This document is a request for proposal (RFP) issued by the Juvenile Court Services System (JCSS) for the upgrade of its data center core chassis switch. JCSS is seeking qualified vendors to provide a replacement solution that includes a minimum of 20 10GbE copper ports, 120 1GbE copper PoE+ ports, and 24 SFP+ fiber ports, with redundant power supplies capable of providing PoE+ to all 1GbE copper ports. The selected vendor will be responsible for removing the existing switch, reconfiguring the rack, and patching the copper ports into the new switch using color-coded 1-foot jumpers. The proposed solution should include a 5-year support contract with 8x5 TAC support, NBD switch and module replacement, and software/firmware updates.

The RFP provides preferred model specifications for the switch and modules, but equivalent models will be considered. Proposals should be submitted by the stated due date. Pricing terms, set-asides, incumbents, funding sources, and other details are not explicitly provided in the document.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24-68 JCSS Data Center Core Upgrade –

REQUIREMENTS

JCSS seeks responsible and responsive vendors to provide a proposal to install and configure a replacement solution for our data center core chassis switch and to realign, test, and label all patch panels in the data center. The vendor will be responsible for removing the existing switch and reconfiguring the rack to accommodate the new solution. The replacement solution should be a switch stack that can provide a minimum of 20 10GbE copper ports, 120 1 GbE copper PoE+ ports, and 24 SFP+ fiber ports. All switches should include redundant power supplies capable of providing PoE+ to all 1GbEcopper ports. Any ports that require transceivers for connectivity should include the transceivers.

Each switch in the stack will be installed with a copper patch panel above and below it and copper ports will be patched into the switches by the vendor with 1 foot copper jumpers provided by the vendor.

Jumpers will be color coded according to the function the port serves.

All network equipment should include a 5-year contract including a minimum of 8x5 TAC support, NBD switch and module replacement, and software and firmware updates.

All network equipment will be configured to match existing configurations.

Please quote the following preferred models of switches and modules OR EQUAL:

JL661A Aruba 6300M 48G CL4 PoE 4SFP56 Switch

JL658A Aruba 6300M 24SFP+ 4SFP56 Switch

JL085A Aruba X371 12VDC 250W AC Power Supply

JL563B Aruba 10GBASE-T SFP+ RJ45 30m Cat6A Transceiver

J9150D Aruba 10G SFP+ LC SR 300m MMF Transceiver

R0M46A Aruba 50G SFP56 to SFP56 0.65m DAC Cable

R0M47A Aruba 50G SFP56 to SFP56 3m DAC Cable

Proposals for equivalent models will be considered.