About this file

This solicitation is for the construction of a new parking garage to accommodate approximately 435 vehicles on the Wilkes-Barre VA Medical Center campus. The project shall include all labor, materials, tools, equipment, permits, testing and reports required to construct the parking structure according to the drawings and specifications provided. The magnitude of the VA project is estimated between $10 million and $20 million. Offerors must perform all work in accordance with the attached statement of work, specifications, drawings, and all applicable federal, state and local codes and VA rules and regulations. The NAICS code for this procurement is 236220 for commercial and institutional building construction. This procurement is set aside for verified service-disabled veteran-owned small businesses and will use a tiered evaluation process including large businesses. Pricing must be in whole US dollars. The solicitation may be cancelled before award if in the best interest of the government. The contractor will be responsible for proper worker classification and wage compliance.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
095113 Acoustical Panel Ceilings.pdf PDF
019100 Gen Commis.docx DOCX document
015816 Temp Int Signage.docx DOCX document
014535 Special Inspections.docx DOCX document
013323 Shop dwgs Product Data.docx DOCX document
042000 Unit Masonry Assemblies.pdf PDF
S02 Pricing Sheet.pdf PDF
36C24420R0075_6.docx DOCX document
EXHIBIT D -SampleTransmittalLetter Past Performance Evaluation Questionnaire.docx DOCX document
36C24420R0075_5.docx DOCX document
S04 Site Visit Sign-in.pdf PDF
P03 JA Yale Lock.pdf PDF
321723 Pavement Markings.pdf PDF
321216 Asphalt Paving.pdf PDF
320523 Cement and Concrete for Exterior Improvements.pdf PDF
280513.pdf PDF
265100.pdf PDF
260526.pdf PDF
238200.pdf PDF
233700.pdf PDF
233400.pdf PDF
233100.pdf PDF
230511.pdf PDF
221436.pdf PDF
210511.pdf PDF
099123 Painting.pdf PDF
024100.docx DOCX document
022113.docx DOCX document
017700 Contract Closeout_Single Prime.pdf PDF
017419.doc DOC document
017700a Contract Closeout Master Punch List_Single Prime.pdf PDF
013526.docx DOCX document
012900 Applications for Payment_Single Prime.pdf PDF
S02 ParkStructure Electrical Dwg.pdf PDF
Pstruct Dwg 21-25.pdf PDF
Pstruct Dwg 5-10.pdf PDF
Pstruct Dwg 1-2.pdf PDF
Arch Dwg 6-10.pdf PDF
S02 Dwg T1-S2.pdf PDF
EXHIBIT E - Past Performance Questionnaire.docx DOCX document
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
36C24420R0075_3.docx DOCX document
334000 Storm Sewer Utilities.pdf PDF
316326 Drilled Caissons.pdf PDF
312319 Dewatering.pdf PDF
280526.pdf PDF
264313.pdf PDF
280500.pdf PDF
260533.pdf PDF
260519.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKING GARAGE PROJECT NUMBER 693-222

DEPARTMENT OF VETERANS AFFAIRS

WILKES-BARRE, PENNSYLVANIA

SECTION 01 45 29

TESTING LABORATORY SERVICES

PART 1 GENERAL

1.1 DESCRIPTION:

This section specifies materials testing activities and inspection services required during project construction to be provided by a Testing Laboratory retained by the General Contractor.

