These improvement plans are for the Winton Residence located at 141 Archer Drive in Santa Cruz, California, prepared by Ramsey Civil Engineering for a slope stabilization and retaining wall project. The project involves removing failed and damaged existing walls due to slope failure and reconstructing a new soldier pile wall with wood lagging, along with an additional small landscape wall and regrading of the failed slope. The work requires obtaining three specific permits: a temporary encroachment permit for drain pipe installation, a regular encroachment permit for the drain pipe to remain in the public right-of-way, and a concrete permit for sidewalk curb drain installation.
The project scope follows Natural Resources Conservation Service (NRCS) standards, specifically the Streambank and Shoreline Protection - 580 standard. The site plan indicates the existing house will remain in place while the surrounding slope and wall are reconstructed. A geotechnical report by Butano Geotechnical Engineering dated June 2023 provides recommendations for soil preparation, and all grading and construction must comply with the 2022 California Building Code. The erosion control plan includes specific measures such as fiber rolls, silt sacks, and concrete washout areas to prevent sediment transport and manage stormwater runoff during construction, with work restricted between October 15th and April 15th to minimize environmental impact.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
AR
C
H
ER
D R
IV
E
BA
Y
D R
IV
E
(E) HOUSE TO
REMAIN
DRAWN BY:
BY
D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N B
LO
C
K
DESIGNED BY:
DATE:
SCALE:
PROJECT NO:
SHEET:
DMR
DMR
08/08/2023
AS NOTED
23-035
N U
M
BE
R
CIVIL ENGINEERING
LAND PLANNING
PROJECT MANAGEMENT
CONSTRUCTION SUPPORT
QSD AND QSP SERIVCES
2905 KRISTIE COURT
SANTA CRUZ, CA 95065
TEL (831) 462-2905
www.ramseycivilengineering.com
DAVID RAMSEY DATE
RCE# 73735
APN# 006-031-37
PLAN TYPE
AR
C
H
ER
D R
IV
E, S
AN
TA
C
R U
Z, C
A, W
IN
TO
N
R
ES
ID
EN
CE
D
AV I D RAMS E Y
NO. C73735
RE
G
I S T E
RE
D PROFESS IONAL ENG
I NEER
S TAT E OF CAL I FORNIACIV I L
RESIDENTIAL
D M
R 9/
/2
C
IT
Y
R
EV
IE
W
C O
M M
EN
TS
1S
T R
O U
TI
N
G
4/3/24
D M
R 3/
7/
C O
O R
D
IN
AT
IO
N R
EV
IS
IO
N
S
C1.0
C O
VE
R
S H
EE
T
INDEX OF SHEETS
SHEET NO. DESCRIPTION
C1.0 COVER SHEET
C2.0 SITE PLAN
C3.0 GRADING AND DRAINAGE PLAN
C3.1 WALL PROFILE & SECTION
C4.0 DETAILS
C5.0 EROSION CONTROL PLAN & DETAILS
VICINITY MAP
N.T.S.
BENCHMARK
ELEVATIONS ARE SHOWN IN THE NORTH AMERICAN VERTICAL DATUM OF
1988 (NAVD88) AND WAS ESTABLISHED BY A REALTIME KINEMATIC (RTK)
GPS TIE TO CONTROL SET AS PART OF THIS SURVEY.
SITE BENCHMARK #52 ELEVATION = 234.89' (NAVD88)
SURVEY
SURVEY FOR THIS PROJECT PROVIDED BY ALPHA LAND
SURVEYS, INC., JOB NO. 2023-113, DATED 06/08/2023.
MAP DATA © GOOGLE
SITE
GRAPHIC SCALE: 1 INCH = FEET
10' 0 5' 10' 20'
LEGEND
WATER THRUST BLOCK
FLOW DIRECTION
AB AGGREGATE BASE
AC AIR CONDITIONER UNIT
ADU ACCESSORY DWELLING UNIT
APN ASSESSORS PARCEL NUMBER
ARV AIR-RELEASE VALVE
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BO BLOW-OFF VALVE
BRW FG AT BOTTOM OF RETAINING WALL
BSW BACK OF SIDEWALK
BVC BEGIN VERTICAL CURVE
BW BOTTOM OF WALL
CATV CABLE TELEVISION
CB CATCH BASIN
CBC CALIFORNIA BUILDING CODE
CI CURB INLET
CIP CAST IRON PIPE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CONC CONCRETE
COTG CLEANOUT TO GRADE
DIP DUCTILE IRON PIPE
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
DWY DRIVEWAY
E EAST, ELECTRICAL
EG EXISTING GROUND
EP EDGE OF PAVEMENT
(E) EXISTING
EQ EQUAL
EX. EXISTING
FC FACE OF CURB
FDC FIRE DEPARTMENT CONNECTION
FG FINISH GRADE
FF FINISH FLOOR
FH FIRE HYDRANT
FL FLOWLINE
FNC FENCE
FO FIBER OPTIC
FS FINISHED SURFACE
FSB FRONT SETBACK
FT FOOT/FEET
FW FIRE WATER
G GAS
GB GRADE BREAK
GF GARAGE FLOOR
HT HEIGHT
HDPE HIGH-DENSITY POLYETHYLENE
HP HIGH POINT
INT INTERSECTION
INV INVERT
IRR IRRIGATION
JB JUNCTION BOX
JT JOINT TRENCH
L LANDING
LF LINEAR FOOT
LIP LIP OF GUTTER
LOG LIMIT OF GRADING
LP LOW POINT
MH MANHOLE
MIN MINIMUM
N NORTH
NE NORTHEAST
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OCEW ON CENTER, EACH WAY
OH OVERHEAD
PCC PORTLAND CEMENT CONCRETE
POC POINT OF CONNECTION
PP POWER POLE
PL PROPERTY LINE
PRC POINT OF REVERSE CURVE
PS PLANTING STRIP
PSE PUBLIC SERVICE EASEMENT
PIV POST-INDICATOR VALVE
PV PAVEMENT
PVC POLYVINYL CHLORIDE PIPE
R RADIUS
RC RELATIVE COMPACTION
RCP REINFORCED CONCRETE PIPE
ROW RIGHT-OF-WAY
RPPB REDUCE PRESSURE PRINICIPLE BACKFLOW
RSB REAR SETBACK
RW RECYCLED WATER
S SOUTH, SLOPE
SD STORM DRAIN
SE SOUTHEAST
SDMH STORM DRAIN MANHOLE
SDE STORM DRAIN EASEMENT
SHT SHEET
SS SANITARY SEWER
SSB SIDE SETBACK
SSE SANITARY SEWER EASEMENT
SSMH SANITARY SEWER MANHOLE
STA STATION
STD STANDARD
SW SIDEWALK, SOUTHWEST
SWE SIDEWALK EASEMENT
T TELEPHONE
TC TOP OF CURB
TH THRESHOLD
TRAN TRANSFORMER
TRW FG AT TOP OF RETAINING WALL
TW TOP OF WALL
USA UNDERGROUND SERVICE ALERT
W WEST, WATER
WM WATER METER
WV WATER WALVE
ABBREVIATIONS
E
FO
FW
G
IRR
JT
OH
RW
SD
SS
T
CATV
W
ELECTRICAL LINE
FIBER OPTIC LINE
FIRE WATER LINE
GAS LINE
IRRIGATION LINE
JOINT TRENCH LINE
OVERHEAD LINE
RECYCLED WATER LINE
STORM DRAIN LINE
SANITARY SEWER LINE
TELEPHONE LINE
CABLE TV LINE
WATER LINE
WATER VALVE
MANHOLE STRUCTURE
GUY ANCHOR
FIRE HYDRANT
CLEANOUT STRUCTURE
CURB INLET
CATCH BASIN
BLOW-OFF VALVE
AIR RELEASE VALVE
WATER METER
PROPERTY LINE
PROPERTY LINE -ADJACENT
FENCE
PROPOSED EASEMENT
> > > SWALE
IMPROVEMENT PLANS
FOR
WINTON RESIDENCE
141 ARCHER DRIVE
SANTA CRUZ, CALIFORNIA
LOG LIMIT OF GRADING
TREE TREE PROTECTION FENCING
BASIS OF BEARINGS
BEARINGS FOR THIS SURVEY ARE BASED ON THE MONUMENT LINE OF
ARCHER DRIVE AS SHOWN ON THAT MAP FILED IN VOLUME 19 OF
PARCEL MAPS AT PAGE 71, SANTA CRUZ COUNTY RECORDS AND WAS
ESTABLISHED BETWEEN FOUND MONUMENTS.
