This document outlines seismic restraint requirements for a parking garage construction project for the Department of Veterans Affairs in Wilkes-Barre, Pennsylvania. The project requires providing seismic restraint in accordance with the specifications for non-structural building components to maintain integrity during a seismic event. Restraint must be designed according to the assigned Seismic Design Category and site class and in compliance with codes and regulations. Shop drawings require certification by a professional structural engineer and include load details, materials, and anchorage methods. Exceptions to seismic restraint requirements are provided for certain small and lightweight equipment, ducts, piping, and conduits.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
150002002 - VAMC Wilkes-Barre Parking Structure FINAL Geotechnical Report 11-30-15.pdf PDF
107300 Exterior Canopy System.pdf PDF
057200 Ornamental Fence and Gates.pdf PDF
024100 Demolition.docx DOCX document
087100 Door Hardware.pdf PDF
022113 Site Surveys.docx DOCX document
017419 Const Waste Mgmt.doc DOC document
015719 Temp Envir Cont.doc DOC document
013526 Safety Requirements.docx DOCX document
010000 General.docx DOCX document
S02 Q_A Parking Structure Solicit.pdf PDF
S02 36C24420R0075 Amend 2.pdf PDF
EXHIBIT E PastPerformanceQuestionnaire.docx DOCX document
334000 Storm Sewer Utilities.pdf PDF
316326 Drilled Caissons.pdf PDF
312319 Dewatering.pdf PDF
280526.pdf PDF
264313.pdf PDF
280500.pdf PDF
260533.pdf PDF
260519.pdf PDF
260511.pdf PDF
230711.pdf PDF
220800.pdf PDF
220512.pdf PDF
220511.pdf PDF
142400 Hydraulic Elevators.pdf PDF
101400 Signage.pdf PDF
089000 Louvers and Vents.pdf PDF
077200 Roof Accessories.pdf PDF
071110 Composite Sheet Waterproofing.pdf PDF
034133 Precast Structural Pretensioned Concrete.pdf PDF
033000 Cast-in-Place Concrete.pdf PDF
017200 Project Record Documents_Single Prime.pdf PDF
014529.docx DOCX document
014500 02.docx DOCX document
013216-13.docx DOCX document
010000.docx DOCX document
012500 Substitutions_Single Prime.pdf PDF
Pstruct Dwg 3.pdf PDF
Arch Dwg 1-5.pdf PDF
S02 Dwg S6-C1.pdf PDF
S02 Dwg S3-S5.pdf PDF
075323 EPDM Single-Ply Membrane Roofing.pdf PDF
321723 Pavement Markings.pdf PDF
321216 Asphalt Paving.pdf PDF
320523 Cement and Concrete for Exterior Improvements.pdf PDF
280513.pdf PDF
265100.pdf PDF
260526.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parking Garage Project Number 693-222

Department of Veterans Affairs

Wilkes-Barre, Pennsylvania

13 05 41 - 1

SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

PART 1 – GENERAL

1.1 DESCRIPTION:

A. Provide seismic restraint in accordance with the requirements of this section in order to maintain the integrity of nonstructural components of the building so that they remain safe and functional in case of seismic event.

B. The design to resist seismic load shall be based on Seismic Design Categories per section 4.0 of the VA Seismic Design Requirements (H-18-8) dated August 2013, http://www.cfm.va.gov/til/etc/seismic.pdf.

C. Definitions: Non-structural building components are components or systems that are not part of the building’s structural system whether inside or outside, above or below grade. Non-structural components of buildings include:

1. Architectural Elements: Facades that are not part of the structural system and its shear resistant elements; cornices and other architectural projections and parapets that do not function structurally; glazing; nonbearing partitions; suspended ceilings; stairs isolated from the basic structure; cabinets; bookshelves; medical equipment; and storage racks.

2. Electrical Elements: Power and lighting systems; substations; switchgear and switchboards;

auxiliary engine-generator sets; transfer switches; motor control centers; motor generators;

selector and controller panels; fire protection and alarm systems; special life support systems; and telephone and communication systems.