1.2 APPLICABLE PUBLICATIONS:

A.The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
B.American Association of State Highway and Transportation Officials (AASHTO):
T27-11Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates
T96-02 (R2006)Standard Method of Test for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
T99-10Standard Method of Test for Moisture-Density Relations of Soils Using a 2.5 Kg (5.5 lb.) Rammer and a 305 mm (12 in.) Drop
T104-99 (R2007)Standard Method of Test for Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate
T180-10Standard Method of Test for Moisture-Density Relations of Soils using a 4.54 kg (10 lb.) Rammer and a 457 mm (18 in.) Drop
T191-02(R2006)Standard Method of Test for Density of Soil In-Place by the Sand-Cone Method
T310-13Standard Method of Test for In-place Density and Moisture Content of Soil and Soil-aggregate by Nuclear Methods (Shallow Depth)
C.American Concrete Institute (ACI):
506.4R-94 (R2004)Guide for the Evaluation of Shotcrete
D.American Society for Testing and Materials (ASTM):
A325-10Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
A370-12Standard Test Methods and Definitions for Mechanical Testing of Steel Products
A416/A416M-10Standard Specification for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete
A490-12Standard Specification for Heat Treated Steel Structural Bolts, 150 ksi Minimum Tensile Strength
C31/C31M-10Standard Practice for Making and Curing Concrete Test Specimens in the Field
C33/C33M-11aStandard Specification for Concrete Aggregates
C39/C39M-12Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
C109/C109M-11bStandard Test Method for Compressive Strength of Hydraulic Cement Mortars
C136-06Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
C138/C138M-10bStandard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
C140-12Standard Test Methods for Sampling and Testing Concrete Masonry Units and Related Units
C143/C143M-10aStandard Test Method for Slump of Hydraulic Cement Concrete
C172/C172M-10Standard Practice for Sampling Freshly Mixed Concrete
C173/C173M-10bStandard Test Method for Air Content of freshly Mixed Concrete by the Volumetric Method
C330/C330M-09Standard Specification for Lightweight Aggregates for Structural Concrete
C567/C567M-11Standard Test Method for Density Structural Lightweight Concrete
C780-11Standard Test Method for Pre-construction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry
C1019-11Standard Test Method for Sampling and Testing Grout
C1064/C1064M-11Standard Test Method for Temperature of Freshly Mixed Portland Cement Concrete
C1077-11cStandard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
C1314-11aStandard Test Method for Compressive Strength of Masonry Prisms
D422-63(2007)Standard Test Method for Particle-Size Analysis of Soils
D698-07e1Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort
D1140-00(2006)Standard Test Methods for Amount of Material in Soils Finer than No. 200 Sieve
D1143/D1143M-07e1Standard Test Methods for Deep Foundations Under Static Axial Compressive Load
D1188-07e1Standard Test Method for Bulk Specific Gravity and Density of Compacted Bituminous Mixtures Using Coated Samples
D1556-07Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method
D1557-09Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000ft lbf/ft3 (2,700 KNm/m3))
D2166-06Standard Test Method for Unconfined Compressive Strength of Cohesive Soil
D2167-08)Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method
D2216-10Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
D2974-07aStandard Test Methods for Moisture, Ash, and Organic Matter of Peat and Other Organic Soils
D3666-11Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials
D3740-11Standard Practice for Minimum Requirements for Agencies Engaged in Testing and/or Inspection of Soil and Rock as used in Engineering Design and Construction
D6938-10Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
E94-04(2010)Standard Guide for Radiographic Examination
E164-08Standard Practice for Contact Ultrasonic Testing of Weldments
E329-11cStandard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection
E543-09Standard Specification for Agencies Performing Non-Destructive Testing
E605-93(R2011)Standard Test Methods for Thickness and Density of Sprayed Fire Resistive Material (SFRM) Applied to Structural Members
E709-08Standard Guide for Magnetic Particle Examination
E1155-96(R2008)Determining FF Floor Flatness and FL Floor Levelness Numbers
E.American Welding Society (AWS):
D1.D1.1M-10Structural Welding Code-Steel

1.3 REQUIREMENTS:

A.Accreditation Requirements: Construction materials testing laboratories must be accredited by a laboratory accreditation authority and will be required to submit a copy of the Certificate of Accreditation and Scope of Accreditation. The laboratory’s scope of accreditation must include the appropriate ASTM standards (i.e.; E329, C1077, D3666, D3740, A880, E543) listed in the technical sections of the specifications. Laboratories engaged in Hazardous Materials Testing shall meet the requirements of OSHA and EPA. The policy applies to the specific laboratory performing the actual testing, not just the “Corporate Office.”
B.Inspection and Testing: Testing laboratory shall inspect materials and workmanship and perform tests described herein and additional tests requested by Resident Engineer. When it appears materials furnished, or work performed by Contractor fail to meet construction contract requirements, Testing Laboratory shall direct attention of Resident Engineer to such failure.
C.Written Reports: Testing laboratory shall submit test reports to Resident Engineer, Contractor, unless other arrangements are agreed to in writing by the Resident Engineer. Submit reports of tests that fail to meet construction contract requirements on colored paper.
D.Verbal Reports: Give verbal notification to Resident Engineer immediately of any irregularity.

