141_Archer_[23-035]_-_IMPROVEMENT_PLANS_(1)_Rev_04.03.24.pdf

PDF 4 MB Posted

Attached to
EWP Project 5228 - 141 Archer Dr.
Solicitation number
IFB No. PW-0124
Issued by
Santa Cruz County, San Francisco City, California

About this file

These improvement plans are for the Winton Residence located at 141 Archer Drive in Santa Cruz, California, prepared by Ramsey Civil Engineering for a slope stabilization and retaining wall project. The project involves removing failed and damaged existing walls due to slope failure and reconstructing a new soldier pile wall with wood lagging, along with an additional small landscape wall and regrading of the failed slope. The work requires obtaining three specific permits: a temporary encroachment permit for drain pipe installation, a regular encroachment permit for the drain pipe to remain in the public right-of-way, and a concrete permit for sidewalk curb drain installation.

The project scope follows Natural Resources Conservation Service (NRCS) standards, specifically the Streambank and Shoreline Protection - 580 standard. The site plan indicates the existing house will remain in place while the surrounding slope and wall are reconstructed. A geotechnical report by Butano Geotechnical Engineering dated June 2023 provides recommendations for soil preparation, and all grading and construction must comply with the 2022 California Building Code. The erosion control plan includes specific measures such as fiber rolls, silt sacks, and concrete washout areas to prevent sediment transport and manage stormwater runoff during construction, with work restricted between October 15th and April 15th to minimize environmental impact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

AR

C

H

ER

D R

IV

E

BA

Y

D R

IV

E

(E) HOUSE TO

REMAIN

DRAWN BY:

BY

D

AT

E

D

ES

C R

IP

TI

O N

R

EV

IS

IO

N B

LO

C

K

DESIGNED BY:

DATE:

SCALE:

PROJECT NO:

SHEET:

DMR

DMR

08/08/2023

AS NOTED

23-035

N U

M

BE

R

CIVIL ENGINEERING

LAND PLANNING

PROJECT MANAGEMENT

CONSTRUCTION SUPPORT

QSD AND QSP SERIVCES

2905 KRISTIE COURT

SANTA CRUZ, CA 95065

TEL (831) 462-2905

www.ramseycivilengineering.com

DAVID RAMSEY DATE

RCE# 73735

APN# 006-031-37

PLAN TYPE

AR

C

H

ER

D R

IV

E, S

AN

TA

C

R U

Z, C

A, W

IN

TO

N

R

ES

ID

EN

CE

D

AV I D RAMS E Y

NO. C73735

RE

G

I S T E

RE

D PROFESS IONAL ENG

I NEER

S TAT E OF CAL I FORNIACIV I L

RESIDENTIAL

D M

R 9/

/2

C

IT

Y

R

EV

IE

W

C O

M M

EN

TS

1S

T R

O U

TI

N

G

4/3/24

D M

R 3/

7/

C O

O R

D

IN

AT

IO

N R

EV

IS

IO

N

S

C1.0

C O

VE

R

S H

EE

T

INDEX OF SHEETS

SHEET NO. DESCRIPTION

C1.0 COVER SHEET

C2.0 SITE PLAN

C3.0 GRADING AND DRAINAGE PLAN

C3.1 WALL PROFILE & SECTION

C4.0 DETAILS

C5.0 EROSION CONTROL PLAN & DETAILS

VICINITY MAP

N.T.S.

BENCHMARK

ELEVATIONS ARE SHOWN IN THE NORTH AMERICAN VERTICAL DATUM OF

1988 (NAVD88) AND WAS ESTABLISHED BY A REALTIME KINEMATIC (RTK)

GPS TIE TO CONTROL SET AS PART OF THIS SURVEY.

SITE BENCHMARK #52 ELEVATION = 234.89' (NAVD88)

SURVEY

SURVEY FOR THIS PROJECT PROVIDED BY ALPHA LAND

SURVEYS, INC., JOB NO. 2023-113, DATED 06/08/2023.

MAP DATA © GOOGLE

SITE

GRAPHIC SCALE: 1 INCH = FEET

10' 0 5' 10' 20'

LEGEND

WATER THRUST BLOCK

FLOW DIRECTION

AB AGGREGATE BASE

AC AIR CONDITIONER UNIT

ADU ACCESSORY DWELLING UNIT

APN ASSESSORS PARCEL NUMBER

ARV AIR-RELEASE VALVE

BF BASEMENT FLOOR

BFP BACKFLOW PREVENTER

BO BLOW-OFF VALVE

BRW FG AT BOTTOM OF RETAINING WALL

BSW BACK OF SIDEWALK

BVC BEGIN VERTICAL CURVE

BW BOTTOM OF WALL

CATV CABLE TELEVISION

CB CATCH BASIN

CBC CALIFORNIA BUILDING CODE

CI CURB INLET

CIP CAST IRON PIPE

CL CENTERLINE

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

CONC CONCRETE

COTG CLEANOUT TO GRADE

DIP DUCTILE IRON PIPE

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

DWY DRIVEWAY

E EAST, ELECTRICAL

EG EXISTING GROUND

EP EDGE OF PAVEMENT

(E) EXISTING

EQ EQUAL

EX. EXISTING

FC FACE OF CURB

FDC FIRE DEPARTMENT CONNECTION

FG FINISH GRADE

FF FINISH FLOOR

FH FIRE HYDRANT

FL FLOWLINE

FNC FENCE

FO FIBER OPTIC

FS FINISHED SURFACE

FSB FRONT SETBACK

FT FOOT/FEET

FW FIRE WATER

G GAS

GB GRADE BREAK

GF GARAGE FLOOR

HT HEIGHT

HDPE HIGH-DENSITY POLYETHYLENE

HP HIGH POINT

INT INTERSECTION

INV INVERT

IRR IRRIGATION

JB JUNCTION BOX

JT JOINT TRENCH

L LANDING

LF LINEAR FOOT

LIP LIP OF GUTTER

LOG LIMIT OF GRADING

LP LOW POINT

MH MANHOLE

MIN MINIMUM

N NORTH

NE NORTHEAST

NTS NOT TO SCALE

NW NORTHWEST

OC ON CENTER

OCEW ON CENTER, EACH WAY

OH OVERHEAD

PCC PORTLAND CEMENT CONCRETE

POC POINT OF CONNECTION

PP POWER POLE

PL PROPERTY LINE

PRC POINT OF REVERSE CURVE

PS PLANTING STRIP

PSE PUBLIC SERVICE EASEMENT

PIV POST-INDICATOR VALVE

PV PAVEMENT

PVC POLYVINYL CHLORIDE PIPE

R RADIUS

RC RELATIVE COMPACTION

RCP REINFORCED CONCRETE PIPE

ROW RIGHT-OF-WAY

RPPB REDUCE PRESSURE PRINICIPLE BACKFLOW

RSB REAR SETBACK

RW RECYCLED WATER

S SOUTH, SLOPE

SD STORM DRAIN

SE SOUTHEAST

SDMH STORM DRAIN MANHOLE

SDE STORM DRAIN EASEMENT

SHT SHEET

SS SANITARY SEWER

SSB SIDE SETBACK

SSE SANITARY SEWER EASEMENT

SSMH SANITARY SEWER MANHOLE

STA STATION

STD STANDARD

SW SIDEWALK, SOUTHWEST

SWE SIDEWALK EASEMENT

T TELEPHONE

TC TOP OF CURB

TH THRESHOLD

TRAN TRANSFORMER

TRW FG AT TOP OF RETAINING WALL

TW TOP OF WALL

USA UNDERGROUND SERVICE ALERT

W WEST, WATER

WM WATER METER

WV WATER WALVE

ABBREVIATIONS

E

FO

FW

G

IRR

JT

OH

RW

SD

SS

T

CATV

W

ELECTRICAL LINE

FIBER OPTIC LINE

FIRE WATER LINE

GAS LINE

IRRIGATION LINE

JOINT TRENCH LINE

OVERHEAD LINE

RECYCLED WATER LINE

STORM DRAIN LINE

SANITARY SEWER LINE

TELEPHONE LINE

CABLE TV LINE

WATER LINE

WATER VALVE

MANHOLE STRUCTURE

GUY ANCHOR

FIRE HYDRANT

CLEANOUT STRUCTURE

CURB INLET

CATCH BASIN

BLOW-OFF VALVE

AIR RELEASE VALVE

WATER METER

PROPERTY LINE

PROPERTY LINE -ADJACENT

FENCE

PROPOSED EASEMENT

> > > SWALE

IMPROVEMENT PLANS

FOR

WINTON RESIDENCE

141 ARCHER DRIVE

SANTA CRUZ, CALIFORNIA

LOG LIMIT OF GRADING

TREE TREE PROTECTION FENCING

BASIS OF BEARINGS

BEARINGS FOR THIS SURVEY ARE BASED ON THE MONUMENT LINE OF

ARCHER DRIVE AS SHOWN ON THAT MAP FILED IN VOLUME 19 OF

PARCEL MAPS AT PAGE 71, SANTA CRUZ COUNTY RECORDS AND WAS

ESTABLISHED BETWEEN FOUND MONUMENTS.