BASIS OF BEARINGS: N00°04'30"W
FIBER ROLLS
PROPOSED RETAINING WALL
PERFORATED PIPE
WORK SCOPE
PROJECT WILL INCLUDE THE REMOVAL OF THE FAILED & DAMAGED
WALLS, DUE TO SLOPE FAILURE, AND THE RECONSTRUCTION OF A NEW
SOLDIER PILE WALL WITH WOOD LAGGING. AN ADDITIONAL SMALL
LANDSCAPE WALL WILL BE CONSTRUCTED UPSLOPE OF THE MAIN WALL,
AND REGRADING OF THE FAILED SLOPE WILL OCCUR. NO OTHER
IMPROVEMENTS ARE PROPOSED.
PROJECT WILL REQUIRE THE FOLLOWING ADDITIONAL PERMITS FOR
WORK WITHIN THE PUBLIC RIGHT-OF-WAY:
1. TEMPORARY ENCROACHMENT PERMIT TO INSTALL THE DRAIN PIPE IN
THE PUBLIC RIGHT-OF-WAY
2. REGULAR ENCROACHMENT PERMIT FOR THE DRAIN PIPE TO REMAIN
IN THE PUBLIC RIGHT-OF-WAY
3. CONCRETE PERMIT TO INSTALL THE SIDEWALK CURB DRAINS.
TO THE BEST OF MY KNOWLEDGE, JUDGEMENT, AND BELIEF, THE DESIGN
FOLLOWS NRCS STANDARDS AND SPECIFICATIONS. FOR 141 ARCHER
WAY, THE ONLY STANDARD IS STREAMBANK AND SHORELINE
PROTECTION - 580. CA NRCS STANDARDS AND SPECIFICATIONS
NRCS REVIEW WAS COMPLETED TO ENSURE COMPLIANCE WITH THE
LISTED NRCS PRACTICE STANDARDS AND SPECIFICATIONS
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text N
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD
SD
SD
(E) 2.44'
3.41'
23.34'
12.40'
41.82'
18.06'
BEGIN NEW WALL
(MATCH END OF
(E) WALL)
END NEW WALL
(MATCH END OF
(E) WALL)
END NEW WALL (MATCH
END OF (E) WALL)
END NEW WALL (MATCH
END OF (E) WALL)
(N) 12" SQ DRAIN INLET
PER DTL 4, SHT C4.0
RIM 217.65
INV 212.58
(N) 12" SQ DRAIN INLET
PER DTL 4, SHT C4.0
RIM 217.32
INV(6"IN) 214.82
INV(4"IN) 207.65
INV(OUT) 207.21
(N) 30LF± 4" PERF
BACK OF WALL DRAIN
SLOPE W/ FOOTING
(N) 18LF± 4" PERF
BACK OF WALL DRAIN
SLOPE W/FOOTING
(N) 6" TWO-WAY SDCO
PER DTL 1, SHT C4.0
RIM 218.40
INV 208.78
(N) 37LF± 6" HDPE SD
S=0.56
PIPE TO BE ANCHORED TO
SLOPE PER CALTRANS STD
DTL D87C, SEE DTL 3, SHT C4.0
(N) 42LF± 6" HDPE SD
S=0.53
PIPE TO BE ANCHORED TO
SLOPE PER CALTRANS STD
DTL D87C, SEE DTL 3, SHT C4.0
(N) 6" SDCO
PER DTL 2,
SHT C4.0
RIM 221.05
INV 218.65
(N) 6" SDCO PER
DTL 2, SHT C4.0
RIM 220.56
INV 218.70
(N) 23LF± 4" PERF
BACK OF WALL DRAIN
S=0.01
(N) 80 LF± 6"
HDPE SD
S=0.064
SITE CROSS
SECTION LINE
SEE BELOW
(N) 25LF± 6"
HDPE SD
S=0.15
(N) 3LF± 4" PVC RD
S=0.75
(N) 3LF± 4"
PVC RD
S=0.30
(N) AREA DRAIN
RIM 222.42
INV 219.92
INSTALL J-BOX
(SOLID LID)
RIM 190.80
INV(IN) 189.30
INV(OUT) 187.07
(N) THRU-CURB DRAIN
PER DTL 6, SHT C4.0,
CORE THRU EX. CURB
(N) THRU-CURB DRAIN
PER DTL 6, SHT C4.0
CORE THRU EX. CURB
(N) 6LF± 4"
PVC RD
S=0.15
(N) 7LF± 4"
PVC RD
S=0.08
(N) 6" SDCO
PER DTL 2, SHT C4.0
RIM 221.57
INV 218.57
INSTALL HARDPIPE
FOR DS, INV 220.39
INSTALL HARDPIPE
FOR DS, INV 219.30
INSTALL HARDPIPE
FOR DS, INV 218.98
(N) 40 LF±
6" HDPE SD
S=0.09
INV
218.42
INV 216.08
INV 216.17(N) SOLDIER PIER W/ WOOD LAGGING
RETAINING WALL PER STRUCTURAL
PLANS. PROVIDE 42" MIN. RAILING
PER CRC SECTION R312, REFER TO
STRUCTURAL PLANS FOR DESIGN
(N) 2.5' MAX HIGH ALAN BLOCK ( OR
EQUIVALENT) LANDSCAPE WALL, NOTE:
WALL SHALL BE UNDER 3' HIGH THEREFORE
NO STRUCTURAL DESIGN REQUIRED.
(N) 2-5LF 3" C.I. OR SCH
80 SD PIPE, S=0.02
(N) 2- 5LF 3" C.I. OR SCH
80 SD PIPE, S=0.02
INSTALL J-BOX
(SOLID LID)
RIM 186.00
INV(IN) 184.50
INV(OUT) 183.00
6.80'
(N) 12LF± 4" PERF
BACK OF WALL DRAIN
SLOPE W/ FOOTING
(N) 13LF± 4" PERF
BACK OF WALL DRAIN
SLOPE W/FOOTING
(N) GRADED SWALE AT
BACK/TOP WALL, TYP.
(N) GRADED SWALE AT
BACK/TOP WALL, TYP.
(N) 6" SDCO PER
DTL 2, SHT C4.0
RIM 217.92
INV 209.87
(N) 6" SDCO PER
DTL 2, SHT C4.0
RIM 220.33
INV (MATCH (E))
(N) 20 LF±
6" HDPE SD
S= 0.01 MIN.
ABANDON (E) PIPE
CONNECT (E)
SURFACE
DOWNSPOUT
TO NEW
INLET
DRAWN BY:
BY
D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N B
LO
C
K
DESIGNED BY:
DATE:
SCALE:
PROJECT NO:
SHEET:
DMR
DMR
08/08/2023
AS NOTED
23-035
N U
M
BE
R
CIVIL ENGINEERING
LAND PLANNING
PROJECT MANAGEMENT
CONSTRUCTION SUPPORT
QSD AND QSP SERIVCES
2905 KRISTIE COURT
SANTA CRUZ, CA 95065
TEL (831) 462-2905
www.ramseycivilengineering.com
DAVID RAMSEY DATE
RCE# 73735
APN# 006-031-37
PLAN TYPE
AR
C
H
ER
D R
IV
E, S
AN
TA
C
R U
Z, C
A, W
IN
TO
N
R
ES
ID
NO. C73735
RE
G
I S T E
RE
D PROFESS IONAL ENGI NEER
S TAT E OF CAL I FORNIACIV I L
RESIDENTIAL
D M
R 9/
/2
C
IT
Y
R
EV
IE
W
C O
M M
EN
TS
1S
T R
O U
TI
N
G
4/3/24
D M
R 3/
7/
C O
O R
D
IN
AT
IO
N R
EV
IS
IO
N
S
C2.0
SI
TE
P
LA
N
GRAPHIC SCALE: 1 INCH = FEET
5' 0 5' 10'
1. SITE PLAN BASED ON TOPOGRAPHIC SURVEY, PERFORMED BY ALPHA LAND SURVEYS, INC., JOB NO. 2023-113, DATED 06/08/2023.
2. ALL GRADING WORK AND CONSTRUCTION OF IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS SPECIFIED IN THE GEOTECHNICAL REPORT BY BUTANO GEOTECHNICAL ENGINEERING, INC., DATED JUNE 2023, PROJECT NO. 23-141-SC, AND ANY SUBSEQUENT ADDENDUM LETTERS. THE GEOTECHNICAL ENGINEER SHALL INSPECT THE COMPLETED PROJECT AND CERTIFY, IN WRITING, THAT ALL WORK CONFORMS TO THE GEOTECHNICAL
INVESTIGATION REPORT.