3. Mechanical Elements: Heating, ventilating, and air-conditioning systems; medical gas systems; plumbing systems; sprinkler systems; pneumatic systems; boiler equipment and components.

4. Transportation Elements: Mechanical, electrical and structural elements for transport systems, i.e., elevators and dumbwaiters, including hoisting equipment and counterweights.

1.2 RELATED WORK:

A. Division 03, CONCRETE

B. Division 14, HYDRAULIC ELEVATORS

B. Division 22, PLUMBING

C. Division 23, HEATING VENTILATION AND AIR CONDITION

D. Division 26, ELECTRICAL

13 05 41 - 2

1.3 QUALITY CONTROL:

A. Shop-Drawing Preparation: In accordance with Division 01, GENERAL REQUIREMENTS and as follows:

1. Have seismic-force-restraint shop drawings and calculations prepared by a professional structural engineer experienced in the area of seismic force restraints. The professional structural engineer shall be registered in the state where the project is located.

2. Submit design tables and information used for the design-force levels, stamped and signed by a professional structural engineer registered in the State where project is located.

B. Coordination:

1. Do not install seismic restraints until seismic restraint submittals are approved by the

Resident Engineer.

2. Coordinate and install trapezes or other multi-pipe hanger systems prior to pipe installation.

C. Seismic Certification:

In structures assigned to IBC Seismic Design Category C, D, E, or F, permanent equipments and components are to have Special Seismic Certification in accordance with requirements of section

13.2.2 of ASCE 7 except for equipment that are considered rugged as listed in section 2.2

OSHPD code application notice CAN No. 2-1708A.5, and shall comply with section 13.2.6 of

ASCE 7.

1.4 SUBMITTALS:

A. Submit a coordinated set of equipment anchorage drawings prior to installation including:

1. Description, layout, and location of items to be anchored or braced with anchorage or brace points noted and dimensioned.

2. Details of anchorage or bracing at large scale with all members, parts brackets shown, together with all connections, bolts, welds etc. clearly identified and specified.

3. Numerical value of design seismic brace loads.

4. For expansion bolts, include design load and capacity if different from those specified.

B. Submit prior to installation, a coordinated set of bracing drawings for seismic protection of piping, with data identifying the various support-to-structure connections and seismic bracing structural connections, include:

1. Single-line piping diagrams on a floor-by-floor basis. Show all suspended piping for a given floor on the same plain.

2. Type of pipe (Copper, steel, cast iron, insulated, non-insulated, etc.).

3. Pipe contents.

4. Structural framing.

13 05 41 - 3

5. Location of all gravity load pipe supports and spacing requirements.

6. Numerical value of gravity load reactions.

7. Location of all seismic bracing.

8. Numerical value of applied seismic brace loads.

9. Type of connection (Vertical support, vertical support with seismic brace etc.).

10. Seismic brace reaction type (tension or compression): Details illustrating all support and bracing components, methods of connections, and specific anchors to be used.

C. Submit prior to installation, bracing drawings for seismic protection of suspended ductwork and suspended electrical and communication cables, include:

1. Details illustrating all support and bracing components, methods of connection, and specific anchors to be used.

2. Numerical value of applied gravity and seismic loads and seismic loads acting on support and bracing components.

3. Maximum spacing of hangers and bracing.

4. Seal of registered structural engineer responsible for design.

D. Submit design calculations prepared and sealed by the registered structural engineer specified above in paragraph 1.3A.

E. Submit for concrete anchors, the appropriate ICBC evaluation reports, OSHPD pre-approvals, or lab test reports verifying compliance with OSHPD Interpretation of Regulations 28-6.

1.5 APPLICABLE PUBLICATIONS:

A. The Publications listed below, latest edition (including amendments, addenda revisions, supplements and errata) form a part of this specification to the extent referenced. The publications are referenced in text by basic designation only.

