23-141-SC_141_Archer_Plan_Review_Letter.pdf

PDF 583 KB Posted

Attached to
EWP Project 5228 - 141 Archer Dr.
Solicitation number
IFB No. PW-0124
Issued by
Santa Cruz County, San Francisco City, California

About this file

This document is a Geotechnical Plan Review letter from Butano Geotechnical Engineering, Inc. dated July 24, 2023, for a retaining wall mitigation project located at 141 Archer Drive in Santa Cruz, California. The letter reviews engineering plans prepared by Brock Dickie Engineering (Sheets S-1 and S-2) for a proposed retaining wall project, with the primary purpose of ensuring conformance with geotechnical conditions and previously established recommendations. The review specifically covers a proposed retaining wall mitigation strategy, focusing on verifying that the engineering plans align with the site's geotechnical characteristics.

The document emphasizes that observation and testing services should be provided by Butano Geotechnical Engineering during construction, with all earthwork requiring full observation and approval by the Geotechnical Consultant. The firm notes that any earthwork performed without their full knowledge and observation will invalidate their recommendations. The review also includes important limitations, highlighting that site conditions may change and that the recommendations are subject to revision based on actual construction findings or changes in applicable codes and standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B U T A N O G E O T EC H N I C A L E N G I N E E R I N G , I N C .

404 WESTRIDGE DRIVE, WATSONVILLE, CALIFORNIA 95076

PHONE: 831.724.2612

WWW.BUTANOGEOTECH.COM

July 24, 2023 Project No. 23-141-SC

Scott Winton 141 Archer Drive Santa Cruz, California 95060

SUBJECT: GEOTECHNICAL PLAN REVIEW

Proposed Retaining Wall Mitigation 141 Archer Drive Santa Cruz, California

REFERENCE: Butano Geotechnical Engineering, Geotechnical Investigation –

Design Phase, 141 Archer Drive, Santa Cruz, California, Project No.

23-141-SC, June 1, 2023

Butano Geotechnical Engineering, Addendum Recommendations – Grouted Tiebacks, 141 Archer Drive, Santa Cruz, California, Project No. 23-141-SC, July 14, 2023

1. INTRODUCTION

a. Per your request, we have reviewed the following plans for the proposed retaining wall mitigation.

Brock Dickie Engineering, Sheet S-1 and S-2, 7-24-23.

b. The purpose of our review was to ensure the conformance of the geotechnical aspects of the plans with the geotechnical conditions present on the site and with the recommendations provided in the referenced report.

2. CONCLUSIONS AND RECOMMENDATIONS

a. It is our opinion that the plans reviewed are in general conformance with the geotechnical conditions present and with the recommendations presented in the referenced report.

Geotechnical Plan Review July 24, 2023 141 Archer Drive Project No. 23-141-SC Santa Cruz, California Page 2

b. The recommendations presented herein and in the referenced report should not be considered to preclude more restrictive criteria by the governing agencies or by structural considerations.

c. In the event that changes are made to the plans, the revised plans should be forwarded to the Geotechnical Engineer to review for conformance with the previous recommendations.

d. Observation and testing services should be provided by Butano Geotechnical

Engineering, Inc. during construction of the subject project. All earthwork must be observed and approved by the Geotechnical Consultant. Any earthwork performed without the full knowledge and observation of Butano Geotechnical Engineering, Inc. will render the recommendations of this review invalid. During grading, all excavation, fill placement and compaction operations should be observed and field density testing should be performed to evaluate the suitability of the fill, and to determine that the applicable recommendations are incorporated during construction.

3. LIMITATIONS

a. Our review was performed in accordance with the usual and current standards of the profession, as they relate to this and similar localities. No other warranty, expressed or implied, is provided as to the conclusions and professional advice presented in this review.

b. As in most projects, conditions revealed during construction may be at variance with preliminary findings. Should this occur, the changed conditions must be evaluated by the Geotechnical Engineer and revised recommendations provided as required.

c. This report is issued with the understanding that it is the responsibility of the

Owner, or his Representative, to ensure that the information and recommendations presented herein are brought to the attention of the Architect and Engineers for the project and incorporated into the plans, and that the Contractor and Subcontractors implement such recommendations in the field.

d. This firm does not practice or consult in the field of safety engineering. We do not direct the Contractor's operations, and we are not responsible for other than our own personnel on the site; therefore, the safety of others is the responsibility of the

Geotechnical Plan Review July 24, 2023 141 Archer Drive Project No. 23-141-SC Santa Cruz, California Page 3

Contractor. The Contractor should notify the Owner if he considers any of the recommended actions presented herein to be unsafe.

e. The findings of this review are considered valid as of the present date. However, changes in the conditions of a site can occur with the passage of time, whether due to natural events or human activity on this or adjacent sites. In addition, changes in applicable or appropriate codes and standards may occur as a result of legislation or a broadening of knowledge. Accordingly, this review may become invalidated, wholly or partially, by changes outside our control. Therefore, this report is subject to review and revision as changed conditions are identified.

It is a pleasure being associated with you on this project. If you have any questions or if we may be of further assistance please do not hesitate to contact our office.

Sincerely, BUTANO GEOTECHNICAL ENGINEERING, INC.

Greg Bloom, PE, GE Principal Engineer