3. REFER TO ABOVE REFERENCED GEOTECHNICAL REPORT FOR ONSITE SOIL PREPARATION (OVEREXCAVATION AND
RECOMPACTION REQUIRED) BELOW CONCRETE FOOTINGS, SLABS, AND PAVEMENT.
4. ALL GRADING WORK AND CONSTRUCTION OF IMPROVEMENTS SHALL BE DONE IN ACCORDANCE WITH THE CBC 2022.
5. NO CHANGES ON THESE PLANS SHALL BE MADE WITHOUT PRIOR APPROVAL OF RAMSEY CIVIL ENGINEERING, INC.
6. EROSION CONTROL PLANS SHALL BE PERMITTED AND FILED WITH THE APPLICABLE AGENCIES PRIOR TO ANY
CONSTRUCTION OR GRADING OPERATIONS.
7. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO, OR USES OF, THESE PLANS. ALL CHANGES MUST BE IN WRITING AND MUST BE APPROVED BY THE ENGINEER PRIOR TO
CONSTRUCTION.
8. ROOF DOWNSPOUTS SHALL DISCHARGE AWAY FROM BUILDING FOUNDATION PER 2022 CBC, AND DIRECTED TO GRADE TO
DRAIN.
9. ALL COMPACTION TO BE DETERMINED USING THE LATEST EDITION OF ASTM D1557.
10. THE TYPES, LOCATIONS, SIZES, AND/OR DEPTHS OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON THE IMPROVEMENT PLANS WERE OBTAINED FROM SOURCES OF VARYING RELIABILITY. THE CONTRACTOR SHALL PERFORM THEIR OWN FIELD INVESTIGATION PRIOR TO CONSTRUCTION TO VERIFY UTILITY LOCATIONS. CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL REVEAL THE TYPES, EXTENT, SIZES, LOCATIONS, AND DEPTHS OF SUCH UNDERGROUND UTILITIES. THE ENGINEER CAN ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE DELINEATION OF SUCH UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED. IF AT ANYTIME THE CONTRACTOR IS UNSURE OF UTILITY LOCATIONS, A CERTIFIED UNDERGROUND UTILITY LOCATOR SHALL BE OBTAINED AT THE COST OF THE CONTRACTOR, FOR
ONSITE UTILITIES, OR CONTACT U.S.A (OR 811) FOR OFFSITE UTILITIES.
11. ALL UTILITY STRUCTURES TO REMAIN WITHIN AREAS EFFECTED BY THE CONSTRUCTION WORK ON THIS PROJECT, INCLUDING, BUT NOT LIMITED TO CLEANOUTS, WATER VALVES, AND PULL BOXES SHALL BE ADJUSTED TO GRADE BY THE CONTRACTOR WHETHER SHOWN ON THESE PLANS OR NOT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH ALL
PUBLIC OR PRIVATE UTILITY COMPANIES.
12. ALL AREAS TO BE GRADED ACCORDING TO THE GRADES SHOWN ON THESE PLANS. A 1% MINIMUM SLOPE FOR DRAINAGE SHALL BE APPLIED IF NO GRADES ARE SHOWN, SUBJECT TO THE APPROVAL OF THE PROJECT ENGINEER.
13. CONTRACTOR SHALL GRADE EVENLY BETWEEN SPOT ELEVATIONS.
14. CONTRACTOR SHALL VERIFY THE CONTENTS AND THICKNESS OF THE BUILDING SLAB SECTION (I.E. CONCRETE, SAND, ROCK) WITH THE STRUCTURAL PLANS PRIOR TO COMMENCEMENT OF GRADING OPERATIONS.
15. ALL GRADING, TRENCHING, SHORING, PAVING, AND CONSTRUCTION WORK SHALL BE PERFORMED IN ACCORDANCE WITH
APPLICABLE O.S.H.A REGULATIONS.
16. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONNEL AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. CONTRACTOR AGREES TO DEFEND, INDEMNIFY, AND HOLD DESIGN PROFESSIONALS AND CITY REPRESENTATIVES HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE
SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL.
17. NO ADDITIONAL IMPERVIOUS OR SEMI-PERVIOUS SURFACE AREA COVERAGE BEYOND THE LIMITS SHOWN ON THESE PLANS SHALL BE CONSTRUCTED WITHOUT UPDATED MITIGATIONS AND PRIOR APPROVAL OF THE CITY OF SANTA CRUZ.
18. RAMSEY CIVIL ENGINEERING PERFORMED AN UPSTREAM AND DOWNSTREAM SITE ASSESSMENT FOR STORMWATER RUNOFF ON APRIL 14TH, 2023 . THERE ARE NO KNOWN DRAINAGE ISSUES THAT CURRENTLY EXIST. THERE WILL BE NO SIGNIFICANT IMPACT TO DOWNSTREAM PROPERTIES DUE TO THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
RAMSEY CIVIL ENGINEERING NOTES:
1. ALL CONSTRUCTION ACTIVITIES SHALL COMPLY WITH APPLICABLE REQUIREMENTS IN THE CURRENT EDITION OF
THE CITY OF SANTA CRUZ STANDARD SPECIFICATIONS AND DETAILS.
2. UNLESS OTHERWISE AGREED UPON WITH THE CITY OF SANTA CRUZ, WORK SHALL BE LIMITED TO 8:00 A.M. TO 5:00 P.M. WEEKDAYS. NON-NOISE PRODUCING ACTIVITIES, SUCH AS INTERIOR PAINTING, SHALL NOT BE SUBJECT TO
THIS RESTRICTION.
3. A "DISTURBANCE COORDINATOR" SHALL BE ESTABLISHED, PRIOR TO CONSTRUCTION, TO RESPOND TO CITIZEN COMPLAINTS AND INQUIRIES REGARDING CONSTRUCTION NOISE AND DUST. THE NAME, PURPOSE AND TELEPHONE NUMBER OF THE DISTURBANCE COORDINATOR SHALL BE POSTED ON A SIGN EASILY VISIBLE FROM OFF-SITE DURING THE ENTIRE TIME PROJECT GRADING AND CONSTRUCTION OCCURS. THE DISTURBANCE COORDINATOR SHALL INVESTIGATE THE CONCERN AND TAKE REMEDIAL ACTION, IF NECESSARY, WITHIN 24 HOURS OF RECEIVING
A COMPLAINT OR INQUIRY.
4. NO CHANGES IN THE APPROVED IMPROVEMENT PLANS SHALL BE MADE WITHOUT PRIOR APPROVAL OF THE
DEPARTMENT OF PUBLIC WORKS.
5. THE CONTRACTOR SHALL NOTIFY THE CITY CONSTRUCTION ENGINEER/INSPECTOR 24 HOURS PRIOR TO START OF
CONSTRUCTION.
6. UNLESS OTHERWISE INDICATED BY A GEOTECHNICAL ENGINEER, THE TOP 8" OF SUB-GRADE UNDER ALL PAVED (CONCRETE AND ASPHALT) SURFACES SUBJECT TO VEHICULAR USE SHALL BE COMPACTED TO A MINIMUM 95%
RELATIVE COMPACTION, OR AS SPECIFIED HEREON.
7. CONTRACTOR SHALL FIELD VERIFY ALL UNDERGROUND UTILITIES AND SUBSTRUCTURES. PRIOR TO ANY CONSTRUCTION TAKING PLACE, THE ENGINEER MUST BE NOTIFIED, IN WRITING, OF ANY DISCREPANCIES THAT MAY
EXIST.
8. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO, OR USES OF, THESE PLANS. ALL CHANGES MUST BE IN WRITING AND MUST BE APPROVED BY THE
ENGINEER PRIOR TO CONSTRUCTION.
9. UNLESS OTHERWISE NOTED, THE TERMS "INSTALL", "CONSTRUCT" AND "NEW" INDICATE THAT THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIALS, PRODUCTS, EQUIPMENT, AND LABOR FOR SAID
INSTALLATION AND CONSTRUCTION.
10. THE DIRECTOR OF PUBLIC WORKS, OR HIS AUTHORIZED REPRESENTATIVE, SHALL HAVE THE AUTHORITY TO "STOP WORK" IF THE WORK IS NOT BEING DONE IN ACCORDANCE WITH THE APPROVED IMPROVEMENT PLANS.
11. THE CONTRACTOR SHALL APPLY WATER TO ALL EXPOSED EARTH SURFACES AT INTERVALS SUFFICIENT TO PREVENT AIRBORNE DUST FROM LEAVING THE PROJECT SITE. ALL EXPOSED EARTH SHALL BE WATERED DOWN AT
THE END OF THE WORK DAY.
CITY OF SANTA CRUZ GENERAL NOTES
AutoCAD SHX Text S
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
BAY DRIVE
(E) HOUSE TO REMAIN
BRW 219.12
TRW 220.62
BRW 218.57
TRW 221.00
BRW 218.81
TRW 220.81
TRW 220.19
BRW 219.19
TRW 217.54
BRW 207.57
BRW 208.45
TRW 218.45
BRW 208.63
TRW 218.58
BRW 210.25
TRW 218.11
BRW 210.50
TRW 218.00
(N) THRU-CURB DRAIN
FL/INV 186.97 (N) THRU-CURB DRAIN
FL/INV 182.91
A A
(N) 2.5' MAX HIGH ALAN BLOCK ( OR
EQUIVALENT) LANDSCAPE WALL, NOTE: WALL
SHALL BE UNDER 3' HIGH THEREFORE NO
STRUCTURAL DESIGN REQUIRED.
(N) RETAINING WALL (SOLDIER PIERS WITH
WOOD LAGGING) PER STRUCTURAL PLANS
SHEET S.1 AND STRUCTURAL CALCULATIONS.
INSTALL J-BOX
(SOLID LID)
RIM 190.80
INV(IN) 189.30
INV(OUT) 187.07
INSTALL J-BOX
(SOLID LID)
RIM 186.00
INV(IN) 184.50
INV(OUT) 183.00
BRW 212.50
TRW 218.00
FL 217.70
FL 218.14
FL 218.50
(HP)
FL 218.12
FL 217.33
BRW 208.82
TRW 217.60
TRW 217.67
BRW 209.79
FL 217.51
2.0%
7.1%
2.6%
3.0% 1.0%
AD
RIM 217.65
AD
RIM 217.32
AD
RIM 222.42
COTG
RIM 220.33
COTG
RIM 221.05
COTG
RIM 218.40
COTG
RIM 220.56
COTG
RIM 217.92
COTG
RIM 221.57
(N) CHRSITY V64 INLET (REPLACE (E) INLET)
RIM 232.0±
CONNECT (E) PIPE TO NEW INLET)
DRAWN BY:
BY
D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N B
LO
C
K
DESIGNED BY:
DATE:
SCALE:
PROJECT NO:
SHEET:
DMR
DMR
08/08/2023
AS NOTED
23-035
N U
M
BE
R
CIVIL ENGINEERING
LAND PLANNING
PROJECT MANAGEMENT
CONSTRUCTION SUPPORT
QSD AND QSP SERIVCES
2905 KRISTIE COURT
SANTA CRUZ, CA 95065
TEL (831) 462-2905
www.ramseycivilengineering.com
DAVID RAMSEY DATE
RCE# 73735
APN# 006-031-37
PLAN TYPE
AR
C
H
ER
D R
IV
E, S
AN
TA
C
R U
Z, C
A, W
IN
TO
N
R
ES
ID
NO. C73735
RE
G
I S T E
RE
D PROFESS IONAL ENGI NEER
S TAT E OF CAL I FORNIACIV I L
RESIDENTIAL
D M
R 9/
/2
C
IT
Y
R
EV
IE
W
C O
M M
EN
TS
1S
T R
O U
TI
N
G
4/3/24
D M
R 3/
7/
C O
O R
D
IN
AT
IO
N R
EV
IS
IO
N
S
C3.0
G R
AD
IN
G
D R
AI
N
AG
E
PL
AN
GRAPHIC SCALE: 1 INCH = FEET
5' 0 5' 10'
CUBIC YARDS (OFFHAUL)
CUBIC YARDS EMBANKMENT
CUBIC YARDS EXCAVATION
ESTIMATED EARTHWORK QUANTITIES
NOTES
1. ESTIMATE DOES NOT INCLUDE UTILITY TRENCH VOLUMES OR ANY
OVEREXCAVATION, IF REQUIRED BY SITE CONDITIONS.
2. ESTIMATE ASSUMES A 15% COMPACTION FACTOR ON ALL FILL
MATERIAL AND A 0% EXPANSION FACTOR ON ALL CUT MATERIAL.
3. PRIOR TO COMMENCEMENT OF WORK CONTRACTOR SHALL CONFIRM
THAT ESTIMATES ARE CORRECT.
4. EXCESS MATERIAL SHALL BE DISPOSED OF OFFSITE AT AN APPROVED
DISPOSAL SITE.
MATCH LINE
MATCH LINE
TOP WALL
STA: 0+00 - 0+53
H: 1"=5' V: 1"=5'
0+00 0+25 0+50 0+53
FINISHED GRADE
AT TOP OF WALL
TOP OF WALL
(6" MIN. FREEBOARD)
FINISHED GRADE AT
BOTTOM OF WALL
CONCRETE PIER @
SOLDIER COL. SPACED
AT 6' MAX. O.C. PER
STRUCTURAL DETAIL
12X WOOD LAGGING
MEMBERS PER
STRUCTURAL DETAIL
EXISTING
GRADE
SITE CROSS SECTION A-A
STA: 0+00 - 0+68
H: 1"=5' V: 1"=5'
0+00 0+25 0+50 0+68
(N) RETAINING
WALL PIER PER
STRUCTURAL
PLANS
(N) 2.5' MAX HIGH ALAN BLOCK ( OR
EQUIVALENT) LANDSCAPE WALL, NOTE:
UNDER 3' THEREFORE NO STRUCTURAL
DESIGN REQUIRED.