B. American Concrete Institute (ACI):

355.2-07 ..................................... Qualification for Post-Installed Mechanical Anchors in Concrete and Commentary

C. American Institute of Steel Construction (AISC):

Load and Resistance Factor Design, Volume 1, Second Edition

D. American Society for Testing and Materials (ASTM):

A36/A36M-08 ............................. Standard Specification for Carbon Structural Steel

A53/A53M-10 ............................. Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

A307-10 ...................................... Standard Specification for Carbon Steel Bolts and Studs; 60,000

PSI Tensile Strength.

13 05 41 - 4

A325-10 ...................................... Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

A325M-09 ................................... Standard Specification for High-Strength Bolts for Structural

Steel Joints [Metric]

A490-10 ...................................... Standard Specification for Heat-Treated Steel Structural Bolts, 150 ksi Minimum Tensile Strength

A490M-10 ................................... Standard Specification for High-Strength Steel Bolts, Classes

10.9 and 10.9.3, for Structural Steel Joints [Metric]

A500/A500M-10 ......................... Standard Specification for Cold-Formed Welded and Seamless

Carbon Steel Structural Tubing in Rounds and Shapes

A501-07 ...................................... Specification for Hot-Formed Welded and Seamless Carbon

Steel Structural Tubing

A615/A615M-09 ......................... Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement

A992/A992M-06 ......................... Standard Specification for Steel for Structural Shapes for Use in

Building Framing

A996/A996M-09 ......................... Standard Specification for Rail-Steel and Axel-Steel Deformed

Bars for Concrete Reinforcement

E488-96(R2003) ........................ Standard Test Method for Strength of Anchors in Concrete and

Masonry Element

E. American Society of Civil Engineers (ASCE 7) Latest Edition.

F. International Building Code (IBC) Latest Edition

G. VA Seismic Design Requirements, H-18-8, August 2013

H. National Uniform Seismic Installation Guidelines (NUSIG)

I. Sheet Metal and Air Conditioning Contractors National Association

(SMACNA): Seismic Restraint Manual - Guidelines for Mechanical Systems, 1998 Edition and

Addendum

1.6 REGULATORY REQUIREMENT:

A. It is the intent of this specification to keep all mechanical building system components and flexible piping in place during a seismic event, except as allowed to be omitted as listed below.

B. All such systems must be installed in strict accordance with assigned seismic design category, assigned building risk category and assigned site class as defined in the IBC and ASCE 7, latest editions, all as determined by the Structural Engineer of record.

C. Exceptions: The seismic restraint of the following items may be omitted:

13 05 41 - 5

1. Equipment weighing less than 400 pounds, which is supported directly on the floor or roof.

2. Equipment weighing less than 20 pounds, which is suspended from the roof or floor or hung from a wall.

3. Gas and medical piping less than 2 ½ inches inside diameter.

4. Piping in boiler plants and equipment rooms less than 1 ¼ inches inside diameter.

5. All other piping less than 2 ½ inches inside diameter, except for automatic fire suppression systems.

6. All piping suspended by individual hangers, 12 inches or less in length from the top of pipe to the bottom of the support for the hanger.

7. All electrical conduits, less than 2 ½ inches inside diameter.

8. All rectangular air handling ducts less than six square feet in cross sectional area.

9. All round air handling ducts less than 28 inches in diameter.

10. All ducts suspended by hangers 12 inches or less in length from the top of the duct to the bottom of support for the hanger.

PART 2 – PRODUCTS

2.1 STEEL:

A. Structural Steel: ASTM A36 // A36M // A992 //.

B. Structural Tubing: ASTM A500, Grade B.

C. Structural Tubing: ASTM A501.

D. Steel Pipe: ASTM A53/A53M, Grade B.

E. Bolts & Nuts: ASTM // A307 // A325 // A325M // A490 // A490M //.

2.2 CAST-IN-PLACE CONCRETE:

A. Concrete: Refer to Division 3 – CONCRETE.

B. Reinforcing Steel: ASTM A615/615M or ASTM A996/A996M deformed and in accordance with

Division 3 – CONCRETE specifications.

