BEAP) Base Exterior Architectural Plan, 2010.
EXTERIOR WALL SYSTEM
Not applicable.
ROOFING
Replacement of existing low built-up roofing system with a MCB CL approved modified bitumen roofing system. Existing structural slope.
Roof drainage is collected via roof drains and conveyed to underground storm water piping. Existing emergency overflow scupper locations will remain and receive new sheet metal sleeves and flashing.
THERMAL INSULATION
The roof assembly provides R-30 continuous insulation above the roof deck.
DOOR AND WINDOW FENESTRATION
Not applicable.
INTERIOR PARTITION SYSTEM
Not applicable.
CEILING SYSTEMS
Not applicable.
FLOOR SYSTEMS
Not applicable.
NOISE AND ACOUSTIC CONTROL
Not applicable.
SECURITY REQUIREMENTS
Not applicable.
SPECIAL DESIGN FEATURES
Not applicable.
HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS
High Performance and Sustainable Building (HPSB) Requirements will be in accordance with UFC 1-200-
02, High Performance and Sustainable Buildings Requirements and limited to roofing system replacement.
ANTITERRORISM (AT) MITIGATION
Not applicable.
STRUCTURAL BASIS OF DESIGN
REFERENCE DOCUMENTS
Note: The active governing codes are as prescribed in UFC 3-301-01 effective on the date of this BOD.
UFC 1-200-01, Change 1, 1 Oct 2020 "General Building Requirements"
UFC 3-301-01, Change 1, 4 February 2022 "Structural Engineering"
UFC 4-010-01, Change 1, 19 August 2020 “Minimum Anti-Terrorism Standards for Buildings”
IBC2018, "International Building Code"
ACI 318-14, “Building Code Requirements for Structural Concrete”
ASCE 7-16, "Minimum Design Loads for Buildings and Other Structures"
AWS D1.1-04, “Structural Welding Code”
ACI360R-10, “Guide to Design of Slabs-on-Ground”
AISC 360-16, “Specification for Structural Steel Buildings”
SDI-07, “Code of Standard Practice for Composite Deck, Form Deck, and Roof Deck Construction”
AWS D1.1-20, “Structural Welding Code”
DESIGN LOAD CRITERIA
Risk Category II
LIVE LOADS
Roof = 20PSF
SNOW LOAD
Importance Factor, Is = 1.0
Ground snow load, Pg = 10psf
Snow Exposure Factor, CE = 1.0
Thermal Factor, Ct = 1.0
WIND DESIGN DATA
Exposure Category = B
Ultimate Wind Speed = 144mph
SEISMIC DESIGN DATA
Seismic Importance Factor, Ie = 1.0
Mapped Spectral Response Accelerations:
Ss = .115g
S1 = .055g
Sds = .123g
Sd1 = .088g
Site Class = D
Seismic Design Category = B
RAIN DESIGN DATA
100-year, 1-hour rainfall = 4.25”
STRUCTURAL MODIFICATIONS
Structural modifications are not in the scope of work.
MECHANICAL BASIS OF DESIGN
PROJECT DESCRIPTION
This roof repairs project requires a very limited mechanical scope and is limited to removal and reinstallation of existing rooftop mechanical equipment to facilitate installation of the new roofing system. The intent is for existing systems to be restored to complete functionality.
ELECTRICAL BASIS OF DESIGN
PROJECT DESCRIPTION
This roof repairs project requires a very limited electrical scope and is primarily disconnection and reconnection of existing rooftop mechanical equipment to be removed and reinstalled.
| BASIS OF DESIGN |
| COVER |
| TABLE OF CONTENTS |
| ARCHITECTURAL BASIS OF DESIGN |
| REFERENCE DOCUMENTS |
| SCOPE OF WORK |
| TYPE OF CONSTRUCTION |
| OCCUPANCY CLASSIFICATIONS |
| LIFE SAFETY CODE ANALYSIS |
| EXTERIOR WALL SYSTEM |
| ROOFING |
| THERMAL INSULATION |
| DOOR AND WINDOW FENESTRATION |
| INTERIOR PARTITION SYSTEM |
| CEILING SYSTEMS |
| FLOOR SYSTEMS |
| NOISE AND ACOUSTIC CONTROL |
| SECURITY REQUIREMENTS |
| SPECIAL DESIGN FEATURES |
| HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS |
| ANTITERRORISM (AT) MITIGATION |
| STRUCTURAL BASIS OF DESIGN |
| REFERENCE DOCUMENTS |
| DESIGN LOAD CRITERIA |
| LIVE LOADS |
| SNOW LOAD |
| WIND DESIGN DATA |
| SEISMIC DESIGN DATA |
| RAIN DESIGN DATA |
| STRUCTURAL MODIFICATIONS |
| MECHANICAL BASIS OF DESIGN |
| PROJECT DESCRIPTION |
| ELECTRICAL BASIS OF DESIGN |
| PROJECT DESCRIPTION |
File details come from the government source that posted it. Updated .