(N) GRADED SWALE
AT BACK OF WALL
EXISTING GRADE
FINISHED GRADE
(N)SOLDIER PILE AND WOOD LAGGING
RETAINING WALL PER STRUCTURAL
PLANS & CALCULATIONS
DRAWN BY:
BY
D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N B
LO
C
K
DESIGNED BY:
DATE:
SCALE:
PROJECT NO:
SHEET:
DMR
DMR
08/08/2023
AS NOTED
23-035
N U
M
BE
R
CIVIL ENGINEERING
LAND PLANNING
PROJECT MANAGEMENT
CONSTRUCTION SUPPORT
QSD AND QSP SERIVCES
2905 KRISTIE COURT
SANTA CRUZ, CA 95065
TEL (831) 462-2905
www.ramseycivilengineering.com
DAVID RAMSEY DATE
RCE# 73735
APN# 006-031-37
PLAN TYPE
AR
C
H
ER
D R
IV
E, S
AN
TA
C
R U
Z, C
A, W
IN
TO
N
R
ES
ID
NO. C73735
RE
G
I S T E
RE
D PROFESS IONAL ENGI NEER
S TAT E OF CAL I FORNIACIV I L
RESIDENTIAL
D M
R 9/
/2
C
IT
Y
R
EV
IE
W
C O
M M
EN
TS
1S
T R
O U
TI
N
G
4/3/24
D M
R 3/
7/
C O
O R
D
IN
AT
IO
N R
EV
IS
IO
N
S
C3.1
W
AL
L
PR
O
FI
LE
A
N D
S
EC
TI
O
N
GRAPHIC SCALE: 1 INCH = FEET
10' 0 5' 10' 20'
DRAWN BY:
BY
D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N B
LO
C
K
DESIGNED BY:
DATE:
SCALE:
PROJECT NO:
SHEET:
DMR
DMR
08/08/2023
AS NOTED
23-035
N U
M
BE
R
CIVIL ENGINEERING
LAND PLANNING
PROJECT MANAGEMENT
CONSTRUCTION SUPPORT
QSD AND QSP SERIVCES
2905 KRISTIE COURT
SANTA CRUZ, CA 95065
TEL (831) 462-2905
www.ramseycivilengineering.com
DAVID RAMSEY DATE
RCE# 73735
APN# 006-031-37
PLAN TYPE
AR
C
H
ER
D R
IV
E, S
AN
TA
C
R U
Z, C
A, W
IN
TO
N
R
ES
ID
NO. C73735
RE
G
I S T E
RE
D PROFESS IONAL ENGI NEER
S TAT E OF CAL I FORNIACIV I L
RESIDENTIAL
D M
R 9/
/2
C
IT
Y
R
EV
IE
W
C O
M M
EN
TS
1S
T R
O U
TI
N
G
4/3/24
D M
R 3/
7/
C O
O R
D
IN
AT
IO
N R
EV
IS
IO
N
S
C4.0
D
ET
AI
LS
TWO-WAY CLEANOUT TO GRADE
NTS
2"
PAVED AREA
12"
LANDSCAPE
AREA
HAND TAMPERED
BACKFILL TO
90% RELATIVE
COMPACTION
AIR-TIGHT THREADED
MPT CAP
TWO-WAY
CLEANOUT
TEE
SEE NOTES BELOW
NOTES:
1. RECTANGULAR OR CIRCULAR BOXES ARE PERMITTED.
2. BOXES INSTALLED IN SIDEWALK AREAS SHALL HAVE SOLID COVERS WITHOUT HOLES.
3. APPROVED RECTANGULAR BOXES:
a. CHRISTY B3 BOX WITH B3C OR B3D LID.
b. BROOKS NO.3 BOX WITH NO. 3 LID.
4. CONCRETE/FIBERLYTE LIDS ARE ACCEPTABLE IN NON-VEHICULAR AREAS. H-20 CAST IRON TRAFFIC LIDS
AND BOXES IN VEHICULAR AREAS.
5. ALL CLEANOUT LIDS SHALL BE MARKED WITH AN "S" OR THE WORD "SEWER" FOR SANITARY SEWER
CLEANOUTS OR "SD" OR THE WORD "STORM" FOR STORM DRAIN CLEANOUTS.
6. CLEANOUT PIPE SHALL BE THE SAME DIAMETER AS THE CONNECTED SITE PIPE.
7. TERMINATE C.O. AT CLOSEST JOINT TO SURFACE WITH TEMPORARY PLUG. AFTER ALL BACKFILL IS
COMPLETE AND SUB-GRADE MADE IN AREAS TO BE PAVED, THE FINAL RISER PIPE AND BOX SHALL BE
INSTALLED AS SHOWN.
8. INSTALL #8 COPPER TRACER WIDE FROM MAIN TO CLEANOUT. EXTEND WIRE UP RISER AND COIL TWO
FEET INSIDE BOX.
CAST-IN-PLACE
CONCRETE PRIOR
TO SUBGRADE
FLOW
INSTALL VERTICALLY &
CUT TO LENGTH/SDR 35
ASTM D3034
EXISTING
LATERAL
FLEXIBLE TRANSITION
COUPLING (MIN 3.5' FROM TEE)
PLACE EXPANDABLE
PLASTIC PLUG FOR
STUB-OUTS.
CLEANOUT TO GRADE
NTS
2"
PAVED AREA
12"
LANDSCAPE AREA
HAND TAMPERED
BACKFILL TO
90% RELATIVE
COMPACTION
AIR-TIGHT THREADED
MPT CAP
1/8 BEND
1/8 BEND AT
TERMINUS ONLY
SEE NOTES BELOW
NOTES:
1. RECTANGULAR OR CIRCULAR BOXES ARE PERMITTED.
2. BOXES INSTALLED IN SIDEWALK AREAS SHALL HAVE SOLID COVERS WITHOUT HOLES.
3. APPROVED RECTANGULAR BOXES:
a. CHRISTY B3 BOX WITH B3C OR B3D LID.
b. BROOKS NO.3 BOX WITH NO. 3 LID.
4. CONCRETE/FIBERLYTE LIDS ARE ACCEPTABLE IN NON-VEHICULAR AREAS. H-20 CAST
IRON TRAFFIC LIDS AND BOXES IN VEHICULAR AREAS.
5. ALL CLEANOUT LIDS SHALL BE MARKED WITH AN "S" OR THE WORD "SEWER" FOR
SANITARY SEWER CLEANOUTS OR "SD" OR THE WORD "STORM" FOR STORM DRAIN
CLEANOUTS.
6. CLEANOUT PIPE SHALL BE THE SAME DIAMETER AS THE CONNECTED SITE PIPE.
7. TERMINATE C.O. AT CLOSEST JOINT TO SURFACE WITH TEMPORARY PLUG. AFTER ALL
BACKFILL IS COMPLETE AND SUB-GRADE MADE IN AREAS TO BE PAVED, THE FINAL
RISER PIPE AND BOX SHALL BE INSTALLED AS SHOWN.
CAST-IN-PLACE
CONCRETE PRIOR
TO SUBGRADE
FLOW
INSTALL VERTICALLY &
CUT TO LENGTH/SDR 35
ASTM D3034
CATCH BASIN
NTS
MODEL A B C
CB1212 12" 12" 4"
CB1818 18" 18" 5"
PLAN
C
H
EI
G H
T
AS
R
EQ
U
IR
ED
GALVANIZED STEEL OR
CAST IRON GRATE TO BE
LOCKED TO FRAME
6"
B
AC
PIPE OPENING
LIFT HOLE
CB2424 24" 24" 5"
STORM PIPE
NOTES:
1. ALL GRATES WITHIN DRIVE AISLES AND WALKWAYS SHALL
BE HEEL PROOF ACCESSIBLE AND RATED FOR H-2O HEAVY
TRAFFIC LOADING.
U.S. CONCRETE PRECAST GROUP OR
APPROVED ALTERNATIVE/H-20
TRAFFIC FRAME & GRATE FOR ALL
GRATES IN VEHICULAR AREAS (SOLID
GRATE FOR JUNCTION BOXES)
TONGUE &
GROOVE JOINT
AS REQUIRED ON
STRUCTURES
OVER 4' DEEP
GROUT PIPE
IN PLACE
TRENCH DETAIL
NTS
4" + 25% O.D. PIPE
(BOTH SIDES)
6"
MIN 3" AC/9"
CLASS II ABPAVEDNON-PAVED
4"
NOTES:
1. TRENCH BEDDING AND SHADING MATERIAL SHALL BE 3/8" DIAMETER OR
GREATER CRUSHED ROCK OR WELL GRADED SAND & GRAVEL MATERIALS
CONFORMING TO THE PIPE MANUFACTURER'S REQUIREMENTS. IF A SOILS
REPORT DIFFERS FROM ABOVE, THE SOILS REPORT SHALL GOVERN.
2. USE 90% RELATIVE COMPACTION IF NO SOILS REPORT EXISTS. IF SOILS
REPORT EXISTS, COMPACTION REQUIREMENTS IN THE REPORT SHALL
GOVERN OVER THIS DETAIL.