PART 3 – EXECUTION

3.1 CONSTRUCTION, GENERAL:

A. Provide equipment supports and anchoring devices to withstand the seismic design forces, so that when seismic design forces are applied, the equipment cannot displace, overturn, or become inoperable.

13 05 41 - 6

B. Provide anchorages in conformance with recommendations of the equipment manufacturer and as shown on approved shop drawings and calculations.

C. Construct seismic restraints and anchorage to allow for thermal expansion.

D. Testing Before Final Inspection:

1. Test 10-percent of anchors in masonry and concrete per ASTM E488, and ACI 355.2 to determine that they meet the required load capacity. If any anchor fails to meet the required load, test the next 20 consecutive anchors, which are required to have zero failure, before resuming the 10-percent testing frequency.

2. Before scheduling Final Inspection, submit a report on this testing indicating the number and location of testing, and what anchor-loads were obtained.

3.2 EQUIPMENT RESTRAINT AND BRACING:

A. Submit shop drawings for equipment to be restrained or braced.

3.3 MECHANICAL DUCTWORK AND PIPING; BOILER PLANT STACKS AND BREACHING;

ELECTRICAL BUSWAYS, CONDUITS, AND CABLE TRAYS; AND TELECOMMUNICATION WIRES

AND CABLE TRAYS

A. Support and brace mechanical ductwork and piping; electrical busways, conduits and cable trays;

and telecommunication wires and cable trays including boiler plant stacks and breeching to resist directional forces (lateral, longitudinal and vertical).

B. Brace duct and breeching branches with a minimum of 1 brace per branch.

D. Provide supports and anchoring so that, upon application of seismic forces, piping remains fully connected as operable systems which will not displace sufficiently to damage adjacent or connecting equipment, or building members.

E. Seismic Restraint of Piping:

1. Design criteria:

a. Piping resiliently supported: Restrain to support // 120 // -percent of the weight of the systems and components and contents.

b. Piping not resiliently supported: Restrain to support // 60 // -percent of the weight of the system components and contents.

//2. Provide seismic restraints according to applicable codes and regulations.

F. Piping Connections: Provide flexible connections where pipes connect to equipment. Make the connections capable of accommodating relative differential movements between the pipe and equipment under conditions of earthquake shaking.

13 05 41 - 7

3.4 PARTITIONS

A. In buildings with flexible structural frames, anchor partitions to only structural element, such as a floor slab, and separate such partition by a physical gap from all other structural elements.

B. Properly anchor concrete walls to the structure for restraint, so as to carry lateral loads imposed due to earthquake along with their own weight and other lateral forces.

C. Seismic bracing for partitions shall comply with the requirements of VA Seismic Design

Requirements Section 4.0 of H-18-8.

3.5 CEILINGS AND LIGHTING FIXTURES

A. At regular intervals, laterally brace suspended ceilings against lateral and vertical movements, and provide with a physical separation at the walls.

B. Independently support and laterally brace all lighting fixtures. Refer to applicable portion of lighting specification, Section 26 51 00, INTERIOR LIGHTING. Seismic bracing for ceilings and lighting fixtures shall comply with the requirements of VA Seismic Design Requirements Section

4.0 of H-18-8.

3.6 FACADES AND GLAZING

A. Do not install concrete unit filler walls in a manner that can restrain the lateral deflection of the building frame. Provide a gap with adequately sized resilient filler to separate the structural frame from the non-structural filler wall.

B. Tie veneers, if applicable, to a separate wall that is independent of the steel frame as shown on construction drawings to ensure strength against applicable seismic forces at the project location.

C. Install attachments to structure for all façade materials as shown on construction drawings to ensure strength against applicable seismic forces at the project location, and accommodate applicable seismic forces.

3.7 STORAGE RACKS, CABINETS, AND BOOKCASES

A. Install storage racks to withstand earthquake forces and anchored to the floor or laterally braced from the top to the structural elements.