PART 2 - PRODUCTS (Not Used)

PART 3 EXECUTION

3.1 EARTHWORK:

A.General: The Testing Laboratory shall provide qualified personnel, materials, equipment, and transportation as required to perform the services identified/required herein, within the agreed to schedule and/or time frame. The work to be performed shall be as identified herein and shall include but not be limited to the following:
1.Observe fill and subgrades during proof-rolling to evaluate suitability of surface material to receive fill or base course. Provide recommendations to the Resident Engineer regarding suitability or unsuitability of areas where proof-rolling was observed. Where unsuitable results are observed, witness excavation of unsuitable material and recommend to Resident Engineer extent of removal and replacement of unsuitable materials and observe proof-rolling of replaced areas until satisfactory results are obtained.

2. Provide part time observation of fill placement and compaction and field density testing in building areas and provide part time observation of fill placement and compaction and field density testing in pavement areas to verify that earthwork compaction obtained is in accordance with contract documents. The geotechnical technician should be onsite for observation and testing a minimum of every other workday while contractor is providing earthwork movement and placement.

3. Provide supervised licensed geotechnical technician to observe, inspect excavation, subsurface preparation, and backfill for structural fill.

B.Testing Compaction:
1.Determine maximum density and optimum moisture content for each type of fill, backfill and subgrade material used, in compliance with Section 312000 Earthwork.
2.Make field density tests in accordance with the primary testing method following compliance with Section 312000 Earthwork. Should the testing laboratory propose these alternative methods, they should provide satisfactory explanation to the Resident Engineer before the tests are conducted.
a.Building Slab Subgrade: At least one test of subgrade for every 185 m2 (2000 square feet) of building slab, but in no case fewer than three tests. In each compacted fill layer, perform one test for every 185 m2 (2000 square feet) of overlaying building slab, but in no case fewer than three tests.
b.Foundation Wall Backfill: One test per 30 m (100 feet) of each layer of compacted fill but in no case fewer than two tests.
c.Pavement Subgrade: One test for each 335 m2 (400 square yards), but in no case fewer than two tests.
d.Curb, Gutter, and Sidewalk: One test for each 90 m (300 feet), but in no case fewer than two tests.
e.Trenches: One test at maximum 30 m (100 foot) intervals per 1200 mm (4 foot) of vertical lift and at changes in required density, but in no case fewer than two tests.
f.Footing Subgrade: At least one test for each layer of soil on which footings will be placed. Subsequent verification and approval of each footing subgrade may be based on a visual comparison of each subgrade with related tested subgrade when acceptable to Resident Engineer. In each compacted fill layer below wall footings, perform one field density test for every 30 m (100 feet) of wall. Verify subgrade is level, all loose or disturbed soils have been removed, and correlate actual soil conditions observed with those indicated by test borings.
C.Fill and Backfill Material Gradation: One test per 3 cubic yards stockpiled or in-place source material. Gradation of fill and backfill material shall be determined in accordance with Section 312000 Earthwork.
D.Testing for Footing Bearing Capacity: Evaluate if suitable bearing capacity material is encountered in footing subgrade.
E.Testing Materials: Test suitability of on-site and off-site borrow as directed by Resident Engineer.

3.2 FOUNDATION PILES:

A.Witness load test procedure for conformance with ASTM D1143 and interpret test data to verify geotechnical recommendations for pile capacity. Submit load test report in accordance with ASTM D1143.
B.Review Contractor's equipment, methods, and procedures prior to starting any work on site. Provide continuous inspection of pile installation. Maintain a record of all pertinent phases of operation for submittal to Resident Engineer.
C.AugerPlaced Piles: Take and test samples of grout in accordance with ASTM C109 for conformance with specified strength requirements. Not less than six cubes shall be made for each day of casting. Test three cubes at 7 days and three at 28 days.
D.CastinPlace Concrete Piles: Test concrete including materials for concrete as required in Article CONCRETE of this section, except make two test cylinders for each day's production of each strength of concrete produced.
E.Prestressed Concrete Piles:
1.Inspection at Plant: Inspect forms, placement of reinforcing steel and strands, placement and finishing of concrete, and tensioning of strands.
2.Concrete Testing: Test concrete including materials for concrete as required in Article, CONCRETE of this section, except make two test cylinders for each day's production of each strength of concrete produced.
3.Test strand for conformance with ASTM A416/A416M and furnish report to Resident Engineer.
4.Inspect piles to insure specification requirements for curing and finishes have been met.

3.3 FOUNDATION CAISSONS:

A.Concrete Testing: Test concrete including materials for concrete as required in Article, CONCRETE of this section, except make two test cylinders for each day's placement of concrete.
B.Maintain a record of concrete used in each caisson. Compare records with calculated volumes.
C.Inspect percussion hole in bottom of each caisson to determine that material is capable of supporting design load.
D.Inspect sides and bottom of each caisson for compliance with contract documents.
E.Submit a certified “Caisson Field Record” for each caisson, recording actual elevation at bottom of shaft; final center line location of top; variation of shaft from plumb; results of all tests performed; actual allowable bearing capacity of bottom; depth of socket into rock; levelness of bottom; seepage of water; still water level (if allowed to flood); variation of shaft (from dimensions shown); location and size of reinforcement, and evidence of seams, voids, or channels below the bottom. Verify the actual bearing capacity of the rock strata by the use of a calibrated penetrometer or other acceptable method.
F.Caissons Bearing on Hardpan: Take undisturbed samples, suitable for tests required, from caisson bottom. Make auger probe to a depth of 2.5 meters (8 feet) below bottom and visually inspect and classify soil. Verify continuity of strata and thickness.
1.Conduct the following test on each sample, and report results and evaluations to the Resident Engineer:
a.Unconfined Compression Test (ASTM D2166).
b.Moisture Content (ASTM D2216).
c.Density.

3.4 LANDSCAPING:

A.Test topsoil for organic materials, pH, phosphate, potash content, and gradation of particles.
1.Test for organic material by using ASTM D2974.
2.Determine percent of silt, sand, clay, and foreign materials such as rock, roots, and vegetation.
B.Submit laboratory test report of topsoil to Resident Engineer.

3.5 ASPHALT CONCRETE PAVING:

A.Aggregate Base Course:
1.Determine maximum density and optimum moisture content for aggregate base material in accordance with Section 321216 Asphalt Paving.
2.Make a minimum of three field density tests on each day's final compaction on each aggregate course in accordance with ASTM D1556.
3.Sample and test aggregate as necessary to insure compliance with specification requirements for gradation, wear, and soundness as specified in the applicable state highway standards and specifications.
B.Asphalt Concrete:
1.Aggregate: Sample and test aggregates in stock pile and hotbins as necessary to insure compliance with specification requirements for gradation per Section 321216 Asphalt Paving.
2.Temperature: Check temperature of each load of asphalt concrete at mixing plant and at site of paving operation.
3.Density: Make a minimum of two field density tests in accordance with ASTM D1188 of asphalt base and surface course for each day's paving operation.

3.6 SITE WORK CONCRETE:

Test site work concrete including materials for concrete as required in Article CONCRETE of this section.

3.7 POST-TENSIONING OF CONCRETE:

A.Inspection Prior to Concreting: Inspect tendons, drape of tendons, and anchorage components for compliance prior to concreting.
B.Concrete Testing: As required in Article, CONCRETE of this section except make three test cylinders representing each area to be tensioned and cylinders shall be cured in same manner as concrete they represent. Make compression test prior to determining minimum specified strength required for post-tensioning.
C.Post-tensioning: Witness post-tensioning operation and record actual gauge pressures and elongations applied to each tendon.
D.Submit reports in quadruplicate of the following:
1.Inspection of placement and post-tensioning of all tendons.
2.Size, number, location, and drape of tendons.
3.Calculated elongations, based upon the length, modulus of elasticity, and cross-sectional area of the tendons used.
4.Actual field elongations. Check elongation of tendons within ranges established by manufacturer.
5.Calculated gauge pressure and jacking force applied to each tendon.
6.Actual gauge pressures and jacking force applied to each tendon.
7.Required concrete strength at time of jacking.
8.Actual concrete strength at time of jacking.
9.Do not cut or cover the tendon ends until the Contractor receives the Resident Engineer’s written approval of the post-tensioning records.