SEE NOTE 1 & 2 TRENCH BACKFILL SHALL BE
NATIVE SOIL WITH MINIMUM 90%
RELATIVE COMPACTION/
COMPACT UPPER 6" TO 95%
RELATIVE COMPACTION
FO
R
H D
PE
P
IP
E
IN
PA
VE
D
A R
EA
S, ' M
IN
C O
VE
R
F R
O M
S U
BG
R
AD
E
O R
C O
N C
R
ET
E C
AP
R
EQ
U
IR
ED
FO
R
P
VC
P
IP
E
IN
PA
VE
D A
R
EA
S, ' M
IN
C
O
VE
R F
R O
M S
U
BG
R
AD
E O
R C
O N
C R
ET
E
C
AP
R
EQ
U
IR
ED
FO
R
S D
R P
IP
E
IN
N
O N
-P
AV
ED
A
R
EA
S, ' M
IN
C
O
VE
R F
R O
M S
U
BG
R
AD
E O
R C
O N
C R
ET
E
C
AP
R
EQ
U
IR
ED
FO
R
S C
H . 8
O
R C
PI
PE
8"
M
IN
C O
VE
R
R
EQ
U
IR
ED
NOTES:
1. DETAIL 3 IS FOR REFERENCE TO THE ANCHORAGE SYSTEM ONLY. CALTRANS DETAIL IS CALCULATED
FOR A 24" PIPE ON SURFACE, PROPOSED DRAIN PIPE WILL BE 6" DIAMETER, THEREFORE, ABOVE
SYSTEM SHALL BE SUFFICIENT FOR SAID APPLICATION.
2. ANY REFERENCE TO RETAINING WALL ON THIS DETAIL SHALL BE IGNORED. REFER TO STRUCTURAL
PLANS AND CALCULATIONS FOR ALL RETAINING WALL INFORMATION AND DESIGN ASPECTS.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
BAY DRIVE
(E) HOUSE TOREMAIN
ARCHER DRIVE
A A
DRAWN BY:
BY
D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N B
LO
C
K
DESIGNED BY:
DATE:
SCALE:
PROJECT NO:
SHEET:
DMR
DMR
08/08/2023
AS NOTED
23-035
N U
M
BE
R
CIVIL ENGINEERING
LAND PLANNING
PROJECT MANAGEMENT
CONSTRUCTION SUPPORT
QSD AND QSP SERIVCES
2905 KRISTIE COURT
SANTA CRUZ, CA 95065
TEL (831) 462-2905
www.ramseycivilengineering.com
DAVID RAMSEY DATE
RCE# 73735
APN# 006-031-37
PLAN TYPE
AR
C
H
ER
D R
IV
E, S
AN
TA
C
R U
Z, C
A, W
IN
TO
N
R
ES
ID
NO. C73735
RE
G
I S T E
RE
D PROFESS IONAL ENGI NEER
S TAT E OF CAL I FORNIACIV I L
RESIDENTIAL
D M
R 9/
/2
C
IT
Y
R
EV
IE
W
C O
M M
EN
TS
1S
T R
O U
TI
N
G
4/3/24
D M
R 3/
7/
C O
O R
D
IN
AT
IO
N R
EV
IS
IO
N
S
C5.0
ER
O
SI
O
N C
O N
TR
O
L
PL
AN
A
N D
D
ET
AI
LS
EROSION CONTROL NOTES
1. THE EROSION CONTROL PLANS IN THIS SET SHALL BE REVIEWED AND
IMPLEMENTED BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF
WORK.
2. THE CONTRACTOR SHALL ENSURE ALL MONITORING AND INSPECTIONS
ARE PERFORMED AS REQUIRED ONSITE THROUGHOUT CONSTRUCTION.
3. NO LAND CLEARING, GRADING OR EXCAVATION SHALL BE DONE
BETWEEN OCTOBER 15TH AND APRIL 15TH. ANY DEVIATION FROM THIS
CONDITION REQUIRES REVIEW AND APPROVAL OF A SEPARATE WINTER
EROSION CONTROL PLAN BY ENVIRONMENTAL PLANNING PRIOR TO
BEGINNING CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE
FOR IMPLEMENTING AND MAINTAINING SITE EROSION CONTROL AT ALL
TIMES.
4. IT SHALL BE THE RESPONSIBILITY OF THE OWNER AND THE PERMITTEE
TO ENSURE THAT EROSION DOES NOT OCCUR FROM ANY ACTIVITY
DURING OR AFTER PROJECT CONSTRUCTION. ADDITIONAL MEASURES,
BEYOND THOSE SPECIFIED, MAY BE REQUIRED BY THE PLANNING
DIRECTOR AS DEEMED NECESSARY TO CONTROL ACCELERATED
EROSION.
5. PRIOR TO ANY FORECAST RAIN AND ANYTIME BETWEEN OCTOBER 15
AND APRIL 15, AT THE END OF EACH WORKDAY, AT THE END OF EACH
WORKWEEK, THE DEVELOPER SHALL IMPLEMENT ALL TEMPORARY
MEASURES NECESSARY TO PREVENT EROSION AND SILTATION, UNTIL
THE PROJECT HAS BEEN FINALIZED. THESE MEASURES SHALL INCLUDE,
BUT NOT BE LIMITED TO, DIRECT SEEDING OF THE AFFECTED AREAS,
STRAW MULCHING, AND/OR INSTALLATION OF STRAW BALES DAMS/SILT
FENCES.
6. DURING CONSTRUCTION, NO TURBID WATER SHALL BE PERMITTED TO
LEAVE THE SITE. USE OF SILT AND GREASE TRAPS, FILTER BERMS, HAY
BALES OR SILT FENCES SHALL BE USED TO PREVENT SUCH DISCHARGE.
7. ALL AREAS ON- AND OFF-SITE EXPOSED DURING CONSTRUCTION
ACTIVITIES, IF NOT PERMANENTLY LANDSCAPED PER PLAN, SHALL BE
PROTECTED BY MULCHING AND/OR SEEDING WITH ANNUAL WINTER
BARLEY.
8. ALL EXCAVATED MATERIAL SHALL BE REMOVED TO AN APPROVED
DISPOSAL SITE OR DISPOSED OF ON-SITE IN A MANNER THAT WILL NOT
CAUSE EROSION.
9. ANY MATERIAL STOCKPILED, FOR LONGER THAN 14 DAYS, DURING
CONSTRUCTION SHALL BE COVERED WITH PLASTIC.
10. UPON COMPLETION OF CONSTRUCTION, ALL REMAINING EXPOSED SOILS
SHALL BE PERMANENTLY REVEGETATED PER LANDSCAPING PLAN. THE
PROTECTION SHALL BE INSTALLED PRIOR TO CALLING FOR FINAL
APPROVAL OF THE PROJECT AND AT ALL TIMES BETWEEN OCTOBER 15
AND APRIL 15. SUCH PROTECTION SHALL BE MAINTAINED FOR AT LEAST
ONE WINTER UNTIL PERMANENT PROTECTION IS ESTABLISHED.
11. EXPOSED SOIL ON SLOPES GREATER THAN 20% SHALL BE SEEDED,
COVERED WITH 2 INCHES OF STRAW, AND AN EROSION CONTROL
BLANKET. THE EROSION CONTROL BLANKET SHALL BE STAKED IN
PLACE.
12. IT IS THE DEVELOPER'S RESPONSIBILITY TO SEE THAT ADDITIONAL
MEASURES, NECESSARY TO CONTROL SITE EROSION AND PREVENT
SEDIMENT TRANSPORT OFF-SITE ARE IMPLEMENTED.
13. ALL SPILLS AND/OR LEAKS SHALL BE IMMEDIATELY CLEANED UP AND
MITIGATED PER THE CONTRACTORS O&M STANDARDS.
FIBER ROLLS
NTS
FIBER ROLLS CONSTRUCTION SPECIFICATIONS
1. PREPARE SLOPE BEFORE THE FIBER ROLL PROCEDURE IS STARTED.
SHALLOW GULLIES SHOULD BE SMOOTHED AS WORK PROGRESSES.
2. DIG SMALL TRENCHES ACROSS SLOPE ON CONTOUR, TO PLACE FIBER
ROLLS IN. THE TRENCH SHOULD BE DEEP ENOUGH TO ACCOMMODATE
HALF THE THICKNESS OF THE FIBER ROLL. WHEN THE SOIL IS LOOSE AND
UNCOMPACTED, THE TRENCH SHOULD BE DEEP ENOUGH TO BURY THE
FIBER ROLL 2/3 OF ITS THICKNESS BECAUSE THE GROUND WILL SETTLE.
IT IS CRITICAL THAT FIBER ROLLS ARE INSTALLED PERPENDICULAR TO
WATER MOVEMENT, PARALLEL TO THE SLOPE CONTOUR.
