HNK A002 VOR Roof Profile AMENDMENT 1 as of 20230525.pdf

PDF 186 KB Posted

Attached to
Roof replacement at the Hancock VOR/DME facility in Kelsey, NY
Solicitation number
2301629
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTED BY:

APPROVED BY:

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER

VOR

REPLACEMENT OF THE VOR BUILDING ROOF

PROFILE DETAILS

HANCOCK HANCOCK NY

DWG NO REV

HNK-D-VOR

SHEET A002 DATE

09/15/2022

REMOVE FIBERGLASS TEEPEE AND REINSTALL OVER NEW ROOFING SYSTEM.

INSTALL REFERENCE MARKINGS TO ENSURE TEEPEE IS REINSTALLED IN THE

PROPER LOCATION (CENTERED ON ROOF). TEEPEE SHALL BE PROPERLY

SECURED AND STORED WHEN ON THE GROUND. ANY DAMAGE SUSTAINED

DURING THE MOVING/STORAGE OF THE TEEPEE SHALL BE REPAIRED BY THE

CONTRACTOR AT NO ADDITIONAL COST.

EXISTING COPPER BOND STRIP

EXISTING VOR

MOUNTING RING

WALKING PADS (TYP)

INSTALL FULLY ADHERED ROOF

MEMBRANE

INSTALL ¾” EXTERIOR GRADE PLYWOOD AND FASTEN PER ROOF

MANUFACTURER SPECIFICATONS

EXISTING GROUNDING CONDUCTORS TO REMAIN (4 TOTAL)

NOTES:

1. INSTALL WALKING PADS AROUND PERIMETER OF TEEPEE, AROUND PERIMETER OF ROOF, FROM THE LADDER

TIE DOWN POINT TO THE TEEPEE AND INSIDE THE TEEPEE.

2. CONTRACTOR SHALL REMOVE AND RE-INSTALL ALL VOR MONITORING ANTENNAS IN THE SAME LOCATION. A STATE OF NY LICENSED SURVEYOR SHALL BE USED TO RECORD THE EXISITNG LOCATION AND ORIENTATION OF

EACH ANTENNA AND THEN CONFIRM THE FINAL LOCATION.

3. THE CONTRACTOR SHALL ENSURE THAT THE FACILITY REMAINS PROTECTED FROM THE WEATHER AT ALL TIMES. CAUTION SHALL BE USED WHEN WORKING AROUND THE VOR ANTENNAS LOCATED INSIDE THE TEEPEE

EXISTING TERNE PLATE TO REMAIN

ROOFING PROFILE DETAILS

26'-5"

R O

O F

C

EN

TE

R

LI

N

E

EXISTING VINYL SOFFIT BETWEEN ROOF EDGE

AND BUILDING (DIMENSION VARIES) TO REMAIN

REPLACE DAMAGED INTERIOR

CEILING PANELS AND PAINT TO

MATCH EXISTING COLOR

INSTALL TEMINATION BAR IN ACCORDANCE WITH MANUFACTURER

SPECIFICATIONS

VOR BUILDING WALL

EXISTING VINYL SIDING AND INSULATION BOARD TO

REMAIN

EXISTING 2" X 6" TONGUE AND

GROVE DECKING

EXISTING ROOF DECK

BLOCKING

2" X 12" FACIA BOARD WITH WHITE

FLASHING TO REMAIN

PAINT EXPOSED NAILER AND BOTTOM OF ROOF BOARDS WITH PRIMER AND 2 COATS

OF EXTERIOR ACRYLIC LATEX WHITE PAINT PRIOR TO INSTALLATION OF THE

MONITORING ANTENNA BRACKETS. NAILERS SHALL BE DRY AND ABLE TO ACCEPT THE

PAINT. DO NOT PAINT WHILE NAILER IS UNABLE TO ABSORB THE PAINT. TOUCH UP AS

NECESSARY AFTER INSTALLATION OF THE BRACKETS.

EXISTING ROOF SUPPORT

CHANNELS AND STEEL BEAMS VOR BUILDING CEILING PANELS

EXTEND PLYWOOD AND MEMBRANE INTO TEEPEE

INSTALL RUBATEX GASKET BETWEEN TEEPEE BASE AND ROOF

MEMBRANE. USE CONTACT ADHESIVE TO HOLD GASKET IN PLACE

IF REQUIRED

INSTALL CAULKING AROUND TEEPEE PERIMETER

(INSIDE AND OUTSIDE). CAULKING MUST BE

COMPATABLE WITH THE ROOFING MEMBRANE

(polyurethane-based elastomeric sealant 3M 5200)

INSTALL 2" X 8" PRESSURE TREATED NAILER (TRIM AS NECESSARY TO FIT

BETWEEN BUILDING FACIA AND ROOF EDGE) AROUND ENTIRE ROOF

PERIMETER USING EQUALLY SPACED GALVANIZED LAG SCREWS. SEE S001 FOR

MONITORING ANTENNA BRACKET SUPPORT FABRICATION MOUNTING DETAILS.

DIM VARIES

X X X X X

INSTALL ADHESIVE/MASTIC IN ACCORDANCE WITH ROOF

MANUFACTURER SPECIFICATIONS

INSTALL SEALANT IN ACCORDANCE WITH ROOF MANUFACTURER

SPECIFICATIONS

SAND OR CHAMFER TOP EDGE OF PLYWOOD (ENTIRE PERIMETER)

SECURE TEEPEE USING EXISTING 3/8" LAG BOLTS AND WASHERS.

CONTRACTOR TO REPLACE ANY DAMAGED LAG BOLTS AT NO

ADDITIONAL COST. INSTALL CAULKING IN THE PILOT HOLES

(36 TOTAL)

X X

X

Joseph Henn Typewritten Text A

Page-1�

2023-05-25T10:07:21-0400
JOSEPH C HENN

File details come from the government source that posted it. Updated .