3.8 CONCRETE:

A.Batch Plant Inspection and Materials Testing:
1.Perform continuous batch plant inspection until concrete quality is established to satisfaction of Resident Engineer with concurrence of Contracting Officer and perform periodic inspections thereafter as determined by Resident Engineer.
2.Periodically inspect and test batch proportioning equipment for accuracy and report deficiencies to Resident Engineer.
3.Sample and test mix ingredients as necessary to insure compliance with specifications.
4.Sample and test aggregates daily and as necessary for moisture content. Test the dry rodded weight of the coarse aggregate whenever a sieve analysis is made, and when it appears there has been a change in the aggregate.
5.Certify, in duplicate, ingredients and proportions and amounts of ingredients in concrete conform to approved trial mixes. When concrete is batched or mixed off immediate building site, certify (by signing, initialing or stamping thereon) on delivery slips (duplicate) that ingredients in truckload mixes conform to proportions of aggregate weight, cement factor, and watercement ratio of approved trial mixes.
B.Field Inspection and Materials Testing:
1.Provide a technician at site of placement at all times to perform concrete sampling and testing.
2.Review the delivery tickets of the ready-mix concrete trucks arriving on-site. Notify the Contractor if the concrete cannot be placed within the specified time limits or if the type of concrete delivered is incorrect. Reject any loads that do not comply with the Specification requirements. Rejected loads are to be removed from the site at the Contractor’s expense. Any rejected concrete that is placed will be subject to removal.
3.Take concrete samples at point of placement in accordance with ASTM C172. Mold and cure compression test cylinders in accordance with ASTM C31. Make at least three cylinders for each 40 m3 (50 cubic yards) or less of each concrete type, and at least three cylinders for any one day's pour for each concrete type. After good concrete quality control has been established and maintained as determined by Resident Engineer make three cylinders for each 80 m3 (100 cubic yards) or less of each concrete type, and at least three cylinders from any one day's pour for each concrete type. Label each cylinder with an identification number. Resident Engineer may require additional cylinders to be molded and cured under job conditions.
4.Perform slump tests in accordance with ASTM C143. Test the first truck each day, and every time test cylinders are made. Test pumped concrete at the hopper and at the discharge end of the hose at the beginning of each day’s pumping operations to determine change in slump.
5.Determine the air content of concrete per ASTM C173. For concrete required to be air-entrained, test the first truck and every 20 m3 (25 cubic yards) thereafter each day. For concrete not required to be air-entrained, test every 80 m3 (100 cubic yards) at random. For pumped concrete, initially test concrete at both the hopper and the discharge end of the hose to determine change in air content.
6.If slump or air content fall outside specified limits, make another test immediately from another portion of same batch.
7.Perform unit weight tests in compliance with ASTM C138 for normal weight concrete and ASTM C567 for lightweight concrete. Test the first truck and each time cylinders are made.
8.Notify laboratory technician at batch plant of mix irregularities and request materials and proportioning check.
9.Verify that specified mixing has been accomplished.
10.Environmental Conditions: Determine the temperature per ASTM C1064 for each truckload of concrete during hot weather and cold weather concreting operations:
a.When ambient air temperature falls below 4.4 degrees C (40 degrees F), record maximum and minimum air temperatures in each 24 hour period; record air temperature inside protective enclosure; record minimum temperature of surface of hardened concrete.
b.When ambient air temperature rises above 29.4 degrees C (85 degrees F), record maximum and minimum air temperature in each 24 hour period; record minimum relative humidity; record maximum wind velocity; record maximum temperature of surface of hardened concrete.
11.Inspect the reinforcing steel placement, including bar size, bar spacing, top and bottom concrete cover, proper tie into the chairs, and grade of steel prior to concrete placement. Submit detailed report of observations.
12.Observe conveying, placement, and consolidation of concrete for conformance to specifications.
13.Observe condition of formed surfaces upon removal of formwork prior to repair of surface defects and observe repair of surface defects.
14.Observe curing procedures for conformance with specifications, record dates of concrete placement, start of preliminary curing, start of final curing, end of curing period.
15.Observe preparations for placement of concrete:
a.Inspect handling, conveying, and placing equipment, inspect vibrating and compaction equipment.
b.Inspect preparation of construction, expansion, and isolation joints.
16.Observe preparations for protection from hot weather, cold weather, sun, and rain, and preparations for curing.
17.Observe concrete mixing:
a.Monitor and record amount of water added at project site.
b.Observe minimum and maximum mixing times.
18.Measure concrete flatwork for levelness and flatness as follows:
a.Perform Floor Tolerance Measurements FF and FL in accordance with ASTM E1155. Calculate the actual overall F- numbers using the inferior/superior area method.
b.Perform all floor tolerance measurements within 48 hours after slab installation and prior to removal of shoring and formwork.
c.Provide the Contractor and the Resident Engineer with the results of all profile tests, including a running tabulation of the overall FF and FL values for all slabs installed to date, within 72 hours after each slab installation.
19.Other inspections:
a.Grouting under base plates.
b.Grouting anchor bolts and reinforcing steel in hardened concrete.
C.Laboratory Tests of Field Samples:
1.Test compression test cylinders for strength in accordance with ASTM C39. For each test series, test one cylinder at 7 days and one cylinder at 28 days. Use remaining cylinder as a spare tested as directed by Resident Engineer. Compile laboratory test reports as follows: Compressive strength test shall be result of one cylinder, except when one cylinder shows evidence of improper sampling, molding or testing, in which case it shall be discarded and strength of spare cylinder shall be used.
2.Make weight tests of hardened lightweight structural concrete in accordance with ASTM C567.
3.Furnish certified compression test reports (duplicate) to Resident Engineer. In test report, indicate the following information:
a.Cylinder identification number and date cast.
b.Specific location at which test samples were taken.
c.Type of concrete, slump, and percent air.
d.Compressive strength of concrete in MPa (psi).
e.Weight of lightweight structural concrete in kg/m3 (pounds per cubic feet).
f.Weather conditions during placing.
g.Temperature of concrete in each test cylinder when test cylinder was molded.
h.Maximum and minimum ambient temperature during placing.
i.Ambient temperature when concrete sample in test cylinder was taken.
j.Date delivered to laboratory and date tested.

