This Information Letter No. 3 is issued by the California Department of Water Resources (DWR) for the Full Pipe Penetration Replacement Deferred Maintenance Program at Davis Sites 545 and 549, Contract No. C51674, Specification No. 24-13 in Yolo County. The letter provides clarification responses to two contractor questions regarding buried utilities and material testing methods. The first clarification identifies the southernmost buried utilities on sheet C-101 and C-201 as an 8" diameter gas line from CPN Pipeline Co., and the northern buried utility as an ATT utility cable, with specific instructions for contractor compliance regarding excavation near these utilities.

The second clarification addresses material testing methods, confirming that ASTM D1557 should be used for establishing compaction curves as specified in Section 02305 – Earthwork Testing, paragraph 3.01.B.1. The letter references Addendum No. 2 which updates Section 02300 - Earthwork, paragraphs 3.03D and 3.03E accordingly. The letter is dated January 29, 2025 and directs additional questions to be sent to doe_specs@water.ca.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor

DEPARTMENT OF WATER RESOURCES

P.O. BOX 942836

SACRAMENTO, CA 94236-0001

TO ALL HOLDERS OF

BIDDING DOCUMENTS ON

FULL PIPE PENETRATION REPLACEMENT

DEFERRED MAINTENANCE PROGRAM

DAVIS – SITES 545 AND 549

STATE PLAN OF FLOOD CONTROL FACILITIES

DIVISION OF FLOOD MANAGEMENT

YOLO COUNTY

CALIFORNIA

SPECIFICATION NO. 24-13

CONTRACT NO. C51674

INFORMATION LETTER NO. 3

The following questions have been received for clarification. The Department of Water Resources (DWR) answers are given immediately following the questions.

Question No. 1 Please clarify what are the buried utilities on sheet C201.

Answer: The southernmost buried existing utilities on sheet C-101 and sheet

C-201 are 8” diameter gas line (CPN Pipeline Co.). Please refer to Addendum No.2 for updated Document 00300 – Information Available, Item 5)a and 5)b. The northern buried existing utility shown on sheet C-101 and sheet C-201 is identified as ATT utility cable. The contractor shall comply with the requirement in Document 00701, paragraph 14.C and Section 01530 – Protection of Existing Facilities prior to any excavation. Refer to Section 02300

– Excavation , paragraph 3.02.N for excavation near existing utilities.

Docusign Envelope ID: 05F6BC3C-D1C8-42A4-AA7C-9C9682C86661

1/29/2025

Specification No. 24-13 Information Letter No. 3

Question No. 2 Section 02300, 3.03D and E – Calls out compaction requirements, citing 95 or 97% of ASTM D698 for the compaction curve. Section 02305, 1.05 E and 3.01.B.1.a cites ASTM D1557 as the compaction curve method to use. Please confirm which ASTM method will be utilized to establish the compaction curve.

Answer: Material testing methods shall be established per ASTM D1557 see

Section 02305 – Earthwork Testing, paragraph 3.01.B.1. Please refer to Addendum No. 2 for updated Section 02300 - Earthwork, paragraph 3.03D and 3.03E.

Please send any additional questions to doe_specs@water.ca.gov.

Sincerely, Lakshika Logantha, Senior Engineer Public Works Contracting Branch Division of Engineering Department of Water Resources

Docusign Envelope ID: 05F6BC3C-D1C8-42A4-AA7C-9C9682C86661

1/29/2025 mailto:doe_specs@water.ca.gov

2025-01-29T17:05:20-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .