23094-Cover Sheet(Halfsize).pdf
PDF 658 KB Posted
- Solicitation number
- IFB-122765
- Issued by
- Augusta County, Virginia
About this file
This is a cover sheet for a bid package submitted by Delta Consultants, Inc. on behalf of the Shenandoah Valley Regional Airport Commission in Weyers Cave, Virginia, for the Aviation Tech Park Phase II development. The project encompasses a 100-foot expansion of the commercial apron, construction of a service road, installation of new airfield security fencing, and stormwater basin modifications. The bid package, identified as Bid Package 1 for May 2026, is structured across 58 sheets of construction documents including geometric layouts, grading and drainage plans, erosion and sediment control specifications, paving details, electrical systems, and comprehensive cross-sections and profiles. The project is located in Augusta County on Tax Map 28, Parcel No. 028-79A, with the Shenandoah Valley Regional Airport Commission listed as the owner at P.O. Box 125, Weyers Cave, Virginia 24486, phone (504) 234-8304. The document indicates the submission was initially reviewed on March 26, 2026, and is designated as "As-Bid for Bidding Purposes" with conformed documents to be issued separately for construction.
The cover sheet establishes that no water or sanitary sewer utility extensions are proposed with this project, though standard Augusta County inspection and compliance requirements apply to all work. The project requires contractors to comply with Augusta Water Authority standards, OSHA safety protocols, and Virginia's Underground Utility Damage Prevention Act, including notification to Miss Utility before commencing excavation. All materials and construction must conform to current design and construction standards, with specific requirements for utility placement, compaction certification, and maintenance of existing services throughout construction. Professional engineers Noah C. Schuster (License No. 066624) and Douglas E. Sander (License No. 034088) are listed as project certifiers, with the AIG Design No. 3-51-0049-053-2025 and Delta Project No. 23094 assigned for tracking purposes. The document explicitly states it is for bidding purposes only and should not be used for construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHENANDOAH VALLEY REGIONAL
FOR THE
MAY 2026
SHENANDOAH VALLEY REGIONAL AIRPORT
WEYERS CAVE, VIRGINIA
AIRPORT COMMISSION
AVIATION TECH PARK - PHASE II -
BID PACKAGE 1
VICINITY MAP
VALLEY
SHENANDOAH
CHARLOTTESVILLE
REGIONAL
o29SKYLIN E
64p
STAUNTON
WEYERS
CAVE
WAYNESBORO
HARRISONBURG
81p
DR
IV
E
11o
AIRPORT
SCALE MILES
13 0 13 26
1"=13 MILES (APPROX.)
33o
33o p64
64p
29o
250o
PROJECT INFORMATION
ZONING:
MAGISTERIAL DISTRICT: MIDDLE RIVER
COUNTY & STATE: AUGUSTA, VIRGINIA
AB
OWNER:
AIRPORT COMMISSION
ADDRESS:
PHONE NO:
WEYERS CAVE, VIRGINIA 24486
SHENANDOAH VALLEY REGIONAL
P.O. BOX 125
(504) 234-8304
PARCEL NO: 028 79A
TAX MAP: 28
AUGUSTA COUNTY PROJECT NO.
AUGUSTA COUNTY PLAN APPROVAL DATE:
COUNTY APPROVAL
SIGNATURE
NAME (PRINTED)
DATE
TITLE
COUNTY SUBMISSION RECORD
SUBMISSION NO. DATE
COUNTY REVIEW SET #1 - INITIAL SUBMISSION 3/26/2026
AUGUSTA WATER NOTES:
1. THERE IS NOT A PROPOSED EXTENSION OF WATER OR SANITARY SEWER
UTILITIES WITH THIS PROJECT.
ACSA STANDARD NOTES AND REQUIREMENTS:
i. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORITY INSPECTORS. THE CONTRACTOR SHALL NOTIFY THE ENGINEERING
DEPARTMENT AT 540-245-5670 AT LEAST 48 HOURS PRIOR TO THE START OF ANY WATER AND SEWER UTILITY WORK. FAILURE TO COMPLY OR PROPERLY NOTIFY MAY RESULT IN ADDITIONAL WORK BY THE CONTRACTOR IN ORDER TO PERMIT THE NECESSARY
INSPECTION AND /OR DISCONNECTION FROM THE SYSTEM.
ALL MAINLINE TAPS, VALVE OPERATION, OPENING OF HYDRANTS, MANHOLE CORING, ETC. SHALL BE DONE BY AUTHORITY
PERSONNEL OR WITH THE AUTHORITY INSPECTORS PRESENT.
ii. THE CONTRACTOR SHALL BE FAMILIAR WITH AUTHORITY OPPM POLICY 10.6 PLAN REVIEW AND PROJECT CCEPTANCES FOR WATER AND SEWER SERVICES. THIS POLICY CONTAINS SPECIFIC REQUIREMENTS THAT MUST BE MET BEFORE THE AUTHORITY WILL
PROVIDE WATER AND/OR SANITARY SEWER SERVICE.
iii. FOR DEDICATED FACILITIES SUCH AS TANKS, PUMP STATIONS, BOOSTER STATIONS, ETC., THE AUTHORITY WILL REQUIRE THE
FOLLOWING (DESIGN/CONSTRUCTION):
- THAT ALL SAFETY DEVICES, EQUIPMENT, AND ANY SPECIALIZED PERSONAL PROTECTIVE EQUIPMENT NEEDED FOR THE
FACILITY ARE INCLUDED/PROVIDED WITH THE PROJECT DESIGN AND CONSTRUCTION.
- EVALUATION OF ALL PROPOSED DEVICES, EQUIPMENT, AND SPECIALIZED PERSONAL PROTECTIVE EQUIPMENT AGAINST THE APPROVED PRODUCTS LIST AND/OR POLICY REQUIREMENTS. CLIMBING SAFETY SYSTEMS MUST BE CERTIFIED BY A QUALIFIED
ENGINEER AT THE EXPENSE OF THE CONTRACTOR/OWNER/DEVELOPER.
- THE REQUIREMENTS UNDER SECTION 01110 - GENERAL REQUIREMENTS PERTAINING TO SUBMITTALS SHALL APPLY TO ALL
SAFETY EQUIPMENT.
THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE FACILITIES FOR SAFE ACCESS TO THE WORK BY AUTHORITY EMPLOYEES, AS
NEEDED.
iv. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR ALL JOB SITE SAFETY AND ASSURANCE THAT ALL REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), DEPARTMENT OF LABOR AND INDUSTRY (DOLI), AND THE CURRENT BUILDING CODE ARE MAINTAINED. HOWEVER, IN THE EVENT THAT AN AUTHORITY ENGINEERING TECHNICIAN OBSERVES CONDITIONS THAT COULD ENDANGER LIFE/LIMB OF ANY PERSON ON THE JOB, THE TECHNICIAN WILL IMMEDIATELY NOTIFY THE JOB SITE SUPERINTENDENT/FOREMAN AND THE AUTHORITY ENGINEERING AND ADMINISTRATION OFFICES. IF A JOBSITE SAFETY ISSUE IS CONFIRMED BY THE SUPERINTENDENT/FOREMAN/AUTHORITY AND THE SITUATION CONTINUES THE AUTHORITY MAY
CONTACT OSHA.
ON-SITE AUTHORITY STAFF WILL REQUIRE A PRECONSTRUCTION SAFETY PLAN BE SUBMITTED FOR REVIEW AT LEAST 48 HOURS PRIOR TO ANY WORK INVOLVING AUTHORITY OWNED FACILITIES REQUIRING CONFINED SPACE ENTRY AND/OR WORKING AT HEIGHTS IN EXCESS OF 6 FEET FOR NEW CONSTRUCTION AND AT HEIGHTS IN EXCESS OF 4 FEET FOR MAINTENANCE OF EXISTING FACILITIES. THE PLAN MUST BE PREPARED BY A COMPETENT PERSON, AS DEFINED BY OSHA/DOLI, AND THE EMPLOYEES PERFORMING THE WORK MUST HAVE PROPER TRAINING. ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE A PLAN PREPARED BY AN ENGINEER OR COMPETENT PERSON (IN ACCORDANCE WITH OSHA REQUIREMENTS) FOR ANY TRENCHING ACTIVITIES REQUIRING ENGINEERED SHORING, OR WHERE OTHER HAZARDS SUCH AS TRENCHING WITH WATER ACCUMULATION OR
TRENCHING WHERE ADJOINING BUILDING/STRUCTURES ARE ENDANGERED BY THE EXCAVATION.
v. ALL EXISTING UTILITIES ADJACENT TO THE PROPOSED WORK MAY NOT BE AS SHOWN ON THE PLANS AND WHERE SHOWN, ARE ONLY APPROXIMATELY LOCATED. THE CONTRACTOR SHALL CONTACT MISS UTILITY AT 811 OR 800-522-7001 TO HAVE UNDERGROUND UTILITIES MARKED IN ACCORDANCE WITH VIRGINIA'S UNDERGROUND UTILITY DAMAGE PREVENTION ACT.
vi. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE MOST CURRENT VERSION OF THESE DESIGN AND CONSTRUCTION
STANDARDS.
vii. ALL WATER AND SEWER PIPES SHALL HAVE A MINIMUM OF 3.5 FEET OF COVER MEASURED FROM THE TOP OF PIPE UNLESS
OTHERWISE APPROVED. THIS INCLUDES ALL FIRE HYDRANT LINES AND SERVICE LATERALS.
viii. A MINIMUM VERTICAL SEPARATION OF 3.5 FEET IS REQUIRED BETWEEN WATER LINE AND STORM SEWER CULVERTS. WHEN THE 3.5 FOOT MINIMUM SEPARATION CANNOT BE ACHIEVED AND WHERE FREEZING IS A POSSIBILITY THE WATER LINE SHALL BE ENCASED IN CONCRETE AND INSULATED AS APPROVED BY THE AUTHORITY. CONCRETE ENCASEMENT AND INSULATION SHALL EXTEND A MINIMUM OF 5 FEET BEYOND THE CENTERLINE OF THE CULVERT IN BOTH DIRECTIONS OR 5 FEET BEYOND ENDS OF CULVERT
WHEN PARALLEL.
ix. CONTRACTOR SHALL PROVIDE CERTIFICATION THAT PROPER COMPACTION HAS BEEN OBTAINED FOR ALL FILL MATERIAL UNDER WATER AND SEWER LINES AND APPURTENANCES IN ACCORDANCE WITH THE CONSTRUCTION STANDARDS. ADDITIONAL COMPACTION CERTIFICATION MAY BE REQUIRED FOR ALL BACKFILL MATERIAL PLACED OVER WATERLINES AND SEWER LINES AND APPURTENANCES AS DEEMED NECESSARY BY THE AUTHORITY WHERE POOR SOIL CONDITIONS ARE IDENTIFIED. THIS CERTIFICATION SHALL BE SIGNED BY A PROFESSIONAL GEOLOGIST OR ENGINEER AND STATE THE EXACT AREA TO WHICH THE CERTIFICATION APPLIES. TESTING SHALL BE IN ACCORDANCE WITH THE DESIGN AND CONSTRUCTION STANDARDS. TESTING
SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
x. VALVES ON DEAD-END LINES SHALL BE RESTRAINED IN ACCORDANCE WITH APPLICABLE STANDARD DETAILS.
xi. WATER LINES SHALL NOT BE PLACED WITHIN 30 HORIZONTAL FEET OF EXISTING OR PROPOSED SANITARY DRAIN FIELDS AND SEPTIC TANKS. WATER OR SEWER LINES SHALL NOT BE PLACED WITHIN 30 HORIZONTAL FEET OF EXISTING OR PROPOSED
UNDERGROUND STORAGE TANKS.
xii. JOINT RESTRAINT SHALL BE PROVIDED FOR ALL BENDS, TEES, DEAD END LINES, AND STUBOUTS, IN ACCORDANCE WITH THE
APPLICABLE STANDARD DETAILS.
xiii. WHEN LOCATED IN VDOT RIGHTS-OF-WAY FIRE HYDRANTS AND ALL OTHER APPURTENANCES SHALL BE LOCATED BEHIND THE
DITCH LINE.
xiv. CONTRACTOR SHALL MAINTAIN WATER AND SEWER SERVICE TO ALL EXISTING CUSTOMERS THROUGHOUT CONSTRUCTION. THIS
MAY REQUIRE TEMPORARY LINES, CONNECTIONS, AND/OR PUMPING.
THE RESPONSIBLE LAND DISTURBER SHALL BE THE ENGINEER OF RECORD FOR THE
PURPOSES OF PLAN APPROVAL ONLY. THE CONTRACTOR SHALL DESIGNATE A QUALIFIED
RESPONSIBLE LAND DISTURBER UPON AWARD OF CONTRACT.
AIG NO. 3-51-0049-053-2025 (DESIGN)
DELTA PROJECT NO. 23094
AIG NO. 3-51-0049-(PENDING) (CONSTRUCTION)
AS-BID
FOR BIDDING PURPOSES
DO NOT USE FOR CONSTRUCTION
CONFORMED DOCUMENTS WILL BE
ISSUED SEPARATELY FOR CONSTRUCTION
MAY 2026
NO. REVISIONS BY APP. DATE
CONSULTANTS, INC.