3.9 REINFORCEMENT:

A.Review mill test reports furnished by Contractor.
B.Make one tensile and one bend test in accordance with ASTM A370 from each pair of samples obtained.
C.Written report shall include, in addition to test results, heat number, manufacturer, type and grade of steel, and bar size.
D.Perform tension tests of mechanical and welded splices in accordance with ASTM A370.

3.10 SHOTCRETE:

A.Inspection and Material Testing:
1.Provide field inspection and testing service as required by Resident Engineer to certify that shotcrete has been applied in accordance with contract documents.
2.Periodically inspect and test proportioning equipment for accuracy and report deficiencies to Resident Engineer.
3.Sample and test mix ingredients as necessary to insure compliance with specifications.
4.Sample and test aggregates daily and as necessary for moisture content. Report instances of excessive moisture to Resident Engineer.
5.Certify, in duplicate, that ingredients and proportions and amounts of ingredients in shotcrete conform to approved trial mixes.
6.Provide field inspection of the proper size and placement of the reinforcement in the shotcrete.
B.Shotcrete Sampling:
1.Provide a technician at site of placement to perform shotcrete sampling.
2.Take cores in accordance with ACI 506.
3.Insure maintenance of watercement ratio established by approved trial mix.
4.Verify specified mixing has been accomplished.
C.Laboratory Tests of Field Sample Panels:
1.Compression test core for strength in accordance with ACI 506. For each test series of three cores, test one core at 7 days and one core at 28 days. Use remaining core as a spare to be tested at either 7 or 28 days as required. Compile laboratory test reports as follows: Compressive strength test shall be result of one core, except when one core shows evidence of improper sampling or testing, in which case it shall be discarded and strength of spare core shall be used.
2.Submit certified compression test reports (duplicate) to Resident Engineer. On test report, indicate following information:
a.Core identification number and date cast.
b.Specific location at which test samples were taken.
c.Compressive strength of shotcrete in MPa (psi).
d.Weather conditions during placing.
e.Temperature of shotcrete in each test core when test core was taken.
f.Maximum and minimum ambient temperature during placing.
g.Ambient temperature when shotcrete sample was taken.
h.Date delivered to laboratory and date tested.
D.Submit inspection reports certification and instances of noncompliance to Resident Engineer.

3.11 PRESTRESSED CONCRETE:

A.Inspection at Plant: Forms, placement and concrete cover of reinforcing steel and tendons, placement and finishing of concrete, and tensioning of tendons.
B.Concrete Testing: Test concrete including materials for concrete required in Article, CONCRETE of this section, except make two test cylinders for each day's production of each strength of concrete produced.
C.Test tendons for conformance with ASTM A416 and furnish report to Resident Engineer.
D.Inspect members to insure that specification requirements for curing and finishes have been met.

3.12 ARCHITECTURAL PRECAST CONCRETE:

A.Inspection at Plant: Forms, placement of reinforcing steel, concrete cover, and placement and finishing of concrete.
B.Concrete Testing: Test concrete including materials for concrete as required in Article CONCRETE of this section, except make two test cylinders for each day's production of each strength of concrete produced.
C.Inspect members to insure specification requirements for curing and finishes have been met.

3.13 MASONRY:

A.Mortar Tests:
1.Laboratory compressive strength test:
a.Comply with ASTM C780.
b.Obtain samples during or immediately after discharge from batch mixer.
c.Furnish molds with 50 mm (2 inch), 3 compartment gang cube.
d.Test one sample at 7 days and 2 samples at 28 days.
2.Two tests during first week of operation; one test per week after initial test until masonry completion.
B.Grout Tests:
1.Laboratory compressive strength test:
a.Comply with ASTM C1019.
b.Test one sample at 7 days and 2 samples at 28 days.
c.Perform test for each 230 m2 (2500 square feet) of masonry.
C.Masonry Unit Tests:
1.Laboratory Compressive Strength Test:
a.Comply with ASTM C140.
b.Test 3 samples for each 460 m2 (5000 square feet) of wall area.
D.Prism Tests: For each type of wall construction indicated, test masonry prisms per ASTM C1314 for each 460 m2 (5000 square feet) of wall area. Prepare one set of prisms for testing at 7 days and one set for testing at 28 days.

3.14 STRUCTURAL STEEL:

A.General: Provide shop and field inspection and testing services to certify structural steel work is done in accordance with contract documents. Welding shall conform to AWS D1.1 Structural Welding Code.
B.Prefabrication Inspection:
1.Review design and shop detail drawings for size, length, type and location of all welds to be made.
2.Approve welding procedure qualifications either by pre-qualification or by witnessing qualifications tests.
3.Approve welder qualifications by certification or retesting.
4.Approve procedure for control of distortion and shrinkage stresses.
5.Approve procedures for welding in accordance with applicable sections of AWS D1.1.
C.Fabrication and Erection:
1.Weld Inspection:
a.Inspect welding equipment for capacity, maintenance and working condition.
b.Verify specified electrodes and handling and storage of electrodes in accordance with AWS D1.1.
c.Inspect preparation and assembly of materials to be welded for conformance with AWS D1.1.
d.Inspect preheating and interpass temperatures for conformance with AWS D1.1.
e.Measure 25 percent of fillet welds.
f.Welding Magnetic Particle Testing: Test in accordance with ASTM E709 for a minimum of:
1)20 percent of all shear plate fillet welds at random, final pass only.
2)20 percent of all continuity plate and bracing gusset plate fillet welds, at random, final pass only.
3)100 percent of tension member fillet welds (i.e., hanger connection plates and other similar connections) for root and final passes.
4)20 percent of length of built-up column member partial penetration and fillet welds at random for root and final passes.
5)100 percent of length of built-up girder member partial penetration and fillet welds for root and final passes.
g.Welding Ultrasonic Testing: Test in accordance with ASTM E164 and AWS D1.1 for 100 percent of all full penetration welds, braced and moment frame column splices, and a minimum of 20 percent of all other partial penetration column splices, at random.