BASIS OF BEARINGS: N00°04'30"W

FIBER ROLLS

PROPOSED RETAINING WALL

PERFORATED PIPE

WORK SCOPE

PROJECT WILL INCLUDE THE REMOVAL OF THE FAILED & DAMAGED

WALLS, DUE TO SLOPE FAILURE, AND THE RECONSTRUCTION OF A NEW

SOLDIER PILE WALL WITH WOOD LAGGING. AN ADDITIONAL SMALL

LANDSCAPE WALL WILL BE CONSTRUCTED UPSLOPE OF THE MAIN WALL,

AND REGRADING OF THE FAILED SLOPE WILL OCCUR. NO OTHER

IMPROVEMENTS ARE PROPOSED.

PROJECT WILL REQUIRE THE FOLLOWING ADDITIONAL PERMITS FOR

WORK WITHIN THE PUBLIC RIGHT-OF-WAY:

1. TEMPORARY ENCROACHMENT PERMIT TO INSTALL THE DRAIN PIPE IN

THE PUBLIC RIGHT-OF-WAY

2. REGULAR ENCROACHMENT PERMIT FOR THE DRAIN PIPE TO REMAIN

IN THE PUBLIC RIGHT-OF-WAY

3. CONCRETE PERMIT TO INSTALL THE SIDEWALK CURB DRAINS.

TO THE BEST OF MY KNOWLEDGE, JUDGEMENT, AND BELIEF, THE DESIGN

FOLLOWS NRCS STANDARDS AND SPECIFICATIONS. FOR 141 ARCHER

WAY, THE ONLY STANDARD IS STREAMBANK AND SHORELINE

PROTECTION - 580. CA NRCS STANDARDS AND SPECIFICATIONS

NRCS REVIEW WAS COMPLETED TO ENSURE COMPLIANCE WITH THE

LISTED NRCS PRACTICE STANDARDS AND SPECIFICATIONS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text N

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SD

SD

(E) 2.44'

3.41'

23.34'

12.40'

41.82'

18.06'

BEGIN NEW WALL

(MATCH END OF

(E) WALL)

END NEW WALL

(MATCH END OF

(E) WALL)

END NEW WALL (MATCH

END OF (E) WALL)

END NEW WALL (MATCH

END OF (E) WALL)

(N) 12" SQ DRAIN INLET

PER DTL 4, SHT C4.0

RIM 217.65

INV 212.58

(N) 12" SQ DRAIN INLET

PER DTL 4, SHT C4.0

RIM 217.32

INV(6"IN) 214.82

INV(4"IN) 207.65

INV(OUT) 207.21

(N) 30LF± 4" PERF

BACK OF WALL DRAIN

SLOPE W/ FOOTING

(N) 18LF± 4" PERF

BACK OF WALL DRAIN

SLOPE W/FOOTING

(N) 6" TWO-WAY SDCO

PER DTL 1, SHT C4.0

RIM 218.40

INV 208.78

(N) 37LF± 6" HDPE SD

S=0.56

PIPE TO BE ANCHORED TO

SLOPE PER CALTRANS STD

DTL D87C, SEE DTL 3, SHT C4.0

(N) 42LF± 6" HDPE SD

S=0.53

PIPE TO BE ANCHORED TO

SLOPE PER CALTRANS STD

DTL D87C, SEE DTL 3, SHT C4.0

(N) 6" SDCO

PER DTL 2,

SHT C4.0

RIM 221.05

INV 218.65

(N) 6" SDCO PER

DTL 2, SHT C4.0

RIM 220.56

INV 218.70

(N) 23LF± 4" PERF

BACK OF WALL DRAIN

S=0.01

(N) 80 LF± 6"

HDPE SD

S=0.064

SITE CROSS

SECTION LINE

SEE BELOW

(N) 25LF± 6"

HDPE SD

S=0.15

(N) 3LF± 4" PVC RD

S=0.75

(N) 3LF± 4"

PVC RD

S=0.30

(N) AREA DRAIN

RIM 222.42

INV 219.92

INSTALL J-BOX

(SOLID LID)

RIM 190.80

INV(IN) 189.30

INV(OUT) 187.07

(N) THRU-CURB DRAIN

PER DTL 6, SHT C4.0,

CORE THRU EX. CURB

(N) THRU-CURB DRAIN

PER DTL 6, SHT C4.0

CORE THRU EX. CURB

(N) 6LF± 4"

PVC RD

S=0.15

(N) 7LF± 4"

PVC RD

S=0.08

(N) 6" SDCO

PER DTL 2, SHT C4.0

RIM 221.57

INV 218.57

INSTALL HARDPIPE

FOR DS, INV 220.39

INSTALL HARDPIPE

FOR DS, INV 219.30

INSTALL HARDPIPE

FOR DS, INV 218.98

(N) 40 LF±

6" HDPE SD

S=0.09

INV

218.42

INV 216.08

INV 216.17(N) SOLDIER PIER W/ WOOD LAGGING

RETAINING WALL PER STRUCTURAL

PLANS. PROVIDE 42" MIN. RAILING

PER CRC SECTION R312, REFER TO

STRUCTURAL PLANS FOR DESIGN

(N) 2.5' MAX HIGH ALAN BLOCK ( OR

EQUIVALENT) LANDSCAPE WALL, NOTE:

WALL SHALL BE UNDER 3' HIGH THEREFORE

NO STRUCTURAL DESIGN REQUIRED.

(N) 2-5LF 3" C.I. OR SCH

80 SD PIPE, S=0.02

(N) 2- 5LF 3" C.I. OR SCH

80 SD PIPE, S=0.02

INSTALL J-BOX

(SOLID LID)

RIM 186.00

INV(IN) 184.50

INV(OUT) 183.00

6.80'

(N) 12LF± 4" PERF

BACK OF WALL DRAIN

SLOPE W/ FOOTING

(N) 13LF± 4" PERF

BACK OF WALL DRAIN

SLOPE W/FOOTING

(N) GRADED SWALE AT

BACK/TOP WALL, TYP.

(N) GRADED SWALE AT

BACK/TOP WALL, TYP.

(N) 6" SDCO PER

DTL 2, SHT C4.0

RIM 217.92

INV 209.87

(N) 6" SDCO PER

DTL 2, SHT C4.0

RIM 220.33

INV (MATCH (E))

(N) 20 LF±

6" HDPE SD

S= 0.01 MIN.