3. START BUILDING TRENCHES AND INSTALL FIBER ROLLS FROM THE
BOTTOM OF THE SLOPE AND WORK UP.
4. CONSTRUCT TRENCHES AT CONTOUR INTERVALS OF THREE TO EIGHT
FEET APART DEPENDING ON STEEPNESS OF SLOPE. THE STEEPER THE
SLOPE, THE CLOSER TOGETHER THE TRENCHES.
5. LAY THE FIBER ROLL ALONG THE TRENCHES FITTING IT SNUGLY AGAINST
THE SOIL. MAKE SURE NO GAPS EXIST BETWEEN THE SOIL AND THE
FIBER ROLL. USE A STRAIGHT BAR TO DRIVE HOLES THROUGH THE FIBER
ROLL AND INTO THE SOIL FOR THE WOODEN STAKES.
6. DRIVE THE STAKE THROUGH THE PREPARED HOLE INTO THE SOIL. LEAVE
ONLY ONE OR TWO INCHES OF STAKE EXPOSED ABOVE FIBER ROLL. IF
USING WILLOW STAKES REFER TO USDA SOIL CONSERVATION SERVICE
TECHNICAL GUIDE, BIOENGINEERING, FOR GUIDELINES TO PREPARING
LIVE WILLOW MATERIAL.
7. INSTALL STAKES AT LEAST EVERY FOUR FEET APART THROUGH FIBER
ROLL. ADDITIONAL STAKES MAY BE DRIVEN ON THE DOWNSLOPE SIDE OF
THE TRENCHES ON HIGHLY EROSIVE OR VERY STEEP SLOPES.
INSTALLATION AND MAINTENANCE
8. INSPECT THE FIBER ROLL AND THE SLOPES AFTER SIGNIFICANT STORMS.
MAKE SURE THE FIBER ROLLS ARE IN CONTACT WITH THE SOIL.
9. REPAIR ANY RILLS OR GULLIES PROMPTLY.
10. RESEED OR REPLANT VEGETATION IF NECESSARY UNTIL THE SLOPE IS
STABILIZED.
4' MAX
FIBER ROLL
8" MIN
3/4" X 3/4"
WOOD STAKE
MAX 4" SPACE
2" M
IN
4"
M
AX
" M
IN
SLOPE
VARIES
ENTRENCHMENT DETAIL
TYPICAL INSTALLATION
FIBER ROLL
4' MAX
4' MAX
4' MAX
NOTE: INSTALL FIBER
ROLL ALONG A LEVEL
CONTOUR.
INSTALL A FIBER ROLL NEAR
SLOPE WHERE IT TRANSITIONS
INTO A STEEPER SLOPE
VERTICAL SPACING
MEASURED ALONG
THE FACE OF THE
SLOPE VARIES
BETWEEN 10' AND 20'
CONCRETE WASHOUT
NTS
NOTE:
ACTUAL LAYOUT DETERMINED IN THE FIELD.
ALTERNATIVE WASHOUTS AVAILABLE, CONFIRM
WITH ENGINEER PRIOR TO INSTALLATION
VARIES
10' MIN.
BB
OPTION #1
ABOVE GRADE
(WOOD PLANKS)
SECTION B - B
TWO-STACKED 2X12
ROUGH WOOD FRAME
STAKE
(TYP.)
10 MIL PLASTIC
LINING
10 MIL PLASTIC
LINING
WOOD FRAME SECURELY
FASTENED AROUND ENTIRE
PERIMETER WITH TWO STAKES
INSPECTION AND MAINTENANCE
1. THE CONTRACTORS WATER POLLUTION CONTROL (WPCM) MANAGER SHALL MONITOR
ON SITE CONCRETE WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST
WEEKLY.
2. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING,
CORING, GRINDING AND GROOVING DAILY TO ENSURE PROPER METHODS ARE
EMPLOYED AS DIRECTED BY THE ENGINEER.
3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE
ADEQUATE HOLDING CAPACITY WITH A MINIMUM FREEBOARD OF 4 INCHES FOR
ABOVE GRADE FACILITIES AND 12 INCHES FOR BELOW GRADE FACILITIES.
MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE
REMOVING AND DISPOSING OF HARDENED CONCRETE AND RETURNING THE
FACILITIES TO A FUNCTIONAL CONDITION. HARDENED CONCRETE SHALL BE REMOVED
AND DISPOSED OF BY THE CONTRACTOR.
4. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED
AND READY FOR USE ONCE THE WASHOUT IS 75% FULL.
5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE INSPECTED FOR DAMAGE
(I.E. TEARS IN POLYETHYLENE LINER, MISSING SANDBAGS, ETC.). DAMAGED
FACILITIES SHALL BE REPAIRED.
GRAPHIC SCALE: 1 INCH = FEET
10' 0 5' 10' 20'
BMP SELECTION RATIONALE
· FIBER ROLLS/STRAW WATTLES - PROPOSED AROUND PERIMETER OF SITE TO
PREVENT SILT AND DEBRIS FROM LEAVING THE PROJECT AREA, AND TO
REDIRECT OFFSITE RUN-ON AROUND THE CONSTRUCTION ZONES.
· DI SILT SACKS - SILT SACKS ARE PROPOSED AT EACH NEW DRAIN INLET, SO
THAT THEY DO NOT IMPEDE CONSTRUCTION ACTIVITIES WHILE STILL
PROTECTING THE INLET AND PIPE NETWORK FROM SILT AND DEBRIS.
· CONCRETE WASHOUT - PROPOSED TO ALLOW FOR A DESIGNATED LOCATION
TO WASH OUT CONCRETE TRUCKS, AND OTHER PAINT/CONCRETE
MATERIALS AND EQUIPMENT.
CITY INSPECTION NOTES:
INSPECTIONS: PLEASE CONTACT ERIC DHAKNI, AT EDHAKNI@CITYOFSANTACRUZ.COM
OR 831-420-5131, FOR THE FOLLOWING INSPECTIONS:
· INSPECTIONS DURING INSTALLATION OF ANY REQUIRED STORM WATER LID (LOW
IMPACT DEVELOPMENT) FEATURES AND BEST MANAGEMENT PRACTICES (BMPS)
SUCH AS INSTALLATION OF PERMEABLE PAVERS, PERMEABLE PAVEMENT,
BIO-SWALES, BIO-RETENTION AREAS AND RETENTION/INFILTRATION FACILITIES.
· INSPECTIONS DURING INSTALLATION OF ANY REQUIRED STORM WATER QUALITY
TREATMENT UNITS SUCH BIO-PLANTERS, BIO-FILTRATION TREE UNITS, PERK FILTERS,
CUDOS, STORM WATER FILTER UNITS, ETC.
· FINAL INSPECTION FOR STORM WATER ONCE THE WORK IS COMPLETED AS PART OF
THE PERMIT “SIGN-OFF” PROCESS.
CITY EROSION CONTROL NOTES:
1. CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPS): PROJECT CONSTRUCTION AND DEMOLITION ACTIVITIES SHALL COMPLY WITH THE CITY'S STORM
WATER BEST MANAGEMENT PRACTICES FOR CONSTRUCTION. SEE THE CITY WEBSITE AT:
HTTP://WWW.CITYOFSANTACRUZ.COM/HOME/SHOWDOCUMENT?ID=6031
2. EROSION & SEDIMENT CONTROL BMPS, SUCH AS FIBER ROLLS OR WATTLES, SHALL BE INSPECTED REGULARLY DURING CONSTRUCTION AND AFTER EACH
SIGNIFICANT RAIN EVENT. MAKE NEEDED REPAIRS IMMEDIATELY.
3. CHECK THE SIDEWALK AND STREET DAILY DURING DEMOLITION AND CONSTRUCTION FOR SOIL DRAG-OUT, AND SWEEP IF NEEDED. ROUTINELY MAINTAIN THE CONSTRUCTION ENTRANCE/EXIT TO ENSURE IT REMAINS EFFECTIVE AT PREVENTING DRAG-OUT.
4. STORE OPEN BAGS OF PARTICULATE, GRANULAR OR POWDER MATERIALS (SUCH AS PLASTER OR CONCRETE) INDOORS IF POSSIBLE. IF STORED OUTSIDE, THEY MUST BE KEPT COVERED OR CLOSED, AND DURING THE RAINY SEASON KEPT WITHIN SECONDARY CONTAINMENT.
5. DUMPSTER LIDS MUST BE KEPT CLOSED AND SECURED WHEN NOT IN USE.
6. SOIL & MATERIAL STOCKPILES: SOIL AND MATERIALS STOCKPILES MUST BE PROTECTED FROM RUNOFF/RUN-ON, WHEN NOT IN USE, BY BMPS SUCH AS SURROUNDED BY BERMS, FIBER ROLLS OR WATTLES AND COVERED WITH SHEETING OR TARPS. SOIL STOCKPILES SHOULD BE STORED ON A FLAT AREA. IF STORED ON AN AREA WITH A 10% SLOPE OR MORE, PLEASE ADD NOTE THAT SOIL SHALL BE HAULED OFFSITE AT END OF EACH THE DAY.
7. CONSTRUCTION ENTRANCE/EXIT: INSTALL THE STABILIZED CONSTRUCTION ENTRANCE/EXIT AT THE PROJECT'S COMMENCEMENT.
8. PORTA-POTTIES: DO NOT LOCATE PORTA-POTTIES ADJACENT TO WATERCOURSES OR STORM DRAIN INLETS.
9. DURING THE RAINY SEASON, ENSURE THAT SEDIMENT CONTROL MEASURES ARE IN PLACE AND EFFECTIVE AT PREVENTING SEDIMENT FROM LEAVING THE
SITE.
10. STORM DRAIN INLET/CATCH BASIN PROTECTION: PLEASE USE FILTER FABRIC OR INSERTS FOR ANY ADJACENT STREET CATCH BASINS AND BMPS FOR ANY ONSITE INLETS. (SAND BAGS, GRAVEL BAGS AND STRAW WATTLES AROUND STORM DRAIN INLETS EXPOSED TO STREET TRAFFIC ARE NOT RECOMMENDED).
IF USING FILTER FABRIC, MAY USE FILTREX 8” SOXX WITH MIRAFI 140N FABRIC (OR SIMILAR) UNDERNEATH THE GRATE. ENSURE FABRIC EXTENDS A MINIMUM OF 6-INCHES BEYOND CATCH BASIN AFTER PLACEMENT OF GRATE AND SECURE PROPERLY. CONTRACTOR SHALL REMOVE FILTER FABRIC UPON PROJECT
COMPLETION.
SITE HOUSEKEEPING REQUIREMENTS
CONSTRUCTION MATERIALS
· ALL LOOSE STOCKPILED CONSTRUCTION MATERIALS THAT ARE NOT ACTIVELY BEING USED
(i.e. SOIL, SPOILS, AGGREGATE, FLY-ASH, STUCCO, HYDRATED LIME, ETC.) SHALL BE
COVERED AND BERMED.
· ALL CHEMICALS SHALL BE STORED IN WATERTIGHT CONTAINERS (WITH APPROPRIATE
SECONDARY CONTAINMENT TO PREVENT ANY SPILLAGE OR LEAKAGE) OR IN A STORAGE
SHED (COMPLETELY ENCLOSED).
· EXPOSURE OF CONSTRUCTION MATERIALS TO PRECIPITATION SHALL BE MINIMIZED. THIS
DOES NOT INCLUDE MATERIALS AND EQUIPMENT THAT ARE DESIGNED TO BE OUTDOORS
AND EXPOSED TO ENVIRONMENTAL CONDITIONS (i.e. POLES, EQUIPMENT PADS, CABINETS, CONDUCTORS, INSULATORS, BRICKS, ETC.).
· BEST MANAGEMENT PRACTICES TO PREVENT THE OFF-SITE TRACKING OF LOOSE
CONSTRUCTION AND LANDSCAPE MATERIALS SHALL BE IMPLEMENTED.
WASTE MANAGEMENT
· DISPOSAL OF ANY RINSE OR WASH WATERS OR MATERIALS ON IMPERVIOUS OR PERVIOUS
SITE SURFACES OR INTO THE STORM DRAIN SYSTEM SHALL BE PREVENTED.
· SANITATION FACILITIES SHALL BE CONTAINED (e.g. PORTABLE TOILETS) TO PREVENT
DISCHARGES OF POLLUTANTS TO THE STORM WATER DRAINAGE SYSTEM OR RECEIVING
WATER, AND SHALL BE LOCATED A MINIMUM OF 20 FEET AWAY FROM AN INLET, STREET OR
DRIVEWAY, STREAM, RIPARIAN AREA OR OTHER DRAINAGE FACILITY.
· SANITATION FACILITIES SHALL BE INSPECTED REGULARLY FOR LEAKS AND SPILLS AND
CLEANED OR REPLACED AS NECESSARY.
· COVER WASTE DISPOSAL CONTAINERS AT THE END OF EVERY BUSINESS DAY AND DURING A
RAIN EVENT.
· DISCHARGES FROM WASTE DISPOSAL CONTAINERS TO THE STORM WATER DRAINAGE
SYSTEM OR RECEIVING WATER SHALL BE PREVENTED.
· STOCKPILED WASTE MATERIAL SHALL BE CONTAINED AND SECURELY PROTECTED FROM
WIND AND AIN AT ALL TIMES UNLESS ACTIVELY BEING USED.
· PROCEDURES THAT EFFECTIVELY ADDRESS HAZARDOUS AND NON-HAZARDOUS SPILLS
SHALL BE IMPLEMENTED.
· EQUIPMENT AND MATERIALS FOR CLEANUP OF SPILLS SHALL BE AVAILABLE ON SITE AND
THAT SPILLS AND LEAKS SHALL BE CLEANED UP IMMEDIATELY AND DISPOSED OF PROPERLY;
AND
· CONCRETE WASHOUT AREAS AND OTHER WASHOUT AREAS THAT MAY CONTAIN ADDITIONAL
POLLUTANTS SHALL BE CONTAINED SO THERE IS NO DISCHARGE INTO THE UNDERLYING
SOIL AND ONTO THE SURROUNDING AREAS.
VEHICLE STORAGE AND MAINTENANCE
· MEASURES SHALL BE TAKEN TO PREVENT OIL, GREASE, OR FUEL TO LEAK IN TO THE
GROUND, STORM DRAINS OR SURFACE WATERS.
· ALL EQUIPMENT OR VEHICLES, WHICH ARE TO BE FUELED, MAINTAINED AND STORED ONSITE
SHALL BE IN A DESIGNATED AREA FITTED WITH APPROPRIATE BMP's.
LANDSCAPE MATERIALS
· CONTAIN STOCKPILED MATERIALS SUCH AS MULCHES AND TOPSOIL WHEN THEY ARE NOT
ACTIVELY BEING USED.
· CONTAIN FERTILIZERS AND OTHER LANDSCAPE MATERIALS WHEN THEY ARE NOT ACTIVELY
BEING USED.
· DISCONTINUE THE APPLICATION OF ANY ERODIBLE LANDSCAPE MATERIAL WITHIN 2 DAYS
BEFORE A FORECASTED RAIN EVEN OR DURING PERIODS OF PRECIPITATION.
· APPLY ERODIBLE LANDSCAPE MATERIAL AT QUANTITIES AND APPLICATION RATES
ACCORDING TO MANUFACTURE RECOMMENDATIONS OR BASED ON WRITTEN
SPECIFICATIONS BY KNOWLEDGEABLE AND EXPERIENCED FIELD PERSONNEL.
· STACK ERODIBLE LANDSCAPE MATERIAL ON PALLETS AND COVERING OR STORING SUCH
MATERIALS WHEN NOT BEING USED OR APPLIED.
AutoCAD SHX Text S
AutoCAD SHX Text S
| Sheets and Views |
| (23-035) - IMPROVEMENT PLANS-C1.0-COVER |
| (23-035) - IMPROVEMENT PLANS-C2.0-SITE PLAN |
| (23-035) - IMPROVEMENT PLANS-C3.0-GRADING |
| (23-035) - IMPROVEMENT PLANS-C3.1-SECTIONS |
| (23-035) - IMPROVEMENT PLANS-C4.0-DTL |
| (23-035) - IMPROVEMENT PLANS-C5.0-EROS |