This document is Addendum #1 for RFQ 24-2540, issued by the Muskegon County Board of Public Works in Michigan for the Pump Station J Overflow Wet Well Rehabilitation project. The addendum, dated April 1, 2024, provides updated bid specifications and clarifications for the project, with quotes due no later than 2:00 p.m. on Wednesday, April 10, 2024. Key modifications include requirements for protecting bypass pump piping during wet well interior coating, an allowance for potentially removing concrete fillets if groundwater leakage is detected, and revised bid review criteria that will evaluate contractors based on cost, coating material performance, project timeline, work quality, contractor qualifications, vendor references, and responsiveness to specifications.

The addendum specifies technical details for the epoxy coating, requiring a total coating thickness of not less than 120 mils and mandating a minimum of six destructive pull tests to verify coating adhesion. All vendors and coating manufacturers are encouraged to submit bids, which will be reviewed using the updated criteria in Section XVI of the bid specifications. The project is part of the Muskegon County Wastewater Management System's improvements for Pump Stations D, E, and J, with the work focused on rehabilitating the overflow wet well at Pump Station J. The addendum includes detailed site plans, sectional views, and engineering drawings to provide bidders with comprehensive project information.

View the file

Other files

File Type Posted
24-2540 Pump Station J Overflow Wet Well Rehabilitation.pdf PDF
24-2540 Pump Station J Overflow Wet Well Rehab Bid Sheet.xlsx XLSX spreadsheet
Q&A Document 1.pdf PDF
W9 BLANK.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Monday, April 1, 2024

ADDENDUM #1

Pump Station J Overflow Wet Well Rehabilitation

REQUEST FOR QUOTE

RFQ 24-2540

Please indicate this addendum on the Addenda Summary of the bid package; failure to acknowledge all addenda may be cause for rejection of the quote.

Quotes are due in no later than 2:00 p.m., Wednesday, April 10, 2024, to the Procurement Office. Submittal Instructions are located in the Quote Conditions/Instructions for Responders in the RFQ.

The time of receipt shall be determined by the time clock stamp in the electronic Bidnet system.

Respondents are responsible for ensuring that their quote response is submitted by the deadline indicated.

No late quote responses will be accepted.

Sincerely, Angela Gasiewski

Angela Gasiewski, CPA Finance Director

BOARD OF

PUBLIC WORKS

Darrell Paige

Chair, District 7

Kim Cyr Vice Chair, District 1

Brenda M. Moore Water Resources

Commissioner Secretary

Michelle Hazekamp

District 3

Marcia Hovey-Wright District 4

Charles Nash

District 5

Jessica Cook District 6

Jennifer Hodges

Ex-Officio Member

Scott Huebler Ex-Officio Member

ADDENDUM No. 1

Add following under Bid Specifications Section XII.1 “Project Information”:

Contractor shall protect the bypass pump piping both above grade and below grade while coating the interior of the overflow wet well.

Add following under Bid Specifications Section XII:

Allowance for Fillet Removing o If during grout sealing it is found that the ground water is leaking into the wet well from behind the concrete fillets, the contractor shall remove the fillets. If leaks are found behind the fillets, contractor shall notify the Engineer and receive approval from the Engineer prior to beginning work.

o Payment shall include all material, equipment and labor to perform the work.

Remove and replace the bid review criteria from Bid Specifications Section XVI with the following:

Cost / Value vs. available budget

Wet well coating material meeting Performance Testing Requirements found in Section 09 96 56

Ability to perform with in the timeframe specified

Quality of work performed on past projects

Qualifications of the Contractor

Vendor References

Vendor Response to Specifications

Clarification:

Per Section 3.03 “Application” in 09 96 56 Epoxy Coatings, the total coating thickness shall be not less than 120 mils.

Per Section 3.06 “Inspection and Testing” in 09 96 56 Epoxy Coatings, the adhesion of the coating will be tested a minimum of six (6) destructive pull tests.

All vendors and coating manufacturers are encouraged to submit a bid. Bids will be reviewed using the criteria listed in Bid Specifications Section XVI per this addendum.

Records plans are attached to this addendum.

aflood Length Measurement

16.00 ft aflood Length Measurement

26.00 ft noyesdo Cloud

ADDENDUM #1
ANSWERS
MAPS AND PROJECT NOTES

File details come from the government source that posted it. Updated .