ABANDON (E) PIPE

CONNECT (E)

SURFACE

DOWNSPOUT

TO NEW

INLET

DRAWN BY:

BY

D

AT

E

D

ES

C R

IP

TI

O N

R

EV

IS

IO

N B

LO

C

K

DESIGNED BY:

DATE:

SCALE:

PROJECT NO:

SHEET:

DMR

DMR

08/08/2023

AS NOTED

23-035

N U

M

BE

R

CIVIL ENGINEERING

LAND PLANNING

PROJECT MANAGEMENT

CONSTRUCTION SUPPORT

QSD AND QSP SERIVCES

2905 KRISTIE COURT

SANTA CRUZ, CA 95065

TEL (831) 462-2905

www.ramseycivilengineering.com

DAVID RAMSEY DATE

RCE# 73735

APN# 006-031-37

PLAN TYPE

AR

C

H

ER

D R

IV

E, S

AN

TA

C

R U

Z, C

A, W

IN

TO

N

R

ES

ID

NO. C73735

RE

G

I S T E

RE

D PROFESS IONAL ENGI NEER

S TAT E OF CAL I FORNIACIV I L

RESIDENTIAL

D M

R 9/

/2

C

IT

Y

R

EV

IE

W

C O

M M

EN

TS

1S

T R

O U

TI

N

G

4/3/24

D M

R 3/

7/

C O

O R

D

IN

AT

IO

N R

EV

IS

IO

N

S

C2.0

SI

TE

P

LA

N

GRAPHIC SCALE: 1 INCH = FEET

5' 0 5' 10'

1. SITE PLAN BASED ON TOPOGRAPHIC SURVEY, PERFORMED BY ALPHA LAND SURVEYS, INC., JOB NO. 2023-113, DATED 06/08/2023.

2. ALL GRADING WORK AND CONSTRUCTION OF IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS SPECIFIED IN THE GEOTECHNICAL REPORT BY BUTANO GEOTECHNICAL ENGINEERING, INC., DATED JUNE 2023, PROJECT NO. 23-141-SC, AND ANY SUBSEQUENT ADDENDUM LETTERS. THE GEOTECHNICAL ENGINEER SHALL INSPECT THE COMPLETED PROJECT AND CERTIFY, IN WRITING, THAT ALL WORK CONFORMS TO THE GEOTECHNICAL

INVESTIGATION REPORT.

3. REFER TO ABOVE REFERENCED GEOTECHNICAL REPORT FOR ONSITE SOIL PREPARATION (OVEREXCAVATION AND

RECOMPACTION REQUIRED) BELOW CONCRETE FOOTINGS, SLABS, AND PAVEMENT.

4. ALL GRADING WORK AND CONSTRUCTION OF IMPROVEMENTS SHALL BE DONE IN ACCORDANCE WITH THE CBC 2022.

5. NO CHANGES ON THESE PLANS SHALL BE MADE WITHOUT PRIOR APPROVAL OF RAMSEY CIVIL ENGINEERING, INC.

6. EROSION CONTROL PLANS SHALL BE PERMITTED AND FILED WITH THE APPLICABLE AGENCIES PRIOR TO ANY

CONSTRUCTION OR GRADING OPERATIONS.

7. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO, OR USES OF, THESE PLANS. ALL CHANGES MUST BE IN WRITING AND MUST BE APPROVED BY THE ENGINEER PRIOR TO

CONSTRUCTION.

8. ROOF DOWNSPOUTS SHALL DISCHARGE AWAY FROM BUILDING FOUNDATION PER 2022 CBC, AND DIRECTED TO GRADE TO

DRAIN.

9. ALL COMPACTION TO BE DETERMINED USING THE LATEST EDITION OF ASTM D1557.

10. THE TYPES, LOCATIONS, SIZES, AND/OR DEPTHS OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON THE IMPROVEMENT PLANS WERE OBTAINED FROM SOURCES OF VARYING RELIABILITY. THE CONTRACTOR SHALL PERFORM THEIR OWN FIELD INVESTIGATION PRIOR TO CONSTRUCTION TO VERIFY UTILITY LOCATIONS. CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL REVEAL THE TYPES, EXTENT, SIZES, LOCATIONS, AND DEPTHS OF SUCH UNDERGROUND UTILITIES. THE ENGINEER CAN ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE DELINEATION OF SUCH UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED. IF AT ANYTIME THE CONTRACTOR IS UNSURE OF UTILITY LOCATIONS, A CERTIFIED UNDERGROUND UTILITY LOCATOR SHALL BE OBTAINED AT THE COST OF THE CONTRACTOR, FOR

ONSITE UTILITIES, OR CONTACT U.S.A (OR 811) FOR OFFSITE UTILITIES.

11. ALL UTILITY STRUCTURES TO REMAIN WITHIN AREAS EFFECTED BY THE CONSTRUCTION WORK ON THIS PROJECT, INCLUDING, BUT NOT LIMITED TO CLEANOUTS, WATER VALVES, AND PULL BOXES SHALL BE ADJUSTED TO GRADE BY THE CONTRACTOR WHETHER SHOWN ON THESE PLANS OR NOT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH ALL

PUBLIC OR PRIVATE UTILITY COMPANIES.

12. ALL AREAS TO BE GRADED ACCORDING TO THE GRADES SHOWN ON THESE PLANS. A 1% MINIMUM SLOPE FOR DRAINAGE SHALL BE APPLIED IF NO GRADES ARE SHOWN, SUBJECT TO THE APPROVAL OF THE PROJECT ENGINEER.

13. CONTRACTOR SHALL GRADE EVENLY BETWEEN SPOT ELEVATIONS.

14. CONTRACTOR SHALL VERIFY THE CONTENTS AND THICKNESS OF THE BUILDING SLAB SECTION (I.E. CONCRETE, SAND, ROCK) WITH THE STRUCTURAL PLANS PRIOR TO COMMENCEMENT OF GRADING OPERATIONS.

15. ALL GRADING, TRENCHING, SHORING, PAVING, AND CONSTRUCTION WORK SHALL BE PERFORMED IN ACCORDANCE WITH

APPLICABLE O.S.H.A REGULATIONS.

16. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONNEL AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. CONTRACTOR AGREES TO DEFEND, INDEMNIFY, AND HOLD DESIGN PROFESSIONALS AND CITY REPRESENTATIVES HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE

SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL.

17. NO ADDITIONAL IMPERVIOUS OR SEMI-PERVIOUS SURFACE AREA COVERAGE BEYOND THE LIMITS SHOWN ON THESE PLANS SHALL BE CONSTRUCTED WITHOUT UPDATED MITIGATIONS AND PRIOR APPROVAL OF THE CITY OF SANTA CRUZ.

18. RAMSEY CIVIL ENGINEERING PERFORMED AN UPSTREAM AND DOWNSTREAM SITE ASSESSMENT FOR STORMWATER RUNOFF ON APRIL 14TH, 2023 . THERE ARE NO KNOWN DRAINAGE ISSUES THAT CURRENTLY EXIST. THERE WILL BE NO SIGNIFICANT IMPACT TO DOWNSTREAM PROPERTIES DUE TO THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.

RAMSEY CIVIL ENGINEERING NOTES:

1. ALL CONSTRUCTION ACTIVITIES SHALL COMPLY WITH APPLICABLE REQUIREMENTS IN THE CURRENT EDITION OF

THE CITY OF SANTA CRUZ STANDARD SPECIFICATIONS AND DETAILS.

2. UNLESS OTHERWISE AGREED UPON WITH THE CITY OF SANTA CRUZ, WORK SHALL BE LIMITED TO 8:00 A.M. TO 5:00 P.M. WEEKDAYS. NON-NOISE PRODUCING ACTIVITIES, SUCH AS INTERIOR PAINTING, SHALL NOT BE SUBJECT TO

THIS RESTRICTION.

3. A "DISTURBANCE COORDINATOR" SHALL BE ESTABLISHED, PRIOR TO CONSTRUCTION, TO RESPOND TO CITIZEN COMPLAINTS AND INQUIRIES REGARDING CONSTRUCTION NOISE AND DUST. THE NAME, PURPOSE AND TELEPHONE NUMBER OF THE DISTURBANCE COORDINATOR SHALL BE POSTED ON A SIGN EASILY VISIBLE FROM OFF-SITE DURING THE ENTIRE TIME PROJECT GRADING AND CONSTRUCTION OCCURS. THE DISTURBANCE COORDINATOR SHALL INVESTIGATE THE CONCERN AND TAKE REMEDIAL ACTION, IF NECESSARY, WITHIN 24 HOURS OF RECEIVING

A COMPLAINT OR INQUIRY.

4. NO CHANGES IN THE APPROVED IMPROVEMENT PLANS SHALL BE MADE WITHOUT PRIOR APPROVAL OF THE

DEPARTMENT OF PUBLIC WORKS.

5. THE CONTRACTOR SHALL NOTIFY THE CITY CONSTRUCTION ENGINEER/INSPECTOR 24 HOURS PRIOR TO START OF

CONSTRUCTION.

6. UNLESS OTHERWISE INDICATED BY A GEOTECHNICAL ENGINEER, THE TOP 8" OF SUB-GRADE UNDER ALL PAVED (CONCRETE AND ASPHALT) SURFACES SUBJECT TO VEHICULAR USE SHALL BE COMPACTED TO A MINIMUM 95%

RELATIVE COMPACTION, OR AS SPECIFIED HEREON.

7. CONTRACTOR SHALL FIELD VERIFY ALL UNDERGROUND UTILITIES AND SUBSTRUCTURES. PRIOR TO ANY CONSTRUCTION TAKING PLACE, THE ENGINEER MUST BE NOTIFIED, IN WRITING, OF ANY DISCREPANCIES THAT MAY

EXIST.

8. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO, OR USES OF, THESE PLANS. ALL CHANGES MUST BE IN WRITING AND MUST BE APPROVED BY THE

ENGINEER PRIOR TO CONSTRUCTION.

9. UNLESS OTHERWISE NOTED, THE TERMS "INSTALL", "CONSTRUCT" AND "NEW" INDICATE THAT THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIALS, PRODUCTS, EQUIPMENT, AND LABOR FOR SAID

INSTALLATION AND CONSTRUCTION.

10. THE DIRECTOR OF PUBLIC WORKS, OR HIS AUTHORIZED REPRESENTATIVE, SHALL HAVE THE AUTHORITY TO "STOP WORK" IF THE WORK IS NOT BEING DONE IN ACCORDANCE WITH THE APPROVED IMPROVEMENT PLANS.

11. THE CONTRACTOR SHALL APPLY WATER TO ALL EXPOSED EARTH SURFACES AT INTERVALS SUFFICIENT TO PREVENT AIRBORNE DUST FROM LEAVING THE PROJECT SITE. ALL EXPOSED EARTH SHALL BE WATERED DOWN AT

THE END OF THE WORK DAY.

CITY OF SANTA CRUZ GENERAL NOTES

AutoCAD SHX Text S

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

BAY DRIVE

(E) HOUSE TO REMAIN

BRW 219.12

TRW 220.62

BRW 218.57

TRW 221.00

BRW 218.81

TRW 220.81

TRW 220.19

BRW 219.19

TRW 217.54

BRW 207.57

BRW 208.45

TRW 218.45

BRW 208.63

TRW 218.58

BRW 210.25

TRW 218.11

BRW 210.50

TRW 218.00

(N) THRU-CURB DRAIN

FL/INV 186.97 (N) THRU-CURB DRAIN

FL/INV 182.91

A A

(N) 2.5' MAX HIGH ALAN BLOCK ( OR

EQUIVALENT) LANDSCAPE WALL, NOTE: WALL

SHALL BE UNDER 3' HIGH THEREFORE NO

STRUCTURAL DESIGN REQUIRED.

(N) RETAINING WALL (SOLDIER PIERS WITH

WOOD LAGGING) PER STRUCTURAL PLANS

SHEET S.1 AND STRUCTURAL CALCULATIONS.

INSTALL J-BOX

(SOLID LID)

RIM 190.80

INV(IN) 189.30

INV(OUT) 187.07

INSTALL J-BOX

(SOLID LID)

RIM 186.00

INV(IN) 184.50

INV(OUT) 183.00

BRW 212.50

TRW 218.00

FL 217.70

FL 218.14

FL 218.50

(HP)

FL 218.12

FL 217.33

BRW 208.82

TRW 217.60

TRW 217.67

BRW 209.79

FL 217.51

2.0%

7.1%

2.6%

3.0% 1.0%

AD

RIM 217.65

AD

RIM 217.32

AD

RIM 222.42

COTG

RIM 220.33

COTG

RIM 221.05

COTG

RIM 218.40

COTG

RIM 220.56

COTG

RIM 217.92

COTG

RIM 221.57

(N) CHRSITY V64 INLET (REPLACE (E) INLET)

RIM 232.0±

CONNECT (E) PIPE TO NEW INLET)

DRAWN BY:

BY

D

AT

E

D

ES

C R

IP

TI

O N

R

EV

IS

IO

N B

LO

C

K

DESIGNED BY:

DATE:

SCALE:

PROJECT NO:

SHEET:

DMR

DMR

08/08/2023

AS NOTED

23-035

N U

M

BE

R

CIVIL ENGINEERING

LAND PLANNING

PROJECT MANAGEMENT

CONSTRUCTION SUPPORT

QSD AND QSP SERIVCES

2905 KRISTIE COURT

SANTA CRUZ, CA 95065

TEL (831) 462-2905

www.ramseycivilengineering.com

DAVID RAMSEY DATE

RCE# 73735

APN# 006-031-37

PLAN TYPE

AR

C

H

ER

D R

IV

E, S

AN

TA

C

R U

Z, C

A, W

IN

TO

N

R

ES

ID

NO. C73735

RE

G

I S T E

RE

D PROFESS IONAL ENGI NEER

S TAT E OF CAL I FORNIACIV I L

RESIDENTIAL

D M

R 9/

/2

C

IT

Y

R

EV

IE

W

C O

M M

EN

TS

1S

T R

O U

TI

N

G

4/3/24

D M

R 3/

7/

C O

O R

D

IN

AT

IO

N R

EV

IS

IO

N

S

C3.0

G R

AD

IN

G

D R

AI

N

AG

E

PL

AN

GRAPHIC SCALE: 1 INCH = FEET

5' 0 5' 10'

CUBIC YARDS (OFFHAUL)

CUBIC YARDS EMBANKMENT

CUBIC YARDS EXCAVATION

ESTIMATED EARTHWORK QUANTITIES

NOTES

1. ESTIMATE DOES NOT INCLUDE UTILITY TRENCH VOLUMES OR ANY

OVEREXCAVATION, IF REQUIRED BY SITE CONDITIONS.

2. ESTIMATE ASSUMES A 15% COMPACTION FACTOR ON ALL FILL

MATERIAL AND A 0% EXPANSION FACTOR ON ALL CUT MATERIAL.

3. PRIOR TO COMMENCEMENT OF WORK CONTRACTOR SHALL CONFIRM

THAT ESTIMATES ARE CORRECT.

4. EXCESS MATERIAL SHALL BE DISPOSED OF OFFSITE AT AN APPROVED

DISPOSAL SITE.

MATCH LINE

MATCH LINE

TOP WALL

STA: 0+00 - 0+53

H: 1"=5' V: 1"=5'

0+00 0+25 0+50 0+53

FINISHED GRADE

AT TOP OF WALL

TOP OF WALL

(6" MIN. FREEBOARD)

FINISHED GRADE AT

BOTTOM OF WALL

CONCRETE PIER @

SOLDIER COL. SPACED

AT 6' MAX. O.C. PER

STRUCTURAL DETAIL

12X WOOD LAGGING

MEMBERS PER

STRUCTURAL DETAIL

EXISTING

GRADE

SITE CROSS SECTION A-A

STA: 0+00 - 0+68

H: 1"=5' V: 1"=5'

0+00 0+25 0+50 0+68

(N) RETAINING

WALL PIER PER

STRUCTURAL

PLANS

(N) 2.5' MAX HIGH ALAN BLOCK ( OR

EQUIVALENT) LANDSCAPE WALL, NOTE:

UNDER 3' THEREFORE NO STRUCTURAL

DESIGN REQUIRED.

(N) GRADED SWALE

AT BACK OF WALL

EXISTING GRADE

FINISHED GRADE

(N)SOLDIER PILE AND WOOD LAGGING

RETAINING WALL PER STRUCTURAL

PLANS & CALCULATIONS

DRAWN BY:

BY

D

AT

E

D

ES

C R

IP

TI

O N

R

EV

IS

IO

N B

LO

C

K

DESIGNED BY:

DATE:

SCALE:

PROJECT NO:

SHEET:

DMR

DMR

08/08/2023

AS NOTED

23-035

N U

M

BE

R

CIVIL ENGINEERING

LAND PLANNING

PROJECT MANAGEMENT

CONSTRUCTION SUPPORT

QSD AND QSP SERIVCES

2905 KRISTIE COURT

SANTA CRUZ, CA 95065

TEL (831) 462-2905

www.ramseycivilengineering.com

DAVID RAMSEY DATE

RCE# 73735

APN# 006-031-37

PLAN TYPE

AR

C

H

ER

D R

IV

E, S

AN

TA

C

R U

Z, C

A, W

IN

TO

N

R

ES

ID

NO. C73735

RE

G

I S T E

RE

D PROFESS IONAL ENGI NEER

S TAT E OF CAL I FORNIACIV I L

RESIDENTIAL

D M

R 9/

/2

C

IT

Y

R

EV

IE

W

C O

M M

EN

TS

1S

T R

O U

TI

N

G

4/3/24

D M

R 3/

7/

C O

O R

D

IN

AT

IO

N R

EV

IS

IO

N

S

C3.1

W

AL

L

PR

O

FI

LE

A

N D

S

EC

TI

O

N

GRAPHIC SCALE: 1 INCH = FEET

10' 0 5' 10' 20'

DRAWN BY:

BY

D

AT

E

D

ES

C R

IP

TI

O N

R

EV

IS

IO

N B

LO

C

K

DESIGNED BY:

DATE:

SCALE:

PROJECT NO:

SHEET:

DMR

DMR

08/08/2023

AS NOTED

23-035

N U

M

BE

R

CIVIL ENGINEERING

LAND PLANNING

PROJECT MANAGEMENT

CONSTRUCTION SUPPORT

QSD AND QSP SERIVCES

2905 KRISTIE COURT

SANTA CRUZ, CA 95065

TEL (831) 462-2905

www.ramseycivilengineering.com

DAVID RAMSEY DATE

RCE# 73735

APN# 006-031-37

PLAN TYPE

AR

C

H

ER

D R

IV

E, S

AN

TA

C

R U

Z, C

A, W

IN

TO

N

R

ES

ID

NO. C73735

RE

G

I S T E

RE

D PROFESS IONAL ENGI NEER

S TAT E OF CAL I FORNIACIV I L

RESIDENTIAL

D M

R 9/

/2

C

IT

Y

R

EV

IE

W

C O

M M

EN

TS

1S

T R

O U

TI

N

G

4/3/24

D M

R 3/

7/

C O

O R

D

IN

AT

IO

N R

EV

IS

IO

N

S

C4.0

D

ET

AI

LS

TWO-WAY CLEANOUT TO GRADE

NTS

2"

PAVED AREA

12"

LANDSCAPE

AREA

HAND TAMPERED

BACKFILL TO

90% RELATIVE

COMPACTION

AIR-TIGHT THREADED

MPT CAP

TWO-WAY

CLEANOUT

TEE

SEE NOTES BELOW

NOTES:

1. RECTANGULAR OR CIRCULAR BOXES ARE PERMITTED.

2. BOXES INSTALLED IN SIDEWALK AREAS SHALL HAVE SOLID COVERS WITHOUT HOLES.

3. APPROVED RECTANGULAR BOXES:

a. CHRISTY B3 BOX WITH B3C OR B3D LID.

b. BROOKS NO.3 BOX WITH NO. 3 LID.

4. CONCRETE/FIBERLYTE LIDS ARE ACCEPTABLE IN NON-VEHICULAR AREAS. H-20 CAST IRON TRAFFIC LIDS

AND BOXES IN VEHICULAR AREAS.

5. ALL CLEANOUT LIDS SHALL BE MARKED WITH AN "S" OR THE WORD "SEWER" FOR SANITARY SEWER

CLEANOUTS OR "SD" OR THE WORD "STORM" FOR STORM DRAIN CLEANOUTS.

6. CLEANOUT PIPE SHALL BE THE SAME DIAMETER AS THE CONNECTED SITE PIPE.

7. TERMINATE C.O. AT CLOSEST JOINT TO SURFACE WITH TEMPORARY PLUG. AFTER ALL BACKFILL IS

COMPLETE AND SUB-GRADE MADE IN AREAS TO BE PAVED, THE FINAL RISER PIPE AND BOX SHALL BE

INSTALLED AS SHOWN.

8. INSTALL #8 COPPER TRACER WIDE FROM MAIN TO CLEANOUT. EXTEND WIRE UP RISER AND COIL TWO

FEET INSIDE BOX.

CAST-IN-PLACE

CONCRETE PRIOR

TO SUBGRADE

FLOW

INSTALL VERTICALLY &

CUT TO LENGTH/SDR 35

ASTM D3034

EXISTING

LATERAL

FLEXIBLE TRANSITION

COUPLING (MIN 3.5' FROM TEE)

PLACE EXPANDABLE

PLASTIC PLUG FOR

STUB-OUTS.

CLEANOUT TO GRADE

NTS

2"

PAVED AREA

12"

LANDSCAPE AREA

HAND TAMPERED

BACKFILL TO

90% RELATIVE

COMPACTION

AIR-TIGHT THREADED

MPT CAP

1/8 BEND

1/8 BEND AT

TERMINUS ONLY

SEE NOTES BELOW

NOTES:

1. RECTANGULAR OR CIRCULAR BOXES ARE PERMITTED.

2. BOXES INSTALLED IN SIDEWALK AREAS SHALL HAVE SOLID COVERS WITHOUT HOLES.

3. APPROVED RECTANGULAR BOXES:

a. CHRISTY B3 BOX WITH B3C OR B3D LID.

b. BROOKS NO.3 BOX WITH NO. 3 LID.

4. CONCRETE/FIBERLYTE LIDS ARE ACCEPTABLE IN NON-VEHICULAR AREAS. H-20 CAST

IRON TRAFFIC LIDS AND BOXES IN VEHICULAR AREAS.

5. ALL CLEANOUT LIDS SHALL BE MARKED WITH AN "S" OR THE WORD "SEWER" FOR

SANITARY SEWER CLEANOUTS OR "SD" OR THE WORD "STORM" FOR STORM DRAIN

CLEANOUTS.

6. CLEANOUT PIPE SHALL BE THE SAME DIAMETER AS THE CONNECTED SITE PIPE.

7. TERMINATE C.O. AT CLOSEST JOINT TO SURFACE WITH TEMPORARY PLUG. AFTER ALL

BACKFILL IS COMPLETE AND SUB-GRADE MADE IN AREAS TO BE PAVED, THE FINAL

RISER PIPE AND BOX SHALL BE INSTALLED AS SHOWN.

CAST-IN-PLACE

CONCRETE PRIOR

TO SUBGRADE

FLOW

INSTALL VERTICALLY &

CUT TO LENGTH/SDR 35

ASTM D3034

CATCH BASIN

NTS

MODEL A B C

CB1212 12" 12" 4"

CB1818 18" 18" 5"

PLAN

C

H

EI

G H

T

AS

R

EQ

U

IR

ED

GALVANIZED STEEL OR

CAST IRON GRATE TO BE

LOCKED TO FRAME

6"

B

AC

PIPE OPENING

LIFT HOLE

CB2424 24" 24" 5"

STORM PIPE

NOTES:

1. ALL GRATES WITHIN DRIVE AISLES AND WALKWAYS SHALL

BE HEEL PROOF ACCESSIBLE AND RATED FOR H-2O HEAVY

TRAFFIC LOADING.

U.S. CONCRETE PRECAST GROUP OR

APPROVED ALTERNATIVE/H-20

TRAFFIC FRAME & GRATE FOR ALL

GRATES IN VEHICULAR AREAS (SOLID

GRATE FOR JUNCTION BOXES)

TONGUE &

GROOVE JOINT

AS REQUIRED ON

STRUCTURES

OVER 4' DEEP

GROUT PIPE

IN PLACE

TRENCH DETAIL

NTS

4" + 25% O.D. PIPE

(BOTH SIDES)

6"

MIN 3" AC/9"

CLASS II ABPAVEDNON-PAVED

4"

NOTES:

1. TRENCH BEDDING AND SHADING MATERIAL SHALL BE 3/8" DIAMETER OR

GREATER CRUSHED ROCK OR WELL GRADED SAND & GRAVEL MATERIALS

CONFORMING TO THE PIPE MANUFACTURER'S REQUIREMENTS. IF A SOILS

REPORT DIFFERS FROM ABOVE, THE SOILS REPORT SHALL GOVERN.

2. USE 90% RELATIVE COMPACTION IF NO SOILS REPORT EXISTS. IF SOILS

REPORT EXISTS, COMPACTION REQUIREMENTS IN THE REPORT SHALL

GOVERN OVER THIS DETAIL.

SEE NOTE 1 & 2 TRENCH BACKFILL SHALL BE

NATIVE SOIL WITH MINIMUM 90%

RELATIVE COMPACTION/

COMPACT UPPER 6" TO 95%

RELATIVE COMPACTION

FO

R

H D

PE

P

IP

E

IN

PA

VE

D

A R

EA

S, ' M

IN

C O

VE

R

F R

O M

S U

BG

R

AD

E

O R

C O

N C

R

ET

E C

AP

R

EQ

U

IR

ED

FO

R

P

VC

P

IP

E

IN

PA

VE

D A

R

EA

S, ' M

IN

C

O

VE

R F

R O

M S

U

BG

R

AD

E O

R C

O N

C R

ET

E

C

AP

R

EQ

U

IR

ED

FO

R

S D

R P

IP

E

IN

N

O N

-P

AV

ED

A

R

EA

S, ' M

IN

C

O

VE

R F

R O

M S

U

BG

R

AD

E O

R C

O N

C R

ET

E

C

AP

R

EQ

U

IR

ED

FO

R

S C

H . 8

O

R C

PI

PE

8"

M

IN

C O

VE

R

R

EQ

U

IR

ED

NOTES:

1. DETAIL 3 IS FOR REFERENCE TO THE ANCHORAGE SYSTEM ONLY. CALTRANS DETAIL IS CALCULATED

FOR A 24" PIPE ON SURFACE, PROPOSED DRAIN PIPE WILL BE 6" DIAMETER, THEREFORE, ABOVE

SYSTEM SHALL BE SUFFICIENT FOR SAID APPLICATION.

2. ANY REFERENCE TO RETAINING WALL ON THIS DETAIL SHALL BE IGNORED. REFER TO STRUCTURAL

PLANS AND CALCULATIONS FOR ALL RETAINING WALL INFORMATION AND DESIGN ASPECTS.

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

BAY DRIVE

(E) HOUSE TOREMAIN

ARCHER DRIVE

A A

DRAWN BY:

BY

D

AT

E

D

ES

C R

IP

TI

O N

R

EV

IS

IO

N B

LO

C

K

DESIGNED BY:

DATE:

SCALE:

PROJECT NO:

SHEET:

DMR

DMR

08/08/2023

AS NOTED

23-035

N U

M

BE

R

CIVIL ENGINEERING

LAND PLANNING

PROJECT MANAGEMENT

CONSTRUCTION SUPPORT

QSD AND QSP SERIVCES

2905 KRISTIE COURT

SANTA CRUZ, CA 95065

TEL (831) 462-2905

www.ramseycivilengineering.com

DAVID RAMSEY DATE

RCE# 73735

APN# 006-031-37

PLAN TYPE

AR

C

H

ER

D R

IV

E, S

AN

TA

C

R U

Z, C

A, W

IN

TO

N

R

ES

ID

NO. C73735

RE

G

I S T E

RE

D PROFESS IONAL ENGI NEER

S TAT E OF CAL I FORNIACIV I L

RESIDENTIAL

D M

R 9/

/2

C

IT

Y

R

EV

IE

W

C O

M M

EN

TS

1S

T R

O U

TI

N

G

4/3/24

D M

R 3/

7/

C O

O R

D

IN

AT

IO

N R

EV

IS

IO

N

S

C5.0

ER

O

SI

O

N C

O N

TR

O

L

PL

AN

A

N D

D

ET

AI

LS

EROSION CONTROL NOTES

1. THE EROSION CONTROL PLANS IN THIS SET SHALL BE REVIEWED AND

IMPLEMENTED BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF

WORK.

2. THE CONTRACTOR SHALL ENSURE ALL MONITORING AND INSPECTIONS

ARE PERFORMED AS REQUIRED ONSITE THROUGHOUT CONSTRUCTION.

3. NO LAND CLEARING, GRADING OR EXCAVATION SHALL BE DONE

BETWEEN OCTOBER 15TH AND APRIL 15TH. ANY DEVIATION FROM THIS

CONDITION REQUIRES REVIEW AND APPROVAL OF A SEPARATE WINTER

EROSION CONTROL PLAN BY ENVIRONMENTAL PLANNING PRIOR TO

BEGINNING CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE

FOR IMPLEMENTING AND MAINTAINING SITE EROSION CONTROL AT ALL

TIMES.

4. IT SHALL BE THE RESPONSIBILITY OF THE OWNER AND THE PERMITTEE

TO ENSURE THAT EROSION DOES NOT OCCUR FROM ANY ACTIVITY

DURING OR AFTER PROJECT CONSTRUCTION. ADDITIONAL MEASURES,

BEYOND THOSE SPECIFIED, MAY BE REQUIRED BY THE PLANNING

DIRECTOR AS DEEMED NECESSARY TO CONTROL ACCELERATED

EROSION.

5. PRIOR TO ANY FORECAST RAIN AND ANYTIME BETWEEN OCTOBER 15

AND APRIL 15, AT THE END OF EACH WORKDAY, AT THE END OF EACH

WORKWEEK, THE DEVELOPER SHALL IMPLEMENT ALL TEMPORARY

MEASURES NECESSARY TO PREVENT EROSION AND SILTATION, UNTIL

THE PROJECT HAS BEEN FINALIZED. THESE MEASURES SHALL INCLUDE,

BUT NOT BE LIMITED TO, DIRECT SEEDING OF THE AFFECTED AREAS,

STRAW MULCHING, AND/OR INSTALLATION OF STRAW BALES DAMS/SILT

FENCES.

6. DURING CONSTRUCTION, NO TURBID WATER SHALL BE PERMITTED TO

LEAVE THE SITE. USE OF SILT AND GREASE TRAPS, FILTER BERMS, HAY

BALES OR SILT FENCES SHALL BE USED TO PREVENT SUCH DISCHARGE.

7. ALL AREAS ON- AND OFF-SITE EXPOSED DURING CONSTRUCTION

ACTIVITIES, IF NOT PERMANENTLY LANDSCAPED PER PLAN, SHALL BE

PROTECTED BY MULCHING AND/OR SEEDING WITH ANNUAL WINTER

BARLEY.

8. ALL EXCAVATED MATERIAL SHALL BE REMOVED TO AN APPROVED

DISPOSAL SITE OR DISPOSED OF ON-SITE IN A MANNER THAT WILL NOT

CAUSE EROSION.

9. ANY MATERIAL STOCKPILED, FOR LONGER THAN 14 DAYS, DURING

CONSTRUCTION SHALL BE COVERED WITH PLASTIC.

10. UPON COMPLETION OF CONSTRUCTION, ALL REMAINING EXPOSED SOILS

SHALL BE PERMANENTLY REVEGETATED PER LANDSCAPING PLAN. THE

PROTECTION SHALL BE INSTALLED PRIOR TO CALLING FOR FINAL

APPROVAL OF THE PROJECT AND AT ALL TIMES BETWEEN OCTOBER 15

AND APRIL 15. SUCH PROTECTION SHALL BE MAINTAINED FOR AT LEAST

ONE WINTER UNTIL PERMANENT PROTECTION IS ESTABLISHED.

11. EXPOSED SOIL ON SLOPES GREATER THAN 20% SHALL BE SEEDED,

COVERED WITH 2 INCHES OF STRAW, AND AN EROSION CONTROL

BLANKET. THE EROSION CONTROL BLANKET SHALL BE STAKED IN

PLACE.

12. IT IS THE DEVELOPER'S RESPONSIBILITY TO SEE THAT ADDITIONAL

MEASURES, NECESSARY TO CONTROL SITE EROSION AND PREVENT

SEDIMENT TRANSPORT OFF-SITE ARE IMPLEMENTED.

13. ALL SPILLS AND/OR LEAKS SHALL BE IMMEDIATELY CLEANED UP AND

MITIGATED PER THE CONTRACTORS O&M STANDARDS.

FIBER ROLLS

NTS

FIBER ROLLS CONSTRUCTION SPECIFICATIONS

1. PREPARE SLOPE BEFORE THE FIBER ROLL PROCEDURE IS STARTED.

SHALLOW GULLIES SHOULD BE SMOOTHED AS WORK PROGRESSES.

2. DIG SMALL TRENCHES ACROSS SLOPE ON CONTOUR, TO PLACE FIBER

ROLLS IN. THE TRENCH SHOULD BE DEEP ENOUGH TO ACCOMMODATE

HALF THE THICKNESS OF THE FIBER ROLL. WHEN THE SOIL IS LOOSE AND

UNCOMPACTED, THE TRENCH SHOULD BE DEEP ENOUGH TO BURY THE

FIBER ROLL 2/3 OF ITS THICKNESS BECAUSE THE GROUND WILL SETTLE.

IT IS CRITICAL THAT FIBER ROLLS ARE INSTALLED PERPENDICULAR TO

WATER MOVEMENT, PARALLEL TO THE SLOPE CONTOUR.

3. START BUILDING TRENCHES AND INSTALL FIBER ROLLS FROM THE

BOTTOM OF THE SLOPE AND WORK UP.

4. CONSTRUCT TRENCHES AT CONTOUR INTERVALS OF THREE TO EIGHT

FEET APART DEPENDING ON STEEPNESS OF SLOPE. THE STEEPER THE

SLOPE, THE CLOSER TOGETHER THE TRENCHES.

5. LAY THE FIBER ROLL ALONG THE TRENCHES FITTING IT SNUGLY AGAINST

THE SOIL. MAKE SURE NO GAPS EXIST BETWEEN THE SOIL AND THE

FIBER ROLL. USE A STRAIGHT BAR TO DRIVE HOLES THROUGH THE FIBER

ROLL AND INTO THE SOIL FOR THE WOODEN STAKES.

6. DRIVE THE STAKE THROUGH THE PREPARED HOLE INTO THE SOIL. LEAVE

ONLY ONE OR TWO INCHES OF STAKE EXPOSED ABOVE FIBER ROLL. IF

USING WILLOW STAKES REFER TO USDA SOIL CONSERVATION SERVICE

TECHNICAL GUIDE, BIOENGINEERING, FOR GUIDELINES TO PREPARING

LIVE WILLOW MATERIAL.

7. INSTALL STAKES AT LEAST EVERY FOUR FEET APART THROUGH FIBER

ROLL. ADDITIONAL STAKES MAY BE DRIVEN ON THE DOWNSLOPE SIDE OF

THE TRENCHES ON HIGHLY EROSIVE OR VERY STEEP SLOPES.

INSTALLATION AND MAINTENANCE

8. INSPECT THE FIBER ROLL AND THE SLOPES AFTER SIGNIFICANT STORMS.

MAKE SURE THE FIBER ROLLS ARE IN CONTACT WITH THE SOIL.

9. REPAIR ANY RILLS OR GULLIES PROMPTLY.

10. RESEED OR REPLANT VEGETATION IF NECESSARY UNTIL THE SLOPE IS

STABILIZED.

4' MAX

FIBER ROLL

8" MIN

3/4" X 3/4"

WOOD STAKE

MAX 4" SPACE

2" M

IN

4"

M

AX

" M

IN

SLOPE

VARIES

ENTRENCHMENT DETAIL

TYPICAL INSTALLATION

FIBER ROLL

4' MAX

4' MAX

4' MAX

NOTE: INSTALL FIBER

ROLL ALONG A LEVEL

CONTOUR.

INSTALL A FIBER ROLL NEAR

SLOPE WHERE IT TRANSITIONS

INTO A STEEPER SLOPE

VERTICAL SPACING

MEASURED ALONG

THE FACE OF THE

SLOPE VARIES

BETWEEN 10' AND 20'

CONCRETE WASHOUT

NTS

NOTE:

ACTUAL LAYOUT DETERMINED IN THE FIELD.

ALTERNATIVE WASHOUTS AVAILABLE, CONFIRM

WITH ENGINEER PRIOR TO INSTALLATION

VARIES

10' MIN.

BB

OPTION #1

ABOVE GRADE

(WOOD PLANKS)

SECTION B - B

TWO-STACKED 2X12

ROUGH WOOD FRAME

STAKE

(TYP.)

10 MIL PLASTIC

LINING

10 MIL PLASTIC

LINING

WOOD FRAME SECURELY

FASTENED AROUND ENTIRE

PERIMETER WITH TWO STAKES

INSPECTION AND MAINTENANCE

1. THE CONTRACTORS WATER POLLUTION CONTROL (WPCM) MANAGER SHALL MONITOR

ON SITE CONCRETE WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST

WEEKLY.

2. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING,

CORING, GRINDING AND GROOVING DAILY TO ENSURE PROPER METHODS ARE

EMPLOYED AS DIRECTED BY THE ENGINEER.

3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE

ADEQUATE HOLDING CAPACITY WITH A MINIMUM FREEBOARD OF 4 INCHES FOR

ABOVE GRADE FACILITIES AND 12 INCHES FOR BELOW GRADE FACILITIES.

MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE

REMOVING AND DISPOSING OF HARDENED CONCRETE AND RETURNING THE

FACILITIES TO A FUNCTIONAL CONDITION. HARDENED CONCRETE SHALL BE REMOVED

AND DISPOSED OF BY THE CONTRACTOR.

4. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED

AND READY FOR USE ONCE THE WASHOUT IS 75% FULL.

5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE INSPECTED FOR DAMAGE

(I.E. TEARS IN POLYETHYLENE LINER, MISSING SANDBAGS, ETC.). DAMAGED

FACILITIES SHALL BE REPAIRED.

GRAPHIC SCALE: 1 INCH = FEET

10' 0 5' 10' 20'

BMP SELECTION RATIONALE

· FIBER ROLLS/STRAW WATTLES - PROPOSED AROUND PERIMETER OF SITE TO

PREVENT SILT AND DEBRIS FROM LEAVING THE PROJECT AREA, AND TO

REDIRECT OFFSITE RUN-ON AROUND THE CONSTRUCTION ZONES.

· DI SILT SACKS - SILT SACKS ARE PROPOSED AT EACH NEW DRAIN INLET, SO

THAT THEY DO NOT IMPEDE CONSTRUCTION ACTIVITIES WHILE STILL

PROTECTING THE INLET AND PIPE NETWORK FROM SILT AND DEBRIS.

· CONCRETE WASHOUT - PROPOSED TO ALLOW FOR A DESIGNATED LOCATION

TO WASH OUT CONCRETE TRUCKS, AND OTHER PAINT/CONCRETE

MATERIALS AND EQUIPMENT.

CITY INSPECTION NOTES:

INSPECTIONS: PLEASE CONTACT ERIC DHAKNI, AT EDHAKNI@CITYOFSANTACRUZ.COM

OR 831-420-5131, FOR THE FOLLOWING INSPECTIONS:

· INSPECTIONS DURING INSTALLATION OF ANY REQUIRED STORM WATER LID (LOW

IMPACT DEVELOPMENT) FEATURES AND BEST MANAGEMENT PRACTICES (BMPS)

SUCH AS INSTALLATION OF PERMEABLE PAVERS, PERMEABLE PAVEMENT,

BIO-SWALES, BIO-RETENTION AREAS AND RETENTION/INFILTRATION FACILITIES.

· INSPECTIONS DURING INSTALLATION OF ANY REQUIRED STORM WATER QUALITY

TREATMENT UNITS SUCH BIO-PLANTERS, BIO-FILTRATION TREE UNITS, PERK FILTERS,

CUDOS, STORM WATER FILTER UNITS, ETC.

· FINAL INSPECTION FOR STORM WATER ONCE THE WORK IS COMPLETED AS PART OF

THE PERMIT “SIGN-OFF” PROCESS.

CITY EROSION CONTROL NOTES:

1. CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPS): PROJECT CONSTRUCTION AND DEMOLITION ACTIVITIES SHALL COMPLY WITH THE CITY'S STORM

WATER BEST MANAGEMENT PRACTICES FOR CONSTRUCTION. SEE THE CITY WEBSITE AT:

HTTP://WWW.CITYOFSANTACRUZ.COM/HOME/SHOWDOCUMENT?ID=6031

2. EROSION & SEDIMENT CONTROL BMPS, SUCH AS FIBER ROLLS OR WATTLES, SHALL BE INSPECTED REGULARLY DURING CONSTRUCTION AND AFTER EACH

SIGNIFICANT RAIN EVENT. MAKE NEEDED REPAIRS IMMEDIATELY.

3. CHECK THE SIDEWALK AND STREET DAILY DURING DEMOLITION AND CONSTRUCTION FOR SOIL DRAG-OUT, AND SWEEP IF NEEDED. ROUTINELY MAINTAIN THE CONSTRUCTION ENTRANCE/EXIT TO ENSURE IT REMAINS EFFECTIVE AT PREVENTING DRAG-OUT.

