HNK C001 VOR ROOF PLAN AMENDMENT 1 as of 20230525.pdf
PDF 413 KB Posted
- Solicitation number
- 2301629
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTED BY:
APPROVED BY:
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
VOR
REPLACEMENT OF THE VOR BUILDING
ROOF PLAN
HANCOCK HANCOCK NY
DWG NO REV
HNK-D-VOR A
SHEET C001 DATE
09/15/2022
N
MAG
NOTES:
1. CONTRACTOR TO REMOVE THE 16 VOR ANTENNA MONITOR ANTENNAS AND MOUNTING
PLATES. CONTRACTOR TO STORE THE ANTENNAS AND PLATES ON-SITE. THE ANTENNAS AND
PLATES SHALL BE REINSTALLED IN THE SAME EXACT LOCATION UPON COMPLETION OF THE
INSTALLATION OF THE NEW ROOFING SYSTEM. A NYS LICENSED SURVEYOR SHALL BE USED
TO RECORD THE EXSITING LOCATION OF THE MONITOR ANTENNA AND LAYOUT THE FINAL
LOCATION/ORIENTATION.
2. CONTRACTOR SHALL CONFIRM ALL DIMENSIONS OF SHELTER AND ROOF.
3. CONTRACTOR TO PROPERLY STORE AND SECURE THE VOR TEEPEE WHEN ON THE
GROUND. THE EXISTING VOR ANTENNAS AND DME ANTENNA WITHIN THE TEEPEE SHALL
REMAIN IN PLACE FOR THE DURATION OF THE PROJECT. CONTRACTOR SHALL PROVIDE
PROTECTION FOR THE ANTENNAS
4. CONTRACTOR TO INSTALL GALVANIZED STEEL LADDER SUPPORT
REMOVE EXISTING ROOFING SYSTEM
DOWN TO THE EXISTING METAL
TERNEPLATE AND INSTALL NEW FULLY
ADHERED EPDM ROOFING SYSTEM.
R 26'-5"
INSTALL WALKWAY PADS AROUND
ENTIRE PERIMETER OF TEEPEE
INSTALL WALKWAY PADS
AROUND ENTIRE
PERIMETER OF ANTENNAS
(REMAINDER NOT SHOWN
FOR CLARITY)
EXISTING GROUND CABLE TO
REMAIN. REMOVE AND RE-ATTACH
AS NEEDED FOR INSTALLING NEW
ROOFING SYSTEM (4 PLACES)
REMOVE AND SAVE
ANTENNA MOUNTING/
KEYSTONE BRACKETS,
FABRICATE NEW
SUPPORT ASSEMBLY
AND REINSTALL
BENEATH ROOF DECK
(16 TOTAL) SEE S001
36' X 36' X 10'
SHELTER
UNBOLT AND REMOVE FIBERGLASS VOR ANTENNA TEEPEE.
REINSTALL TEEPEE IN SAME EXACT LOCATION AFTER NEW ROOF
IS INSTALLED. IF NECESSARY, REMOVE TOP COVER TO ALLOW
FOR PROPER REMOVAL OF THE TEEPEE. CONTRACTOR TO
REMOVE ALL EXISTING GASKETS/CAULKING MATERIAL AND CLEAN
ALL SURFACES TO ALLOW FOR PROPER INSTALLATION OF NEW
GASKET AND CAULKING R 5'-0"
22.5 DEGREES
INSTALL
GALVANIZED STEEL
LADDER SUPPORT
16 VOR ANTENNA
MONITORS (TYP)
Page-1�
| 2023-05-25T10:19:48-0400 | |
| JOSEPH C HENN |
File details come from the government source that posted it. Updated .