This document is a Statement of Work (SOW) for mechanical repairs at Building 54, issued by the Department of the Navy Naval Facilities Engineering Command. The scope of work requires a contractor to replace HVAC Units 1, 3, 4, 5, 7, and 8, with specific instructions to reuse existing hot water coils where possible or replace them with matching new coils. Additional requirements include adjusting ductwork to accommodate new air handlers, replacing refrigerant line sets, and transporting recyclable materials to the TMP Lot for recycling.

The SOW emphasizes that contractors must field verify all quantities, measurements, and dimensions before submitting a quote, with provided data serving as reference only. Special scheduling conditions mandate contacting building occupants to schedule work. The solicitation is limited to Mechanical MACC Contractors listed on the General Requirements cover page, specifically for the ROICC Camp Lejeune area of responsibility. No hazardous materials or environmental concerns were noted in the document.

View the file

Other files

File Type Posted
Amend 0002.pdf PDF
Amend 0001.pdf PDF
RFP 240004.pdf PDF
N4008524B0004 Specs.pdf PDF
N4008524B0004 Dwgs.pdf PDF
24-0004 ACM Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE

MECHANICAL REPAIRS, BUILDING 54

ATTACHMENTS:

SCOPE OF WORK:

The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following:

GENERAL DESCRIPTION:

Scope: Replace HVAC Units 1, 3, 4, 5, 7, and 8. Reuse existing hot water coils, in existing air handlers, if possible. If existing hot water coils cannot be reused, replace with new hot water coils that will match up with new air handlers. Adjust ductwork to accommodate connection to new air handlers and hot water coils. Replace refrigerant line sets.

DETAILED REQUIREMENTS AND SPECIFICATIONS:

1. General Note

a. The contractor shall field verify all quantities, measurements, dimensions, and type of material for submission of quote. Data provided in this scope is for reference only, however the specified material shall be used when it meets the applicable requirements.

SPECIAL SCHEDULING AND ACCESS:

Contact building occupants to schedule all work.

SPECIAL CONDITIONS:

Contactor shall transport all recyclable material from job to the TMP Lot for recycling, HAZARDOUS MATERIALS:

None

ENVIRONMENTAL:

None