XR
EF
S:
IM
AG
ES
SH
D lo go
.jp g;
D R
AW
IN
G : 2
C O
V-
BP
1.
dw g L
AY
O
U T:
L
DELTA AIRPORT
JOB NO.
SHEET
DATE:SCALE:
DESIGNED BY:
DRAWN BY:
OF
w w w . d e l t a a i r p o r t . c o m
2700 Polo Parkway Midlothian, Virginia 23113 phone: (804) 275-8301
AVIATION TECH PARK - PHASE II - BP 1
COVER SHEET
SHENANDOAH VALLEY REGIONAL AIRPORT
3-51-0049-053-2025 23094
ELS
NCS/LMH
MAY 2026
NONE
AIG NO.
P REE
R
AN
SS
EF
O
OI L E
NIGN
RG
O M M
C
IWN
Lic. No. 034088
DOUGLAS E. SANDER
O
T
E LA FOH
V
I A I N
P REE
R
AN
SS
EF
O
OI L E
NIGN
RG
O M M
C
IWN
Lic. No. 066624
NOAH C. SCHUSTER
O
T
E LA FOH
V
I A I N
SHEET INDEX
SHEET # TITLE
1 COVER SHEET
2 LAND USE ZONING MAP
3 GENERAL LAYOUT
4 PROJECT NOTES
5 PHASING LAYOUT - PHASE 1
6 PHASING LAYOUT - PHASE 2
7 PHASING LAYOUT - PHASE 2
8 PHASING NOTES
9 PHASING DETAILS
10 CONSTRUCTION NOTES
11 EXISTING CONDITIONS - OVERALL
12 DEMOLITION PLAN - ALTERNATE 1
13 DEMOLITION PLAN - ALTERNATE 2
14 DEMOLITION PLAN
15 DEMOLITION PLAN
16 GEOMETRIC LAYOUT
17 GEOMETRIC LAYOUT
18 GEOMETRIC LAYOUT
19 GRADING & DRAINAGE
20 GRADING & DRAINAGE
21 GRADING & DRAINAGE
22 EROSION & SEDIMENT CONTROL LAYOUT
23 EROSION & SEDIMENT CONTROL LAYOUT
24 EROSION & SEDIMENT CONTROL LAYOUT
25 EROSION & SEDIMENT CONTROL NOTES
26 EROSION & SEDIMENT CONTROL DETAILS
27 EROSION & SEDIMENT CONTROL DETAILS
28 EROSION & SEDIMENT CONTROL DETAILS
29 TYPICAL SECTIONS
30 PAVING DETAILS
31 PORTLAND CEMENT CONCRETE PAVEMENT JOINT LAYOUT
32 CCP JOINT & PAVEMENT NOTES & DETAILS
33 CCP JOINT & PAVEMENT DETAILS
34 DRAINAGE DETAILS
35 FENCE LAYOUT
36 FENCE LAYOUT
37 FENCE GATE & SIGN SCHEDULE
38 FENCE DETAILS
39 FENCE NOTES & DETAILS
40 MARKING LAYOUT - ALTERNATE 1
41 MARKING LAYOUT - ALTERNATE 2
42 MARKING LAYOUT
43 MARKING DETAILS
44 MARKING NOTES & DETAILS
45 ELECTRICAL LAYOUT
46 ELECTRICAL LAYOUT
47 ELECTRICAL NOTES
48 DUCT BANK & TRENCH DETAILS
49 LIGHT FIXTURE DETAILS
50 ELECTRICAL DETAILS
51 CENTERLINE PROFILES
52 CENTERLINE PROFILES
53 CENTERLINE PROFILES
54 DRAINAGE PROFILES
55 CROSS SECTIONS - SERVICE ROAD BASELINE
56 CROSS SECTIONS - SERVICE ROAD BASELINE
57 CROSS SECTIONS - AIR CARRIER APRON BASELINE
58 CROSS SECTIONS - AIR CARRIER APRON BASELINE
C:
\U se rs
\e st ev en s\
DC
\A
CC
Do cs
\D
AC
\2
\P ro je ct F ile s\
BP
1\
4C
OV
-B P1
.d w g, L
1, /1 1/
:3
6:
P M
, e st ev en s
| Sheets and Views |
| L1 |
| 2026-05-12T18:47:37-0400 | |
| Noah C Schuster |
| 2026-05-12T22:24:01-0400 | |
| Douglas E Sander |
File details come from the government source that posted it. Updated .