24-2540 Pump Station J Overflow Wet Well Rehap Addendum #1.pdf
PDF 2 MB Posted
- Attached to
- Pump Station J Overflow Wet Well Rehabilitation
- Solicitation number
- 24-2540
- Issued by
- Muskegon County, Michigan
About this file
This document is Addendum #1 for RFQ 24-2540, issued by the Muskegon County Board of Public Works in Michigan for the Pump Station J Overflow Wet Well Rehabilitation project. The addendum, dated April 1, 2024, provides updated bid specifications and clarifications for the project, with quotes due no later than 2:00 p.m. on Wednesday, April 10, 2024. Key modifications include requirements for protecting bypass pump piping during wet well interior coating, an allowance for potentially removing concrete fillets if groundwater leakage is detected, and revised bid review criteria that will evaluate contractors based on cost, coating material performance, project timeline, work quality, contractor qualifications, vendor references, and responsiveness to specifications.
The addendum specifies technical details for the epoxy coating, requiring a total coating thickness of not less than 120 mils and mandating a minimum of six destructive pull tests to verify coating adhesion. All vendors and coating manufacturers are encouraged to submit bids, which will be reviewed using the updated criteria in Section XVI of the bid specifications. The project is part of the Muskegon County Wastewater Management System's improvements for Pump Stations D, E, and J, with the work focused on rehabilitating the overflow wet well at Pump Station J. The addendum includes detailed site plans, sectional views, and engineering drawings to provide bidders with comprehensive project information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-2540 Pump Station J Overflow Wet Well Rehabilitation.pdf | ||
| 24-2540 Pump Station J Overflow Wet Well Rehab Bid Sheet.xlsx | XLSX spreadsheet | |
| Q&A Document 1.pdf | ||
| W9 BLANK.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Monday, April 1, 2024
ADDENDUM #1
Pump Station J Overflow Wet Well Rehabilitation
REQUEST FOR QUOTE
RFQ 24-2540
Please indicate this addendum on the Addenda Summary of the bid package; failure to acknowledge all addenda may be cause for rejection of the quote.
Quotes are due in no later than 2:00 p.m., Wednesday, April 10, 2024, to the Procurement Office. Submittal Instructions are located in the Quote Conditions/Instructions for Responders in the RFQ.
The time of receipt shall be determined by the time clock stamp in the electronic Bidnet system.
Respondents are responsible for ensuring that their quote response is submitted by the deadline indicated.
No late quote responses will be accepted.
Sincerely, Angela Gasiewski
Angela Gasiewski, CPA Finance Director
BOARD OF
PUBLIC WORKS
Darrell Paige
Chair, District 7
Kim Cyr Vice Chair, District 1
Brenda M. Moore Water Resources
Commissioner Secretary
Michelle Hazekamp
District 3
Marcia Hovey-Wright District 4
Charles Nash
District 5
Jessica Cook District 6
Jennifer Hodges
Ex-Officio Member
Scott Huebler Ex-Officio Member
ADDENDUM No. 1
Add following under Bid Specifications Section XII.1 “Project Information”:
Contractor shall protect the bypass pump piping both above grade and below grade while coating the interior of the overflow wet well.
Add following under Bid Specifications Section XII:
Allowance for Fillet Removing o If during grout sealing it is found that the ground water is leaking into the wet well from behind the concrete fillets, the contractor shall remove the fillets. If leaks are found behind the fillets, contractor shall notify the Engineer and receive approval from the Engineer prior to beginning work.
o Payment shall include all material, equipment and labor to perform the work.
Remove and replace the bid review criteria from Bid Specifications Section XVI with the following:
Cost / Value vs. available budget
Wet well coating material meeting Performance Testing Requirements found in Section 09 96 56
Ability to perform with in the timeframe specified
Quality of work performed on past projects
Qualifications of the Contractor
Vendor References
Vendor Response to Specifications
Clarification:
Per Section 3.03 “Application” in 09 96 56 Epoxy Coatings, the total coating thickness shall be not less than 120 mils.
Per Section 3.06 “Inspection and Testing” in 09 96 56 Epoxy Coatings, the adhesion of the coating will be tested a minimum of six (6) destructive pull tests.
All vendors and coating manufacturers are encouraged to submit a bid. Bids will be reviewed using the criteria listed in Bid Specifications Section XVI per this addendum.
Records plans are attached to this addendum.
aflood Length Measurement
16.00 ft aflood Length Measurement
26.00 ft noyesdo Cloud
| ADDENDUM #1 |
| ANSWERS |
| MAPS AND PROJECT NOTES |