SPEC WRITER NOTE: Specify radiographic testing only for very large jobs or those with complicated full penetration welds.

h.Welding Radiographic Testing: Test in accordance with ASTM E94, and AWS D1.1 for 5 percent of all full penetration welds at random.
i.Verify that correction of rejected welds are made in accordance with AWS D1.1.
j.Testing and inspection do not relieve the Contractor of the responsibility for providing materials and fabrication procedures in compliance with the specified requirements.
2.Bolt Inspection:
a.Inspect highstrength bolted connections in accordance AISC Specifications for Structural Joints Using ASTM A325 or A490 Bolts.
b.Slip-Critical Connections: Inspect 10 percent of bolts, but not less than 2 bolts, selected at random in each connection in accordance with AISC Specifications for Structural Joints Using ASTM A325 or A490 Bolts. Inspect all bolts in connection when one or more are rejected.
c.Fully Pre-tensioned Connections: Inspect 10 percent of bolts, but not less than 2 bolts, selected at random in 25 percent of connections in accordance with AISC Specification for Structural Joints Using ASTM A325 or A490 Bolts. Inspect all bolts in connection when one or more are rejected.
d.Bolts installed by turn-of-nut tightening may be inspected with calibrated wrench when visual inspection was not performed during tightening.
e.Snug Tight Connections: Inspect 10 percent of connections verifying that plies of connected elements have been brought into snug contact.
f.Inspect field erected assemblies; verify locations of structural steel for plumbness, level, and alignment.
D.Submit inspection reports, record of welders and their certification, and identification, and instances of noncompliance to Resident Engineer.

SPEC WRITER NOTE: Verify need for and extent of Steel Decking Inspection and testing services with Structural Engineer.

3.15 STEEL DECKING:

A.Provide field inspection of welds of metal deck to the supporting steel, and testing services to insure steel decking has been installed in accordance with contract documents and manufacturer’s requirements.
B.Qualification of Field Welding: Qualify welding processes and welding operators in accordance with “Welder Qualification” procedures of AWS D1.1. Refer to the “Plug Weld Qualification Procedure” in Part 3 “Field Quality Control.”
C.Submit inspection reports, certification, and instances of noncompliance to Resident Engineer.

3.16 SHEAR CONNECTOR STUDS:

A.Provide field inspection and testing services required by AWS D.1 to insure shear connector studs have been installed in accordance with contract documents.
B.Tests: Test 20 percent of headed studs for fastening strength in accordance with AWS D1.1.
C.Submit inspection reports, certification, and instances of noncompliance to Resident Engineer.

3.17 TYPE OF TEST:

Approximate Number of Tests Required

A.Earthwork:
Laboratory Compaction Test, Soils:_____
Field Density, Soils_____
Penetration Test, Soils_____
B.Landscaping:
Topsoil Test_____
C.Aggregate Base:
Laboratory Compaction,_____
Field Density,_____
Aggregate, Base Course Gradation_____
Wear_____
Soundness_____
D.Asphalt Concrete:
Field Density,_____
Aggregate, Asphalt Concrete Gradation_____
Wear_____
Soundness_____
E.Concrete:
Making and Curing Concrete Test Cylinders_____
Compressive Strength, Test Cylinders_____
Concrete Slump Test_____
Concrete Air Content Test_____
Unit Weight, Lightweight Concrete_____
Aggregate, Normal Weight: Gradation_____
Deleterious Substances_____
Soundness_____
Abrasion_____
Aggregate, Lightweight Gradation_____
Deleterious Substances_____
Unit Weight_____
Flatness and Levelness Readings_____
F.Reinforcing Steel:
Tensile Test_____
Bend Test_____
Mechanical Splice_____
Welded Splice Test_____
G.Shotcrete:
Taking and Curing Test Cores_____
Compressive Strength, Test Cores_____
H.Prestressed Concrete:
Testing Strands_____
I.Masonry:
Making and Curing Test Cubes_____
Compressive Strength, Test Cubes_____
Sampling and Testing Mortar, Comp. Strength_____
Sampling and Testing Grout, Comp. Strength_____
Masonry Unit, Compressive Strength_____
Prism Tests_____
J.Structural Steel:
Ultrasonic Testing of Welds_____
Magnetic Particle Testing of Welds_____
Radiographic Testing of Welds_____
K.Inspection:
Technical Personnel (Man-days)_____
L.Technical Personnel:(Minimum _________ months)
1.Technicians to perform tests and inspection listed above. Laboratory will be equipped with concrete cylinder storage facilities, compression machine, cube molds, proctor molds, balances, scales, moisture ovens, slump cones, air meter, and all necessary equipment for compaction control.

E N D 01 45 29 - 21