4. STORE OPEN BAGS OF PARTICULATE, GRANULAR OR POWDER MATERIALS (SUCH AS PLASTER OR CONCRETE) INDOORS IF POSSIBLE. IF STORED OUTSIDE, THEY MUST BE KEPT COVERED OR CLOSED, AND DURING THE RAINY SEASON KEPT WITHIN SECONDARY CONTAINMENT.

5. DUMPSTER LIDS MUST BE KEPT CLOSED AND SECURED WHEN NOT IN USE.

6. SOIL & MATERIAL STOCKPILES: SOIL AND MATERIALS STOCKPILES MUST BE PROTECTED FROM RUNOFF/RUN-ON, WHEN NOT IN USE, BY BMPS SUCH AS SURROUNDED BY BERMS, FIBER ROLLS OR WATTLES AND COVERED WITH SHEETING OR TARPS. SOIL STOCKPILES SHOULD BE STORED ON A FLAT AREA. IF STORED ON AN AREA WITH A 10% SLOPE OR MORE, PLEASE ADD NOTE THAT SOIL SHALL BE HAULED OFFSITE AT END OF EACH THE DAY.

7. CONSTRUCTION ENTRANCE/EXIT: INSTALL THE STABILIZED CONSTRUCTION ENTRANCE/EXIT AT THE PROJECT'S COMMENCEMENT.

8. PORTA-POTTIES: DO NOT LOCATE PORTA-POTTIES ADJACENT TO WATERCOURSES OR STORM DRAIN INLETS.

9. DURING THE RAINY SEASON, ENSURE THAT SEDIMENT CONTROL MEASURES ARE IN PLACE AND EFFECTIVE AT PREVENTING SEDIMENT FROM LEAVING THE

SITE.

10. STORM DRAIN INLET/CATCH BASIN PROTECTION: PLEASE USE FILTER FABRIC OR INSERTS FOR ANY ADJACENT STREET CATCH BASINS AND BMPS FOR ANY ONSITE INLETS. (SAND BAGS, GRAVEL BAGS AND STRAW WATTLES AROUND STORM DRAIN INLETS EXPOSED TO STREET TRAFFIC ARE NOT RECOMMENDED).

IF USING FILTER FABRIC, MAY USE FILTREX 8” SOXX WITH MIRAFI 140N FABRIC (OR SIMILAR) UNDERNEATH THE GRATE. ENSURE FABRIC EXTENDS A MINIMUM OF 6-INCHES BEYOND CATCH BASIN AFTER PLACEMENT OF GRATE AND SECURE PROPERLY. CONTRACTOR SHALL REMOVE FILTER FABRIC UPON PROJECT

COMPLETION.

SITE HOUSEKEEPING REQUIREMENTS

CONSTRUCTION MATERIALS

· ALL LOOSE STOCKPILED CONSTRUCTION MATERIALS THAT ARE NOT ACTIVELY BEING USED

(i.e. SOIL, SPOILS, AGGREGATE, FLY-ASH, STUCCO, HYDRATED LIME, ETC.) SHALL BE

COVERED AND BERMED.

· ALL CHEMICALS SHALL BE STORED IN WATERTIGHT CONTAINERS (WITH APPROPRIATE

SECONDARY CONTAINMENT TO PREVENT ANY SPILLAGE OR LEAKAGE) OR IN A STORAGE

SHED (COMPLETELY ENCLOSED).

· EXPOSURE OF CONSTRUCTION MATERIALS TO PRECIPITATION SHALL BE MINIMIZED. THIS

DOES NOT INCLUDE MATERIALS AND EQUIPMENT THAT ARE DESIGNED TO BE OUTDOORS

AND EXPOSED TO ENVIRONMENTAL CONDITIONS (i.e. POLES, EQUIPMENT PADS, CABINETS, CONDUCTORS, INSULATORS, BRICKS, ETC.).

· BEST MANAGEMENT PRACTICES TO PREVENT THE OFF-SITE TRACKING OF LOOSE

CONSTRUCTION AND LANDSCAPE MATERIALS SHALL BE IMPLEMENTED.

WASTE MANAGEMENT

· DISPOSAL OF ANY RINSE OR WASH WATERS OR MATERIALS ON IMPERVIOUS OR PERVIOUS

SITE SURFACES OR INTO THE STORM DRAIN SYSTEM SHALL BE PREVENTED.

· SANITATION FACILITIES SHALL BE CONTAINED (e.g. PORTABLE TOILETS) TO PREVENT

DISCHARGES OF POLLUTANTS TO THE STORM WATER DRAINAGE SYSTEM OR RECEIVING

WATER, AND SHALL BE LOCATED A MINIMUM OF 20 FEET AWAY FROM AN INLET, STREET OR

DRIVEWAY, STREAM, RIPARIAN AREA OR OTHER DRAINAGE FACILITY.

· SANITATION FACILITIES SHALL BE INSPECTED REGULARLY FOR LEAKS AND SPILLS AND

CLEANED OR REPLACED AS NECESSARY.

· COVER WASTE DISPOSAL CONTAINERS AT THE END OF EVERY BUSINESS DAY AND DURING A

RAIN EVENT.

· DISCHARGES FROM WASTE DISPOSAL CONTAINERS TO THE STORM WATER DRAINAGE

SYSTEM OR RECEIVING WATER SHALL BE PREVENTED.

· STOCKPILED WASTE MATERIAL SHALL BE CONTAINED AND SECURELY PROTECTED FROM

WIND AND AIN AT ALL TIMES UNLESS ACTIVELY BEING USED.

· PROCEDURES THAT EFFECTIVELY ADDRESS HAZARDOUS AND NON-HAZARDOUS SPILLS

SHALL BE IMPLEMENTED.

· EQUIPMENT AND MATERIALS FOR CLEANUP OF SPILLS SHALL BE AVAILABLE ON SITE AND

THAT SPILLS AND LEAKS SHALL BE CLEANED UP IMMEDIATELY AND DISPOSED OF PROPERLY;

AND

· CONCRETE WASHOUT AREAS AND OTHER WASHOUT AREAS THAT MAY CONTAIN ADDITIONAL

POLLUTANTS SHALL BE CONTAINED SO THERE IS NO DISCHARGE INTO THE UNDERLYING

SOIL AND ONTO THE SURROUNDING AREAS.

VEHICLE STORAGE AND MAINTENANCE

· MEASURES SHALL BE TAKEN TO PREVENT OIL, GREASE, OR FUEL TO LEAK IN TO THE

GROUND, STORM DRAINS OR SURFACE WATERS.

· ALL EQUIPMENT OR VEHICLES, WHICH ARE TO BE FUELED, MAINTAINED AND STORED ONSITE

SHALL BE IN A DESIGNATED AREA FITTED WITH APPROPRIATE BMP's.

LANDSCAPE MATERIALS

· CONTAIN STOCKPILED MATERIALS SUCH AS MULCHES AND TOPSOIL WHEN THEY ARE NOT

ACTIVELY BEING USED.

· CONTAIN FERTILIZERS AND OTHER LANDSCAPE MATERIALS WHEN THEY ARE NOT ACTIVELY

BEING USED.

· DISCONTINUE THE APPLICATION OF ANY ERODIBLE LANDSCAPE MATERIAL WITHIN 2 DAYS

BEFORE A FORECASTED RAIN EVEN OR DURING PERIODS OF PRECIPITATION.

· APPLY ERODIBLE LANDSCAPE MATERIAL AT QUANTITIES AND APPLICATION RATES

ACCORDING TO MANUFACTURE RECOMMENDATIONS OR BASED ON WRITTEN

SPECIFICATIONS BY KNOWLEDGEABLE AND EXPERIENCED FIELD PERSONNEL.

· STACK ERODIBLE LANDSCAPE MATERIAL ON PALLETS AND COVERING OR STORING SUCH

MATERIALS WHEN NOT BEING USED OR APPLIED.

AutoCAD SHX Text S

AutoCAD SHX Text S

Sheets and Views
(23-035) - IMPROVEMENT PLANS-C1.0-COVER
(23-035) - IMPROVEMENT PLANS-C2.0-SITE PLAN
(23-035) - IMPROVEMENT PLANS-C3.0-GRADING
(23-035) - IMPROVEMENT PLANS-C3.1-SECTIONS
(23-035) - IMPROVEMENT PLANS-C4.0-DTL
(23-035) - IMPROVEMENT PLANS-C5.0-EROS

File details come from the government source that posted it. Updated .